HomeMy WebLinkAbout20080058 Ver 1_Baseline Monitoring Report_20110321DW ova
Monitoring Baseline Report
Final
Unnamed Tributary to Crab Creek
Stream & Wetland Restoration Site
NCEEP Project Number: 857
Alleghany County, North Carolina
Submitted to
Ecosystem Enhancement Program
North Carolina Department of Environment and Natural Resources
February 2011
Y
EVancement
PROGRAM
1619 Mail Service Center
Raleigh, NC 27699
4A/N FF�o
ziFhTAST >
R�
r
- � ,
Table of Contents
1.0 EXECUTIVE SUMMARY
1
2.0 PROJECT BACKGROUND
2
2.1 Location and Setting
2
2.2 Project Goals and Objectives
4
2.3 Project Structure, Restoration Type, and Approach
4
2.4 Project History, Contacts, and Attribute Data
9
3.0 SUCCESS CRITERIA
12
3.1 Morphometric Parameters and Channel Stability
12
3.13 Substrate
13
3.2 Hydrology
13
33 Vegetation
14
4.0 MAINTENANCE AND CONTINGENCY PLAN
14
5.0 PROJECT MONITORING and AS -BUILT CONDITIONS
14
51 Feature Monitoring Details
14
5.11 Stream
14
5.1.2 Hydrology
15
51.3 Vegetation
15
5.1.4 Permanent Photo Locations
15
5.2 As -Built Conditions
16
5.21 Streams
16
5.2.2 Hydrology
16
52.3 Vegetation
16
5.2.4 Permanent Photo Stations
17
6.0 REFERENCES
26
Appendix A. Monitoring Plan View
Appendix B. As -Built Plan View
Appendix C Cross - Section Plots and Photos
Appendix D. Longitudinal Profile Plots
Appendix E. Vegetation Plot Photos
Appendix F. Permanent Photo Station Photos
i
Figures
Figure 1. Vicinity Map 3
Figure 2. Project Components and Assets Map 8
Tables
Table la.
Protect Components
6
Table lb.
Component Summation
7
Table 2.
Protect Activity and Reporting History
9
Table 3.
Protect Contacts
10
Table 4.
Protect Attributes
11
Table 5
Baseline Stream Data Summary
18
Table 6.
Baseline Morphology and Hydraulic Monitoring Summary
21
Table 7.
Vegetation Plot Attribute Data
23
Table 8
CVS Vegetation Plot Metadata
24
Table 9
Planted and Total Stem Counts (Species by Plot with Annual Means)
25
11
1.0 EXECUTIVE SUMMARY
The project resides on an Unnamed Tributary to Crab Creek (UTCC) and involved the
restoration, enhancement, and preservation of 6,928 linear feet of stream and 16 8 acres of
wetlands The goals of the project included water quality improvement, enhancement and
preservation of riparian buffers, enhancement of aquatic and terrestrial habitat, and improvement
of wetland function and habitat components Project objectives to accomplish the goals involved
the restoration of stream channel pattern, profile, and dimension Additionally, bed
heterogeneity and habitat corridor continuity were re- established through restoration of stream
features and replacement of an existing culvert Riparian area function was restored by
revegetating with native trees, shrubs, and herbaceous plant species Wetland hydrology and
vegetation were restored in areas historically utilized for croplands
The project site was delineated into three primary stream reaches that include unnamed tributary
1 (UT 1), unnamed tributary to Crab Creek upstream (UTCC -US), and unnamed tributary to Crab
Creek downstream (UTCC -DS) A total of 1,775 linear feet of restoration and 496 linear feet of
enhancement were implemented on UT1 The UTCC -US reach included 2,485 linear feet of
restoration and the UTCC -DS reach included 2,172 linear feet of stream preservation
The primary focus of the revegetation element of the project was to restore natural plant
communities within the Southern Appalachian Bog and Swamp Forest -Bog Complex areas as
well as the UT 1 and UTCC floodplains Planting plans for six distinct planting zones were
implemented to restore native species composition commonly associated with the various stream
and wetland habitat types on the project site Additionally, invasive species control was
implemented during construction to minimize the impacts of multiflora rose Rosa multiflora on
the restored plant communities
Eight separate wetland areas were identified within the project site which included Montane
Alluvial Forest, Southern Appalachian Bog, and Swamp Forest -Bog complex types (Schafale
and Weakley 1990) Targeted wetland project components included approximately 8 0 acres of
wetland restoration, 3 1 acres of wetland enhancement, 0 2 acres of wetland creation, and 5 3
acres of wetland preservation
Annual monitoring will begin during the 2010 growing season and will include stream, wetland,
and vegetation monitoring components as established within this document Annual monitoring
will occur for five years or until project success criteria have been achieved
UT Crab Creek Stream & Wetland Final l Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
2.0 PROJECT BACKGROUND
2.1 Location and Setting
The Unnamed Tributary to Crab Creek (UTCC) restoration site is on a parcel owned by Mr
Keith Andrews (Figure 1) It is situated within the Little,Rlver watershed (14 -digit HUC -
05050001030020) of the New River basin cataloging unit (8 -digit HUC — 05050001) The Little
River watershed was identified by the North Carolina Ecosystem Enhancement Program
(NCEEP) as a Targeted Local Watershed with significant stream and wetland restoration needs
(NCEEP 2009) The site is located approximately 6 miles west of the intersection of NC 89 and
NC 18 in Alleghany County, North Carolina Prior to project implementation, portions of the
streams and wetlands within the site had been heavily degraded due to historical and active
agricultural practices
UT Crab Creek Stream & Wetland Final 2 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Momtonng Year 0
��I�� \��\- /JJ�I!I %j� !�r �� � ((• i � /�"- �~-ftir �� , !i/'1�\.`t =.e.� I%' //� r /`��.;�'(`✓ , \~ � = {�J� />� \� 1
� -h\�-r _.%J �- �y iii rlir`j-.�i 1 .! \ t rl ^� /: \ \/i •, �.� (�( � h� �;J /� �'�`� "
s�✓ / � '„ ./ x_ ,i, ? ✓. ,S � /y. �i�� (� (/� I(t L.'�fir� �j! tfSl i ° %`� f � / / _
�i ' � / !� �JI `�C'l \ � �J ''����`v la � � / %� i�`✓``\ I -� I � •s` r �a� , �1 . %% -�'� �l ��1,' : � - ' � � J� �-
�(� , - 'tea
1.� �(j - �� � \ \�d �, � r
J � �! r'�� �� \� �i 1 i r /1 '� 1 � i � 7 : � ;`�i` ; i•• )l r I i� , \�� /o O� i � = r ^ /
� � � (i !' ice_ 1 ��l .J rr /r y 1 �', 5� - � � �� / , r• - � � =I ! �v. \� 1 1 1 a+ � J `U/' V/
I {,i -� •t I�If '� �•!!t /r /i �_L,_ f` /l)'L 1, tl ,�\`� 700
! p ` ��a 1, I iC.�tr�i,� /i(t��� ,1 /f / r��s yf / /! /! f J( I'il)� 4•tl' �� , +/ r
��;�= ;`� ='-� t// I l l �_ 1 i ..y- _� •t c- fi l r x � �,,� I t 1 � r/. } f ` �1 �, z
J l
;ail\
\Q
rl �I.15t�^
•- 1, � � , 1,1 �rr��= /�J= 1 \ +���: �f 'r J�'��1 � ��f I I����'� \� l� _ ` \_ /, / /J�- _�/ { [�� �,= :v
UT to Crab Creek Stream
Wetland Restoration Site ,
J77.�
-�� -'',r ��
/Ire \(.,- �\� rr l t• - " I "
r
A.
