Loading...
HomeMy WebLinkAbout20110040 Ver 1_Application_201104250-5TAIJ!� LV STATE OF NORTH CAROLINA 20 q �o s4�sq�R 11 DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR WBS Element Number County Description April 12 2011 2B 200711 Beaufort EUGENE A CON-R JR SECRETARY )II -,-"MWZ =E < ( _ C)C),-C c) v Beaufort 314 SR 1721 Little Creek Road Over Little Creek MEMORANDUM TO Stephen Lane NCDCM Field Representative Tom Steffens USACOE Field Representative Garcy Ward NCDWQ Field Representative Sonia Canllo NCDWQ Administrative Assistant FROM Jay Johnson Division 2 Environmental Officer Id SUBJECT Permit Modification for Design Change and Sheeting for De- Watering Division 2 respectfully request a CAMA Permit Modification of Permit Number 55253 and for USACOE Action ID SAW - 201100279 RGP 31 The original design was permitted for a I4 x 8 -T x 40 CAPPA The revised design is a proposed 25'-4 x 8 - 7 x 27 CAABC Sheet Piling for DeWatenng and a Proposed Temporary 40 x 24 CMP are also shown on the revised plan Temporary Cofferdams will be driven for Dewatering Operations and the site will be pumped dry Permanent Sheeting will be installed and will tie into the proposed Aluminum Box Culvert The Existing Bridge will then be removed and the Proposed Box Culvert w111 be installed The installation site of the Proposed Box Culvert will be backfilled and the Temporary Cofferdams Removed The Temporary 40 x 24 CMP will be removed Embankment Stabilization Sheet Piles will be driven The Existing Timber Headwalls will be retained for shoulder stabilization MAILING ADDRESS TELEPHONE (252) 695 2044 LOCATION NC DEPARTMENT OF TRANSPORTATION FAX (252) 830 -3341 P O Box 1587 DrvisiwOFMGHwAYs GREENVH.LE NC P O BOX 1587 WEBsnF wwwarcDoT Gov GREENVH1.E, NC 27835 The revision will have additional impacts due to the proposed sheeting for De- Watering The original impacts were 357 Square Feet (0 008 Acres) of Coastal Wetlands and no 404 Wetland Impacts The Proposed Design has 585 Square Feet (0 01 Acres) of Coastal Impacts No 404 Wetland Impacts and 60 Linear Feet of Stream Impacts and 765 Square Feet of Temporary Open Water Impacts A Revised Plan Sheet, a Revised DCM- MP2,DCM -MP5, and a Revised Pages 4 and 5 of the PCN are attached Your assistance is this matter is greatly appreciated J13J /ms C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non -404 other) (acres) Temporary W1 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ 0 Sq Ft W2 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ 0 Sq Ft W3 ❑ P ❑ T ❑ Yes ❑ Corps OSq Ft ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps 0 Sq Ft ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P [:IT ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 0 Sq Ft 2h Comments No 404 Wetland Impacts 585 Sq ft (Additional 228 Sq Ft) Coastal Impacts 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non -404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Box Culvert Little Creek ® PER ❑ INT ❑ Corps ® DWQ 30 30 S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ® P [:IT Box culvert Little Creek ® PER ❑ INT ❑ Corps ® DWQ 30 30 S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 [] P [] T ❑ PER E:1 Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 60 LF 31 Comments 60 Linear Feet of Stream Impacts Page 4 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody Buffer impact impact number— (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Buffer Zone 1 impact Zone 2 impact Permanent (P) or Temporary Stream name mitigation (square feet ) (square feet) 01 ❑ P ®T Little Creek De- Watenng Tributary 270 Sq Ft 02 ❑ P ® T Little Creek De- Watenng Tributary 105 Sq Ft 03 ❑ P ®T Little Creek De- Watenng Tributary 210 Sq Ft 04 ❑ P ® T Little Creek De- Watering Tributary 180 Sq Ft 4f Total open water impacts 765 Sq ft 0 02 Acres 4g Comments 0 02 