Loading...
HomeMy WebLinkAbout20120717 Ver 1_Stormwater Site Plans_20120727:� -.. - - -.� Q �' -__` .,�.� \ .,� �� -_- ! �r w. T \ r�. - y�.� —.. N`� •.1,11 I �� -_ --,__ ��i� p - _.? z r �� I x I � .� v �', , � CrL'Z - _. ___ _ __ - _ _ ___ , ,!, � �.. - .r QQZ ,� �, � *.. ;� �+� N' 11 � _ , =� _ �, >•' as gg � ' k - z W -- /: 0 z�s� / , Az�.. w _ � _ y \w Lr I h t4 z l \ 1 T� t 1 l \ \l I f e-- o. I J // / �^\! "kt z �: � ; I �/ /: 1. ^cx•e, I L. / O =O , , z i I ' 1 r-_� � 1 W - � - _._- �i7:.:�`� •:. / �/ C. °:r. �`4fl ,k, - \ z I ` r v \ ! �. _ I fJ � ,' � I r I u �t, ;u ' , :, -! ` I ;y::: -. I r �, , ,, ;l r : o •_o � cz4` �" : \' :. <J. \_ — I 1 ,.� ! - Y., I I \- Pak.: I z (!/ r� / ° ;•''1� I I J I rn II - 1. .>-7 o- GG , ` '.�'zz'•. `.� A ,z � r � - I / _, �- - / _' i. f� °: �- ;;: A � d I I 1 '���'�.. 71. - -,,� _ t1,�� 1r� � �. �F� °.I SS v.n GO , 0 , , r r -�� � ` -'. _ -` -! , - -'; ;•�, ` '. ,' ,' , � r ,� -,. -_I i � r `R ;� /:i ••>�I v � I !�I _ �O t11 ..11 / U. 41 \ \� 1- -^-r-x / ��-�.I I i _ I • \ - III 1 I p I '� . � � ,� -" I C� I u I i \ ( � L I t I I1 l - r' I - r I � - -_ a� ,., � -, `` \ ', -_ ;,' ,' : -' ;. ,� ), - - -- ' -_" ,;. •:. � ti i : � �', X 1 I�` �i 1, �r ib , {r '.i 1 Iri- A�o Y wows I , \ �, . . .- �-( ' � % / , � , d L dr. lY,� - 1 �.. ..•� r.:i 1j�1, :!_{ wn ,�.., _�, �. 4 / \ ` -. -_ -�. ,' �" _- ,, , � ��- I °('. 4 °.i• dn? II I 1., � /11r 11..:j.: , � ; I ✓ : � � \'� \ r'" 1- e _.� � � �1 ;' s A " .o � � -T' P' I;� -. t l l -i - (x.l y I t P .._ -"`_ � " T `t. < :�. ; � ' � � asana �i' t . s � iI I I� ' - r �. -, 'P . -n) -, i,:. •J - O;, ., ,_. _.!.; . x nn 1 / I ifl /I , ,- - N tt / y r I I :. .r ( L - o'J'- :Y \��- ,. -- —. �\ � - -.\ __ - -_ - � _ — _ _�-_ -\_ ✓�A `,OOH �� -�\ oov -tzow I I - a �I� - - L jF \ � os- os -zotz FIGURE 3 OVERALL IMPACT MAPS..,, FeG3 MCADAMS 1 I Planning & Development ary Devetopme Emrttlngp appropiaterry ypa antln an -X list t A. ❑ ❑y ❑ ❑ ❑ Sect on A aPm PNAfKC 4 M-E5 q i W��cOyxur I «Ka - �o. �rr ewip, �0 O SITE - CM G o � / O VICINITY MAP 1"= 1000' %j P 1111 III - ������i �� N Ell ��� I SITE DATA REQUIRED PARKING Preliminary Nitrogen Export Summary BUILDING 1 Total TN Load Before Treatment 1 BEDROOM 56.x 15SP /BDR. 84.... 2 BEDROOM 68.x 2 0 SP /BDR. 136. 3 BEDROOM 11.x 25 SP /BDR. 28. BUILDING 2 Offset Payment 1 BEDROOM 84.x 1.5 SP /BDR. 126 2 BEDROOM 67.x 2 0 SP /BDR. 134 3 BEDROOM 11 x 2 5 SP /BDR.. 28........ TOTAL UNITS 297 LEASING CENTER (LOCATED IN BUILDING 1 6 280 / 200 SF 32 POOL 2187./ 100 SF 22 REQUIRED PARKING (BEFORE LANDSCAPE REDUCTION) 589....... 10% LANDSCAPE REDUCTION 58.. TOTAL REQUIRED PARKING 531. PROVIDED PARKING STANDARD PARKING 569. ACCESSIBLE PARKING 14. TOTAL PARKING (EXCLUDING GARAGES) 583 GARAGE SPACES 8........ SITE AREA 22.25 ac....... OPEN SPACE REQUIRED OPEN SPACE WHICHEVER IS GREATER 10h OF THE SITE 223 ac 001 AC PER DWELLING UNIT 297 ac PROVIDED OPEN SPACE 994 ac TREE CONSERVATION PROVIDED EXCEEDS REQUIREMENT PREVIOUSLY RECORDED FOR THE SUBDVISION IN BM 2008, PAGES 178 -179 (INCLUDED WITH THIS PLAN SET) BUILDING LOT COVERAGE BUILDING 1: 46,855 SF BUILDING 2: 50,678 SF CABANAS: 960 SF GARAGES: 2,696 SF TOTAL: 101,189 SF (10.44A) GROUP HOUSING PLAN GH -3 -12 TRANSACTION NO. 331722 2521 RATCHFORD DRIVE RALEIGH, NORTH CAROLINA PROJECT NUMBER: DDV -12000 DATE: MAY 10, 2012 REVISED: JUNE 14, 2012 REVISED: JULY 10, 2012 OWNER: WILLIAM HAMRICK CAROLINA MULMANIILY 1050 EAGLES LANDING PARKWAY SUITE 300 STOCKBRIDGE, GA TEL: (770) 474 -4345 email: william ®davisdevga.com ZONING CONDITIONS: ORDINANCE NO. (2008) 19 ZC 587 AN ORDINANCE TO AMEND ME ZONING ORDIANCE OF ME ON OF RALEIGH WHICH INCLUDES ME ZONING DISTRICT MAP. BE IT ORDAINED BY ME CITY COUNCIL OF ME CITY OF RALEIGH, NORM CAROLINA: SECTION 1. THAT SECTION 10 OF ME CITY OF RALEIGH CODE OF ORDINANCES, WHICH INCLUDES ME ZONING DISTRICT MAP, BE AND ME SAME IS HEREBY AMENDED AS FOLLOWS. 1. Z -3 -06 CAPITAL BOULEVARD AND 1 -440, NORTHWEST SIDE OF CAPITAL BOULEVARD, NORTHWEST OF ITS INTERSECTION WITH 1 -440, BEING WAKE COUNTY PINS 1715-53-506; 1]15 -52 -5191; AND 1715 -42 -9948. APPROXIMATELY 47.01 ACRES FROM INDUSTRIAL -I WM SPECIAL HIGHWAY OVERLAY DISTRICT-2 TO OFFICE AND INSTUTON -2 CONOm- USE WIM SPECIAL HIGHWAY OVERLAY DISTRCT-2. CONO T ONS DATED MARCH 19, 20D6 A. ME FOLLOWING USES SHALL BE PROHIBITED ON ME SUBJECT PROPERTY: (p) GENERAL USES: CEMETERY HOSPITAL (p) CFUNERAL HOME ONDIMONAL USES: EMERGENCY SHELTER SPECIAL CARE FACILITY I TEN= COMMUN1CAnON TOWERS (p) SPECIAL USES: g. ALL SPECIAL USES RECUIRED TO BE APPROVED BY ME BOARD OF ADJUSTMENT AS SPECIFIED IN CODE SECTION 10 -2144 ARE PROHIBITED, SAVE AND EXCEPT FOR YARD ENCROACHMENTS AND YARD REDUCTIONS WHICH ARE PERMITTED NIM BOARD OF ADJUSTMENT APPROVAL AND SAVE AND EXCEPT OTHER PROFESSIONAL OFFICES NOT OTHERWISE LISTED AS ALLOWED IN ME OFFICE AND INSmUTON DISTRICT BY CODE SECTION 10 -2071. H AU- SPECIAL USES REWIRED TO BE APPROVED BY ME RALDGH CITY COUNCIL AS SPECIFIED IN CODE SECnON 10 -2145 ARE PROHIBI Mo. B. A SHOD -2 NATURAL PROMCTVE YARD SHALL BE PRONGED ALONG THE FRONTAGE OF -440 AND THE EXIT RAMP TO CAPITAL BOULEVARD, NHICH YARD SHALL HAVE AN AVERAGE WDM DIMENSION OF FIFTY FEET (50) AND A MINIMUM WIDTH DIMENSION OF TWENTY -FIVE FEET (25). C. PRIOR To SUBDIVISION APPROVAL OR ME ISSUANCE OF ANY BUILDING PERMIT, WHICHEVER SHALL FIRST OCCUR, ME OWNER OF ME PROPERTY SHALL DEED TO ME CITY A MANS IT EASEMENT MEASURING TWENTY FEET (20) LONG BY FIFTEEN FEET (15) WADE ADJACENT TO ME PUBLIC RIGHT -OF -WAY TO SUPPORT A BUS STOP FOR FUTURE TRANSIT SERVICES IN ME AREA. ME LOCATION OF ME MANST EASEMENT SHALL BE TIMELY REVIEWED AND APPROVED BY ME TRANSIT DIVISION OF ME CITY AND ME CITY ATTORNEY OR HIS DESIGNEE SHALL APPROVE ME MANST EASEMENT DEED PRIOR TO RECORDATION IN ME WAKE COUNTY REGISTRY. D. WTHIN FIFTY FEET (507 OF ADJOINING RESIDENTIAL PARCELS, SIZE UGHIMG FIXTURES FOR PARKING AREAS SHALL NOT EXCEED SIXTEEN FEET 18 IN HEIGHT UNLESS LOCATED IN A PROTECTIVE YARD WHERE HEIGHT OF UGHTING FIXTURES SHALL NOT EXCEED TWELVE FEET (12) IN HEIGHT (ALL MEASUREMENTS SHALL BE FROM FINISHED GRADE.) ADDITIONALLY, ALL SUCH FIXTURES SHALL BE OF FULL CUT- OFF'(SHIELDED) DESIGN E. NATURAL PROTECTIVE YARDS SHALL BE PROVIDED I ALONG ME COMMON UNE OF PROPERTY AND ME PROPERTY NOW KNOWN AS ME ATLANTIC PLACE CONDOMINIUM (PIN 1715427698 71 BOO( 8008 PACE 334 AND ATI76) A PLACE CONDOMINIUM (PIN 1 71 542 73 35: OLEO BOOK E P PAGE 2708 AND PIN NC EA7022; DEED BOOK POWER PAGE 776) AND (2) ALONG PO COMMON UNE OF ME PROPERTY AND ME PARCEL NOW GINNED G NC EASTERN MUNICIPAL PON£R ACDNCY AND NC MUNICIPAL POWER AGENCY NUMBER 1 (PIN 1715532498; DEED BOOK 3502, PAGE WD WHICH NATURAL PROTECTIVE YARDS SHALL HAVE AN AVERAGE WIDTH DIMENSION OF TWENTY FIVE FEET (25) AND A MINIMUM 'THEM DIMENSION OF TWENTY FEET (207 F. REIMBURSEMENT FOR ANY RECUIRED RIGHT -OF -WAY Do"CA'r SHALL RETAIN ME CURRENT INDUSTRIAL -I VALUE. G. ME MA NUM HEIGHT OF ANY BUILDING OR BUILDINGS UPON ME PROPERTY SHALL BE UNITED TO NO MORE MAN ONE HUNDRED TWENTY FEET (120); PROVIDED HOWEVER, ME BUILDING OR BUILDINGS LOCATED WITHIN ONE HUNDRED FEET (100) OF ME COMMON UNE OF ME PROPERTY AND ME PROPERTIES NOW KNOWN AS ATLANTIC PLACE CONDOMINIUM (PIN 1715427898; DEED BOOK 8008, PAGE 334) AND A-TIC PLACE 11 CONDOMINIUM (PIN 1]1542]335; DEED BOOK 8851. PACE 2] 08 AND PIN 1]1542]022: OLEO BOOK 924], PACE 776) AND (2) ALONG ME COMMON UNE Of ME PROPERTY AND ME PARCEL NOW OWNED BY NC EASTERN MUNICIPAL POWER AGENCY AND NC MUNICIPAL POWER AGENCY NUMBER I (PIN 1715532498; OEM BOO( 35D2, PACE 544) SHALL HAVE A MAXIMUM HEIGHT OF SXTY FEET (601. H. RESIDENnAL DENSITY UPON ME PROPERTY SHALL NOT EXCEED 1,200 DWELUNG UNITS AND OFFICE OEVEIAPMDNT UPON ME PROPERTY SHALL NOT EXCEED 350,000 SQUARE FEET. *� Q x1 Ft� f SHEET RvDEX o= z 0 < Of LL . o w r OI QOj IT, SPIN, LLC �131 W, P BSP ATLAVT7C LL ---- -- ----- ----- Cs ff6aj PC 7o UN OR J1624 PG 2526 sm 2003 PC 42C -------------- RN 1715429946 0.445ACRES V c—A A 'f "MM 1 ­ TOVIN AND COUNTRY ' Y -,% -------- DEVELOPERS OF RALEIGH. INC. Ptt 159361 8 ,. ni J k A R.AiV77C PLACE CONDOMINIUMS MELLOW F7EL 'DRIV, .I, IRV -- -- ------ 'J L A 7LAN770 PLACE - I I,-,- 1 I , I_ CONDOMINIUMS 11 --------- ,'I I - --------- ------------ ILA 7� L Lff I APE4-,�2.923ACR ---------- -7' k LEGM 'VAQAN ---------- ------ SET No ---------------- ` qpw -alma - - - - - - ---------- t 11 IT ------ ---- --- -------- --------- ---- --------- -------- g , A �l r 'A K'7 111 --- "I � smmr A - ---------- 11— MIX vw RY s -------------------- - ----------- -- ---------- ip —Ap Elk - ---------- - ---- - ----- -------------- - --------- - - -- --------- ".4 A -- ----------- __j RENE L NOFORO. INa --- ------- ------ -- - - ------------ ------ 9247 ps K ---------- PC 51, I ____ , " ___ --- - _.'. =_ 11- =;'� - --------- wAm METER 7'I V, - ----------------------- - ----- Mme ----- ----- CASV ----------- 1=11f, -------- -------------- ' WK, r DCtw. 1m%11_.% -------- <�:_ ------- :� �� -:: -_ - - lii Kimil ----------- .11A ff;& 7 ------ -- ----- ---- - - (A—AIL .—I) � EAR, - ! J11 RALEIGH PROPERTY GROUP, Ur STATE OF NORTH CAROLFNA cfo DEPARINEN F OF A00RISMA 77ON WITHER & RAVENEL NOTE: PIN q__C ORIGINAL IMAGE REDUCED TO APPROXIMATE I" = t00' TO FTF PAGE MAY 23 2005 DRAM BY KD JOB 061.-1 SHEET OF I SHEETS PC 7 62 1 IG 0528 YK Lff I APE4-,�2.923ACR ---------- -7' k LEGM 'VAQAN ---------- ------ SET No ---------------- ` qpw -alma - - - - - - ---------- t 11 IT ------ ---- --- -------- --------- ---- --------- -------- g , A �l r 'A K'7 111 --- "I � smmr A - ---------- 11— MIX vw RY s -------------------- - ----------- -- ---------- ip —Ap Elk - ---------- - ---- - ----- -------------- - --------- - - -- --------- ".4 A -- ----------- __j RENE L NOFORO. INa --- ------- ------ -- - - ------------ ------ 9247 ps K ---------- PC 51, I ____ , " ___ --- - _.'