-'ri_ � ��� •l ` _ � tC1i \) /`l � ,e {,C -� � i it 1`\i_ 4 r ,� `'--_ '` _ y � .St ,r`� �, �'i +�:
I
4 • � �y�� ' /�f/ f x-'��f l_ M1 / _ l�� � �� 1. -\ �J � t r , . _� \' \� �.
✓�Jl _ N76 -. A7 +-�i� f I ! �J� /+ / `- + � /'e! / \ {- __1 , , /� ✓�� jt � t 1 /� f 1 a� '\: - I , ,`
'All
(' �� ' -� i . ! ..i,\ ! r ! l l \; ja � •1 \�'/`�' 1 q" ��� - -_ "y /� I ` >, if r ` 11 ti� ��� � f � 'r(_ '�',
C-1" \
C.>rr6�
C_� Figure 1- Vicinity Map L J �-
r
Carwar OT io Geb Gaex Stream Caury r \
6 W I. c'. ReAOralbn Slty )
UT to Crab Creek Stream &
`""" E�UINOX-
tem
c°"'o' � scemr i eR ■orrnlsnrxr.
0°"" Wetland Restoration Site °---•° a ement
W'�° - PROGRAM
"°." F-YihC " Project No 857 N
Directions From Raleigh proceed west on 1-40 towards 0 1,250 2,500 5 000
Winston Salem Take Exit 193 B (NC 8N/US 52N) towards Feet
Mount Airy Proceed on US 52N to 174W towards Wytheville Alleghany County, North Carolina
VA Take Exit 5 0 77S) and proceed to Exit 100 (Mount
Airy/Galax/NC 89) Turn left and proceed west on NC 89 7 5 Minute Series Cumberland Knob
Tian left at NC 18 and go approximately 6 mules to the project Quadrangle
site The site is located on the north side of NC 18
�l
2.2 Project Goals and Objectives
I
The goals and objectives stated in the UT to Crab Creek Restoration Site Restoration Plan
(NCEEP 2007) are as follows
Project Goals
• Reduce bank sediment export and nutrient inputs to the receiving watershed of Crab
Creek, a Class C Trout Water,
• Enhance and preserve riparian buffers of a headwater trout stream,
• Enhance aquatic and terrestrial habitat along an intact stream corridor,
• Improve wetland functions by connecting and expanding the following wetland
communities Swamp Forest -Bog Complex, Southern Appalachian Bog, and Montane
Alluvial Forest, and
• Improve and expand Southern Appalachian Bog wetland habitat for the Bog Turtle
Clemmys muhlenburgit
Project Objectives
• Restore 4,026 linear feet of stream channel with appropriate pattern, profile, and
dimension to support a gravel transport system,
• Re- establish the natural stream features (bed heterogeneity) to restore aquatic habitat,
(" • Improve aquatic organism passage and habitat corridor continuity by replacing the
(l culvert, and
• Convert existing croplands into Swamp Forest -Bog Complex and Southern Appalachian
Bog Communities
2.3 Project Structure, Restoration Type, and Approach
Prior to project implementation, agricultural use and un- forested riparian buffers in the
watershed led to increased surface runoff, erosion, and sedimentation in the UT and UTCC
stream reaches Additionally, agriculture impacts such as ditching and cultivation within the
existing wetlands resulted in degraded wetland habitats associated with the project site
Work on UT involved restoring and enhancing a total of 2,271 linear feet of B4c /C4 stream
types A Priority Level 3 approach was implemented for the upper portion (1,336 linear feet) of
UT restoration reaches while a Priority Level 1 approach was utilized for the lower portion (439
linear feet) of UT 1 (Rosgen 1997) Because an appropriate reference reach could not be found
for UT I, the stream dimensions were based on an analytical design approach for a B4c /C4
stream type The design pattern and profile were developed from detailed morphological criteria
and hydraulic geometry relationships taken from stable sections of UT 1 Additionally, a total of
496 linear feet of enhancement Level II (revegetation and stream bank stabilization) occurred
within four areas along UT
The design for UTCC -US included a Priority 1 restoration of 2,485 linear feet of meandering C4
stream channel and associated floodplam The Priority Level 1 approach established a bankfull
channel with a new floodplam, a channel bed at the original elevation, and a cross - section
dimension necessary to provide stable flow maintenance and sediment transport
UT Crab Creek Stream & Wetland Final 4 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
The restored channels of UT 1 and UTCC -US were stabilized with In- stream structures, including
step pools and riffle grade control These structures were designed to reduce bank erosion,
Influence secondary circulation in the near -bank region of the stream bends, and provide grade