Acres (765 Sq Ft) Open Water Impacts 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a I 5b 1 5c 5d 5e Pond ID I Proposed use or purpose number of pond Wetland Impacts (acres) Stream Impacts (feet) I Upland Flooded I Filled I Excavated I Flooded I Filled I Excavated I Flooded P1 P2 5f Total None 5g Comments None 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no i Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ® Tar Pamlico ❑ Other None Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet ) (square feet) Temporary impact re wred� 131 ❑ P [:IT ❑❑ Nos 0 Sq Ft 0 Sq Ft B2 ❑P ❑T DYes 0 S Ft 0 S Ft B3 ❑ P [IT 0 Nos 0 Sq Ft OSq Ft 6h Total buffer impacts 0 Sq Ft 0 Sq Ft 61 Comments No Buffer Impacts Coastal Marsh Page 5 of 10 PCN Form — Version 1 3 December 10 2008 Version Form DCM MP -2 EXC"ATiON and FILL (Except for badges and culverts) Attach this form to Joint Application for CAMA Major Permit Form DCM MP 1 Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information Describe below the purpose of proposed excavation and/or fill activities All values should be given in feet 1 EXCAVATION ®This section not applicable a Amount of material to be excavated from below NHW or NWL in b Type of material to be excavated cubic yards c (i) Does the area to be excavated include coastal wetlands/marsh Access (CW) submerged aquatic vegetation (SAV) shell bottom (SB) or other wetlands (WL)? If any boxes are checked provide the number of square feet affected Other ❑CW ❑SAV ❑SB Channel Canal Boat Basin Boat Ram p Rock Groin Rock (excluding (NLW or 2 DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a Location of disposal area b Dimensions of disposal area Breakwater shoreline c (i) Do you claim title to disposal area? NWL ) ❑Yes ONa ONA ❑Yes ❑No ONA (u) If no attach a letter granting permission from the owner (io If yes where? e (i) Does the disposal area include any coastal wetlands/marsh stabilization Length (CW) submerged aquatic vegetation (SAV) shell bottom (SB) OYes ❑No ❑NA or other wetlands (WL)? If any boxes are checked provide the number of square feet affected @Q If yes how much water area is affected? OCW ❑SAV []SB Width OWL ❑None Avg Existing Depth NA NA Final Project Depth N A NA 1 EXCAVATION ®This section not applicable a Amount of material to be excavated from below NHW or NWL in b Type of material to be excavated cubic yards c (i) Does the area to be excavated include coastal wetlands/marsh d High-ground excavation in cubic yards (CW) submerged aquatic vegetation (SAV) shell bottom (SB) or other wetlands (WL)? If any boxes are checked provide the number of square feet affected ❑CW ❑SAV ❑SB OWL ❑None (r) Describe the purpose of the excavation in these areas 2 DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a Location of disposal area b Dimensions of disposal area c (i) Do you claim title to disposal area? d n Wig a disposal area be available for future maintenance? ❑Yes ONa ONA ❑Yes ❑No ONA (u) If no attach a letter granting permission from the owner (io If yes where? e (i) Does the disposal area include any coastal wetlands/marsh f () Does the disposal include any area in the water? (CW) submerged aquatic vegetation (SAV) shell bottom (SB) OYes ❑No ❑NA or other wetlands (WL)? If any boxes are checked provide the number of square feet affected @Q If yes how much water area is affected? OCW ❑SAV []SB OWL ❑None (it) Describe the purpose of disposal In these areas j A 7 - 3 51 - 7 t -3 SIP " ITJ- 2 or 2) 3 SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin use MP 4 — Structures) a i ype of snoreiine staoilization ®Bulkhead EIRiprap ❑Breakwater /Sill ❑Other c Average distance waterward of NHW or NWL 3 e Type of stabilization material Class B Mart g Number of square feet of fill to be placed below water level Bulkhead backfill Riprap 60' For Pine Bedding