Loading...
HomeMy WebLinkAbout20210497 Ver 1_Meeting Request Review_20210303ID#* 20210497 Version* 1 Regional Office* Asheville Regional Office - (828) 296-4500 Reviewer List* Andrew Moore Pre -Filing Meeting Request submitted 3/3/2021 ............................................................................................................................................................................................................................................................................................. Contact Name * Wade Burns, Architect Contact Email Address* Project Name* Project Owner* Project County* Owner Address: wdbmountainliving@gmail.com Driveway Rev. Jim and Jere Bowden Buncombe Street Address 287 North Carolina Terrace Address Line 2 aty Montreat Rbstal / Zip Code 28757 Is this a transportation project?* r Yes r No State / Frovince / Region N.C. Country United States Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express W Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Amenda Jones Please give a brief project description below. Construct a new driveway to provide access from street to home for a couple in their eighties. It will be 100' x 10' wide ending at the living level where a small stream passes thru a stone and masonry dry "pond" about 6' x 12'. The steam water passes thru the pond thru a 4" pipe. The 4" pipe is all that is needed normally as the stream which seems to begin as surface water less than 20 feet above the "pond". The pipe size will be increased to accomodate higher water flow during rain storms. The pond structure will be filled in and driveway will go over pond structure. The driveway (to be concrete) climbs at 18 degrees on existing 18 degree incline. Total disturbed area 2,000 sq. ft. Please give a couple of dates you are available for a meeting. 3/4/2021 Please attach the documentation you would like to have the meeting about. pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 3/3/2021 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No