control Riffle areas were enhanced with graded gravel material to mimic existing stable riffle
features
The project also Included the preservation of 2,172 linear feet of stream within the UTCC -DS
reach Overall, this reach has a stable pattern with extensive forested buffers
Wetland and buffer community Improvements Included plugging ditches, grading, and replanting
with native plant species The targeted buffer communities Included Montane Alluvial Forest,
Southern Appalachian Bog, and Swamp Forest -Bog Complex Wetland restoration practices
were Implemented for 0 8 acres of Montane Alluvial Forest and 7 2 acres of Southern
Appalachian Bog Wetland enhancement practices were applied to 3 1 acres of Montane
Alluvial Forest An additional 0 2 acre Southern Appalachian Bog was created to expand this
habitat type within the project site Fully functional wetlands Identified within the project site,
Including 2 1 acres of Southern Appalachian Bog and 3 2 acres of Swamp Forest Bog, were
preserved through a permanent conservation easement
The project components and summations are reported in Tables la and lb and Illustrated in
Figure 2 below
UT Crab Creek Stream & Wetland Final 5 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
Table Ia. Project Components
UT Crab Creek Stream & Wetland /Pro ct No 857
Project
Existing
Restoration
Fodor
Buffer
Comment
Component or
Feet/Acres
Level
Approach
Stationing
Acres
BMP Elements
Reach 1D
Acreage
100+00 101 +71
Stream channel stabilized with in
103+00 104 +35
R
P3
1 775 If
stream structures including step pools
105 +34 112 +29
and riffle Bade control
113 +51 116 +86
Eu culvert and
120+26 124 +65
UTI
23131f
crossingremoved
101 +71 103 +00
Included revegetation and stream bank
104 +35 105 +34
E
Ell
4961f
stabilization
112+29 113 +51
116 +88 118 +34
Existing culvert and
Stream channel stabilized with in
UTCC US
20861£
R
P2
24851f
10+00 34 +85
crossing rep Laced
with open bottom
stream structures including step pools
and riffle Bade control
arch culvert
UTCC DS
2 1721f
P
2 172 If
34 +85 56 +57
Intact Swamp Forest Bog Complex
UT 1 restoration and enhancement
Wetland 1
0 5 ac
P
0 5 ac
reach goes through this wetland
Wetland preservation (united to areas
outside of the stream buffer
Overfill cropland sod removed and site
graded to restore Southern
Wetland 2
1 0 ac
R
10 ac
Appalachian Bog Community
hydrology
Cropland drainage ditches filled to
Wetland 3
3 0 ac
R
3 2 ac
restore Southern Appalachian Bog
Community hydrology
Overfill cropland sod removed, ditch
filled, and wellhead removed to restore
Wetland 4
2 7 ac
R
2 7 ac
Southern Appalachian Bog
Community hydrology
Preservation of Swamp Forest Bog
Wetland 5
0 7 ac
P
0 7 ac
Complex along UTCC DS reach
Preservation of Swamp Forest Bog
Wetland 6
2 0 ac
P
2 0 ac
Comp lex along UTCC DS reach
Ditch filled and existing fill debns and
0 9 ac
R
0 8 ac
culvert drain removed Extstingseep
Wetland 7
heads developed and additional
hardwood trees planted to restore and
3 1 ac
E
3 1 ac
enhance Montane Alluvial Forest
Overfill cropland soil removed,
0 3 ac
R
0 3 ac
groundwater springs exposed and bog
Wetland 8
wetland spores planted to restore and
0 0 ac
C
0 2 ac
create Southern Appalachian Bog
Community hydrology
Preservation of Southern Appalachian
Wetland 9
2 2 ac
P
2 2 ac
Bog Community
Information unavadable
Non AppYcable
UT Crab Creek Stream & Wetland Final 6 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
Table lb. Component Summations
UT Crab Creek Stream & Wetland / Pro jectNo 857
Restoration
Level
Stream
Riparian Wetland (Ac)
Non-
Riparian
Ac
Upland
(Ac)
Buffer
(Ac)
BMP
-
1Lvenne
Non- Rtvenne
v
Restoration
4,260
80
Enhancement
3 1
Enhancement 1
0-
Enhancement 11
496
Creation
02
Preservation
2,172
53
HQ Preservation
0
0
0
i
166
00
Totals
6,928
166
0
0
0
0
[Non- Apphcable j
_ UT Crab Creek Stream & Wetland Final
Project No 857
Baseline Monitoring Year 0
7 Equinox Environmental Consultation and Design, Inc
February 2011
l: Project c:omgonents and Assets
Prepared for
o�wstem
a .
E ement
PROGRAM
Project: UT to Crab Creek Stream and Wetland Restoration
Mitigation Plan
Alleghany County, North Carolina
Sheet 1 of 1
Date
February 2011
Notes: 1) Base Map from CAD file "Crab—base—final" Provided by KCI Associates of NC P.A.