. =_ 11- =;'� - --------- wAm METER 7'I V, - ----------------------- - ----- Mme ----- ----- CASV ----------- 1=11f, -------- -------------- ' WK, r DCtw. 1m%11_.% -------- <�:_ ------- :� �� -:: -_ - - lii Kimil ----------- .11A ff;& 7 ------ -- ----- ---- - - (A—AIL .—I) � EAR, - ! J11 RALEIGH PROPERTY GROUP, Ur STATE OF NORTH CAROLFNA cfo DEPARINEN F OF A00RISMA 77ON WITHER & RAVENEL NOTE: PIN q__C ORIGINAL IMAGE REDUCED TO APPROXIMATE I" = t00' TO FTF PAGE MAY 23 2005 DRAM BY KD JOB 061.-1 SHEET OF I SHEETS JiI. ¢... s " I 8 PON MAINTENANCE/ 1? S EASEMENT ACCES MAX S OF WEILAND ACCESS/ MAINTENANCE EXISTING FEMA xxr I CITY OF RALEIGH All Construction must he in accordance with all Local, State, and Federal Rules and Regulations TRANSPORTATION SERVICES PUBLIC UTILITIES STORMWATER PLANNING FIRE - - - -- �`� E IST l ll j / / �YEiCANB -ACC SS / /\ GIN BY 0 OTHERS pG9'NDOCTOR -SHALL PRW9DE� /'� /t- �dd /E.ITZONAL MA7UA7- COVEEFP 0 / \� \\ \ 0 P�OF�FHE DOSRCR ANDS WAY ��� - �_�� _ CONTRACTORHALL,LIryE' THE 54OPE� PBOVI; AIJO'AROUWD THE f,ONCffEfE ENDWAL PNO WINOWAttS -WITH NC00 \ �CLASSiB'�RIP /f0 PREVENTS V RR� EROSION /STOUR FROM'OCC[R(RING� X �PROUJYD'TH E�A NDYL /WINGWA5.1 00.5 %- a 0 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION a F z ^Q zo i"1 a a N x a O C) a E--I age: � a � W m W Z C7 z W ,\A CARp� 2o�.�ESSro e a SEAL _ 031452 = �"01NF.EQ- Z' rri 0 a Q d X a m d Ca W0. SEM WzWw � U q W O O 0 W � z O vi M 11 W A� a �0 Z O xLnC+ K z x 0 x � 6 W 5 F l ' ° DDV -12000 eme. DDV12000 -SW DESIGNED BY: JF JF N TS 05 -03 -2012 Fr 1a. SW -1 McADAMS r - - sQ 1 a° URBAN FORESTRY NEW GRAPHIC SCALE ♦O�T�4 - -.�. -® x�- mFaam�S0 +,J NK. HAN 1 i 1 inuch 40 It. PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION a F z ^Q zo i"1 a a N x a O C) a E--I age: � a � W m W Z C7 z W ,\A CARp� 2o�.�ESSro e a SEAL _ 031452 = �"01NF.EQ- Z' rri 0 a Q d X a m d Ca W0. SEM WzWw � U q W O O 0 W � z O vi M 11 W A� a �0 Z O xLnC+ K z x 0 x � 6 W 5 F l ' ° DDV -12000 eme. DDV12000 -SW DESIGNED BY: JF JF N TS 05 -03 -2012 Fr 1a. SW -1 McADAMS r - - sQ 1 a° URBAN FORESTRY 25NK::. [L TING NK. HAN 1 i STORMWATER WETLAND CONSTRUCTION SPECIFICATIONS N R LLR. E N/S f GENERAL NOTES CONSTRUCTION SEQUENCE *" 1. PRIOR TO CONSTRUCTION, ANY DISCREPANCIES IN THE PLANS AND NOTES SHALL BE BROUGHT TO 11. THE RETAINING WALL IS TO BE A DESIGN -BUILD PROJECT(S) BY THE CONTRACTOR. IT SHALL BE 1. PRIOR TO CONSTRUCTION, THE OWNER SHALL OBTAIN A LAND DISTURBING (GRADING) PERMIT AND AN THE DESIGN ENGINEER'S ATTENTION IMMEDIATELY. THE CONTRACTOR'S RESPONSIBILTY TO OBTAIN FINAL CONSTRUCTION DRAWINGS FROM A REGISTERED "APPROVAL TO CONSTRUCT' FROM THE CITY OF RALEIGH AND ALL OM ER APPLICABLE AGENCIES PRIOR TO PROFESSIONAL ENGINEER AND GAIN ALL REQUIRED PERMITS NECESSARY FOR THE CONSTRUCTION OF CONSTRUCTION. 2. PRIOR TO CONSTRUCTION, THE ON -SITE GEOTECHNICAL ENGINEER SHALL VERIFY ME SUITABIUTIY THE RETAINING WALL. OF THE PROPOSED BORROW AREA/FILL FOR USE IN THE DAM EMBANKMENT/KEY TRENCH. 2. INSTALL ALL SEDIMENT AND EROSION CONTROL MEASURES PER THE APPROVED SEDIMENT AND EROSION 3. THE ON -SITE GEOTECHNICAL ENGINEER SHALL INSPECT THE KEY TRENCH EXCAVATION PRIOR TO 12. THE RETAINING WALL SHALL BE ASSUMED TO BE BACKFlLLED WITH OFF -SITE BORROW MATERIAL OR PROCESSED FILL UNLESS CONTRACTOR CAN PROVIDE OWNER WITH CONFIRMATION FROM THE CONTROL PLAN. THE CONTRACTOR SHALL MAINTAIN ALL APPROVED SEDIMENT AND EROSION CONTROL MEASURES THROUGHOUT ME ENTIRE PROJECT, AS REQUIRED. THE CONTRACTOR SHALL RECEIVE APPROVAL 13. UPON COMPLETION OF DAM EMBANKMENT, PROMPTLY STABILIZE AND SEED DAM EMBANKMENT PER SEEDING PLACEMENT OF ANY BACKFlLL WTHIN THE KEY TRENCH. IF ME CONTRACTOR CONSTRUCTS AND COVERS UP THE KEY TRENCH PRIOR TO INSPECTION, THEN THE KEY TRENCH SHALL BE UNCOVERED GEOTECHNICAL ENGINEER AND THE RETAINING WALL DESIGNER THAT READILY AVAIIABLE ON -SITE SOILS CAN BE USED. FROM THE EROSION CONTROL INSPECTOR, AS REQUIRED BY GOVERNING AGENCIES, PRIOR TO ANY CLEARING. SCHEDULE. AND TESTED AT THE CONTRACTOR'S EXPENSE. 3 CONSERUCIION. ALL THEIR DBE 14. SCHEDULE A FINAL AS-BUILT INSPECTION AND AS -BUILT SURVEY WITH THE ENGINEER. AN AS -BUILT 13. THE TOP AND BOTTOM OF WALL ELEVATIONS SHOWN ON THESE PUNS IDENTIFY FINISHED GRADE ENTRE ROOT SYSTEMSAM STT REMOVED FROM THE DAM BACKFILTLED WITH INSP INSPECTION SHOULD BE SCHEDULED A MINIMUM OF 60 DAYS BEFORE A PERMIT TO IMPOUND IS REQUIRED. 4. THE CONTRACTOR SHALL REFER TO THE LANDSCAPE PLAN FOR THE PERMANENT PLANTING PLAN /SCHEDULE. PLEASE NOTE THAT NO TREES /SHRUBS OF ANY TYPE MAY BE PLANTED ON ME ELEVATIONS ONLY. THE EXTENT THAT THE RETAINING WALL WILL BE EXTENDED BELOW GRADE TO THE FOOTING SHALL BE IDENTIFIED ON ME RETAINING WALL CONSTRUCTION DRAWINGS. SUITABLE SOIL MATERIAL. ME BACKFILLED AREAS SHALL BE COMPACTED TO THE SAME STANDARDS AS THE DAM EMBANKMENT. ME REMAINING AREA OF ME EMBANKMENT SHALL BE STRIPPED TO A SUITABLE ANY COMMENTS OR DEFICIENCIES IN THE DAM CONSTRUCTION MUST BE CORRECTED TO ME SATISFACTION OF ME ENGINEER AND OWNER BEFORE CERTIFICATION SHALL BE GRANTED. PROPOSED DAM EMBANKMENT (FILL AREAS). DEPTH AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. ANY RESIDUAL SOILS TO BE LEFT IN 5. DURING THE INITIAL STAGES OF CONSTRUCTION, ME WETLAND MAY BE USED AS A SEDIMENT BASIN 14. THE PROPOSED RETAINING WALL ON THE NORM SIDE OF THE FACILITY MAY BE A BLOCK /CEOGRID WALL (IF RETAINING WALL DESIGN REQUIRES TIEBACKS /GEOGRID TO ENCROACH UNDER PROPOSED PLACE MUST BE WELL SCARIFIED TO PROMOTE BONDING OF ME NEW EMBANKMENT FILL. NO EMBANKMENT MATERIAL SHALL BE PLACED FOR ME DAM OR KEY TRENCH UNTIL APPROVAL OF THE DAM SUBGRAOA / OUTLET STRUCTURE MATERIAL SPECIFICATIONS FOR EROSION CONTROL PURPOSES. IF SO, ME CONTRACTOR SHALL FOLLOW THE GENERAL PARKING LOT, APPROVAL FROM CITY OF RALEIGH IS REQUIRED). THE RETAINING WALL DESIGNER TRENCH IS OBTAINED FROM THE ON -SITE GEOTECHNICAL ENGINEER. CONTRUCTION SEQUENCE BELOW: SHALL ACCOUNT FOR PRESSURE ON THE WALLS DUE TO SOIL SATURATION BEHIND THE WALLS I. ME 24 "0 RCP OUTLET BARRELS SHALL BE CLASS III RCP, MODIFIED BELL AND SPIGOT, MEETING THE DURING DESIGN. APPROPRIATELY SIZED DRAINAGE SYSTEMS, WHICH SHALL OUTLET INTO THE FACILITY 4. EXCAVATE FOR THE NEW KEY TRENCH ALONG ME CENTERLINE OF THE PROPOSED DAM EMBANKMENT. THE REQUIREMENTS OF ASTM C76- LATEST. ME PIPES SHALL HAVE CONFINED O -RING RUBBER GASKET JOINTS A. THE CONTRACTOR SHALL CONSTRUCT THE ENTIRE FACIUTY (PERMANENT OUTLET STRUCTURE, FOR THE BLOCK /GEOGRID WALL, SHALL BE DESIGNED AND INSTALLED BEHIND THE RETAINING WALLS TRENCH SHALL EXTEND A MINIMUM OF 5 FT BELOW EXISTING GRADE OR 2 FT BELOW THE 24 "0 OUTLET MEETING ASTM C- 443 - LATEST. ME PIPE JOINTS SHALL BE TYPE R -4. DAM, KEY TRENCH, ETC.) WITH THE EXCEPTION OF THE INTERIOR WETLAND GRADING. THE TO RELIEVE SOIL WATER PRESSURE. BARRELS AND SHALL HAVE A MINIMUM BOTTOM WDM OF 10 FEET. THE KEY TRENCH SIDESLOPES SHALL INTERIOR GRADING WILL BE CONSTRUCTED ONCE THE EROSION CONTROL PHASE IS COMPLETE. 15. SAFETY FENCING SHALL BE INSTALLED ALONG THE TOP OF ALL RETAINING WALLS. BE A MINIMUM OF 1:1 (H:V). THE KEY TRENCH SHALL BE COMPACTED TO THE SAME SPECIFICATION LISTED IN ITEM 3 OF ME SECTION TITLED "BERM AND SOIL COMPACTION SPECIFICATIONS." DEPENDING UPON 2. ME STRUCTURAL DESGN FOR THE 5'x5' (INTERNAL DIMENSIONS) RISER BOXES WIM EXTENDED BASE SHALL BE BY OTHERS. PRIOR TO ORDERING ME STRUCTURE,THE CONTRACTOR SHALL PROVIDE TO THE DESIGN B. THE TEMPORARY ORAWDOWN RISER (OR SKIMMER) 91ALL BE CONNECTED TO ME PERMANENT ON -SITE SOIL CONDITIONS ENCOUNTERED DURING EXCAVATION, THE ON -STE GEOTECHNICAL ENGINEER MAY ENGINEER FOR REVIEW SHOP DRAWINGS AND SUPPORTING STRUCTURAL CALCULATIONS SEALED BY A P.E. 8 °0 DIP DRAIN PIPE. BERM AND SOIL COMPACTION SPECIFICATIONS VARY THE DEPTH AND DIMENSIONS OF THE KEY TRENCH AS DEEMED NECESSARY. THE ON -SITE GEOTECHNICAL ENGINEER SHALL RETAIN DOCUMENTATION OF ANY VARIATION FOR FUTURE AS -BUILT REGISTERED IN NORTH CAROLINA DEMONSTRATING THE PERMENT VERTICAL LOADS ARE SUPPORTED BY ME CONCRETE RISER STRUCTURE. C. ONCE THE UPSTREAM DRAINAGE AREA IS STABILIZED AND THE EROSION CONTROL INSPECTOR SUBMITTALS TO ME CITY OF RALEIGH. APPROVES REMOVAL OF ME SEDIMENT BASIN ME CONTRACTOR SHALL REMOVE ME E 3. ME RISER BOX OUTLET STRUCTURE SHALL BE PROVIDED WM STEPS 16" ON CENTER. STEPS SHALL BE TEMPORARY DR RISER (OR SKIMMER) AND CLEAN -OUT THE BASIN. ALL SEDIMENT, I. ALL FILL MATERIALS T BE USED FOR THE OATH EMBANKMENT SHALL BE TAKEN FROM BORROW AREAS APPROVED BY THE ON -SITE GEOTECHNICAL ENGINEER. ME FILL MATERIAL SHALL BE FREE 5. BEGIN PLACEMENT OF BACKFlLL THE KEY TRENCH. "BERM KEY TRENCH SHALL BE COMPACTED TO THE "BERM PROVIDED ON THE INNER WALL OF THE RISER BOX. STEPS SHALL BE IN ACCORDANCE WTH NCDOT STD. TRASH ETC. SHALL BE DISPOSED OF PROPERLY I.E. - PLACED IN A LANDFILL AND NOT SALLOBE ( ) FROM ROOTS STUMPS STONES GREATER MAN fi" AND FROZEN OTHER OBJECTIONABLE SHE KEY TRENCH NS LISTED ITEM 3 OF THE SECTION TITLED AND SOIL COMPACTION SPECIFICATIONS." OF THE KEY TRENCH SHALL BE TESTED PER THE SPECIFICATIONS LISTED IN THAT SECTION. 840.fi6. PLEASE REFER TO SHEET SW -2 FOR LOCATION OF ME RISER STEPS. STOCKPILED IN AN AREA WHERE WATER DALITY COULD BE ADVERSELY AFFECTED. Q NG S W MATERIAL. ME FOLLOWING SOIL TYPES ARE SUITABLE FOR USE AS FILL WMIN THE DAM 4. ME CONCRETE ANT- FLOTAION BLOCKS SHALL BE PRECAST AS THE EXTENDED BASE OF THE RISER BOX EMBANKMENT AND KEY TRENCH: ML AND CL. fi. ARDOR TO INSTALLATION, CONDO TONS ALONG THE SPILLWAY PEAR SHOULD BE EVALUATED BY DURING FABRICATION. THE PRECAST BASE SHALL AS PART THE SHOP DRAWINGS THAT D. ONCE THE BASIN IS CLEANED OUT, AND ALL EROSION CONTROL DEVICE REMOVED, THE CONTRACTOR SHALL CONSTRUCT ME INTERIOR GRADING SHOWN ON THIS SHEET. 