HomeMy WebLinkAbout20210497 Ver 1_Meeting Request Review_20210303ID#* 20210497
Version* 1
Regional Office* Asheville Regional Office - (828) 296-4500
Reviewer List* Andrew Moore
Pre -Filing Meeting Request submitted 3/3/2021
.............................................................................................................................................................................................................................................................................................
Contact Name * Wade Burns, Architect
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
wdbmountainliving@gmail.com
Driveway
Rev. Jim and Jere Bowden
Buncombe
Street Address
287 North Carolina Terrace
Address Line 2
aty
Montreat
Rbstal / Zip Code
28757
Is this a transportation project?* r Yes r No
State / Frovince / Region
N.C.
Country
United States
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
W Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Amenda Jones
Please give a brief project description below.
Construct a new driveway to provide access from street to home for a
couple in their eighties. It will be 100' x 10' wide ending at the living level
where a small stream passes thru a stone and masonry dry "pond" about
6' x 12'. The steam water passes thru the pond thru a 4" pipe. The 4"
pipe is all that is needed normally as the stream which seems to begin as
surface water less than 20 feet above the "pond". The pipe size will be
increased to accomodate higher water flow during rain storms. The pond
structure will be filled in and driveway will go over pond structure. The
driveway (to be concrete) climbs at 18 degrees on existing 18 degree
incline. Total disturbed area 2,000 sq. ft.
Please give a couple of dates you are available for a meeting.
3/4/2021
Please attach the documentation you would like to have the meeting about.
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 3/3/2021
Reviewer Meeting Request Decision
Has a meeting been scheduled?* r Yes r No