2) 2005 Aerial Photo
Project Number
WEEP # 857
Prepared by
EgUINO&
IN RONMENTAL
<oM�wmwo o nowo
2.4 Project History, Contacts, and Attribute Data
The NCEEP contracted KCI Associates of NC to initiate project planning and data collection for
the Environmental Resources Technical Report in 2006 The Restoration Plan was completed by
KCI in December 2007 ( NCEEP 2007) and construction was initiated in August 2009
Construction was completed in April 2010 with baseline data collection initiated in April 2010
The project activity and reporting history are reported in Table 2 below Project personnel and
contact information for the design and monitoring components is presented in Table 3 Table 4
presents background project attribute information for the site
Table 2 Project Activity & Reporting History
UT Crab Creek Stream & Wetland / Pro ect No 857
Activity or Report
Data
Collection
Complete
Actual
Completion or
Delivery
Land AcQuisition
N/A
5/9/2006
Environmental Resource Technical Report
2006
May 2007
Restoration Plan
2007
Dec 2007
Permit Date
N/A
4/30/2008
Final Des - Construction Plans
N/A
Auiz 2008
Construction
N/A
A ri12010
Temvorary S &E nux applied
N/A
2009-2010
Permanent seed mix applied
N/A
Aril 2010
Planting
N/A
A ri12010
Initial Wetland Monitoring Gauges & Rain Gau a Installed
N/A
Aril 2010
Momhological Data Collection
June 2010
N/A
Mitigation Plan / As -built Year 0 Monitoring - Baseline
June 2010
Feb 2011
Year 1 Monitoring
Year 2 Monitoring
Year 3 Monitoring
Year 4 Monrtorin
Year 5 Monrtorin
N/A - Item does not apply
UT Crab Creek Stream & Wetland Final 9 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
Table 3 Project Contacts
UT Crab Creek Stream & Wetland / Project No 857
Designer
Primary Project Design POC
KCI Associates of North Carolina
Landmark Center II, Suite 220 4601 Sic Forks Road
Raleigh NC 27609
April Davis (919) 783 9214
Construction Contractor
Construction Contractor POC
Carolina Environmental Contracting Inc
P O Box 1905
Mount Airy, NC 27030
Stephen James (336) 320 3849
Planting Contractor
Planting Contractor POC
Carolina Environmental Contracting Inc
P O Box 1905
Mount Airy, NC 27030
Stephen James (336) 320 -3849
Seeding Contractor
Seeding Contractor POC
Carolina Environmental Contracting Inc
P O Box 1905
Mount Airy NC 27030
Stephen James (336) 320 -3849
Seed M ix Sources
Green Resources
Nursery Stock Suppliers
Mellow Marsh Farm
(919) 742 1200
Monitoring Performers (YO) - 2009
Equinox Environmental Consultation & Design Inc
37 Haywood Street Suite 100
Asheville, North Carolina 28801
Stream Momtonng POC
Steve Melton (828) 253 6856
Vegetation Momtonng POC
Wm Taylor (828) 253 -6856
Wetland Monitoring POC
Win Taylor (828) 253 6856
Monitoring Performers (Y1) - 2010
Stream M omtonng POC
Vegetation M omtonng POC
Wetland Monitoring POC
Monitoring Performers (Y2) - 2011
Stream M omtonng POC
Vegetation M omtonng POC
Wetland Monitoring POC
Momtonng Performers (Y3)- 2012
Stream MonitonngPOC
Vegetation M omtonng POC
Wetland Monitoring POC
Monitoring Performers (Y4)- 2013
Stream M omtonng POC
Vegetation M omtonng POC
Wetland M omtonng POC
Monitoring Performers (Y5)- 2014
Stream M omtonng POC
Vegetation M omtonng POC
Wetland MonitonngPOC
UT Crab Creek Stream & Wetland Final
Project No 857
Baseline Monitoring Year 0
10 Equinox Environmental Consultation and Design, Inc
February 2011
Table 4 Project Attributes
UT Crab Creek Stream & Wetland / Project No 857
Project County
Alle han
Ph sio ra hic Region
Blue Ridge
Ecore ton
New River Plateau
River Basin
Little River
USGS HUC
05050001030020
NCDW Sub -Basin
05 -07 -03
Within Extent ofEEP Watershed Plan
Little River and Laurel Branch Local Watershed Plans
W RC Class
Cold
% of Prorlect Easement Fenced or Demarcated
00/0
Beaver Activity Observed During Design Phase
No
Restoration Component Attributes
UTl
UTCC -US
UTCC -DS
Drainage Area (sq mi
053
165
2 64
Stream Order
Fist
Second
Second
Restored Length feet
1,775
2,485
N/A
Perennial or Intermittent
Perennial
Perennial
Perennial
Watershed Type
Rural
Watershed LULC Distribution
Forest/Wetland
Pasture/Managed Herbaceous
Other
53%
45%
2%
Watershed Impervious Cover
-
-
-
NCDW AU /Index Number
10 -9 -12
10 -9-12
10 -9-12
NCDWQ Classification
C, Tr
C, Tr
C, Tr
303d Listed
No
No
No
Upstream of 303d Listed Segment
No
No
No
Reasons for 303d Listing or Stressor
N/A
N/A
N/A
Total Acreage of Easement
478
Total Vegetated Acreage within Easement
90
106
197
Total Planted Acreage as Part of Restoration
33
106
15
Ros en Classification of Pre-Fmstm
G4/C4
C4
E4
Ros en Classification of As -Built
Cb /C
C
N/A
Vallev TvDe
-
-
Val)ey Sloe
0 025
0 010
-
Valley Side Slope Range
-
-
-
Valley Toe Slope Range
-
Cowardm Classification
N/A
N/A
N/A
Trout Waters Designation
Yes
Yes
Yes
Species of Concern, Endangered, Etc
Bog Turtle, American Speedwell, and Canadian Burnet
Donnnant Sod Senes and Charactenstics
Series
Depth
Clay%
K
T
Nikwasi
-
-
Information unavailable
N/A - Item does not apply
UT Crab Creek Stream & Wetland Final I I Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitonng Year 0
3.0 SUCCESS CRITERIA
3.1 Morphometric Parameters and Channel Stability
Considering the typical 5 -year timeframe for mitigation monitoring, the determination of success
for stream projects is often based primarily on the degree of morphological stability The
complete absence of any change over these timeframes will certainly be interpreted as stability,
but is not a pre - requisite To the contrary, it is typical for streams to demonstrate variation over a
5 -year monitoring period in the form of sustainable rates of change or stable patterns of variation
(dynamic stability) Considering the young state of woody buffers and the fact that design
parameters are estimates and therefore never a perfect match for the watershed regimes, restored
streams typically adjust or shift to some extent after their exposure to varying flows in the years
that immediately follow construction However, these changes should be moderate and exhibit
little discernable trends Annual variation is to be expected, but over time and with buffer
development should generally demonstrate a reduction in amplitude and demonstrate dynamic
maintenance around some central tendency that represents acceptable distributions for design
parameters and/or stable stream types Key among these are parameters that indicate lateral and
