Loading...
HomeMy WebLinkAbout20120726 Ver 1_401 Application_20120712July 27 2012 INj���� TO Ms Emily Hughes JUL 3 0 2012 U S Army Corps of Engineers EENR GaATER O"ALfTy 69 Darlington Avenue ►"and& a U LITy Wilmington NC 28402 RE NWP 12 Application, Castle Hayne Water Main, New Hanover County NC Cape Fear Public Utility Authority Dear Emily Enclosed is a NWP 12 application for your review This application is submitted on behalf of the Cape Fear Public Utility Authority for the installation of a water main along Castle Hayne Road in New Hanover County NC Approximately 20 LF of stream and 0 002 acre of a jurisdictional non RPW will be temporarily impacted during construction The jurisdictional areas could not be directionally bored for economic and maintenance considerations An open cut crossing with bends and ductile iron pipe is more confined and can be laid more shallow than a longer deeper directional drill with HDPE Areas will be returned to pre construction contours after the line is installed The Pre Construction Notification form, associated maps, and site plan are enclosed for your review Please contact me if you have any questions Thank you for your assistance with this project Sincerely _ Kim Williams Wetland Scientist Encl C Mr Frank Styers CFPUA Mr Jeremy Blair Paramounte Engineering Mr Chad Coburn NC DWQ Mr Ian McMillan, NC DWQ www Imgroup net info @Imgroup net Phone 910 452 0001 Fax 910 452 0060 3805 Wrightsville Ave Suite 15 Wilmington NC 28403 P 0 Box 2522 Wilmington NC 28402 20120726 Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 �y ;+:kv�m�vttk Page 1 of 13 PCN Form - Version 1 3 December 10 2008 Version Pre - Construction Notification (PCN) Form m WW A Applicant Information C� Py 1 Processing la Type(s) of approval sought from the Corps ®Section 404 Permit F1 Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number 1 c Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ® Yes ❑ No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1 g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ® Yes ❑ No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Castle Hayne Water Main 2b County New Hanover 2c Nearest municipality / town Wilmington 2d Subdivision name N /A`''— ,. N/A f 2e NCDOT only T I P or state project no 3 Owner Information 3a Name(s) on Recorded Deed NCDOT /Public Right of Way �r� `- 3b Deed Book and Page No N/A Wetlan e� 3c Responsible Party (for LLC if applicable) N/A 3d Street address 1 South Wilmington Street 3e City state zip Raleigh NC 27601 3f Telephone no (919)733 7932 3g Fax no (919)733 1390 3h Email address Page 1 of 13 PCN Form - Version 1 3 December 10 2008 Version 4 Applicant Information (►f different from owner) 4a Applicant is ❑ Agent ® Other specify Easement Holder 4b Name Mr Frank Styers 4c Business name (if applicable) Cape Fear Public Utility Authority 4d Street address 235 Government Center Drive 4e City state zip Wilmington NC 28403 4f Telephone no (910) 332 6670 4g Fax no (910) 332 6353 4h Email address frank styers @cpua org 5 Agent/Consultant Information (►f applicable) 5a Name Kim Williams 5b Business name (if applicable) Land Management Group Inc 5c Street address 3805 Wrightsville Avenue Suite 15 5d City state zip Wilmington NC 28403 5e Telephone no (910) 452 0001 5f Fax no (910) 452 0060 5g Email address I kwimams@Imgroup net Page 2 of 13 B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) N/A 1 b Site coordinates (in decimal degrees) Latitude 34 2825 N Longitude 77 9225 W (DD DDDDDD) ( DD DDDDDD) 1c Property size --4500 linear feet of easement 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to Northeast Cape Fear River proposed project 2b Water Quality Classification of nearest receiving water SC SW 2c River basin Cape Fear 03030007 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The site is a maintained DOT roadway currently used for general transportation Land use in the vicinity of the site is mixed commercial and residential 3b List the total estimated acreage of all existing wetlands on the property —17 linear feet of jurisdictional non RPW within project area 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property — 20 linear feet of perennial stream within project area 3d Explain the purpose of the proposed project The purpose of the proposed project is to install a new large diameter water transmission main As designated in the master planning efforts by the CFPUA completion of this main will improve system pressure reliability and water quality