2. FILL PLACEMENT FOR THE EMBANKMENT SHALL NOT EXCEED A MAXIMUM 8' LIFT (UNCOMPACEED). THE ON-SIEE EL. SHOULD S ENGINEER TO ASSESS WHETHER SORTABLE BEARING CONDITIONS EXIST M THE AL ENGINEER SDBGRADE LEVEL. SHOULD SOFT OR OMERWSE UNSUITABLE CONDITIONS BE ENCOUNTERED ALONG ME (INCLUDED IN WLL O SUBMITTED TO THE TO CAST-IN-PLACE FOR REVIEW SEE ITEM 2 ABOVE). IN LIEU M A PRE -CAST BASE. ME CONTRACTOR MAY OPT TO CAST -IN -PLACE THE ANTI- FLOTAION BLOCK IN THE FIELD. HOWEVER, E. ONCE THE GRADING IS COMPLETE, THE CONTRACTOR SHALL REQUEST AN ON -SITE INSPECTION EACH UFT SHALL BE CONTINUOUS FOR ME ENTIRE LENGTH OF EMBANKMENT. BEFORE PLACEMENT PIPE ALIGNMENTS, MESS MATERIALS SHOULD BE UNDERCUT AS DIRECTED BY THE GEOTECHNICAL ENGINEER. PRIOR TO CONSTRUCTING ME CAST -IN -PLACE BASE, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO AND AN AS -BUILT SURVEY PRIOR TO INSTALLATION OF THE WETLAND PLANTS. IF THE OF FILL FOR ME BERM SECTION ALL UNSUITABLE MATERIAL SHALL BE REMOVED AND ME THE MATERIALS SHALL REPLACED ADEQUATELY COMPACTED STRUCTURAL FILL, LEAN ME ENGINEER FOR REVIEW DENOTING THE FOLLOWING: CONTRACTOR PLANTS ME PROPOSED VEGETATION PRIOR TO AN AS -BUILT SURVEY (AND SURFACE PROPERLY PREPARED FOR FILL PLACEMENT. FILL MATERIAL ADJACENT TO ALL SPILLWAY AND DRANAGE STRUCTURES SHALL PLACED IN 4 -INCH COMPACTED) LIFTS AND CONCRETE OR PLOWABLE FILL AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. CONCRETE IR HE A. STEEL CEMENT SUBSEQUENT APPROVAL), ANY CHANGES TO THE GRADING RE- PLANTING OF PLANTS WILL / M HANG- COMPACTED i0 THE SAME COMPACTION AND MOISTURE REQUIREMENTS AS THE ENTIRE RE 7. ORDER i0 HELP PROTECT THE SOIL FROM DETERIORATION (ONE TO EXPOSURE, RAINFALL, B. ME CONNECTION MECHANISM TO JOIN THE ANTI- FLOTAION BLOCK WIM THE RISER SECTION NNECII BE AT ME CONTRACTOR'S EXPENSE. EMBANKMENT. S SEEPAGE, AND RUNOFF) BEFORE ME CRADLE CAN BE POURED, IT IS STRONGLY RECOMMENDED THAT A 3" CRADLE A TO 4' THICK CONCRETE MUD MAT BE POURED OVER THE SUBGRANE ONCE IT IS APPROVED BY THE 5. ME RISER BOX JOINTS SHALL BE SEALED USING BUTYL RUBBER SEALANT CONFORMING TO F. ONCE THE ENGINEER HAS APPROVED AS -BUILT ME CONTRACTOR SHALL PLANT 3. ALL FILL SOILS USED IN ME EMBANKMENT KEY TRENCH CONSTRUCTION SHALL BE COMPACTED ON -SITE GEOTECHNICAL ENGINEER. THE MUD MAT WILL ALSO PROVIDE BEARING FOR ME BLOCKS THAI ASTM -C990- LATEST. IF NECESSARY, THE CONTRACTOR SHALL INCORPORATE A WAEERSTOP INTO ME RISER SHOWN THE PROPOSED WETLAND PLANTS SHOWN DN THE LANDSCAPE PLAN FOR MI5 FACILITY. AFTER LANDSCAPE TO AT LEAST 95R OF ME STANDARD PROCTOR MAXIMUM DRY DENSITY ASTM -696. THE FILL ( ) TEMPORARILY SUPPORT THE SPILLWAY PIPE UNTIL THE CRADLE CAN BE POURED. THE METHOD OF BLOCK BOX JOINT TO ENSURE A WATERTIGHT CONNECION. THE CONTRACTOR SHALL FARCE JOINTS ON BOTH ME COMPLETION OF THE PLANTING, THE LANDSCAPE CONTRACTOR SHALL PROVIDE A LETTER TO THE ENGINEER CERIFMNG THAT ME PLANTS HAVE BEEN INSTALLED PER ME APPROVED SOILS SHALL BE COMPACTED Ai A MOISTURE CONTENT WTHIN -1 i0 +3 PERCENT OF ITS OPTIMUM MOISTURE CONTENT. COMPACION TESTS SHALL BE PERFORMED BY THE ON -SITE SUPPORT FOR THE PIPE PROPOSED BY THE CONTRACTOR SHOULD BE SUBMITTED i0 THE JOHN R. McADPA1S COMPANY FOR REVIEW. INSIDE AND OUTSIDE WITH NON- SHRINK GROUT. WETLAND PLANTING PLAN. GEOTECHNICAL ENGINEER FIRING CONSTRUCTION TO VERIFY THAT THE PROPER COMPACTION LEVEL 6. IF THE ANTI - FLOTATION BLOCK IS PRECAST AS PART OF THE RISER BASE SECTION THE ENTIRE PRECAST HAS BEEN REACHED. FILL SHOULD BE COMPACTED USING A TYPE COMPACTOR. IN 8. BALM CONSTRUCTION THE NEW EMBANKMENT. FILL MATERIALS SHALL PLACED MAXIMUM 8" THICK RISER BOX STRUCTURE SHALL HAVE A MINIMUM WEIGHT OF LBS. THE STRUCTURE HEIGHT RATE IS GREATER THAN 0.01 MNST L ORDER TO HELP MAINTAIN A fi. IF THE ENT ORDER TO PREVENT DAMAGE TO EQUIPMENT SHALL AM THE PIPE. NO COMPACTION EQUIPMENT SHALL CROSS ANY PIPE C IT H L ENGINEER. LIFTS ARDOR TO COMPACTION, UNLESS DIRECTED O BY ME ON -SITE G DETERMINED SHALL BE ME SHIPPING WEIGHT PAID SHALL BE DETARMNED BY SINE RM TIO ME WEIGHT OF THE SUBTRACTING PERMANENT POOL, THE CONTRACTOR WALL NEED TO INSTALL A CLAY LAYER OR A PERMANENT POOL, UNTIL MINIMUM COVER IS ESTABLISHED ALONG THE PIPE. B E UENGE ECE SARY, FILL LIFTS SHALL BE CONTINUOUS OVER THE ENTIRE LENGTH OF FILL. IF Ii IS NECESSARY ME FACTORY CKOUTS FROM CROSS STRUCTURE WEIGHT. THIS INFORMATION SHALL SHOWN ON THE GAOSYNTTOM CLAY LINER A MINIMUM OF L FOOT BELOW THE LOWEST GRADE HI 1 -FOOT BELOW THE BOTTOM ELEVATION OF ROOT BALL FOR THE PROPOSED PLANTINGS WHICHEVER IS 4. ME CONTRACTOR SHALL PROVIDE ME ENGINEER WM REPORTS TO VERIFY THAT ME DAM EMBANKMENT FILL MATERIAL WILL BE OVERBUILT IN HORIZONTAL LIFTS AND CUT BACK TO FINAL GRADE IN ORDER TO ACHIEVE PROPER COMPACTION. SHOP DRAWINGS SUBMITTED TO ME ENGINEER FOR REVIEW. R THE CONTRACTOR OPTS ENTIRE CAST-IN-PUCE WINGS SUB TO T PLACE ME ANTI - FLOTATION BLOCK ME CONTRACTOR SHALL ENSURE THE WEIGHT OF THE ENTIRE RISER GREATER). IF A CEOSYN THETIC LINER IS CHOSEN THE LINER SHALL BE BENTOMAT CL BY CETCO C EMBANKMENT MEETS THE SPECIFIED COMPACTION REQUIREMENTS. COMPACTION REPORTS WILL BE STRUCTURE IS EQUAL TO ME MINIMUM DSTEO ABOVE. LINING TECHNOLOGIES OR ENGINEER APPROVED EQUIVALENT. IF IT IS DETERMINED BY THE ON -SITE NEEDED DURING THE AS -BUILT CERTIFICATION PROCESS FOR THIS STORMWATER FACILITY. 9. AS CRETECRADL OF THE EMBANKMENT MOTES FORWARD IT WILL BE NECESSARY TO INSTALL THE GEOTI YN CTH ENGINEER THAI A LINER IS NOT ROMDED MEN A LETTER TO THE ENGINEER RATE SHALL BE PROMNEO WHICH WILL BE USED DURING THE CERTIFYING THE NATION THEREFORE, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE COMPACTION TESTING AND TO ENSURE COMPACTION TESTS ARE PROPERLY PERFORMED DURING CONSTRUCTION. CONCRETE CRADLE. THIS MAY BE CONSTRUCTED USING ONE OF THE FOLLOWING METHODS: 7. PRIOR VI ORDERING, THE CONTRACTOR SHALL SUBMIT TRASH RACK SHOP DRAWINGS IN THE ENGINEER FOR REVIEW. CONTRACTOR SHALL ENSURE THAT AN ACCESS HATCH IS PROVIDED WITHIN THE TRASH RACK R AS -BUILT CERTIFICATION PROCESS. A. THE PROPOSED STRUCTURAL FILL MATERIAL IS UTILIZED AS THE FORMWORK FOR THE CONCRETE (SEE DETAIL FOR LOCATION) THAT WILL ALLOW FOR FUTURE MAINTENANCE ACCESS. CONTRACTOR SHALL 5. PRIOR USE AS FILL MATERIAL FOR DAM EMBANKMENT, THE CONTRACTOR SHALL PERFORM CRADLE, THEN THE STRUCTURAL FILL SHOOED INSTALLED AND COMPACTED UP THE TOP OF C ALSO PROVIDE A CHAIN AND LOCK FOR SECURING ME ACCESS HATCH. 7. THE GRADES TUND (A THIS PLAN ARE FINISHED N GRADES. IF ME EXISTING SOIL LAYERS IN THE PROPOSED WETLAND (AFTER EXCAVATION) ARE NOT DETERMINED SUITABLE BY A LANDSCAPE ED W MATERIAL STANDARD PROCTORS II THE PROPOSED BORROW MATERIAL TO ENSURE MAT OPTIMUM MOISTURE R CONTENT AND COMPACTION CAN BE ACHIEVED /CONTROLLED DURING CONSTRUCTION. C W CONCRETE CRADLE ELEVATION. ONCE CO STRUCTURAL FILL REACHES ME NEXT DOWNSTREAM JUNCTION BOX OR HEADWALL AND IS COMPACTED TO THE ELEVATION OF THE TOP OF ME CONCRETE B. ALL POURED CONCRETE 9iALL BE MINIMUM 3000 PSI 20 DAY UNLESS OTHERWSE NOTED. ( ) PROFESSIONAL FOR ME FUTURE WETLAND (FROM HE ME CONTRACTOR SHALL OVER EXCAVATE THE INTERIOR PORTIONS OF THE (FROM THE NORMAL WATER SURFACE ELEVATION TO ME 6. TESTING OF THE NEW FILL MATERIALS SHALL PERFORMED TO VERIFY MAT THE RECOMMENDED CRADLE, EXCAVATE THE CONCRETE CRADLE TRENCH PER D E PROVIDED DETAILS AND CONSTRUCT THE CONCRETE CRADLE AS PER ME PROVIDED CONCRETE CRADLE DETAIL. 9. GEOTEXTILE FABRIC FOR THE 24 "0 OUTLET BARREL JOINTS SHALL BE MIRAFI 180N OR ENGINEER APPROVED INCHES. ME CONTRACTOR SHALL THEN BRING ME WETLAND AREA TO THE BOTTOM) BY CONTRACTOR LEVEL OF COMPACTION IS ACHIEVED DURING CONSTRUCTION. THEREFORE, ONE DENSITY TEST SHALL O DENSITY EQUAL (NON -WOVEN FABRIC) EQUAL (NO D E TOPSOIL ON-SITE (AMENDED AS DIRECTED BY THE FINISHED GRADES USING PERFORMED FOR EVERY SQUARE FEET OF AREA FOR EVERY UFT OF FILL OR AS B. IF THE PROPOSED STRUCTURAL FILL IS NOT U ZED AS THE FORMWORK FOR THE CONCRETE CRADLE, F BETTER ON -SITE LANDSCAPE PROPOSED AL). THE OVER EXCAVATION WILL ALLOW FOR BETTER PLANING ME OVER DIRECTED BY THE ON -9 EE GEOTECHNICAL ENGINEER. DI GEOTECHNICAL MEN ARDOR TO AL FILL EMBANKMENT, ME FORMWORK FOR ME BE ME STRUCTURAL 10. STORM WAFER WETLAND EMERGENCY OR IS VIA AN 8"0 PLUG VALVE. THE VALVE SHALL BE A CONDITIONS FOR THE PROPOSED WETLAND PLANTS. 7. TESTING WILL BE REQUIRED ALONG ME 24 "0 O -RING OUTLET BARRELS AT A FREQUENCY OF ONE EX CONCRETE CRADLE SHOULD BE INSTALLED ON EXISTING GROUND AND / OR THE MUD MAT. THE LE SHOULD CONCRETE CRADLE SHALL BE CONSTRICTED PER THE PROVIDED DETAILS. OVER E 04 STYLE .5, X- CENTRIC VALVE A APPROVED EQUAL. MIS VALVE IS IN ACCORDANCE WITH (SEE DETAIL SEC. 5.5, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANOWHEEL (SEE DETAIL 8. ANY REMOVED TOPSOIL SHALL BE STOCKPILED FOR USE IN PLANTING (SEEDING) ON THE DAM TEST PER 25 LF OF PIPE PER VERTICAL FOOT OF FILL OR AS DIRECTED BY THE ON -SITE SHEET SW -2). ME CONTRACTOR SHALL PROVDE A REMOVEABLE VALVE WRENCH WTH A HPNDWHEEL ON EMBANKMENT ONCE FINAL GRADES (AS SHOWN ON THE GRADING PLAN) HAVE BEEN ESTABLISHED WITH COMPACTEN FILL. PRIOR TO TOPSOIL INSTALLATION, ME CONTRACTOR SHALL SCARIFY THE GEOEECHNI CAL ENGINEER. 