Loading...
HomeMy WebLinkAbout20110023 All Versions_Application_20120726C C S l s CJ bra vU STATE OF NORTH CAROLINA - 6' DEPARTMENT OF TRANSPORTATION`)Z%a osr� R 2012 BEVERLY EAVES PERDUE EUGEIVt�TI JR GOVERNOR SECRE pH July 25 2012 'K United States Army Corps of Engineers Washington Regulatory Field Office 2407 West 5`h St Washington NC 27899 ATTN Mr Bill Biddlecome NCDOT Coordinator l' - UUZ3 v Z SUBJECT Application for Nationwide Permit 6 for Foundation Load Test Replacement of Bridge 11 over Oregon Inlet on NC 12 in Dare County North Carolina TIP Project B 2500 (Phase I) Federal Aid Projects BRNHF 0012 (48) and BRNHF 0012 (36) WBS Element 32635 14 Dear Sir The North Carolina Department of Transportation ( NCDOT) is in the process of planning a foundation load test for the replacement of Bridge No 1 I over Oregon Inlet (TIP Project B 2500 Phase I) in Dare County North Carolina A completed Pre Construction Notification and associated site drawings are attached for your review As Oregon Inlet is designated as a 'High Quality Water' and portions of the work will be occurring on a barrier island notification to the appropriate agencies through a Nationwide Permit 6 application is required The contractor and their subcontractors will conduct the foundation load test Additionally the contractor is required to conduct a static load test involving axial and lateral loading All activities are temporary and will be removed at the completion of testing One primary test pile and a small number of non production indicator test piles are planned at the following locations Primary Test Pile A static load test of a 36 square precast pre stressed concrete pile involving axial and lateral loading to failure will be performed in Scour Region III (near proposed Bent 24 in Oregon Inlet) This test would occur prior to commencement of bridge construction This test pile will be installed in open water The temporary impact including test pile frame will be limited to the area shown in the attached plan sheet The exact location of the test pile and frame are to be determined on site based on current site conditions • Indicator Test Piles A small number of non production non instrumented indicator piles (both 36 square and 54 cylinder) will be installed near the locations of the primary test pile (in Oregon Inlet) and at the North Approach (near proposed bents 80 81 in uplands) The first indicator piles would be attempted by driving only (no betting) to the planned tip elevations Preliminary analyses indicate that installation by driving only will be possible at a very limited MAILING ADDRESS LOCATION NC DEPARTMENT OF TRANSPORTATION TELEPHONE 919 707 6000 CENTURY CENTER BUILDINGA PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS FAX 919 250 4224 1000 BIRCH RIDGE DRIVE 1548 MAIL SERVICE CENTER RALEIGH NC 27610 RALEIGH NC 27699 1548 WEBSITE WWW NCDOT GOV/DOH/PRECONSTRUCT /PE/ number of locations Jetting will be utilized where driving is nut anticipated to be successful The driven piles will be monitored with a Pile Driving Analyzer (PDA) solely to measure the driving stresses and available resistance Where these indicator piles cannot be installed by driving alone the DBT will use this opportunity to refine the Jetting procedures proposed in the 404 /401 /CAMA permit application for B 2500 Phase 1 currently under review and evaluate various Jetting setups for both the 36 square piles and the 54 cylinder piles without instrumentation possibly getting in the way or being damaged It is anticipated that the installation of the Primary Test Pile and Indicator Test Piles will also provide an opportunity to �`- refine the Jetting procedures and Jetting spoils containment system prior to production pile installation In Oregon Inlet, it will likely be a maximum of 3 Indicator Test Piles in addition to the Primary Test Pile to be installed • Test Pile frames Eight to twelve temporary —18 pipe piles will be driven to support the Primary Test Pile frame from which the equipment will operate and guide the test piles into place All piles are temporary and will be removed at the completion of testing The overall timeframe is anticipated to be 4 8 weeks from beginning to end The 36 square Indicator Test Pile(s) and Primary Test Pile near proposed Bent 24 in open water will be installed first followed by the 54 cylinder Indicator Test Pile(s) near proposed Bents 80 — 81 on land at the north end of the bridge Activities are planned to begin in October 2012 Regulatory Approvals Section 404 The NCDOT anticipates that these activities will be authorized by a Nationwide Permit 6 will follow the general conditions of that permit Section 401 Permit We anticipate 401 General Certification number 3883 will apply to this project All general conditions of the Water Quality Certification will be met and therefore NCDOT is not requesting written approval NCDOT is providing two copies of this application to the NCDWQ for their review Section 10 Permit Application is hereby made for a USACE Section 10 Permit as required for the above described activities If you have any questions or would like additional