in the northern part of New Hanover County 3e Describe the overall project in detail including the type of equipment to be used The applicant will install a water line within a utility easement located along the NCDOT nght -of way Utility lines in jurisdictional areas will be installed via open cut methodology and will be temporary Construction will include grading of the right of way to its original state after installation of the utility line and culverts where needed 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination what type ❑ Preliminary ® Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Land Management Group Name (if known) Corey Novak Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation Emily Hughes of the ACOE issued a JD on December 17 2009 (Action ID # SAW 2009 02166) 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions N/A Page 3 of 13 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain N/A Page 4 of 13 C Proposed Impacts Inventory 1 Impacts Summary 1 a Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2 Wetland Impacts NIA If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number— Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non -404 other) (acres) Temporary T ❑ Yes ❑ Corps W1 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W2 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W3 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W4 ❑ P FIT ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑No ❑DWQ W6 ❑ P ❑ T ❑ Yes No ❑ Corps ❑DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non -404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ®T Utility installation UT of Northeast Cape Fear River ® PER ❑ INT ® Corps ® DWQ 4 20 S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 20 31 Comments Page 5 of 13 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then indiv ually list all open water impacts below 4a Open water impact number — Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 ❑ P ®T N/A Utility Installation JurisdicctP� I non 0 002 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 05 ❑ PEI T 4f Total open water impacts 0 002 4g Comments Dimensions of impact are 17 length x 5 width (= 85 sf of impact) 5 Pond or Lake Construction NIA If pond or lake construction proposed then complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes No If yes permit ID no 51 Expected pond surface area (acres) N/A 5j Size of pond watershed (acres) N/A 5k Method of construction N/A Page 6 of 13 6 Buffer Impacts (for DWQ) N/A If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse El Tar Pamlico ❑Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact re uired� B1 ❑P ❑T El Yes ❑ No B2 ❑ PEI T ❑Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h Total buffer impacts 61 Comments Page 7 of 13 D Impact Justification and Mitigation 1 Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project All impacts to jurisdictional areas will be temporary The water line will be installed along with culverts where necessary as not to impede existing channels Natural grade will be re established once the line has been installed The jurisdictional areas could not be directionally bored for economic and maintenance considerations An open cut crossing with bends and ductile iron pipe is more confined and can be laid more shallow than a longer deeper directional drill with HDPE 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques All work will occur within a designated construction corndor to reduce discharge of sediment into jurisdictional areas Slit fences will be used to control sediment erosion 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes mitigation is required by (check all that apply) N/A ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project? N/A ❑ Mitigation bank ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank N/A 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program N/A 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan N/A 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan N/A Page 8 of 13 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required N/A 6c 6d 6e Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) N/A 6h Comments N/A Page 9 of 13 E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? lb If yes then is a diffuse flow plan included? If no explain why ❑ Yes ❑ No Comments N/A 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? None 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why The purpose of the project