10. INSTALL RISER / BARREL ASSEMBLY, ALONG WITH THE EMERGENCY DRAIN SYSTEM. THE DRAIN VALVE LOCATED WTHIN THE RISER BOX SHALL BE KEPT OPEN UNTIL AN AS -BUILT CERTIFICATION HAS BEEN TOP FOR OPERATION OF ME 8 "0 PLUG VALVE. A CHAIN AND LOCK SHALL ALSO BE PROVIDED FOR SECURING THE WRENCH TO ME TRASH RACK. THE TOP 2"-3" OF THE BERM SECTION TO PROMOTE BONDING OF ME TOPSOIL WM THE COMPLETED BY THE ENGINEER AND AN APPROVAL TO IMPOUND HAS BEEN ISSUED BY ALL APPLICABLE COMPACTED FILL. ME TOPSOIL DEPTH SHALL RANGE FROM 3"-4" ON ME DAM EMBANKMENT. AGENCIES. STATEMENT OF RESPONSIBILITY 9. THE CONTRACTOR SHALL FURNISH, INSTALL, OPERATE, AND MAINTAIN ANY PUMPING EQUIPMENT, 11. INSTALL SPILLWAY FILTER PER DIRECTION OF ME ON -SITE GEOTECHNICAL ENGINEER AND THE DETAILS ETC. NEEDED FOR REMOVAL OF WATER FROM VARIOUS PARTS OF THE STORMWATER WETLAND SITE. SHOWN ON SHEET SW -3. I. ALL REQUIRED MAINTENANCE AND INSPECTIONS OF THIS FACILITY SHALL BE THE RESPONSIBIUTY OF THE IT IS ANTICIPATED THAT PUMPING WILL BE NECESSARY IN ME EXCAVATION AREAS (I.E. -KEY 12. CONSTRUCT EMBANKMENT PER SPECIFICATIONS LISTED IN ME SECTION TITLED "BERM AND SOIL PROPERTY OWNER'S ASSOCIATION, PER THE EXECUTED OPERATION AND MAINTENANCE AGREEMENT FOR MIS FACILITY. TRENCH). DURING PLACEMENT OF FILL WMIN THE KEY TRENCH (OR OTHER AREAS AS NECESSARY), COMPACTION SPECIFICATIONS" AND REQUIREMENTS OF THE ON GEOEECHNICAL ENGINEER. ALL THE CONTRACTOR SHALL KEEP THE WATER LEVEL BELOW THE BOTTOM OF THE EXCAVAION. ME CHARACEERISEICS OF THE EMBANKMENT FILL MATERIAL SHALL MEET THE STANDARDS SET FORM IN "BERM MANNER IN WHICH THE WATER IS REMOVED SHALL BE SUCH THAT THE EXCAVATION BOTTOM AND SIDESLOPES ARE STABLE. AND SOIL COMPACTION SPECIFICATIONS ", INCWOINC COMPACTION AND MOISTURE REQUIREMENTS. IF NECESSARY TO ACHIEVE PROPER COMPACTION, ME EMBANKMENT FILL MATERIAL WILL BE OVERBUILT IN 10. THE RETAINING WALL ALIGNMENT SHOWN ON MESE PLANS DEPICTS THE LOCATION OF THE FRONT HORIZONTAL LIFTS AND CUT BACK TO PROPER FINAL GRADE. MY HAND COMPACTION ACTIMEIES AROUND FACE OF THE RETAINING WALL AT THE BOTTOM. SPILLWAY OR DRAIN STRUCTURES SHALL BE CONDUCTED IN 4 -INCH LOOSE LIFTS AND BE TO THE SAME COMPACTION AND MOISTURE REQUIREMENTS AS THE ENTIRE EMBANKMENT. ALL COMPACTION AND MOISTURE TESTING SHALL BE CARRIED OUT AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER AND AS LISTED IN THE SECTION fl TLED "BERM AND SOIL COMPACTION SPECIFICATIONS ". PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION a F z ^Q zo i"1 a a N x a O C) a E--I age: � a � W m W Z C7 z W ,\A CARp� 2o�.�ESSro e a SEAL _ 031452 = �"01NF.EQ- Z' rri 0 a Q d X a m d Ca W0. SEM WzWw � U q W O O 0 W � z O vi M 11 W A� a �0 Z O xLnC+ K z x 0 x � 6 W 5 F l ' ° DDV -12000 eme. DDV12000 -SW DESIGNED BY: JF JF N TS 05 -03 -2012 Fr 1a. SW -1 McADAMS 10 FT. WIDE MINIMUM COMPACTED BERM SECTION (SEE BERM AND SOIL COMPACTION SPECIFICATIONS ON SHEET SW -1) 3 Z;Z-lI DEPTH VARIES / I1 2 -FT. NON -WOVEN GEOTEXTILE FABRIC SHALL BE PLACED AROUND EACH JOINT OF THE 24'0 O -RING RCP BARREL IN 2' WIDE STRIPS CENTERED ON JOINT. CITY OF RALEIGH All Construction must be in accordance with all Local, State, and Federal Rules and Regulations TRANSPORTATION SERVICES PUBLIC UTILITIES STORMWATER PLANNING FIRE URBAN FORESTRY SPILLWAY FILTER (SEE DETAIL SHEET SW -3) T2° COVER / (MIN.) XH E iRICAVP&H S I APPROVED ` 2 4 ' CLASS 198 O-RING RCP ..' I l l , i I I I I I I I I I I I I I I I I I I I I I I Ili I I I i � l l l - I I I 1 1 1 - I I I - - III -114,r I l li KEY TRENCH (SEE BERM pN0 I I I III - III - III - III - III - III - III -11 I l l I- 111-111 - 111-111 -I ='' -III I I OIL A °coftDANCE WITH AWWALC BE N sQ4 fl- DETAIL MPACnON SPECIFICATIONS - III -III III -III III - III -III- - III - III - III - III - III -III- _ _ _ _ _ - III -III III - III - III - III - III -III 11=111=111: 1 1 I- III - III -III -I I -I -I l I -I SEC. 5.5. AND SHALL BE KEY TRENCH TO BE PROVIDED -III III -I -I -I I- III -III III - III - III -III III -I -� -1 I- III -III -I STRUCTUREFMAMATOHPNDW EELS PERM Wr DAM CROSS SECTION GEO CHNICALCENOGINEERTHE SITE - I - III - III - I� 111111 I�' III CONCRETE CRADLE 1 -III RCP 2= EL ,91200 N.T.S. (SEE DETAIL SHEET SW -4) i "O GRADE 8 STAINLESS STEEL CONCRETE LAG SCREW x/12" X Z GALVANIZED ED STEEL STRAP (4 PER RISER JOINT) RISER J4 CONNECTION DETAIL N.T.S. NOTES 1. CONCRETE ANTI - FLOTATION BLOCK TO BE PROVIDED WITH MINIMUM TEMPERATURE AND SHRINKAGE STEEL REINFORCEMENT 2. TRASH RACKS FOR RISER AND B" DIP EMERGENCY DRAIN NOT SHOWN FOR CLARITY. 3. THE NUMBER OF GUIDES FOR THE VALVE STEM SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTOR. THE VALVE STEM MUST BE OPERABLE FROM THE TOP OF THE RISER MA THE HANDWHEEL WITH AN INSIGNIFICANT MOUNT OF PLAY IN THE VALVE STEM. SIPHON OUTLET INV = EL. 201.00 (NWSE) (SEE DETAIL SHEET SW -4 FOR SIPHON DETAIL) CONCRETE COLLAR (TO BE CONSTRUCTED IN THE 6.0' FIELD BY THE CONTRACTOR, SEE DETAIL SHEET SW -2) CONCRETE CRADLE f (SEE DETAIL SHEET SW -4) SIPHON OUTLET (SEE DETAIL SHEET SW -4 FOR SIPHON DETAIL) 9.0' 6.0' 0 24° 0 -RCP FLOW 1.5' CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WTH NCDOT SM. 840.66. STEPS SHALL BE PLACED AT 16" O.C. (SEE DETAIL SHEET SW -4) TOP OF HANDWHEEL TO EXTEND 6" MIN. WALL APPROXIMATE LOCATION CONTRACTOR SHALL PROVIDE TOP OF HANDWHEEL TO EXTEND OF EXISTING GROUND CONTRACTOR SHALL PROVIDE NCDOT SM. 840.66. STEPS 1 -FOOT ABOVE TRASH RACK SHALL BE PLACED AT 16" O.C. NCDOT STD. 840.66. STEPS "0 PVC SIPHON TRASH RACK PROVIDE A BLOCK OUT °p (SEE DETAIL SHEET SW -4) 4 INV (INSIDE RISER) = EL. 201.00 (NWSE) (SEE DETAIL SHEET SW -2) NWSE = EL. 201.00 FOR THE 24 0 -RING RCP SIPHON TO EXTEND 12" UP FROM THE INSIDE FRONT VIEW CONCRETE ANTI - FLOTATION BLOCK CONCRETE FACE OF THE RISER - (SEE DETAIL SHEET SW -4 FOR SIPHON DETAIL) CONCRETE COLLAR (TO BE CONSTRUCTED IN - 1 GUIDE STEM THE FIELD BY THE CONTRACTOR, FLOW 1 fi SEE DETAIL SHEET SW -2) o (T>R) 0.50' 8" EMERGENCY DIP DRAIN 3 , " COVER PROPOSED GRADE c" (SEE DETAIL SHEET SW -3 8" DIP DRAWDOWN (MIN.) DRAIN (® 0.00,2) e 2 4 INV. = 198.00 RAC K DETAIL) 3 CLEARANCE 1' DEPTH 1 CONCRETE CRADLE TO OUTSIDE OF }4 REBAR) 1 8 "a EMERGENCY DIP DRNN -• X "`' 96 LF CLASS III 24b 0- t RING RCP (ASTM C76 L ST) A E WITH TRASH RACK . -.r (SEE DETAIL SHEET SW -3) ''' L } ®6 259 10 FT. WIDE MINIMUM COMPACTED BERM SECTION (SEE BERM AND SOIL COMPACTION SPECIFICATIONS ON SHEET SW -1) 3 Z;Z-lI DEPTH VARIES / I1 2 -FT. NON -WOVEN GEOTEXTILE FABRIC SHALL BE PLACED AROUND EACH JOINT OF THE 24'0 O -RING RCP BARREL IN 2' WIDE STRIPS CENTERED ON JOINT. CITY OF RALEIGH All Construction must be in accordance with all Local, State, and Federal Rules and Regulations TRANSPORTATION SERVICES PUBLIC UTILITIES STORMWATER PLANNING FIRE URBAN FORESTRY SPILLWAY FILTER (SEE DETAIL SHEET SW -3) T2° COVER / (MIN.) XH E iRICAVP&H S I APPROVED ` 2 4 ' CLASS 198 O-RING RCP ..' I l l , i I I I I I I I I I I I I I I I I I I I I I I Ili I I I i � l l l - I I I 1 1 1 - I I I - - III -114,r I l li KEY TRENCH (SEE BERM pN0 I I I III - III - III - III - III - III - III -11 I l l I- 111-111 - 111-111 -I ='' -III I I OIL A °coftDANCE WITH AWWALC BE N sQ4 fl- DETAIL MPACnON SPECIFICATIONS - III -III III -III III - III -III- - III - III - III - III - III -III- _ _ _ _ _ - III -III III - III - III - III - III -III 11=111=111: 1 1 I- III - III -III -I I -I -I l I -I SEC. 5.5. AND SHALL BE KEY TRENCH TO BE PROVIDED -III III -I -I -I I- III -III III - III - III -III III -I -� -1 I- III -III -I STRUCTUREFMAMATOHPNDW EELS PERM Wr DAM CROSS SECTION GEO CHNICALCENOGINEERTHE SITE - I - III - III - I� 111111 I�' III CONCRETE CRADLE 1 -III RCP 2= EL ,91200 N.T.S. (SEE DETAIL SHEET SW -4) i "O GRADE 8 STAINLESS STEEL CONCRETE LAG SCREW x/12" X Z GALVANIZED ED STEEL STRAP (4 PER RISER JOINT) RISER J4 CONNECTION DETAIL N.T.S. NOTES 1. CONCRETE ANTI - FLOTATION BLOCK TO BE PROVIDED WITH MINIMUM TEMPERATURE AND SHRINKAGE STEEL REINFORCEMENT 2. TRASH RACKS FOR RISER AND B" DIP EMERGENCY DRAIN NOT SHOWN FOR CLARITY. 3. THE NUMBER OF GUIDES FOR THE VALVE STEM SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTOR. THE VALVE STEM MUST BE OPERABLE FROM THE TOP OF THE RISER MA THE HANDWHEEL WITH AN INSIGNIFICANT MOUNT OF PLAY IN THE VALVE STEM. SIPHON OUTLET INV = EL. 201.00 (NWSE) (SEE DETAIL SHEET SW -4 FOR SIPHON DETAIL) CONCRETE COLLAR (TO BE CONSTRUCTED IN THE 6.0' FIELD BY THE CONTRACTOR, SEE DETAIL SHEET SW -2) CONCRETE CRADLE f (SEE DETAIL SHEET SW -4) SIPHON OUTLET (SEE DETAIL SHEET SW -4 FOR SIPHON DETAIL) 9.0' 6.0' 0 24° 0 -RCP FLOW 1.5' CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WTH NCDOT SM. 840.66. STEPS SHALL BE PLACED AT 16" O.C. (SEE DETAIL SHEET SW -4) TOP OF HANDWHEEL TO EXTEND 6" MIN. WALL 1 -FOOT ABOVE TRASH RACK CONTRACTOR SHALL PROVIDE DEPTH STEPS IN ACCORDANCE WTH CONTRACTOR SHALL PROVIDE NCDOT SM. 840.66. STEPS STEPS IN ACCORDANCE WITH SHALL BE PLACED AT 16" O.C. NCDOT STD. 840.66. STEPS (SEE DETAIL SHEET SW -4) SHALL BE PLACED AT 16" O.C. PROVIDE A BLOCK OUT °p (SEE DETAIL SHEET SW -4) TOP OF RISER = EL. 202.00 4.001 FOR SIPHON DETAIL) NWSE = EL. 201.00 FOR THE 24 0 -RING RCP CONCRETE COLLAR (TO BE CONSTRUCTED IN THE FIELD BY THE CONTRACTOR, SEE DETAIL SHEET SW 2) OENOTESV THEVACCESS HATCH TO BE PROVIDED BY THE TRASH RACK FABRICATOR PER OUTLET STRUCTURE MATERIAL SPECIFICATIONS (SHEET SW -3A) (TYP.K U SEE NOTE #, 11.9 LF 11.9 LF 2 "x2'.1 /4" 2".2".1 /4' ANGLE ANGLE CONCRETE ANCHOR BOLT (TYP.. SEE NOTE p4) R ALL PER NCDOT STD 638.80 DETAIL SHEET SW 3) VELOCITY SSI' RI NCDOT CLASS '2 SS '2 RIPRAP 24'L X 26'W X 27' THICK D50 = 14" (SEE DETAIL SHEET SW -3) TRASH RACK DETAM N.T.S. NOTES' I. ALL REBAR TO BE g4 REBAR 2. ALL REBAR AND ANGLES TO BE HOT- DIPPED GALVANIZED AND BE PROVIDED WITH AN EPDXY COATING. 3. THE HOT- DIPPED, GALVANIZED 2 ".2 ".1/4" ANGLES SHALL BE WELDED TO THE REBAR TRASH RACK. ONCE WELDED, THE ENTIRE ASSEMBLY SHALL BE PLACED ONTO THE RISER WITH ANGLES SITTING DIRECTLY ON TOP OF RISER. 4. CONTRACTOR SHALL ANCHOR THE TRASH RACK TO MANHOLE WALL WTH FOUR 4 "x1/4" CONCRETE ANCHOR BOLTS THROUGH ANGLES. NOTES: 6" MIN. WALL 12" ANCHOR DEPTH DEPTH THICKNESS (TYP.) SIPHON OUTLET REBAR PRECASTER SHALL 3.8' . 