Breakwater/Sill Other Pipe Bedding I Source of fib material b Length 180 (90 East And 90 West) Width 6 10 d Maximum distance waterward of NHW or NWL 5 f () Has there been shoreline erosion during preceding 12 months? [--]Yes ®No ❑NA (ii) If yes state amount of erosion and source of erosion amount information h Type of fill material Gramtel 4 OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a (i) Will fill material be brought to the site? ❑Yes El No ❑NA b (i) Will fill material he niaced in coastal watiands /march (rw) If yes (ii) Amount of material to be placed in the water (te) Dimensions of fill area (iv) Purpose of fill submerged aquatic vegetation (SAV) shell bottom (SB) or other wetlands (WL)? If any boxes are checked provide the number of square feet affected ❑CW ❑SAV ❑SB OWL ❑None (u7 Describe the purpose of the fill in these areas 5 GENERAL a How will excavated or fill material be kept on site and erosion b What type of construction equipment will be used (e g dregline controlled? backhoe or hydraulic dredge)? Sift Fences and Rip Rap Typical Road and Bridge Construction Equipment c (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (it) if yes explain what type and how they will be implemented October 1 2010 Revised March 31 2011 Date Permit Modification Beaufort 314 SR 1721 Little Creek Road Bridge To pipe Replacement WBS Element Number 2B 200711 Project Name d Of Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (a) If yes explain steps that will be taken to avoid or minimize environmental impacts Jay B Johnson Applicant me Applicant at e Fero' DON NP-5 BRIDGES and CULVERTS Attach this form to Joint Application for CAMA Major Permit Form DCM MP 1 Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information 1 BRIDGES ®This section not applicable a Is the proposed bridge ❑Commercial ❑Public /Government ❑Pnvate /Community c Type of bridge (construction material) e (i) Will proposed bridge replace an existing bridge? []Yes []No If yes (it) Length of existing bridge (ui) Width of existing bridge (rv) Navigation clearance underneath existing bridge (v) Will all or a part of the existing bridge be removed? (Explain) 9 Length of proposed bridge b Water body to be crossed by bridge d Water depth at the proposed crossing at NLW or NWL f n Will proposed bridge replace an existing culvert? ❑Yes El No If yes (-u) Length of existing culvert (ii) Width of existing culvert (v) Height of the top of the existing culvert above the NHW or NWL (v) Will aU or a part of the existing culvert be removed? (Explain) h Width of proposed bridge i Will the proposed bridge affect existing water flow? ❑Yes ❑No l Will the proposed bridge affect navigation by reducing or If yes explain increasing the existing navigable opening? ❑Yes ONO If yes explain k Navigation clearance underneath proposed bridge I Have you contacted the U S Coast Guard concerning their approval? []Yes ❑No If yes explain m Will the proposed bridge cross wetlands containing no navigable n Height of proposed bridge above wetlands waters? []Yes []No If yes explain 2 CULVERTS ❑This section not applicable a Number of culverts proposed 1 b Water body in which the culvert is to be placed Little Creek < Form continues on back> I I w )t -) c Type of culvert (construction material) 25 -4 x 8 T x 27 CAABC d (Q Will proposed culvert replace an existing bridge? ®Yes ❑No If yes (u) Length of existing bridge 26 (m) Width of existing bridge 19 2 Clear Roadway 20 1 Out To Out (iv) Navigation clearance underneath existing bridge 1 (v) Will all or a part of the existing bridge be removed? (Explain) All of the Existing Bridge well be Removed f Length of proposed culvert 27 h Height of the top of the proposed culvert above the NHW or NWL 458 l Will the proposed culvert affect navigation by reducing or increasing the existing navigable opening? ®Yes []No, If yes explain The Hydraulic Opening wnil Increase Due To The Increased Height Of The Proposed Box Culvert e n Will proposed culvert replace an existing culvert? 