vertical stability and intended levels of floodplain connection If some trends or patterns become
evident, they should be modest or indicate migration toward another stable form Lastly, all of
this must be evaluated in the context of hydrologic events to which the system is exposed over
the monitoring period
3.1.1 Dimension
Dimensional stability will be based on comparisons of overlays of annual cross - section plots and
their calculated parameters to the as -built conditions, design distributions, and distributions for
stable stream types Parameters such as cross - sectional area and the channel's width to depth
ratio should demonstrate modest overall change and patterns of variation that are in keeping with
above description of dynamic stability The stream dimension should not demonstrate trends of
enlargement either through downcutting or widening, however, modest year -to -year variation or
oscillation in channel elevation or width demonstrating maintenance around baseline or design
distributions is acceptable Changes from depositional processes resulting in the development of
constructive features on the banks and floodplain, such as an inner berm, channel narrowing,
natural levees, and general floodplain deposition will be acceptable forms of change and
indicative of stability
The entire project will also be visually cataloged for areas of bank instability and represented as
proportions of overall bank footage The overall proportion, seventy, spatial distribution, and
temporal trends in this parameter will be assessed to serve as an additional indicator of
dimensional stability In general, stability proportions (stable bank/total bank) below 85% would
be of concern Considering temporal trends, a higher percentage in a given year may also be of
concern if it represents a data point in a trend of decreasing stability Instability dominated by
surface scour versus mass wasting would be an example of differing seventy and the latter would
be more concerning than the former Erosion in meanders versus riffle reaches would generate
differing levels of concern because erosion in the former is more likely given greater bank shear
stress, whereas instability concentrated in nffle /run reaches might be more indicative of an
overall design flaw
UT Crab Creek Stream & Wetland Final 12 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Momtonng Year 0
C'
C
C
t,
3.1.2 Pattern and Profile
Reach profiles should not exhibit any consistent trends in thalweg degradation over any
significant continuous portion of its length Some aggradation will be acceptable and will not be
actionable unless it is apparently causal for widening/bank erosion Over the monitoring period,
the profile should also demonstrate the maintenance or development of bedform (facets) more in
keeping with reference level diversity and distributions for the stream type in question It should
also provide a meaningful contrast in terms of bedform diversity against the pre - existing
condition Bedform distributions, riffle /pool lengths and slopes will vary, but should do so with
maintenance around design/as -built size distributions This requires that the majority of pools
are maintained at greater depths with lower water surface slopes and riffles are shallower with
greater water surface slopes
3.1.3 Substrate
Pebble count data should indicate the progression towards or the maintenance of the known size
distributions from the design phase The absence of any significant trends in bed aggradation or
deposition should represent stable conditions in terms of sediment input and transport
functionality
While stream protects are designed to transport bedload in equilibrium and carry overall
sediment loads at bankfull, fines can be transported even at low discharges and upstream
instability beyond design projections can also lead to deposition as storm events recede in areas
of energy dissipation such as restoration reaches This can have the effect of obscuring bedform
and fining of riffles especially in the first few years after the implementation of a stream project
In many cases subsequent narrowing and reduction of width/depth ratios as a project
develops /stabilizes can then increase transport efficiency and return bedform to intended
distributions, but some fining can persist due to upstream disturbance
3.2 Hydrology
3 3.1 Stream
A minimum of two bankfull events must occur within separate years during the five -year
monitoring period
3.3 2 Wetland
Wetland hydrology will be considered established if groundwater monitoring data indicates
saturated soils within 12 inches of the soil surface for 5% of the growing season under normal
weather conditions The growing season for the site was based on the Natural Resource
Conservation Service (MRCS) data set for Ashe County (MRCS 2009) The Alleghany County
data set is based on a site with elevations approximately 1,000 feet different from the project site
According to NRCS, the growing season for Ashe County is defined to be the period with a 50%
probability that the daily minimum temperature is higher than 28 °F At the project site, this
period extends from May 2 "d to October 5th for a total of 157 days (NRCS 2009) Based on this,
wetland hydrology success will be achieved if the water table is within 12 inches of the soil
surface for 8 consecutive days or more during the growing season
UT Crab Creek Stream & Wetland Final 13 Equinox Environmental Consultation and Design, Inc
Project No 857 February 201 l
Baseline Monitoring Year 0
3.3 Vegetation
The success of the riparian and wetland vegetation plantings will be determined by planted stem
densities within established monitoring plots Survival of planted woody species must meet a
nunimum survival success criterion of 320 stems per acre through year three and 260 stems per
acre after year five Two planting zones (Zones D and E1) were subject to low density planting
efforts Planting zone D is classified as a Southern Appalachian Bog community in which
vegetation establishment consisted of an open shrub layer with areas dominated by herbaceous
vegetation Zone E 1 classified as Montane Alluvial Forest community consisted of a
supplemental planting to enhance the existing vegetative community To capture planting zones
with lower, planted woody stem densities, data will be collected from temporary, random
circular plots in Zone D to document species presence biannually during the five -year