is for the installation of a utility line After burial of the utility the right of way will be restored to it s original grade prior to construction Pavement of the installation area is not necessary 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan N/A ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? N/A ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review N/A 3a In which local government s jurisdiction is this project? N/A ❑ Phase li ❑ NSW 3b Which of the following locally implemented stormwater management programs ❑ USMP apply (check all that apply) N/A ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? N/A 4 DWQ Stormwater Program Review N/A ❑ Coastal counties ❑ HQW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) N/A ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been El Yes El No attached? N/A 5 DWQ 401 Unit Stormwater Review N/A 5a Does the Stormwater Management Plan meet the appropriate requirements? N/A ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? N/A ❑ Yes ❑ No Page 10 of 13 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval ❑ Yes No ❑ letter ) Comments N/A 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) N/A 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description Installation of the utility line will be limited to the described area 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility No wastewater will be generated by project Page 11 of 13 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c if yes indicate the USFWS Field Office you have contacted N/A ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The NC Natural Heritage Program GIS layer was used to determine the presence of federally listed species Several rare plant and animal species are known to occur in the vicinity but not in the specific project area 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? The NOAA Fisheries Essential Fish Habitat Mapper GIS program was used to determine the presence of Essential Fish Habitat No data was depicted for the project area 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? The NC State Historic Preservation Office HPOWEB GIS mapping resource was used to determine the presence of cultural or historic resources No resources are located within the utility easement but several surveyed properties (no designation) have been identified off of Castle Hayne Road within close proximity to the easement This project will not impact these properties 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ® Yes ❑ No 8b If yes explain how project meets FEMA requirements N/A 8c What source(s) did you use to make the floodplain determination? The NC Floodplain Mapping Information System website was used to determine the boundaries of the 100 year floodplain The northern crossing is located within the 100 yr floodplain Kim Williams ��L 7126/2012 ,/ �� Applicant/Agent s Printed Name Date Applicant/Agents Signature (Agents signature is valid only if an authorization letter from the applicant is provided Page 12 of 13 4 \ S AGENT AUTHORIZATION FORM TO WHOM IT MAY CONCERN I /wt the undersi,ned hereby authorirt Land Management Group Inc to ict aS our agent in the. preparation and representation of information related to t11e Section 404/401 ptrmit application for the Castle H tyne Water M un E \tension prOJLLt All quEStionS in mg -Irds to this project should be dirLcted to Land Management Group Inc Sinc,uely C ipc Fear Pubht Utility Authority Owntr /Applit unt F'renk C Stytrs PE DirtI for of En`intermg 1 i2- D itL U S ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id SAW 2009 02166 County New Hanover U S G S Quad Castle Hayne NOTIFICATION OF JURISDICTIONAL DETERMINATION Applicant Mr Jeremv Blair, Paramount Engineering Authorized Agent Corey Novak, LMG, Inc Address 5911 Oleander Drive Address 3805 Wrightsville Ave, Suite 15 Wilmmeton, forth Carolina 28403 Wilmington, NC 28403 Telephone No (910) 452 0001 Property description Size (acres) 30 foot corridor Nearest Town Castle Havne Nearest Waterway NE Cape Fear River River Basin Cape Fear River USGS HUC 03030007 Coordinates N 34 2825 W 77 9225 Location description The project area is located alone the east side of Castle hayne Road, between 23 d Ave and N Kerr Avenue New Hanover County North Carolina The parcel iD # s are R02400 002 005 000, R02400 002 004 000 Indicate Which of the Following Apply A Preliminary Determination _ Based on preliminary information there may be wetlands on the above described property