4'• (SEE DETAIL SHEET SW -4 o PROVIDE A BLOCK OUT °p "0 5.0' 4.001 FOR SIPHON DETAIL) CENTER) FOR THE 24 0 -RING RCP 24 0 -RING RCP FRONT VIEW CONCRETE ANTI - FLOTATION BLOCK CONCRETE 3" ANCHOR DEPTH \6.50' 3" CLEARANCE 24 0 -RING RCP 1 GUIDE STEM o FLOW 1 fi INVERT = EL. 198.00 o (T>R) 0.50' 8" EMERGENCY DIP DRAIN , y4 REBAR) c" (SEE DETAIL SHEET SW -3 a REBAR) 2.00' FOR DRNN TRASH 2 4 RAC K DETAIL) 3 CLEARANCE 1' DEPTH 7�.' CONCRETE CRADLE TO OUTSIDE OF }4 REBAR) PRECAST STRUCTURE WALL (SEE DETAIL SHEET SW -4) 8" MIN. BASE 8" DIP GRAIN THICKNESS (TYP.) CONTRACTOR SHALL SEAL THE RAIN PIPE 8" PLUG VALVE. THE VALVE ". PIPE PENETRATION USING A CONTRACTOR SHALL CORE -DRILL SHALL BE A M &H STYLE 820 3" CLEARANCE RUBBER BOOT AND STAINLESS THE HOLE FOR THE 8 "0 DIP PIPE X- CENTRIC VALVE OR CONTRACTOR SHALL FORM INVERT OF RISER STRUCTURE STEEL HARDWARE IN THE FIELD. PRECASTER SHALL OMIT REINFORCEMENT IN THIS APPROVED EQUAL. THIS VALVE SHAL ABE IN ACCORDANCE TO DRAIN POSITIVELY TO INVERT OF OUTLET BARREL CONCRETE ANTI - FLOTATION AREA WITH AND SHALL BE OPERABLE USING NON- SHRINK GROUT BLOCK FROM TOP OF OUTLET STRUCTURE MA A HANDWHEEL. CONTRACTOR SHALL PERMANENT OUTLET STRUCTURE DETARS N.T.S. OENOTESV THEVACCESS HATCH TO BE PROVIDED BY THE TRASH RACK FABRICATOR PER OUTLET STRUCTURE MATERIAL SPECIFICATIONS (SHEET SW -3A) (TYP.K U SEE NOTE #, 11.9 LF 11.9 LF 2 "x2'.1 /4" 2".2".1 /4' ANGLE ANGLE CONCRETE ANCHOR BOLT (TYP.. SEE NOTE p4) R ALL PER NCDOT STD 638.80 DETAIL SHEET SW 3) VELOCITY SSI' RI NCDOT CLASS '2 SS '2 RIPRAP 24'L X 26'W X 27' THICK D50 = 14" (SEE DETAIL SHEET SW -3) TRASH RACK DETAM N.T.S. NOTES' I. ALL REBAR TO BE g4 REBAR 2. ALL REBAR AND ANGLES TO BE HOT- DIPPED GALVANIZED AND BE PROVIDED WITH AN EPDXY COATING. 3. THE HOT- DIPPED, GALVANIZED 2 ".2 ".1/4" ANGLES SHALL BE WELDED TO THE REBAR TRASH RACK. ONCE WELDED, THE ENTIRE ASSEMBLY SHALL BE PLACED ONTO THE RISER WITH ANGLES SITTING DIRECTLY ON TOP OF RISER. 4. CONTRACTOR SHALL ANCHOR THE TRASH RACK TO MANHOLE WALL WTH FOUR 4 "x1/4" CONCRETE ANCHOR BOLTS THROUGH ANGLES. NOTES: ANCHOR 12" ANCHOR DEPTH DEPTH I. ALL REBAR TO BE /4 REBAR. 3.8' . 4'• y4 REBAR ANCHORS. 3" CLEARANCE CONTRACTOR SHALL ORILL (CENTER TO (CENTER TO (CENTER TO 5.0' CENTER) CENTER) CENTER) N4 REBAR) ANCHORS USING EPDXY GROUT FRONT VIEW CONCRETE ANTI - FLOTATION BLOCK CONCRETE 3" ANCHOR DEPTH 3" CLEARANCE 3" CLEARANCE TO OUTSIDE TO OUTSIDE OF F O4 d y4 REBAR) REBAR) 3 CLEARANCE 1' DEPTH TO OUTSIDE OF }4 REBAR) PRECAST STRUCTURE WALL 3000 PSI CONCRETE COLLAR (MIN. 28 DAY STRENGTH) ". 3" CLEARANCE .4. TO OUTSIDE OF }4 REBAR ANCHORS. g4 REBAR) CONTRACTOR SHALL DRILL INTO PRECAST 3.625' 24° 0 -RING 4.375' STRUCTURE WALL AND SET ANCHORS USING 24" 0 -RING RCP EPDXY GROUT RCP . 5.5" CENTER TO CENTER 1.0' ANCHOR 12" ANCHOR DEPTH DEPTH 4" 3.8' . 4'• y4 REBAR ANCHORS. 3" CLEARANCE CONTRACTOR SHALL ORILL (CENTER TO (CENTER TO (CENTER TO TO OUTSIDE OF INTO PRECAST BASE AND SET CENTER) CENTER) CENTER) N4 REBAR) ANCHORS USING EPDXY GROUT FRONT VIEW CONCRETE ANTI - FLOTATION BLOCK CONCRETE SIDE VIEW CONCRETE ANTI - FLOTATION BLOCK COLLAR DETAIL N.T.S. PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION a F ^� z u d3 6 q E- •0.7 s L.7 m W Z PA GARp� 'p* E ; o SEAL. _ __ 031452 = y z O ti a Q d X a m d Ca W0. �gC]C7 wzWw 5418 G Cn v] �µ04 U q W O I Go Oa � z ti O �O a Z O l �0 t7 ° eNe. 0D5 D-V -1 03 _ 2000 DDV12000 -S JF Dr- JF W N 2 ar A McADAMS NOres: 1. A FILTER BLANKET IS TO BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. THE FILTER BLANKET WILL CONSIST OF A MINIMUM 4'• THICK LAYER OF STONE (NCDOT g57) UNDERLAIN WITH MIRAFI FILTER WEAVE 700 OR APPROVED EQUIVALENT ENDN NCDOT 5m (SEE 24'0 0 -RING RCF AL 4.0' WIDE g6 REBAR PERIMETER FRAME ENDWALL PER NCDOT STD. 838.80 (SEE DETAIL) 24'9 0 -RING RCP JA 26' .III —III —III — FILTER BLANKET (SEE NOTE) 24" OUTLET BARREL VELOCITY DISSIPATOR N.T.S. 4" x 4" 8/8 WELDED IRE g" MIN. WALL 4" x 4" 6/6 WELDED FABRIC (EACH SLED & i0P OF THICKNESS WIRE FABRIC CAGE) (EACH SIDE & TOP OF CAGE) CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT 18" (iYP) AND STAINLESS STEEL HARDWARE 2.03' 2 LF Q o 3' (TYP.)� 8" 0 DIP 2.00' 8" PLUG VALVE. VALVE e ° SHALL BE A M 820 18" (TYPJ .4 X- CENTRIC VALVE S OR E OR 8 ENGINEER APPROVED EQUAL 4" ANCHOR DEPT ° THIS VALVE SHALL BE IN CONTRACTOR SHALL LL ° ACCORDANCE WITH AWWA RILL INTO PRECAST C -504 SEC. 5.5, AND SHA D EXTENDED BASE AND ° ° ° BE OPERABLE FROM TOP OF 117 OUTLET STRUCTURE VIA A SET ANCHORS USING 8 "m OIP GRAIN PIPE HANDWHEEL. EPDXY GROUT (CENTER TO CONTRACTOR SHALL CORE -DRILL CENTER) THE HOLE FOR THE 8 "0 DIP IN THE FIELD. PRECASTER SHALL g8 REBAR PERIMETER FRAME — OMIT REINFORCEMENT IN THIS AREA. SECTION A A 27' LAYER OF CLASS "2' RIP -RAP (SEE CHART ABOVE FOR CLASS AND II THICKNESS) CONTRACTOR SHALL CORE -DRILL FILTER BLANKET SECTION A A 2 LF 8 "m DIP CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT ^a AND STAINLESS STEEL HARDWARE 8"o EMERGENCY DIP DRAIN TRASHRACK DETAILS N.T.S. S "O DIP DRAIN PIPE 1.17' CONTRACTOR SHALL CORE -DRILL (CENTER TO p ° " THE HOLE FOR THE S "O DIP IN CENTER) D z THE FIELD. PRECASTER SHALL OMIT REINFORCEMENT IN MI5 a O O AREA O O O PLAN " MIN. WALL B" PLUG VALVE. THE VALVE CKNES SHALL BE A M &H STYLE 820 9 O = es m <^ C n z X- CENTRIC VALVE OR W ..1 �, I m 2 °Gy M` �.Z -I c0mx m M / APPROVED EQUAL. MIS VALVE SHALL BE IN ACCORDANCE L "9Eh _L + } 11 -1 pJN.. < WT AWWA C -504 SEC. 5.5, DDr o 1TI o 3 y a a °W'm ZJ AND SHALL BE OPERABLE a�cnox ao ELEVATION y y m a N W m = LU G .°}., W p ? w Z Z oa v sae poi 6THI FROM TOP OF OUTLET s3e.oi STRUCTURE VIA A HANDWHEEL. El 2 LF 8 "m DIP CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT ^a AND STAINLESS STEEL HARDWARE 8"o EMERGENCY DIP DRAIN TRASHRACK DETAILS N.T.S. 2424oOLMZr ENDWALL DETMSENDWALL DETMS N.T.S. 1' THICK JOINT ° FILLER MATERIAL ..I a 24'0 0 -RING RCP FLOW 24'fl O-RING RCP I FLOW ,1 .. i I L I }/ 1" RUCK JOINT 1' THICK JOINT FILLER MATERIAL ! FILLER MATERIAL CONCRETE J CONCRETE ANTI - FLOTATION J ANTI- FLOTATION BLOCK BLOCK CITY OF RALEIGH All Construction must be in accordance with all Local, State, and Federol Rules and Regulations TRANSPORTATION SERVICES PUBLIC UTILITIES PLANNING FIRE URBAN FORESTRY 1 4'-0" RISER BARREL CONNECTION DETAIL N.T.S. DU a 2'-7.5" 24'0 O -RING RCP xy p ° " p iZ D z O O O a O O O O O PLAN O O 9 O = es m <^ C n z 1xr c° ,T v ax°U DOWEL 0 BAR -'X" ENO ELEVATION c " N' W ..1 �, I m 2 °Gy M` �.Z -I c0mx m M / y> °GO. a°, LU � J 6 a L "9Eh _L + } 11 -1 pJN.. < DDr o 1TI o 3 y a a °W'm ZJ m C O E p z m W 2 9 F y n m M a�cnox ao ELEVATION y y m a N W m = LU G .°}., W p ? w Z Z oa v sae poi s3e.oi 2424oOLMZr ENDWALL DETMSENDWALL DETMS N.T.S. 1' THICK JOINT ° FILLER MATERIAL ..I a 24'0 0 -RING RCP FLOW 24'fl O-RING RCP I FLOW ,1 .. i I L I }/ 1" RUCK JOINT 1' THICK JOINT FILLER MATERIAL ! FILLER MATERIAL CONCRETE J CONCRETE ANTI - FLOTATION J ANTI- FLOTATION BLOCK BLOCK CITY OF RALEIGH All Construction must be in accordance with all Local, State, and Federol Rules and Regulations TRANSPORTATION SERVICES PUBLIC UTILITIES PLANNING FIRE URBAN FORESTRY 1 4'-0" RISER BARREL CONNECTION DETAIL N.T.S. ENDWALL PER NCDOT STO. 838.8 MODIFIED TO ACCOMODATE 4" WEEPH OLES (SEE DETAIL) NOTE: 4' WEEPHOLES TO BE PROVIDED W H VARMINT GUARD ON DOWNSTREAM S10E PND GALVANIZED HARDWARE CLOTH ON UPSTREAM SIDE (Y' MAXIMUM OPENINGS) NO ALL PER CDOT STD. 838.80 ;EE DETAIL) ENDWALL PER NCOOT STD 838.80 (SEE DETAIL) PROLES ON EACH SIDE OF 4'9 WEEPHOLE PIPES SHALL BE TED THROUGH THE SPILLWAY FILTER JO OUTSIDE THE SPILLWAY FILTER. ...,SHED STONE ENCASED IN NON -WOVEN GEOTEXTILE FABRIC (MIRAR 18ON OR EQUIVALENT). NON -WOVEN GEOTEXTILE FABRIC OVERLAP TO BE A MINIMUM 2' IN THE nn—TS F°n, n "FrTION N0. 67 WASHED STONE ENCASED IN NON -WOVEN GEOTEXTILE FABRIC ( MIRAFl 180N OR EQUIVALENT) F-� 3 \ O 24'0 0 -RING RCP _ 67.5° JoJoJo � oJoJ `NO. 67 WASHED STONE ENCASED IN NON -WOVEN GEOTEXTILE FABRIC ( MIRAFl 18ON OR EQUIVALENT) 24" RCP SPILLWAY FILTER DETA L N.T.S. 4 "0 WEEPHOLES ON EACH SIDE OF SPILLWAY - INVERTS OF 4 "0 WEEPHOLES TO BE PLACED w2" ABOVE INVERT OF 24" RCP 4 "0 WEEPHOLE PIPES SHALL BE PERFORATED THROUGH THE SPILLWAY FILTER AND SCUD OUTSIDE THE SPILLWAY FILTER PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION a F �I z O a a°']ti W z aA E- a m � a � w m w z C7 W GARp o SEAL = 031452 = y 2. z O ti a Q d X a m d CV W0. Sze" k7 54 �BWG 00 � µ� q W O E O � 04 W � O w G� O �+ �0 t7 Qi ° DDV 12000 e DDV12000 -SW DESIGNED BY: JF DEA­ BY JF N TS 05 -03 -2012 EFT °. SW -3 McADAMS 2'-7.5" 24'0 O -RING RCP G O O O O O I� �I O O O O O b O O O 0 ENDWALL PER NCDOT STO. 838.8 MODIFIED TO ACCOMODATE 4" WEEPH OLES (SEE DETAIL) NOTE: 4' WEEPHOLES TO BE PROVIDED W H VARMINT GUARD ON DOWNSTREAM S10E PND GALVANIZED HARDWARE CLOTH ON UPSTREAM SIDE (Y' MAXIMUM OPENINGS) NO ALL PER CDOT STD. 838.80 ;EE DETAIL) ENDWALL PER NCOOT STD 838.80 (SEE DETAIL) PROLES ON EACH SIDE OF 4'9 WEEPHOLE PIPES SHALL BE TED THROUGH THE SPILLWAY FILTER JO OUTSIDE THE SPILLWAY FILTER. ...,SHED STONE ENCASED IN NON -WOVEN GEOTEXTILE FABRIC (MIRAR 18ON OR EQUIVALENT). NON -WOVEN GEOTEXTILE FABRIC OVERLAP TO BE A MINIMUM 2' IN THE nn—TS F°n, n "FrTION N0. 