Loading...
HomeMy WebLinkAbout20120626 Ver 1_Approval Letter_20120719NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Waktld P E Governor Director July 19 2012 USFS Brady Dodd 160 A Zillicoa St Asheville NC 28801 Subject 401 Water Quality Certification - Approval Boone Fork Stream Rehabilitation DWQ Project # 12 0626 Caldwell County CTB / Boone Frk and UTs / 11 38 32 12 / B, HQW Dear Mr Dodd Dee Freeman Secretary The Division of Water Quality has completed the review of your 401 Water Quality Certification application associated with the subject project listed above Approval has been granted to place fill within or otherwise impact 778 feet of streams for the purpose of stream rehabilitation at the subject property This approval requires you to follow the conditions listed in the attached Certification and any additional conditions listed below Protect impacts are covered by General Water Quality Certification Number 3885 This Certification allows you to use Nationwide Permit 27 when issued by the US Army Corps of Engineers ( USACE) Authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the corresponding USACE Permit Verification In addition you should obtain or otherwise comply with any other required federal, state or local permits before you proceed with your project including (but not limited to) Erosion and Sediment Control regulations This approval is for the purpose and design that you described in your application If you change your project you must notify us and may be required to submit a new application Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification are met No other impacts are approved including incidental impacts Location 2090 U S Highway 70 Swannanoa North Carolina 28778 Phone 828 296415001 FAX 828 299 7043 Internet www ncwaterqualrty org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Ngtu&4 Amount Approved nits Plan Location or Reference Stream 60 (feet) S 1 UT Stream 150 (feet) S2 UT Stream 10 feet S3 UT Location 2090 U S Highway 70 Swannanoa North Carolina 28778 Phone 828 296415001 FAX 828 299 7043 Internet www ncwaterqualrty org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Ngtu&4 USFS Brady Dodd July 19 2012 Page 2 of 2 Stream 528 (feet) S4 Boone Frk Stream 30 feet S5 Deep Cove Crk T Additional Condition 1 Stream/Structure Stabdity Monitoring Upon completion of construction activities, as built drawings shall be developed along with photo documentation of the project Monitoring reports shall be subnutted to the DWQ annually for three years which include a narrative of findings, any repairs needed, and photographic documentation of conditions of all the rehabilitation areas Submit the as built drawing and annual reports to the Division of Water Quality, 2090 US HWY 70 Swannanoa, NC 28778 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties If you do not accept any of the conditions of phis Certification (associated with the approved wetland or stream impacts) you may ask for an adjudicatory hearing You must act within 60 days of the date that you receive this letter To ask for a hearing send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings 6714 Mail Service Center, Raleigh, N C 27699- 6714 This certification and its conditions are final and binding unless you ask for a hearing This letter completes the review of your application by the Division of Water Quality under Section 401 of the Clean Water Act If you have any questions please contact Linda Wiggs in the Asheville Regional Office at 828 296 4500 Sincerely, Charles Waki d, P E Director Enc GC3885 Certificate of Completion cc USACE Asheville Regulatory Field Office WeBSCaPe Unit — Central Office File Copy WRC Mark Fowlkes (e copy) S \SWP \Caldwell \401sWon DOT\Boone Frk Rehab\BooneFrk Approval July 2012 doc