Loading...
HomeMy WebLinkAbout20052134 Ver 2_Staff Comments_20120730Lucas, Anne+te From Lucas Annette Sent Monday July 30 2012 1 56 PM To Witherspoon Lauren Subject 05 2134v2 Gates of Ethan s Glen Subdivision — take 2 REVISED Attachments 05 21 '34v2 Gates of Ethan a Clen Subdivision — take 2 dorx LC The consultant called and as a result of that conversation I revised the hold bullets Here are the updated ones Thanks A Annette M Lucas PE Environmental Engineer NCDENR I DWQ I Wetlands and Stormwater Branch 1650 Mail Service Center Raleigh NC 27699 1650 (Mail) 512 N Salisbury St Raleigh NC 27604 1 9th Floor (Location & Parcels) Phone (919) 807 6381 1 Fax (919) 807 6494 1 Email Annette Lucas(cbncdenr gov Website http / /portal ncdenr org /web /wq /swp/ws /401 A Before printing this email please consider your budget and the environment E mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties 05 2134v2 Gates of Ethan s Glen Subdivision —take 2 REVISED AML comments July 30 2012 1 For all three level spreaders a The required items checklists that were provided with the Supplement Forms did not include the page /plan sheet numbers where the information may be found In the future please complete these cells to allow DWQ to review your submittal more efficiently b Please provioe a construction sequence per the required items checklist c Bypass channels must be trapezoidal d Please ,how depLh. dir ne nsion, and elevat ors of the floc, spl tte, de>,ices or the plans 2 For Level Spreader 2 a The bypass channel (including proposed one foot contour lines) must be shown in plan view For Level Spreader 3 a The plans do not show all of the one foot contour lines downslope of the level spreader This information was requested in the DWQ s previous letter for this project and failure to provide the information in the next submittal will result in a return of application b It appears that the slope between the base of the level lip and the top of streambank exceeds the allowable slope of S% The next submittal must include a diffuse flow plan as this discharge point that complies with Chapter 8 of the BMP Manual or the application will be returned Please provide an updated LS VFS Supplement Form for Level Spreader 3 if the design is modified The bypass channel (including proposed one foot contour lines) must be clearly shown in plan view Lucas, Anne##e From Lucas Annette Sent Monday July 30 2012 1104 AM To Witherspoon Lauren Cc Lucas Annette Subject 05 2134v2 Gates of Fthan s Glen Subdivision - takP 2 Attachments 05 2134v2 Gates of Ethan s Glen Subdivision - take 2 docx Lauren This consultant is having a difficult time with level spreader design I think this would be a good demo for the BMP Reeil-%ae Cer* clas, Annette Annette M Lucas PE Environmental Engineer NCDENR I DWQ I Wetlands and Stormwater Branch 1650 Mail Service Center Raleigh NC 27699 1650 (Mail) 512 N Salisbury St Raleigh NC 27604 1 9th Floor (location & Parcels) Phone (919) 807 6381 1 Fax (919) 807 6494 1 Email Ann(tte Luc i,,Lriedenr got Website http / /portal ncdenrorg/web/wQ/swP/ws/401 A Before printing this email please consider your budget and the environment E mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties 05 2134v2 Gates of Ethan s Glen Subdivision — take 2 AML comments July 30 2012 1 For Level Spreader 3 a The plans do not show all of the one foot contour lines downslope of the level spreader This information was included in the DWQ s previous letter for this project and failure to provide the information in the next submittal will result in a return of application b it appears that the slope between the base of the level lip and the top of streambank exceeds the allowable slope of 5% Tne next submittal must include a aiffuse flow plan as this discharge point that complies with Chapter 8 of the BMP Manual or the appl cation u II be eturned Please prov de an updated LS JFS Supplement Form fog Level Spreader 3 if the design is modified 2 For all three level spreaders a Bypass channels must be trapezoidal b The bypass channels (including proposed one foot contour lines) must be shown in plan view c Details of the flow splatter devices including dimensions elevations and supporting calculations must be provided d Please provide a construction sequence per the required items checklist 3 The required items checklists that were provided with the Supplement Forms did not include the page /plan sheet numbers where the information may be found In the future please fill out these cells to allow DWQ to review your submittal more efficiently