We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction To be considered final a jurisdictional determination must be verified by the Corps This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 33 1) B Approved Determination There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act Unless there is a change in the law or our published regulations this determination may be relied upon for a period not to exceed five years from the date of this notification X There are waters of the U S on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC $ 1344) Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification We strongly suggest you have the wetlands on your property delineated Due to the size of your property and /or our present workload the Corps may not be able to accomplish this wetland delineation in a timely manner For a more timely delineation you may wish to obtain a consultant To be considered final any delineation must be verified by the Corps X The Hatci s of the U S on vour project are i have been delineated and the delineation has been verified bN_ the Corps We strongly suggest you have this delineation surveyed Upon completion, this survey should be reviewed and verified by the Corps Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on vour property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five year The waters of the U S including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on Unless there is a change in the law or our published regulations this determination may be relied upon for a period not to exceed five years from the date of this notification _ There are no waters of the U S to include wetlands present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344) Unless there is a change in the law or our published regulations this determination may be relied upon for a period not to exceed five years from the date of this notification ft X The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA) You should contact the Division of Coastal Management in Wilmington NC at (910) 796 7215 to determine their requirements Placement of dredged or fill material within waters of the US and /or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311) If you have any questions regarding this determination and /or the Corps regulatory program please contact Emily Hughes at 910 251 4635 C Basis For Determination The site exhibits water bodies with mean high water and are abutting the Cape Fear River, a Section 10 Navigable Waterway This determination is based on information provided by LMG Inc and a site visit conducted by Emily Hughes on 11/25/2009 D Remarks E Attention USDA Program Participants This del neation/determmation has been conducted to identify the limits of Corps Clean Water Act jurisdiction for the particular site identified in this request The delineation /determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985 If you or your tenant are USDA Program participants or anticipate participation in USDA programs you should request a certified wetland determination from the local office of the Natural Resources Conservation Service prior to starting work F Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B above) This correspondence constitutes an approved jurisdictional determination for the above described site If you object to this determination you may request an administrative appeal under Corps regulations at 33 CFR part 331 Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form If you request to appeal this determination you must submit a completed RFA form to the following address District Engineer Wilmington Regulatory Division Attn Emily Hughes Project Manager Wilmington Regulatory Field Office 69 Darlington Ave Wilmington North Carolina 28403 In order for an RFA to be accepted by the Corps the Corps must determine that it is complete that it meets the criteria for appeal under 33 CFR part 331 5 and that it has been received by the District Office within 60 days of the date of the NAP Should you decide to submit an RFA form it must be received at the above address by February 17, 2009 * *It is not necessary to submit an RFA form to the District Office if you do not object to the determination in this correspondence ** Corps Regulatory Official _Emily Hughes Date December 17, 2009 J (JB piration Date December 17, 2014 The Wilmington District is committed to piovidmg the highest level of support to the public To help us ensure we continue to do so please complete the Customer