monitoring period Random circular plots will not be employed in Zone E1 due to the presence
of existing mature trees within this zone
4.0 MAINTENANCE AND CONTINGENCY PLAN
During annual monitoring efforts any potential constraints to project success criteria will be
documented and reported Maintenance recommendations will be based on the seventy of the
problem and in consultation with NCEEP The site will be subject to invasive vegetation species
control to suppress and eliminate isolated areas currently containing high threat invasive
vegetation species Any maintenance activities and corrective measures deemed necessary will
be documented within the annual reports
5.0 PROJECT MONITORING and AS -BUILT CONDITIONS
5.1 Feature Monitoring Details
Features established for baseline data collection and future annual monitoring purposes included
stream cross - sectional and longitudinal profiles, substrate assessment sites, stream and wetland
hydrological monitoring stations, vegetation monitoring plots, and photographic monitoring
stations (Appendix A — Monitoring Plan View)
5.1.1 Stream
Ten permanent cross - sections were established throughout the restoration reaches Cross -
sections transecting three riffles and two pools were established on both UT and UTCC -US
Cross - section locations were marked on both banks with rebar and PVC conduit with fluorescent
pink flagging tape Cross - section data will be collected annually to document changes in
dimensions such as area, width to depth ratios, and entrenchment ratios
Longitudinal profile monitoring reaches were established for 3,352 linear feet of restored
channel UT 1 included two reaches (UT 1 — Upper and UT 1 — Lower) for a total of 897 linear
feet and UTCC -US included 2,455 linear feet The beginning and ending locations of the
longitudinal profile reaches were marked on both banks with rebar and PVC with blue and white
UT Crab Creek Stream & Wetland Final 14 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
l
r
�l
striped flagging tape Annual measurements will be compared with as -built conditions to
document trends in the stream profile occurring throughout the monitoring period A total
station will be used to collect annual cross - sectional and longitudinal profile data Visual
monitoring will be conducted for all additional stream segments
Bed material composition will be documented through annual pebble counts at each cross -
section location
512 Hydrology
Two crest gauges were installed within the project site, one at the downstream end of on UT1
and one at the downstream end of UTCC -US Crest gauges were marked with red and white
striped flagging tape, whereas wetland gauges were marked with PVC and fluorescent green
flagging tape Crest gauge readings will be collected during each site visit to document bankfull
events
Eight wetland gauges were installed throughout the project site and included seven restoration
areas and one reference gauge in the preservation area Additionally, an automated rain gauge
was installed on site Wetland and rain data will be collected monthly during the growing season
to document groundwater hydrology and site precipitation
513 Vegetation
Nine riparian and wetland vegetation monitoring plots were established based on the CVS -EEP
protocol and include five non - standard 5 x 20 meter plots and four standard 10 x 10 meter plots
Approximately 0 025 -acre in size, vegetation plots were established and data was collected to
document baseline vegetation conditions Annual monitoring will determine the success of
planted vegetation and the overall trajectory of woody plant restoration and regeneration at the
project site Plots were placed within the applicable planting zones to capture the heterogeneity
of the designed vegetative communities Vegetation monitoring plot corners were marked with
rebar and PVC pipe, and recorded with a handheld GPS unit Plot corners and planted stems
were also marked with fluorescent orange flagging tape The vegetation plot origin was labeled
with the plot number Data for the baseline report was collected according to the CVS -EEP
Level I protocol and entered into the CVS -EEP Data Entry Tool (Version 2 2 7) Subsequent
annual monitoring data collections will follow Level H (Lee et al 2008)
In order to capture planting zones with lower, planted woody stem densities, CVS -EEP data
collection efforts and visual surveys will be supplemented with eight temporary, random 200m2
circular plots in Zone D The purpose of these plots is to detect changes in stem density over
( time Only species presence data will be collected biannually in Year 2 and Year 4 monitoring
Plot placement in Year 4 monitoring will be independent of Year 2
5.1.4 Permanent Photo Locations
Permanent photo stations were established at each cross - section to digitally document annual
conditions of the left and right banks Each vegetation monitoring plot includes a photo station
taken diagonally from the origin towards the opposite plot corner Additionally, 16 permanent
photo stations were established throughout the project area to provide representative digital
t
UT Crab Creek Stream & Wetland Final 15 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
documentation of stream features and vegetation conditions Permanent photo stations were
marked with labeled wooden stakes and red flagging tape
5.15 Visual Assessment
Visual stream assessments will occur during annual monitoring to summarize performance
percentages of morphological and structural feature categories Visual vegetation assessments
will occur to catalog the extent and type of vegetation issue areas as compared to the total
planted acreage within the project site
5.2 As -Built Conditions
The project's as -built conditions are included in Appendix B — As -built Plan View
5.2.1 Streams
Baseline stream monitoring data were collected in June 2010 Data are summarized in Tables 5
and 6, while cross - section and longitudinal profile graphics are located in Appendices C & D In
general, the restored and enhanced stream pattern was similar to the proposed design The
design Rosgen classification for UT was a B4c /C4 Based on the as -built conditions, the UT1-
Upper reach classifies as a Cb and the UT1 -Lower reach classifies as a C with both having low
width to depth ratios for these stream types A portion of one stream reach within UT1,