0Yes ®No If yes (u) Length of existing culvert(s) (w) Width of exrsbng culvert(s) (nr) Height of the top of the existing culvert above the NHW or NWL (v) Will all or a part of the existing culvert be removed? (Explain) g Width of proposed culvert 25 -4 i Depth of culvert to be buned below existing bottom contour 1 Ic Will the proposed culvert affect existing water flow? 0Yes ®No If yes explain 3 EXCAVATION and FILL [I This section not applicable a (i) Will the placement of the proposed bridge or culvert require any b excavation below the NHW or NWL? ®Yes ❑No If yes (u) Avg length of area to be excavated 37 For Box Culvert Bedding (ui) Avg width of area to be excavated 29 for Box Culvert Bedding (iv) Avg depth of area to be excavated 1 0 (v) Amount of material to be excavated in cubic yards 40 Cubic Yards c (i) Will the placement of the proposed bridge or culvert require any high- ground excavation? ®Yes ❑No If yes (u) Avg length of area to be excavated 5 (iii) Avg width of area to be excavated 5 (iv) Avg depth of area to be excavated 4 (v) Amount of material to be excavated in cubic yards 4 Cubic Yards (i) Will the placement of the proposed bridge or culvert require any excavation within coastal wetlandstmarsh (CW) submerged aquatic vegetation (SAV) shell bottom (SB) or other wetlands (WL)? if any boxes are checked provide the number of square feet affected ®CW 585 Sa Ft ❑SAV ❑SB OWL ❑None (o) Describe the purpose of the excavation in these areas Sheeting For De- Watering -- _ ) I W , , T u Lk d If the placement of the bridge or culvert involves any excavation please complete the following (i) Location of the spoil disposal area Temporary Spoil Area is in the Exssting Road (ii) Dimernswns of the spoil disposal area 100 x 200 (iii) Do you claim title to the disposal area? ®Yes ❑No (lfno attach a lettergranting pernyssron from the owner) (iv) Will the disposal area be available for future maintenance? ®Yes ❑No (v) Does the disposal area include any coastal wetlands/marsh (CW) submerged aquatic vegetation (SAVs) other wetlands (WL) or shell bottom (SB)? ❑CW ❑SAV OWL ❑SB ®None If any boxes are checked give dimensions if different from i(i) above (vi) Does the disposal area include any area below the NHW or NWL? ? ❑Yes ®No If yes give dimensions if different from () above e (i) Will the placement of the proposed bridge or culvert result in any IF fill (other than excavated material described in Item d above) to be placed below NHW or NWL? ®Yes ❑No If yes (ii) Avg length of area to be filled 3T (iii) Avg width of area to be filled 29 (iv) Purpose of fill Pipe Bedding 9 (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high - ground? ®Yes ❑No If yes (ii) Avg length of area to be filled 270 (iii) Avg width of area to be filled 40 (iv) Purpose of fill Raise Existing Grade to Accommodate Proposed Box Culvert 4 GENERAL a Will the proposed project require the relocation of any existing b utility lines? ❑Yes ®No If yes explain ff thts portion of the proposed project has already received approval from local authorities please attach a copy of the approval or certification n Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed within coastal wetlandstmarsh (CW) submerged aquatic vegetation (SAV) shelf bottom (SB) or other wetlands (WL)? if any boxes are checked provide the number of square feet affected ❑CW ❑SAV ❑SB OWL ®None (7 Describe the purpose of the excavation in these areas Will the proposed project require the construction of any temporary detour structures? ❑Yes ®No If yes explain < Form continues on backb �, I ) c Will the proposed project require any work channels? d How wig excavated or fill material be kept