information please contact Michael Turchy at maturchygncdot gov or (919) 707 6157 A copy of this application will also be posted at http //www doh dot state nc us /preconstruct/pe/ Sincerely, w Gregory Thorpe Ph D Manager Project Development and Environmental Analysis Unit cc NCDOT Permit Application Standard Distribution List r J o_ s� F wA7- o � t - -- - - - Use Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Page 1 of 1 PCN Form - Version 1 3 December 10 2008 Version Pre - Construction Notification PC Form A Applicant Information 1 Processing 1 a Type(s) of approval sought from the Corps ®Section 404 Permit ®Section 10 Permit lb Specify Nationwide Permit (NWP) number 6 or General Permit (GP) number 1c Has the N WP or GP number been verified by the Corps? ® Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification - Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ® Yes ❑ No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ® Yes ❑ No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ® Yes ❑ No 2 Project Information 2a Name of project B 2500 (Phase 1) Replacement of Bridge 11 over Oregon Inlet on NC 12 2b County Dare 2c Nearest municipality / town Nags Head 2d Subdivision name 2e NCDOT only T I P or state project no B 2500 (Phase 1) 3 Owner Information 3a Name(s) on Recorded Deed North Carolina Department of Transportation 3b Deed Book and Page No 3c Responsible Party (for LLC i f applicable) 3d Street address 1598 Mail Service Center 3e City state zip Raleigh NC 27699 1598 3f Telephone no 919 707 6157 3g Fax no 919 212 5785 3h Email address maturchy @ncdot gov Page 1 of 1 PCN Form - Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is — — - — - — - El-Agent— -- - El Other specify — - - -- - - -- — - - -- 4b Name 4c Busines s name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 2 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History- - - -- -- -- 1 Property Identification la Property identification no (tax PIN or parcel ID) lb Site coordinates (in decimal degrees) Latitude 35 77271 Longitude 7553754 (DD DDDDDD) ( DD DDDDDD) 1c Property size n/a acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to Oregon Inlet/Pamlico Sound proposed project 2b Water Quality Classification of nearest receiving water SA 2c River basin Pasquotank 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Natural intertidal marsh and open water partially within the Cape Hatteras National Seashore 3b List the total estimated acreage of all existing wetlands on the property The 2 5 mile corridor is primarily either wetland or open water 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property n/a 3d Explain the purpose of the proposed project To perform tests to determine the axial and lateral loading to failure of the 36 square precast prestressed concrete piles and the 54 precast prestressed cylinder piles (see cover letter) 3e Describe the overall project in detail including the type of equipment to be used Please see cover letter for description of work to be performed Equipment to be used will include barges hammer and jetting equipment The foundation load testing being performed on land will be performed with rubber tire or tracked heavy equipment hammer and jetting equipment 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination what type ❑ Preliminary ® Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company CZR Inc Name (if known) Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation May 4 2012 Action ID SAW 2012 00715 The Division of Coastal Management concurred with CAMA mapping on May 30 2012 5 Project History 5a Have permits or certifications been requested or obtained for ® Yes ❑ No ❑ Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions NW 6 Action 10200310829 Issued 11/13/2003 NW 6 Action ID SAW 2011 00107 issued 1/13/2011 and modified 9/27/2011 Recently submitted Individual Permit Application for construction of B 2500 (Phase 1) Page 3 of 3 PCN Form -Version 1 3 December 10 2008 Version 6 Future Project Plans 6a Is this a phased project? - ® Yes ❑ No - - -- - - — - -- - 6b If yes explain The foundation load testing will be conducted as part of final design of Phase I (per the ROD) of the replacement of the Bonner Bridge Future phases of B 2500 are not included herein Page 4 of 4 PCN Form - Version 1 3 December 10 2008 Version C — Proposed Impacts Inventory -- -- - -- - — - -- - - -- — - - - - -- 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number- Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ - non 404 other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P FIT ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P [-IT ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ - non 404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments Page 5 of 5 PCN Form - Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑ POT Oregon inlet/ Foundation Load Testing Open Water <0 01 (temporary) Pamlico Sound 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts <0 01 (temporary) 4g Comments Temporary open water impacts are from 36 precast prestressed square piles (to be removed after testing is completed) and a series of 18 pipe piles for the test frame The pipe piles will be used to support the load testing equipment and will be removed after testing is completed 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Meth od of construction Page 6 of 6 PCN Form — Version 1 3 December 10 2008 Version Page 7 of 7 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Impacts (for DWQ) If project Will impact —a protected riparian buffer then complete the chat below If yes -then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑Tar Pamlico El Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T im act required? 