originally designed for enhancement, was actually restored Additionally, a step -pool structure
and three log sills were added during construction of UT 1
5 2 2 Hydrology
The grading originally proposed for wetland area 5 was deemed unnecessary during
construction, additional grading occurred in wetland area 3 to compensate for this change
Stream and wetland hydrological monitoring will be initiated prior to the beginning of the 2010
growing season
5.2 3 Vegetation
Baseline vegetation monitoring data were collected in April 2010 Vegetation plot attribute data
are included in Table 7 and Table 8, whereas individual plot photos are included in Appendix E
Individual plant species by plot and plot means are reported in Table 9 Stem counts for each of
the nine vegetation monitoring plots were recorded by species
Approved substitutions from the proposed planting plan included black gum Nyssa sylvatica for
sweet birch Betula lenta, common three square Schoenoplectus pungens for green bulrush
Scirpus atrovirens, hop sedge Carex lupuhna for nut sedge Cyperus esculentus, lurid sedge
Carex lurida for prickly bog sedge Carex atlantica, and cardinal flower Lobeka cardinalcs for
spotted jewelweed Impatiens capensis Additionally, coralberry Symphoricarpos orbiculatus
was planted in Zones C, D, and E1/E2 Undisturbed forested areas within some planting zones
were not planted, resulting in a planted area of 15 4 acres out of a total of 23 9 vegetated acres
within the easement area
Results from the baseline documentation indicate a planted stem density ranging from 121 to 768
stems per acre The average stem density for the entire restoration site is 450 stems per acre, of
these, 85% were noted to have either good or excellent vigor values However, vegetation plots
UT Crab Creek Stream & Wetland Final 16 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
4, 5, and 6 do not meet the interim success cntena of 320 stems per acre In addition, invasive
exotic plants such as Japanese honeysuckle Lonicerajaponica, Chinese privet Ligustrum
sinense, and multiflora rose Rosa multiflora were recorded in dense patches adjacent to
vegetation plots 8 and 9
5.2.4 Permanent Photo Stations
Photos were collected during April 2010 at the 16 permanent photo stations established
throughout the project area to provide representative digital documentation of baseline stream
and vegetation conditions (Appendix F — Permanent Photo Station Photos) Pre - construction
photos are included in Appendix F where available
UT Crab Creek Stream & Wetland Final 17 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
V/A Item doa cot apply
Number- reported ore the man pmmta a from the r Mc arface pebble eomts
The ilea section — were developed tamg m malyticel des 9n approach Pities. cad profile dos de—ed from U.N. —h—col niche. from the —sting to I dma
UT Crab Creek Stream & Wetland Final 18 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitonng Year 0
Table S BaseORe Stream Data Summary
UT Crab Creek Stream & Wetland / Pro ect Ni 857 - UTI - Upper (500 feet)
Parameter
local Cone
Pre4sistl
Condition
Reference
Reach Data
Restart
As Built /Baseline
Dimension &Substrate Rime
!L
UL
F4
No
Mean
Med I
Max
I SD
N
No
INkital
Med I
Max
SD
N I
No
IN&ka o
Max
No
Mew
Med
Max
SD
N
Bankfu0 Width (ft)
9 9
13 5
13 6
158
251
5
N/A
N/A I
N/A
N/A
N/A
N/A 1
1 131
148
153
153
15 7
NA
2
Fktodpmre Wdth(ft)
182
N/A
N/A
155
N/A
5
N/A
N/A
N/A
N/A
N/A
N/A
22
1
33
>I00
>1001
>1001
1100
NA
2
Baokfull Mean Depth (ft)
090
120
120
150
023
L
N/A
N/A
N/A
N/A
N/A
110
130
150
150
160
NA
2
Bankfu0 Mu Depth (R)
1 20
0
2 40
0 51
_L
5
N/A
N/A
N/A
N/A
N/A
N/A
200
240
250
250
250
NA
2
BankfL l Cross Sectional Arm (ft')
140
141
_L80
151
150
159
072
5
N/A
N/A
N/A
N/A
N/A
N/A
148
203
222
222
240
NA
2
Width/Depth Rmm
1
1
65
122
117
167
4 12
5
N/A
N/A
N/A
N/A
N/A
N/A
120
92
107
10 7
12 2
NA
2
Entrenchment Ruro
1 2
3 4
3 3
>5 6
1 56
5
N/A
N/A
N/A
N/A
N/A
N/A
17
16 4
16 6
_>t±
>6 7
NA
2
Book Height Rum
1 0
1 6
1 7
2 4
054
5
N/A
N/A
N/A
N/A
N/A
N/A
1 0
1 0
1 1
1 1
1 1
NA
2
d50 (rant)
19
1 40
45
56
16 70
5
N/A
N/A
N/A
N/A
N/A
N/A
Profile
Riffle Irngh (ft)
N/A
N/A
N/A
N/A
N/A
N/A
58
28 7
122 6
68 2
2342
7
Riffle Slope(ft/ft)
0023
0057
0014
003
0014
003
0014
0023
RE
0033
0007
7
Pool bengh(ft)
70
130
14
47
140
470
35
86
BI
198
444
13
Paol Max Depth (ft)
19
2 1
2 1
22
0 13
5
N/A
N/A
N/A
N/A
N/A
N/A
10
1 1
32
32
3 2
3 2
NA
1
Pool Spacmg(ft)
600
650
34
126
540
1260
68
389
340
1131
3033
12
Pool Vohr�(ftr)
N/A
N/A
N/A
N/A
Pattern
Ctmnnel Beh Wuah (ft)
21 01
1
15801
32
1
1
1 58
1
1
13201
58 0
126 6
137 4
140 1
1 44 4
1 7 06
6
Radius of Cw-.V re (ft)
110
370
1 20
37
20 0
77 0
28 7
12,!171
32 4
51 3
111311
6
Rc BmkOrO Width (ft)
07
3 7
N/A
N/A
N/A
N/A
N/A
N/A
I S
2 6
1 9
2 1
3'
NA
NA
Memrder Wavekngh(ftl
900
1910
900
1910
900
1910117913551307162670LM
4
Meander Width Ruro
13
58
N/A
N/A
N/A
N/A
N/A
N/A
2 4
4 4
2 6
2 6
2 6
2 7
NA
2
Substrate BedwdT rtParamete
Rr% /Ruh / P A / G A / S%
N/A
42% / 8%/ 24% / 22 %/ 4%
SC% /Sa% /G % /C% /BA /Bc%
• <1 %/10%/59-/./28 %l3 % /0%
N/A
d16/D35/d50/d84/d95I di /tit°( ®)
72/222/400/1030 /1970/ /
N/A
R eadt Shm Stress (Competency) Wit,
N/A
208
Max Part Sae (mm) Mobdaed u Ban"
N/A
262
Stream Power (Trompmt Capaaty) Whet
N/A
Additional Reach Parameters
D,smalp Ara Iwr)
053
N/A
impervious Cover Ea®ete (h)
N/A
Rmga Classtliratton
G41C4
N/A
B4c/C4
Cb
Banklhll Velowy (fps)
39 47
N/A
45
Bankfu0 Durharge(cfs)
62
59 71
N/A
66
ValLy iengh (ft)
N/A
Channel Thalweg itugh(ft)
1730
N/A
1621
500
Smtrosdy
119
N/A
L14
174
Water Surface Slope (M)
00210
N/A
00210
00278
Bankfu0 Slope (ft/ft)
N/A
0 0251
Bankfull Floodp lam Area (ave)
N/A
Proportmo over Wide ( %)
N/A
Ennertrhaent Class (ER Rang)
12 56
N/A
loctsmn Clan (BHR Rang)
N/A
BEHII
Moderate (25 8)
N/A
Channel Stability or Habnu Metro
N/A
Bmlogual or Other
N/A
V/A Item doa cot apply
Number- reported ore the man pmmta a from the r Mc arface pebble eomts
The ilea section — were developed tamg m malyticel des 9n approach Pities. cad profile dos de—ed from U.N. —h—col niche. from the —sting to I dma
UT Crab Creek Stream & Wetland Final 18 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitonng Year 0
Table 5 Baseline Stream Data Summary
UT Crab Creek Stream & Wetland / Project No 857 UTI - Lower (397 feet)
Paremeter
Regiong Cone
Pr
Edstl CotxAtlon
I Reference
Reach Data
--Desillo
As Built / Bmellne
Dimension & Substrate Mille
LL
UL
Eq.