on site and erosion ❑Yes ®No controlled? If yes complete Form DCM MP 2 Turbidity Curtains and Silt Fences will be used to retain sediment on site e What type of construction equipment will be used (for example dragline backhoe or hydraulic dredge)? Typical Bridge Construction Equipment g Will the placement of the proposed bridge or culvert require any shoreline stabilization? ®Yes []No !f yes complete form MP 2 Section 3 for Shoreline Stabilization only October 1 2010 Revised March 31 2011 WBS Element 2B 200711 Debit $400 Date Beaufort 314 SR 1721 Little Creek Road Bndge to Box Culvert Replacement Beaufort County WBS Element Number 2B 200711 Project Name Jay B Johnson Applicant Name Applicant Signa e f Will wetlands be crossed in transporting equipment to project site? []Yes ®No If yes explain steps that will be taken to avoid or minimize environmental impacts I I 201115 27 I I t d S tt ng \m tt n \My D m t \PROJECTS \B f t \BRIDGE R pl m t \B f t314 \B p f t314 dg F RNAMF Lt f L rn rn o ° O O W� O 5 C� ~ to y Il000_� rn o� � (z mrn� n O ~ ,ON In m D N OD I tv 4 z I n =I (n gam, (A g m zt rri rn I � �I V O rrl � R1 I I� r I 3 z I rn n I �c 4� o I C7 � I rn N y Z rn z CO rn� C ' n n I g o O � I c , � r rnrnZ�zO ,o n o z O� 4 O� y �b O rn y O � N � o I j LO � O ry- rn CZ nT -lJ rn O rn Z m 0 P � 9 Z O IO g�Sz 0 19 ° V rn GiO y O � O Z Ul rn �b O W n Z O Z R (� C N M .P O C-- No �b ar �y �z A n� n O °o c - gm co ti O � r n �D C rn o co N � y O Z NN zz rn rn o ° O O W� O 5 C� ~ to y Il000_� rn o� � (z mrn� n O ~ ,ON In m D N OD I tv 4 z I n =I (n gam, (A g m zt rri rn I � �I V O rrl � R1 I I� r I 3 Q ° O rn 0 0 rrl :D 'b� rtl i u Q� OD ppOp�L4 rri C� mj° II N a .2 N `Ai rr, I I � � I g I I I n =I (n IN to g m � � rri rn I � �I V O I m I R1 I I� r I N z I rn n I �c 4� o I C7 � I rn N y Z rn z CO rn� C ' n n I g o O � I c , � r rnrnZ�zO ,o n o z O� 4 O� y �b O rn y O � N � o I j LO � O ry- rn CZ nT -lJ O rn Z m 0 P � 9 O IO g�Sz 0 19 V rn GiO y O � Ul rn �b o) O Z R (� A o z OD I� m � h g REVISIOWs x I I l rn l i I I y I O I +I ti I I `Ai rr, I I � � I g I I I z =I (n IN to g m � � rri rn I � �I V r I m I I r I ~ I I� r I r � I rn n I �c D I C7 L ZZ rn I rn N I � C ' n n I g o O � I c / rn e I Nm �c �A �z�q Coco (S NN m N - rn ; �(0, m- 0 n n o °i�oo � y �o �� " i u o mrnwo V);�rn L� II rn ~ a y O M C I k I I k K- i : v I I � oo x r K I n o b N � rl� it o I/ 'e f� n rn Rz- In y I rrn- n Cb m Iii g � rri I � I N 0 R1 ��n I �' �I I N I IN to Vim: r n © rri rn I � o r N I r I ~ r � D (A o I/ 'e f� n rn Rz- In y I rrn- n Cb m Iii g � rri I � I N rn rn �x o riy rq y2 Uy i� r; �g 8t UTTLE CREEK �u < O� N� m�;rn � n 4Vg corn rn o � NAp�83 R1 oN �' �I I N I IN to Vim: r n © rri rn R' y o N Q D O L ZZ rn I �a O z co , rn rn �x o riy rq y2 Uy i� r; �g 8t UTTLE CREEK �u < O� N� m�;rn � n 4Vg corn rn o � NAp�83 o rl No d �rn 'ON rn co II a 4 y R1 oN �' �I I I IN to rn C N Q D O L ZZ rn I �a O < co , � r z o O� O� y �b � N r � n I j LO � O ry- rn CZ nT -lJ O rn Z o rl No d �rn 'ON rn co II a 4 y n Z 0 oN �' �I I I IN to i C mrn D U1 L ZZ rn I �a O < co , O� O� y �b 0 P � 9 O IO g�Sz 0 19 V rn Ul o) O Z I`O M .P O �b ar �y �z n Z 0 REVISIONS 201116 52 A t " S tt ng \m tt n \My D m t \PROJECTS \B f \BRIDGE R pl m nt B f t314 \P f l dg FRNAMFt48S t 11l < D C,,) m 70 w m -i cn o � m zH -0m'-ox 7 o (/) m ° ° h1 { ° K D n N H m ' M1 ° K M (n D � z cn 0o m (n O N) z m ° C z �Hmz o D �u O N TI D G7 V) F- CC) I = w U1 , O O� X770 x a N O H -I 1 O D ° C) e O X _I mo6'� -• °O mz c r- I N O Co �m r O D z < I I w -D H m I {-{ O m 1 X 1--- m Uli m D - F- O (n U) n m ---I I a D O z I O c7 m C c) I G' I m o D D O cc) �o o i CC) C7 r O m I p I H n i I m K CC) m X o 1 m � O D m W ' cn C) o I i 1- O „ �, + rm 7z �, ' O I H I / O fTl L ` �- cn '" w D —I m ° m II w ° ° D 1—' O N G) St �� °-z< z i Z �b ar n 2z �Z m �Q Z 0