61 ❑P ❑T El Yes ❑ No B2 ❑P ❑T El Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h Total buffer impacts 61 Comments D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The foundation load test being performed in the vicinity of bent 24 will be performed from a barge The indicator tests being performed in uplands near bents 80 81 will be performed with rubber tire drill rigs or low ground pressure tracked drill rigs 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques NCDOT will implement Guidelines for Avoiding Impacts to the West Indian Manatee Precautionary Measures for Construction Activities in North Carolina Waters during work for this project All conditions of Nationwide 6 will be adhered to during installation 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S or Waters of the State? 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps ❑ Mitigation bank 2c If yes which mitigat ion option will be used for this ❑ payment to in lieu fee program project ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity Page 7 of 7 PCN Form — Version 1 3 December 10 2008 Version Page 8 of 8 PCN Form — Version 1 3 December 10 2008 Version 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 8 of 8 PCN Form — Version 1 3 December 10 2008 Version - -5 - Endangered Species and Designated Critical Habitat (Corps Requirement) — - - - - - 5a Will this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ® Raleigh 5c If yes ind icate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS website and agency consultation FEIS /ROD 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ® Yes ❑ No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS county index FEIS /ROD 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur In or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ® Yes ❑ No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA documentation FEIS /ROD 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ® Yes ❑ No 8b If yes explain how project meets FEMA requirements This temporary activity will not result in changes in permanent flood elevations 8c What source(s) did you use to make the floodplain determination? approved NEPA documents GIZ156094 J 121 �°-- -� �- f Zorl 40 2-, 1 Applicant/Agent s Printed Name Date Ap icant/Agent s Signature (Agent s signature is valid only if an authorization letter from the applicant is provided Page 11 of 11 PCN Form - Version 1 3 December 10 2008 Version Project Overview IUR Figure 1 ONE COMPANYIM y S ! B- 50 lh— l l C w ors I L rogr m tbl I it R II I INITIALS DATE INITIALS DA DRAWING MADE, BY I I ICHECKEO BY ll ' I III { x I I I I I Ir TI uu T-- - �I II II II III II II II II I I 11 II I 1 11 11 i 1 II II I - - -_ —I PT, D CO m Z tt Lp H W + U1 N p ISTA 70+69143 L p I I II I, I I II II II II II II II II I I II II 11 II r O x x I I II I, ,I 1, �I iii Ln0 �O 0 -I m o-, Ln 00 0 F-A O O II h x in O II Ij D D II h \ ii q I z I I II III I I II I, II II I I II II ► II I, I I II II II II I I II I, II I II III Ln -�� II 11 , DW Il h m tt rQ II L�l + H II Ln Ln W II 0 II � II II I I I II I, II II I I �I Ij HE I-- - -I I I Z I �7 p I I I I 'I II I I II II II II II I, I I II II c I�±j 0 m L) z m J II a II m x �_ O Ln II N Ln 0 O ,I q m f�= =mil 4lui m o p D G° Z H • D I °o o I 'LLlI r D x O Q Co H O x D z O z 1 1 I N► o -NE � III — x z I I x I I r - -A m D 0 J z + -H L, + I II 0 0 Ln I _r, ^ o I I 1 II I � I _ �-4 0 • NN -O W N N 0 0 N + O O 40 0 CLEAR RDWY W O O 'PAN r d O O z 0 O a O I + 4 O 00 O O 01 ■ HDR CHECK PRINT NO DATE INITIALS DATE INITIALS DATE INITIALS DATE CORRECTIONS CHECKED BY I CHANGES MADE BY I CHANGES VERIFIED BY z D H C7 D H O z C z H co ^m xz N N N 6 0 0 0 --4 0 U.1 N O 0 0 0 O O 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 I I I MATCH LINE D SEE SHEET 4 OF 1 m �z XV w N m L7 H 0 z W z N O x o Z z n D H O r H x O H 2 n 0 o z C-) rrn r N r— m -� C) O x Cu m z � N LD Im IN I� I+ SEE Y L 4 I i I I I i I i 1 I I I I r I IW IN I+ I I N WL- IN! m' VIW I r- C) m--I 00) -0 r0 c + + x I Ln m Ln o Om om 0() I 00 Om H O ITI p O H I- z I r 0 m m n H x N I O G) 1 I+ i C) m n xxx O 1-I - cLnx z -Io 0 F-i x Z H re's H D i? H M I I I I I � r M x r � 1 m I O r Ln O 12, 1 N LO 70 0 MIN I+ VERT CLR N ►J (TY21 PANS m �z r I c I D x\ � m N HO 1 rz m � VI 1 1 �7 m — H x —H x D z N W 0 O O + O O N O 0 W O O 0 O Ln N o � O D z N 6� O O O O co O O m --I r- p r O x x Ln0 �O 0 -I m o-, O 'D 00 0 F-A O x H z G-) m — H x —H x D z N W 0 O O + O O N O 0 W O O 0 O Ln N o � O D z N 6� O O O O co O O