Satisfaction Survey located at our website at http //i egtil3tory usacesurvey coin/ to complete the survey online I 1 ;.S. SAMPSON 1, ry UND�� I V• Boundaries are approximate and are not meant to be absolute. Map Source: North Carolina Atlas & Gazetteer. Pg 84 .2003 SCALE 1" = 1 Mile Castle Hayne Road Water Main LMG Cape Fear Public Utility Authority LAND MANAGEMENT GROUP Figure 1 fnvrf —I—W Can Wf.Its New Hanover County, NC ww LMGroup.net Vicinity Map Phone: 910.452.0001 •1.866.LMG.1078 June 2012 Fax: 910.452.0060 40 -09 -189 P.O. Box 2522, Wilmington, NC 28402 rCastle es are approximate and are not meant to be absolute. ce: Quadrangle 7.5 minute (topographic) 1990. SCALE 1" = 800' ayne Road Water Main LMG ar Public Utility Authority LAND MANAGEMENTGAQIlPiw Figure 2 Hanover County, NC f— 'O—maf COnlOr-1 www.LMGroup.net USGS Topographic Map June 2012 Phone: 910.452.0001 •1.866.LMG.1078 Fax: 910.452.0060 40 -09 -189 P.O. Box 2522, Wilmington, NC 28402 *Boundaries are approximate and are not meant to be absolute. Map Source: NRCS Soil Survey. SCALE 1" — 800' Castle Hayne Road Water Main LMG Cape Fear Public Utility Authority LAND MANAGCMENT GROUP New Hanover County, NC EnrironmrnrarConrullanrr Figure 3 www.LMGroup.net Soils Map June 2012 Phone: 910.452.0001 •1.866.LMG.1078 Fax: 910.452.0060 40 -09 -189 P.O. Box 2522, Wilmington, NC 28402 and are not meant to be absolute. Map Source: 2008 NAPP Aerial Photography SCALE 1" = 800' Castle Hayne Road Water Main LMG Cape Fear Public Utility Authority LAND MANAGEMENT GROUP:w_ f-'--W c- 'Of-f, New Hanover County, NC Figure 4 www.LMGroup.net Aerial Photograph Phone: 910.452.0001 •1.866.LMG.1078 June 2012 Fax: 910.452.0060 40 -09 -189 P.O. Box 2522, Wilmington, NC 28402 KERR AVENUE O J 2 2Q �441 TEMPORARY IMPACT #1 Q (SEE FIG. 2) �� yER�TgGF pq Rk OR TEMPORARY IMPACT #2 (SEE FIG. 3) / SPRI �G ROgO 'Aa DARAMOUNTE SDcaile: 7 /NTS2 FIG.1 IL Drawn: JRB INDEX 5911 Olea 1d �Dnve, \Wilmington, NC, 28403 (910) -791 -6'07 2533 Raeford Road, Fayetteville, NC, 28305 (910) -263 -8092 Chk: JRB NCLceme #:C -2846 Proj.No: 09152.PE CASTLE HAYNE WATER MAIN 1 -16" MJ GATE VALVE "STREAM" PER US ARMY CORP OF ENGINEERS. PROPOSED TEMPORARY IMPACT TO ±20 LF FOR WATER MAIN INSTALLATION. Impact #1: 20 LF 1 -16" MJ GATE VALVE 37 +00� 38 +00 39 +00 OD e W W! — - -�� W-- gee o W —mil— V1 �W W- 01 001 ooi aol eon -col a ao -col - d } F in ROCK SILT CHECK DAM (SEE DETAIL) CASTLE HAYN E ROAD NOTE: VERTICAL BENDS FOR PLAN VIEW DITCH CROSSING SHALL BE SCALE: 1 " — 50' INSTALLED ACCORDING TO CFPUA STANDARD DETAIL. 20 ib7 10 EXISTING GRADE I 16" C905 \ DR -18 PVC 2-'6" MJ 2 -16" MJ 45° BEND 45° BEND I 16" DIP FROM VALVE TO VALVE (ALL JOINTS RESTRAINED) 38 +00 39 +00 PROFILE VIEW HORIZ. SCALE: 1" = 50' VERT. SCALE: 1" = 5' SILT FENCE (SEE DETAIL) N111] 15 10 PA R A M o v N T E 7/15/ �i Q o 0' " 5911 Oleander Drive, Wilmington, NC, 284(13 (910) - 791 -6707 Drawn: JRB TEMPORARY IMPACT #1 2533 Raeford Road, Fayetteville, NC, 2830, (910) -263 -8092 Chk: JRB �Q NC License #:C -2846 Prol.No: 09152.PE wa PA R A M o v N T E 7/15/ FIG. 2 Scale: 0' " 5911 Oleander Drive, Wilmington, NC, 284(13 (910) - 791 -6707 Drawn: JRB TEMPORARY IMPACT #1 2533 Raeford Road, Fayetteville, NC, 2830, (910) -263 -8092 Chk: JRB CASTLE HAYNE WATER MAIN NC License #:C -2846 Prol.No: 09152.PE "JURISDICTIONAL NON -RPW" PER US ARMY CORPS OF ENGINEERS. PROPOSED TEMPORARY IMPACT TO ±17 LF FOR WATER MAIN Impact #2; INSTALLATION. 0.002 ac 0- 10 56 +00 e"oc 57t .- eee —I-- w w�— w� w ao, 101 -moo, o0, co - CASTL E HAYN E ROAD NOTE: VERTICAL BENDS FOR DITCH CROSSING SHALL BE INSTALLED ACCORDING TO CFPUA STANDARD DETAIL. 2E 2C 15 20 LF OF 16" DIP i gee 58+00 59 +00 �a .— w� w —+ w w —+-- w ao, ro, 001 Clo, 001 no, SILT FENCE (SEE DETAIL) PLAN VIEW SCALE: 1" = 50' 57 +00 58 +00 PROFILE VIEW HORIZ. SCALE: 1" = 50' VERT. SCALE: 1" = 5' 25 20 15 pARA MOUNTE Scale: 7/15/ FIG. 3 Drawn: JRB TEMPORARY IMPACT ##2 5911 Oleander Drive, Wilmington, NC, 28403 (910)- 791 -6707 2533 Raeford Road, Fayetteville, NC, 28305 (910)- 263 -8092 Chk: JRB NC License #:C -2846 Prol.No: 09152.PE CASTLE HAYNE WATER MAIN XISTING GRADE I 16" C -905 DR18 PVC 20 \I LF 16" DIP 57 +00 58 +00 PROFILE VIEW HORIZ. SCALE: 1" = 50' VERT. SCALE: 1" = 5' 25 20 15 pARA MOUNTE Scale: 7/15/ FIG. 3 Drawn: JRB TEMPORARY IMPACT ##2 5911 Oleander Drive, Wilmington, NC, 28403 (910)- 791 -6707 2533 Raeford Road, Fayetteville, NC, 28305 (910)- 263 -8092 Chk: JRB NC License #:C -2846 Prol.No: 09152.PE CASTLE HAYNE WATER MAIN