67 WASHED STONE ENCASED IN NON -WOVEN GEOTEXTILE FABRIC ( MIRAFl 180N OR EQUIVALENT) F-� 3 \ O 24'0 0 -RING RCP _ 67.5° JoJoJo � oJoJ `NO. 67 WASHED STONE ENCASED IN NON -WOVEN GEOTEXTILE FABRIC ( MIRAFl 18ON OR EQUIVALENT) 24" RCP SPILLWAY FILTER DETA L N.T.S. 4 "0 WEEPHOLES ON EACH SIDE OF SPILLWAY - INVERTS OF 4 "0 WEEPHOLES TO BE PLACED w2" ABOVE INVERT OF 24" RCP 4 "0 WEEPHOLE PIPES SHALL BE PERFORATED THROUGH THE SPILLWAY FILTER AND SCUD OUTSIDE THE SPILLWAY FILTER PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION a F �I z O a a°']ti W z aA E- a m � a � w m w z C7 W GARp o SEAL = 031452 = y 2. z O ti a Q d X a m d CV W0. Sze" k7 54 �BWG 00 � µ� q W O E O � 04 W � O w G� O �+ �0 t7 Qi ° DDV 12000 e DDV12000 -SW DESIGNED BY: JF DEA­ BY JF N TS 05 -03 -2012 EFT °. SW -3 McADAMS 4 "9 PVC SIPHON INV. EL. = 201.00 4" PVC CAP WITH SCREW TYPE PLUG TOP EL. = 201.00 PVC SIPHON I.0 INVERT ERT EL. = 201.00 - 12 INVERT THROUGH RISER EL. = 200.00 2" 12" BOTTOM EL. - 199.00 4" PVC SIPHON I J RISER OUTLET STRUCTURE T PROPOSED GRADE 12" MIN. ° ' CONCRETE ANTI - FLOTATION BLOCK TOP OF CHANNEL SIPHON 01U1 P DETAIL N.T.S. i� CONTRACTOR SHALL UNE THE BYPASS CHANNEL WITH NORTH AMERICAN GREEN SC250 PERMANENT TURF MATING (OR APPROVED EQUAL). THE UNER SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. 5' (MIN.) CONTRACTOR SHALL TRENCH THE LINER INTO THE GROUND A MINIMUM OF 12 ". THE TRENCH SHALL THEN BE 8 CKFlLLED AND COMPACTED. EMERGENCY SPILLWAY DETAM N.T.S. NOTES: I. ALL PE BARS(U -BARS) ARE g3 (AS LABELED) REBAR(GRADE 60) SPACED AT 10 FT. CENTER TO CENTER ALONG THE LENGTH OF THE CRADLE. 2. MAINTAIN A MIN. COVER OF 3" OF CONCRETE (TO THE OUTSIDE OF THE REBAR) FOR ALL REINFORCEMENT. 3. TRENCH TO BE BACKFILLED IN 4" LOOSE LIFTS PRIOR i0 COMPACTION MEN COMPACTION IS BY MANUALLY OPERATED OR LIGHT EQUIPMENT. BACKFILL IS IN 8" LOOSE LIFTS PRIOR TO COMPACTION WHEN CONDUCTED BY HEAVY EQUIPMENT. MINIMUM OF 2 FEET COVER MUST BE PRESENT ON 24 "0 RCP BEFORE DRIVING OVER WITH HEAVY EQUIPMENT. 4. ANY DEMATION FROM THIS DETAIL SHALL BE SUBMITTED TO AND REVIEWED BY THE AP NOTES; O [N6T ALL STEPS PROTRUDING 4 PIXe [NAIOE FADE OF STRJCTURE 4� PS DIFFERING IN DIMENSIDNB, GOpFIGURATIUN DR MATERIALS FAOMATFgSE SHOWN T MAY ALSO BE USED PROVIDED THE GONTRAGTOfl HAS FURNISHED �a Q THE ENGINEE0. WITH DETAILS OF THE 90POSED STEP9 AND HAS RECEIVED WRITTEN PROVAL FROM THE N6]NEER FOR THE IISF OF SUCH STEPS.' DN Z 2CeU o�pom � _ ur�FOa �c�HT a tnroo� Dye y PLAN. L�SIOE PLAN SIDE ELEVATION ELEVATION W N � LL.r CAST IRO CAST IRON z N T 0 ELEVATION ELEVATION � W mr„ ¢¢ H D o 7 9 ➢ �. as M i L I a o RJt H73" GA DAR DR o R xfWs PObY NorrLENE "Z -1 .PLAN SI ➢E P TI' y x �,.'• _ELEVATION PLAN ELEVAT ION G "'~ l..!_l.i_LLl�� PEIflFORGING GTEEL ELEVATION mrs; S3EEFRPO'� SECTION A A ELEVATION SANIT ARY MAINTENANCE ACCESS STEPS N.T.S. DESIGN ENGINEER PRIOR TO IMPLEMENTATION. 5. SUPPORT BLOCKS /CHAIRS SHOULD NOT BE LOCATED AT PIPE JOINTS. RATHER, SUPPORT BLOCKS /CHAIRS SHOULD BE PLACED NO CLOSER THAN 2' FROM JOINTS i0 ALLOW FREE FLOW OF CONCRETE AROUND JOINTS. fi 7.5" MIN. BARREL PIPE CONCRETE CRADLE rnucmllrnnN ccnl lcurc 1. IF OPTION A IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE (SEE DETAIL SHEET SW-1A), THEN BRING GRADE OF DAM EMBANKMENT TO SPRINGUNE OF PIPE ELEVATION. IF OPTION B IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE (SEE DETAIL SHEET SW -1A), THEN CONSTRUCT FORMWORK FOR CONCRETE CRADLE ON EXISTING GRADE. 2. IF OPTION A IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE (SEE DETAIL SHEET SW-IA). THEN EXCAVATE TRENCH FOR CRADLE AND BARREL PER DIMENSIONS ON DRAWINGS. IF OPTION B IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE (SEE DETAIL SHEET SW -1 A), PROCEED TO STEP 3 BELOW. 3. PLACE REINFORCING STEEL AND JOINT FILLER MATERIAL PER DRAWINGS. ALL REINFORCING STEEL SHALL HAVE A MINIMUM OF 3" OF CONCRETE COVER (INCLUDING TIES). 4. PLACE BARREL PIPE ON CONCRETE BLOCKS TO GRADE. CONTRACTOR SHALL WRAP EXPOSED PORTIONS OF JOINTS PoTIH 2 -FT WIDE STRIPS OF FABRIC AT THIS STEP. 5. POUR CONCRETE CRADLE ON PREPARED SUBGRADE APPROVED BY CEOTECHNICAL ENGINEER. CONCRETE SHALL FILL ENTIRE AREA UNDER PIPE AND PIPE HAUNCHES AS TO LEAVE NO VOIDS UNDER ME PIPE. POUR ENTIRE CRADLE AS ONE LIFT (VERTICALLY) PER ORAPoNGS. 6. ALLOW CRADLE TO CURE FOR A MINIMUM OF 7 DAYS OR AS INDICATED BY GEOTECHNICAL ENGINEER BEFORE ANY VIBRATING COMPACTION EQUIPMENT IS USED IN THE VICINITY OF THE BARREL PIPE. _/)6 REBAR (GRADE 60) _ # 3 REBAR TIES (U -BARS) SPACED AT 10 Ff. ON CENTER 18" C/C (T1P.) Z11 _ 3• TO CqrTER OF C/C 5. (TY94" P.) 3" COVER (MIN.) TO OUTSIDE OF d3 TIE BAR (i1P.) TEMPORARY SEEDING SCHEDULE t (MIN.) OF CRADLE REBAR 24" CONCRETE CRADLE DETAIL N.T.S. SEEDING GATE SEEDING MIXTURE APPLICATION RATE JAN I -MAY 1 RYE (GRAIN) 120 LEIS /AC KOBE LESPEDEZA 50 LBS /AC MAY 1 -AUG 15 GERMAN MILLET 40 LEIS/AC AUG 15 -DEC 30 RYE (GRAIN) 120 LBS /AC SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB /AC GROUND AGRICULTURE LIMESTONE AND 750 LB /AC 10 -10 -10 FERTILIZER (FROM AUG 15 -DEC 30, INCREASE 10 -10 -10 FERTILIZER i0 1000 LB /AC). MULCH APPLY 4000 LB /AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE JAN I -AUG I5: REFERTIU ZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTIUZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. AUG 15 -DEC 30: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS PoTH 50 LEI /AC OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB /AC KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. NOTE: USE THE TEMPORARY SEEDING SCHEDULE ONLY WHEN GATE IS NOT CORRECT TO USE THE PERMANENT SEEDING SCHEDULE. PERMANENT SEEDING SCHEDULE (DAM EMBANKMEN SEEDING GATE SEEDING MIXTURE APPLICATION RATE AUG 25 - OCT (BEST) TALL FESCUE 200 LBS /AC FEB -APR IS (POSSIBLE) SOIL PMENOMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 4,000 LB /AC GROUND AGRICULTURE LIMESTONE AND 1000 LEI /AC 10 -10 -10 FERTIU ZER. MULCH APPLY 4000 LB /AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. AINTFNWN INSPECT AND REPAIR MULCH FREQUENTLY. REFERTILIZE IN LATE WINTER OF THE FOLLOWING YEAR; USE SOIL TESTS OR APPLY 150 LB /AC 10 -10 -10 FERTILIZER. MOW REGULARLY i0 A HEIGHT OF 2 -4 INCHES. HQ¢L PERMANENT SEEDING SCHEDULE IS FOR SLOPES OF THE BASIN, TOP OF BERM, AND RIPARIAN /UPLAND SEED MIX BASIN FLOOR. BARREL PIPE CRADLE MATERIAL SPECIFICATIONS rnuracrc • COMPRESSIVE STRENGTH OF 3500 PSI AT 28 DAYS • APPROVED MIX DESIGN • 4 -6% AIR ENTRAINED • MAXIMUM MIX TO POUR TIME OF 90 MINUTES • FOUR CYLINDERS SHALL BE PREPARED FOR TESTING FOR EACH UFT. ONE SHALL BE TESTED AT SEVEN DAYS, TWO AT 28 DAYS, AND THE FOURTH SHALL BE HELD FOR 56 DAYS. • A MINIMUM OF 3" OF CONCRETE COVER ON ALL STEEL IS REQUIRED (INCLUDING TIES). • CONCRETE TO BE VIBRATED VERTICALLY. WET CONCRETE SHALL NOT BE MOVED HORIZONTALLY WITH THE VIBRATOR. SJEEL • ALL STEEL TO BE GRADE 60. • ALL STEEL SHALL BE FREE OF RUST OR OTHER DEBRIS THAT MIGHT PREVENT BONDING TO THE CONCRETE. • ALL STEEL SHALL BE BENT WTH A MINIMUM RADIUS OF 3DB (1.13" FOR /3) AS SHONN ON THE DRAWINGS. • THE /6 BARS IN THE CONCRETE CRADLE SHALL BE SPUCED WITH A MINIMUM OVERLAP OF 32 ". THE SPLICES SHALL BE SPACED SUCH THAT NO TWO SPUCES OCCUR WTHIN THE SAME LENGTH OF PIPE. SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. PER ONE TIME ONLY, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL. 5. CONTINUE PELAGE UNTIL AWELL- PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. B. INSPECT ALL SEEDED AREAS AND CITY OF RALEIGH All Construction must be in accordance with all Local, State, and Federal Rules and Regulations TRANSPORTATION SERVICES PUBLIC UTILITIES FIRE URBAN FORESTRY MARE NECESSARY REPAIRS OR RESEEOINGS VA R11N THE PLANTING SEASON, IF POSSIBLE. AFTER PERMANENT COVER IS ESTABLISHED. 9. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT PLANTING INSTRUCTIONS PLANTING TECHNIO0UE3 A Insure that r [s once Oved from ore straightened and face downward. pot, 9 B Create planting a for each loot. and a vote 't C Place pints pit insuring roots are facing completely downward. 0. Heel in soil Orouond plant and proceed to next pldnt'ng location. E Newly planted p loots need to he fastenetl to the Substrate far the establishment of new roots F Roots shall be spread in then nOrrn01 position. All broken or frayed roots hall be cut off clean' y. C The dameler of the p'ts for all vegetc t've stock shall be at least three t'mes the ON Ometer of the root mass Plan[ pit wall shall be star fed prior to plant 'nstcllal'an H Set the plants upright, in the center of the pit. The bottom of the root mass should be resting on undisturbed soil. I. Place the hackfll arountl the hose and s'tles of the root mass and work each layer lD settle hackfll antl to eliminate va tls and IF pockets When pit s motel 2/3 full water thoroughly before ma ntler of the backf ll Walerx again after placing foal layer f ackf ll placing re J. Broken or damaged parts will be <u[ back to undamaged tssue ledv'ng a s much green basal Issue as pass ble above the roots If more than fifty percent (50%) of the plant is damaged then contractor shall replace the plant CONTAINER STOCK /BARE RDOT A Slack shall have keen grown n a onto ner long enough far the root system to have developed sufficiently to hold its Sol I together once removed from the on tt'ner. B Canto ner plants will need to he watered regularly and placed in shady cond tons unt'I plan t occur' C. Bare root plOnfs are for immediate plant ng otherwise see D) below. D If bare roots spec mens are at to he plantetl within four (4) days temporary holding OF bare root spec mens are [0 be tOVered entirely by a su' tab le med um (etc sal sewtlust, mulch or the Ike) and watered regularly s0 as to not dry out PLANT LOCATIONS A New plantings shall be locatetl where shown on plan except where changes have been made n proposed construction B . Necessary edystments shall be tle only after appravtl by the owner Or the owners representat ve PSI Wo�leEr@shcll be potable and shall not contain tlements toic to plant life. a F z ^d z i••1 � � Q � x O a O O � 4. GO D a � w m W Z C7 W _ :4 SEAL'• _ 031452 _ rri z O N a Q N X -+ a m d N W 0. � saw`" wzww v]LT�anµWj � U q W O O � W � z O W � W �a� A O OR PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION x w ° DDV 12000 e DDV12000 -SW JF JF N TS 05 -03 -2012 eHTN °. SW -4 McADAMS G R 840 •66 � RVSEWEi N4+HOLES. �84Q.66 AP NOTES; O [N6T ALL STEPS PROTRUDING 4 PIXe [NAIOE FADE OF STRJCTURE 4� PS DIFFERING IN DIMENSIDNB, GOpFIGURATIUN DR MATERIALS FAOMATFgSE SHOWN T MAY ALSO BE USED PROVIDED THE GONTRAGTOfl HAS FURNISHED �a Q THE ENGINEE0. WITH DETAILS OF THE 90POSED STEP9 AND HAS RECEIVED WRITTEN PROVAL FROM THE N6]NEER FOR THE IISF OF SUCH STEPS.' DN Z 2CeU o�pom � _ ur�FOa �c�HT a tnroo� Dye y PLAN. L�SIOE PLAN SIDE ELEVATION ELEVATION W N � LL.r CAST IRO CAST IRON z N T 0 ELEVATION ELEVATION � W mr„ ¢¢ H D o 7 9 ➢ �. as M i L I a o RJt H73" GA DAR DR o R xfWs PObY NorrLENE "Z -1 .PLAN SI ➢E P TI' y x �,.'• _ELEVATION PLAN ELEVAT ION G "'~ l..!_l.i_LLl�� PEIflFORGING GTEEL ELEVATION mrs; S3EEFRPO'� SECTION A A ELEVATION SANIT ARY MAINTENANCE ACCESS STEPS N.T.S. DESIGN ENGINEER PRIOR TO IMPLEMENTATION. 5. SUPPORT BLOCKS /CHAIRS SHOULD NOT BE LOCATED AT PIPE JOINTS. RATHER, SUPPORT BLOCKS /CHAIRS SHOULD BE PLACED NO CLOSER THAN 2' FROM JOINTS i0 ALLOW FREE FLOW OF CONCRETE AROUND JOINTS. fi 7.5" MIN. BARREL PIPE CONCRETE CRADLE rnucmllrnnN ccnl lcurc 1. IF OPTION A IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE (SEE DETAIL SHEET SW-1A), THEN BRING GRADE OF DAM EMBANKMENT TO SPRINGUNE OF PIPE ELEVATION. IF OPTION B IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE (SEE DETAIL SHEET SW -1A), THEN CONSTRUCT FORMWORK FOR CONCRETE CRADLE ON EXISTING GRADE. 2. IF OPTION A IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE (SEE DETAIL SHEET SW-IA). THEN EXCAVATE TRENCH FOR CRADLE AND BARREL PER DIMENSIONS ON DRAWINGS. IF OPTION B IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE (SEE DETAIL SHEET SW -1 A), PROCEED TO STEP 3 BELOW. 3. PLACE REINFORCING STEEL AND JOINT FILLER MATERIAL PER DRAWINGS. ALL REINFORCING STEEL SHALL HAVE A MINIMUM OF 3" OF CONCRETE COVER (INCLUDING TIES). 4. PLACE BARREL PIPE ON CONCRETE BLOCKS TO GRADE. CONTRACTOR SHALL WRAP EXPOSED PORTIONS OF JOINTS PoTIH 2 -FT WIDE STRIPS OF FABRIC AT THIS STEP. 5. POUR CONCRETE CRADLE ON PREPARED SUBGRADE APPROVED BY CEOTECHNICAL ENGINEER. CONCRETE SHALL FILL ENTIRE AREA UNDER PIPE AND PIPE HAUNCHES AS TO LEAVE NO VOIDS UNDER ME PIPE. POUR ENTIRE CRADLE AS ONE LIFT (VERTICALLY) PER ORAPoNGS. 6. ALLOW CRADLE TO CURE FOR A MINIMUM OF 7 DAYS OR AS INDICATED BY GEOTECHNICAL ENGINEER BEFORE ANY VIBRATING COMPACTION EQUIPMENT IS USED IN THE VICINITY OF THE BARREL PIPE. _/)6 REBAR (GRADE 60) _ # 3 REBAR TIES (U -BARS) SPACED AT 10 Ff. ON CENTER 18" C/C (T1P.) Z11 _ 3• TO CqrTER OF C/C 5. (TY94" P.) 3" COVER (MIN.) TO OUTSIDE OF d3 TIE BAR (i1P.) TEMPORARY SEEDING SCHEDULE t (MIN.) OF CRADLE REBAR 24" CONCRETE CRADLE DETAIL N.T.S. SEEDING GATE SEEDING MIXTURE APPLICATION RATE JAN I -MAY 1 RYE (GRAIN) 120 LEIS /AC KOBE LESPEDEZA 50 LBS /AC MAY 1 -AUG 15 GERMAN MILLET 40 LEIS/AC AUG 15 -DEC 30 RYE (GRAIN) 120 LBS /AC SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB /AC GROUND AGRICULTURE LIMESTONE AND 750 LB /AC 10 -10 -10 FERTILIZER (FROM AUG 15 -DEC 30, INCREASE 10 -10 -10 FERTILIZER i0 1000 LB /AC). MULCH APPLY 4000 LB /AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE JAN I -AUG I5: REFERTIU ZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTIUZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. AUG 15 -DEC 30: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS PoTH 50 LEI /AC OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB /AC KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. NOTE: USE THE TEMPORARY SEEDING SCHEDULE ONLY WHEN GATE IS NOT CORRECT TO USE THE PERMANENT SEEDING SCHEDULE. PERMANENT SEEDING SCHEDULE (DAM EMBANKMEN SEEDING GATE SEEDING MIXTURE APPLICATION RATE AUG 25 - OCT (BEST) TALL FESCUE 200 LBS /AC FEB -APR IS (POSSIBLE) SOIL PMENOMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 4,000 LB /AC GROUND AGRICULTURE LIMESTONE AND 1000 LEI /AC 10 -10 -10 FERTIU ZER. MULCH APPLY 4000 LB /AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. AINTFNWN INSPECT AND REPAIR MULCH FREQUENTLY. REFERTILIZE IN LATE WINTER OF THE FOLLOWING YEAR; USE SOIL TESTS OR APPLY 150 LB /AC 10 -10 -10 FERTILIZER. MOW REGULARLY i0 A HEIGHT OF 2 -4 INCHES. HQ¢L PERMANENT SEEDING SCHEDULE IS FOR SLOPES OF THE BASIN, TOP OF BERM, AND RIPARIAN /UPLAND SEED MIX BASIN FLOOR. BARREL PIPE CRADLE MATERIAL SPECIFICATIONS rnuracrc • COMPRESSIVE STRENGTH OF 3500 PSI AT 28 DAYS • APPROVED MIX DESIGN • 4 -6% AIR ENTRAINED • MAXIMUM MIX TO POUR TIME OF 90 MINUTES • FOUR CYLINDERS SHALL BE PREPARED FOR TESTING FOR EACH UFT. ONE SHALL BE TESTED AT SEVEN DAYS, TWO AT 28 DAYS, AND THE FOURTH SHALL BE HELD FOR 56 DAYS. • A MINIMUM OF 3" OF CONCRETE COVER ON ALL STEEL IS REQUIRED (INCLUDING TIES). • CONCRETE TO BE VIBRATED VERTICALLY. WET CONCRETE SHALL NOT BE MOVED HORIZONTALLY WITH THE VIBRATOR. SJEEL • ALL STEEL TO BE GRADE 60. • ALL STEEL SHALL BE FREE OF RUST OR OTHER DEBRIS THAT MIGHT PREVENT BONDING TO THE CONCRETE. • ALL STEEL SHALL BE BENT WTH A MINIMUM RADIUS OF 3DB (1.13" FOR /3) AS SHONN ON THE DRAWINGS. • THE /6 BARS IN THE CONCRETE CRADLE SHALL BE SPUCED WITH A MINIMUM OVERLAP OF 32 ". THE SPLICES SHALL BE SPACED SUCH THAT NO TWO SPUCES OCCUR WTHIN THE SAME LENGTH OF PIPE. SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. PER ONE TIME ONLY, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL. 5. CONTINUE PELAGE UNTIL AWELL- PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. B. INSPECT ALL SEEDED AREAS AND CITY OF RALEIGH All Construction must be in accordance with all Local, State, and Federal Rules and Regulations TRANSPORTATION SERVICES PUBLIC UTILITIES FIRE URBAN FORESTRY MARE NECESSARY REPAIRS OR RESEEOINGS VA R11N THE PLANTING SEASON, IF POSSIBLE. AFTER PERMANENT COVER IS ESTABLISHED. 9. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT PLANTING INSTRUCTIONS PLANTING TECHNIO0UE3 A Insure that r [s once Oved from ore straightened and face downward. pot, 9 B Create planting a for each loot. and a vote 't C Place pints pit insuring roots are facing completely downward. 0. Heel in soil Orouond plant and proceed to next pldnt'ng location. E Newly planted p loots need to he fastenetl to the Substrate far the establishment of new roots F Roots shall be spread in then nOrrn01 position. All broken or frayed roots hall be cut off clean' y. C The dameler of the p'ts for all vegetc t've stock shall be at least three t'mes the ON Ometer of the root mass Plan[ pit wall shall be star fed prior to plant 'nstcllal'an H Set the plants upright, in the center of the pit. The bottom of the root mass should be resting on undisturbed soil. I. Place the hackfll arountl the hose and s'tles of the root mass and work each layer lD settle hackfll antl to eliminate va tls and IF pockets When pit s motel 2/3 full water thoroughly before ma ntler of the backf ll Walerx again after placing foal layer f ackf ll placing re J. Broken or damaged parts will be <u[ back to undamaged tssue ledv'ng a s much green basal Issue as pass ble above the roots If more than fifty percent (50%) of the plant is damaged then contractor shall replace the plant CONTAINER STOCK /BARE RDOT A Slack shall have keen grown n a onto ner long enough far the root system to have developed sufficiently to hold its Sol I together once removed from the on tt'ner. B Canto ner plants will need to he watered regularly and placed in shady cond tons unt'I plan t occur' C. Bare root plOnfs are for immediate plant ng otherwise see D) below. D If bare roots spec mens are at to he plantetl within four (4) days temporary holding OF bare root spec mens are [0 be tOVered entirely by a su' tab le med um (etc sal sewtlust, mulch or the Ike) and watered regularly s0 as to not dry out PLANT LOCATIONS A New plantings shall be locatetl where shown on plan except where changes have been made n proposed construction B . Necessary edystments shall be tle only after appravtl by the owner Or the owners representat ve PSI Wo�leEr@shcll be potable and shall not contain tlements toic to plant life. a F z ^d z i••1 � � Q � x O a O O � 4. GO D a � w m W Z C7 W _ :4 SEAL'• _ 031452 _ rri z O N a Q N X -+ a m d N W 0. � saw`" wzww v]LT�anµWj � U q W O O � W � z O W � W �a� A O OR PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION x w ° DDV 12000 e DDV12000 -SW JF JF N TS 05 -03 -2012 eHTN °. SW -4 McADAMS i i CITY OF RALEIGH All Construction must be in accordance with all Local, State, and Federal Rules and Regulations TRANSPORTATION SERVICES PUBLIC UTILITIES STORMWATER PLANNING FIRE URBAN FORESTRY — — — - - - - -/ /r _��—ham _ - -_ -- v IT / .1 i �� IF /i II I i i -i �fit�tl I -I 1 I� v STORMWATER WETLAND LANDSCAPE SPECIFICATIONS LEGEND OTY. SYM. SCIENTIFIC NAME COMMON NAME HATCH TYPE SPACING SHALLOW WATER yi N Z CITY OF RALEIGH All Construction must be in accordance with all Local, State, and Federal Rules and Regulations TRANSPORTATION SERVICES PUBLIC UTILITIES STORMWATER PLANNING FIRE URBAN FORESTRY — — — - - - - -/ /r _��—ham _ - -_ -- v IT / .1 i �� IF /i II I i i -i �fit�tl I -I 1 I� v STORMWATER WETLAND LANDSCAPE SPECIFICATIONS LEGEND OTY. SYM. SCIENTIFIC NAME COMMON NAME HATCH TYPE SPACING SHALLOW WATER SMIUAWATM WETLAND LANDSCAPE PLAN VIEW 1" = 40• SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. J. REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. PER ONE TIME ONLY, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL. 5. CONTINUE TILLAGE UNTIL A WELL— PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. AFTER PERMANENT COVER IS ESTABLISHED. 9. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT TEMPORARY SEEDING SCHEDULE SEEDING GATE SEEDING MIXTURE APPLICATION RATE JAN 1 — MAY 1 RYE (GRAIN) 120 IBS /AC KOBE LESPEDEZA 50 LBS /AC MAY 1 — AUG 15 GERMAN MILLET 40 LBS /AC AUG 15 — DEC 30 RYE (GRAIN) 120 LBS /AC SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB /AC GROUND AGRICULTURE LIMESTONE AND 750 LB /AC 10 -10 -10 FERTILIZER (FROM AUG 15 — DEC 30, INCREASE 10 -10 -10 FERTILIZER TO 1000 LB /AC). MULCH APPLY 4000 LB /AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE JAN 1 — AUG 15: REFERTIUZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFER ILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. AUG 15 — DEC 30: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB /AC OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WTH 50 LB /AC KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. NOTE; USE THE TEMPORARY SEEDING SCHEDULE ONLY WHEN DATE IS NOT CORRECT TO USE THE PERMANENT SEEDING SCHEDULE. PERMANENT SEEDING SCHEDULE (DAM EMBANKMENTS) SEEDING GATE SEEDING MIXTURE APPLICATION RATE AUG 25 — OCT (BEST) TALL FESCUE 200 LBS /AC FEE — APR 15 (POSSIBLE) SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 4,000 LB /AC GROUND AGRICULTURE LIMESTONE AND 1000 LB /AC 10 -10 -10 FERTILIZER. MULCH APPLY 4000 LB /AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. AINTFNA INSPECT AND REPAIR MULCH FREQUENTLY. REFERTILIZE IN LATE WINTER OF THE FOLLOWING YEAR; USE SOIL TESTS OR APPLY 150 LB /AC 10 -10 -10 FERTILIZER. MOW REGULARLY TO A HEIGHT OF 2 -4 INCHES. NOTE; PERMANENT SEEDING SCHEDULE IS FOR SLOPES OF THE BASIN, TOP OF BERM, AND BASIN FLOOR / L-- -- - - -- - -�' C- Av 9 \ GRAPHIC SCALE I ; j w0 o sb as e0 L inch = 40 ft. �r 7 PLANTING INSTRUCTIONS PLANTING TECHNIODES A. Insure that ... ts, once —d! from p.t, a straightened and face downward. B. Create planting area Torre each plant and exc rva to pit. C. Place plants in pit in ring roots a e facing completely downward. D. Heel in sail or ..antl plant and proceed to next planting location. E. Newly planted plants need to be fastened to the substrate for the establishment of new roots. F. Roots shall be spread in their normal position. All broken or fr.Ted roots hall be cut off cleanlya G. The diameter f the pits for all vegetative stock shall be at least three times the diameter of the root mass. Plant pit wall shall be scarified prior to plant instal latian. H. Set the plants upright, in the center of the pit. The bottom of the root mass should be r-tin' an undisturbed soil. I. Place the bockfll a round the base and sides of the root mass, and work each layer to settle backfill and to eliminate voids and air pockets. Men pit is approximately 2/3 full, water thoroughly before placing remainder of the baekfill. Water again after placing final layer of backfill. J. Broken or damaged parts will s be cut back to undamaged tissue, leaving a much green basal [issue as possible above the roots. If more than fifty percent (50 %) of the plant is damaged then contractor shall replace the plant. CONTAINER STOCK /BARE ROOT A. Stock shall have been grown in a t ontainer long enough for the root system to have d r eveloped sufci.ntly to hold its sail together once removed from the ontainer. B. Can plants will need to be watered regularly and placed in shady conditions until pllanling o o C. Bare t plant. are for immedio to planting, otherwise see D) below. 0. If bare roots specimens are not to be planted within four (4) days, temporary holding of bare root specimens are to be c vered entirely by a suitable medium (etc. soil, sawdust, mulch or the like) and watered regularly so as to not dry out. PLANT LOCATIONS A. New plantings shall be located where shown on plan ext<p[ where thang<s have been made m proposed hall be ad B. Necessary adjustments shall be made only after approval by the owner or the owners representative. Wo�te ErB shall be potable and shall not contain elements toxic to plant life. PRELIMINARY DRAWING — NOT RELEASED FOR CONSTRUCTION a F ^� z 0 a O C) a° ti W z atl a VA, w mW Z C7 z w OQ ,3NOSj?y'. i/� 1155* 0 a Q r d X -+ a m d Ca W0. 3.5 `" PA z W k � U q W O O � w � O w� A Z O� z �0 e 5 Qi ° DDV -12000 eNe. DDV12000 —LS DESIGNED BY: GB D—N BY GB N TS 05 -03 -2012 rl­SW -LS McADAMS 1056 IV IRIS VIRGINIANA BLUE FLAG IRIS 4" CONTAINER 24" O.C. 649 PC PONTEOERIA CORDATA PICKEREL WEED 4" CONTAINER 24 O.C. 895 SC SAURURUS CERNUS UZARD'S TAIL LLLLL LLLL 4" CONTAINER 24" O.C. 1601 ST SCHOENOPLECTUS SOFT —STEM BULRUSH 4" CONTAINER 24 O.C. TABERNAEMONTANI 440¢P4P 551 SL SAGITTARIA LANCIFOLIA BULLTONGUE ® 4" CONTAINER 24" O.C. SHALLOW LAND 639 AI ASCLEPIAS INCARNATE SWAMP MILKWEED 4" CONTAINER 24 O.C. 1058 LC LOBELIA CARDINALIS CARDINAL FLOWER 4' CONTAINER 24 O.C. 551 CT CAREX TENERA QUILL SEDGE ® 4" CONTAINER 24 O.C. 1253 EF EUPATORIADELPHUS JOE PYE WEED 4" CONTAINER 24 O.C. FISTULOSUS 1052 EM EUPATORIADELPHUS SPOTTED TRUMPETWEEO 4" CONTAINER 24" O.C. MACULATUS SMIUAWATM WETLAND LANDSCAPE PLAN VIEW 1" = 40• SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. J. REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. PER ONE TIME ONLY, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL. 5. CONTINUE TILLAGE UNTIL A WELL— PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. AFTER PERMANENT COVER IS ESTABLISHED. 9. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT TEMPORARY SEEDING SCHEDULE SEEDING GATE SEEDING MIXTURE APPLICATION RATE JAN 1 — MAY 1 RYE (GRAIN) 120 IBS /AC KOBE LESPEDEZA 50 LBS /AC MAY 1 — AUG 15 GERMAN MILLET 40 LBS /AC AUG 15 — DEC 30 RYE (GRAIN) 120 LBS /AC SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB /AC GROUND AGRICULTURE LIMESTONE AND 750 LB /AC 10 -10 -10 FERTILIZER (FROM AUG 15 — DEC 30, INCREASE 10 -10 -10 FERTILIZER TO 1000 LB /AC). MULCH APPLY 4000 LB /AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE JAN 1 — AUG 15: REFERTIUZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFER ILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. AUG 15 — DEC 30: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB /AC OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WTH 50 LB /AC KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. NOTE; USE THE TEMPORARY SEEDING SCHEDULE ONLY WHEN DATE IS NOT CORRECT TO USE THE PERMANENT SEEDING SCHEDULE. PERMANENT SEEDING SCHEDULE (DAM EMBANKMENTS) SEEDING GATE SEEDING MIXTURE APPLICATION RATE AUG 25 — OCT (BEST) TALL FESCUE 200 LBS /AC FEE — APR 15 (POSSIBLE) SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 4,000 LB /AC GROUND AGRICULTURE LIMESTONE AND 1000 LB /AC 10 -10 -10 FERTILIZER. MULCH APPLY 4000 LB /AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. AINTFNA INSPECT AND REPAIR MULCH FREQUENTLY. REFERTILIZE IN LATE WINTER OF THE FOLLOWING YEAR; USE SOIL TESTS OR APPLY 150 LB /AC 10 -10 -10 FERTILIZER. MOW REGULARLY TO A HEIGHT OF 2 -4 INCHES. NOTE; PERMANENT SEEDING SCHEDULE IS FOR SLOPES OF THE BASIN, TOP OF BERM, AND BASIN FLOOR / L-- -- - - -- - -�' C- Av 9 \ GRAPHIC SCALE I ; j w0 o sb as e0 L inch = 40 ft. �r 7 PLANTING INSTRUCTIONS PLANTING TECHNIODES A. Insure that ... ts, once —d! from p.t, a straightened and face downward. B. Create planting area Torre each plant and exc rva to pit. C. Place plants in pit in ring roots a e facing completely downward. D. Heel in sail or ..antl plant and proceed to next planting location. E. Newly planted plants need to be fastened to the substrate for the establishment of new roots. F. Roots shall be spread in their normal position. All broken or fr.Ted roots hall be cut off cleanlya G. The diameter f the pits for all vegetative stock shall be at least three times the diameter of the root mass. Plant pit wall shall be scarified prior to plant instal latian. H. Set the plants upright, in the center of the pit. The bottom of the root mass should be r-tin' an undisturbed soil. I. Place the bockfll a round the base and sides of the root mass, and work each layer to settle backfill and to eliminate voids and air pockets. Men pit is approximately 2/3 full, water thoroughly before placing remainder of the baekfill. Water again after placing final layer of backfill. J. Broken or damaged parts will s be cut back to undamaged tissue, leaving a much green basal [issue as possible above the roots. If more than fifty percent (50 %) of the plant is damaged then contractor shall replace the plant. CONTAINER STOCK /BARE ROOT A. Stock shall have been grown in a t ontainer long enough for the root system to have d r eveloped sufci.ntly to hold its sail together once removed from the ontainer. B. Can plants will need to be watered regularly and placed in shady conditions until pllanling o o C. Bare t plant. are for immedio to planting, otherwise see D) below. 0. If bare roots specimens are not to be planted within four (4) days, temporary holding of bare root specimens are to be c vered entirely by a suitable medium (etc. soil, sawdust, mulch or the like) and watered regularly so as to not dry out. PLANT LOCATIONS A. New plantings shall be located where shown on plan ext<p[ where thang<s have been made m proposed hall be ad B. Necessary adjustments shall be made only after approval by the owner or the owners representative. Wo�te ErB shall be potable and shall not contain elements toxic to plant life. PRELIMINARY DRAWING — NOT RELEASED FOR CONSTRUCTION a F ^� z 0 a O C) a° ti W z atl a VA, w mW Z C7 z w OQ ,3NOSj?y'. i/� 1155* 0 a Q r d X -+ a m d Ca W0. 3.5 `" PA z W k � U q W O O � w � O w� A Z O� z �0 e 5 Qi ° DDV -12000 eNe. DDV12000 —LS DESIGNED BY: GB D—N BY GB N TS 05 -03 -2012 rl­SW -LS McADAMS