Min
an
MedlMazl
SDI
N
Min
Mena
Med
I Max
SO
N
Min
Mean
Max
Min
Mean
Med
Max
SD
N
Bankfull Width (R)
99
135
13 6
15 8
2 511
5
N/A
N/A
N/A
N/A
NIA
N/A
1 131
11
115
1151
115
NA
I
Floodprone Width (ft)
182
N/A
NIA
>55
N/A
5
N/A
N/A
N/A
N/A
N/A
N/A
220
330
>I00
>I00
>I00
NA
I
Bankfull Mean Depth (ft)
090
120
120
150
023
5
N/A
N/A
N/A
NIA
N/A
N/A
11
150
150
150
NA
I
Bankfull M ax Depth (R)
1 20
1 SD
180
240
051
5
N/A
N/A
N/A
N/A
N/A
N/A
20
250
250
250
NA
I
Bankfull Cross Searonal Area (fl°)
140
141
151
150
159
072
5
N/A
NIA
N/A
N/A
N/A
N/A
148
176
r75
176
176
NA
I
Width43epth Raw
65
122
117
167
412
5
N/A
NIA
N/A
N/A
N/A
N/A
120
75
75
75
NA
1
Fstrtxicvtrnt Raw
1 2
3 4
7 3
>5 6
1 56
5
NIA
N/A
N/A
N/A
N/A
N/A
1 7
>8 7
>8 7
>8 7
NA
1
Boo Hnght Raw
10
16
17
24
054
5
N/A
N/A
N/A
N/A
N/A
N/A
10
10
10
10
NA
1
d50 (mm)
19
40
45
56
167
5
N/A
NIA
N/A
N/A
N/A
N/A
Profile
Rrf . L—lith (fl)
NIA
N/A
N/A
N/A
N/A
N/A
210
376
402
526
1519
5
Rtfik Slope (Will
0 023
0 057
0 014
0 030
0 014
0 030
0 020
0 026
002710033
0 005
5
Pool lrngth(R)
70
130
140
470
140
470
118
174
174
271
624
5
Pool Max Depth (R)
19
2 1
2 1
22
0 13
5
NIA
N/A
N/A
N/A
NIA
N/A
10
2 6
26
26
1 26
NA
1
Pool Spacmg(fl)
600
650
540
1260
540
1260
450
713
734
936
2155
4
Pool Vohime(W)
N/A
N/A
NIA
Pattern
Channel Bell Wtdth(fl),_
[__J__12101
1
15801
32
1
1
1 58
1
1
1320
1
158015721629164216621
39
4
Radius of Curvature (ft)
110
370
20
37
200
370
312
366
378
971
38
4
Rc B-kfull Width (fl)
07
1
1 3 7
1
1
1 N/A
N/A
I N/A
I NIA
I N/A
N/A
1 I S
1
1 2 8
1 2 71
11 3 18
3 28
13 45
1 NA
NA
Meander lNuckn h(fll
I I
1 9001
1
119101
9001
1
119101
900
1910
1420
1960
2020
2440
NA
3
Meander Width Raro
13
1
1
1 58
1
1
N/A
I N/A
I N/A
I N/A
I N/A
I NIA
1 2 4 1
1 44
15581
5 58
1 5 5815
581
NA
I
Substrate Bed and Transport Parameters
R?/ Ru% /P % /G % /S%
NIA
48% 5%/22A/25 % /1%
SC%ISW G % /C % /Ba /BeA
•<1/o/10%/59%/2W/3 % /D%
N/A
dl6 /D35 /d50 /d84 /d95 1df /dt1(mm)
72/222/400/1030 /19701 /
N/A
Reach Shear Stress (Competency) Wit'
N/A
136
M ex Pmt Sae (mm) Mobdaed at B®kfinil
N/A
191
Stream Power(fransport Capacty) Whet
N/A
Adtetional Reach Parameters
Dramage Area (rmr)
053
NIA
lnnpa mCover Estttoae( %)
NIA
RmiFn Classtfaation
G4/C4
NIA
B4r/C4
C
Bankfull Velomty (fps)
39 47
N/A
45
Bankfull Dudtoge(cfa)
62
59 71
N/A
66
Valley lrngh (R)
NIA
Channel Thalweg lrngh (R)
1 730
N/A
1 621
397
Smumay
119
NIA
114
115
Water Surface Slope(R/fl)
00210
N/A
00210
00156
Bankfull Slope (It/ft 1
N/A
001 4
Banitfu0 Floodplam Am (ones)
N/A
Proportnn Over Wide (A)
N/A
Eattendunent Class (ER R.W)
12 56
N/A
Inmwn Class (BHR ltange)
N/A
BEHI
Modcrate(25 8)
N/A
Charnel Stabthty or Habitat M etm
N/A
Bwloly al or Other
N/A
Informawn wavadabte
N/A Item does not apply
Numbers mponcd are the mean percentages from the nfilc srfoee pcbhle mints
The dev section mtma were developed mng m malyncal design approach Pattern and profile data de—ed from stable enhancement reaches from the cxmmg UT I data
UT Crab Creek Stream & Wetland Final 19 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
Table 5 Basehne Stream Data Summary
UT Crab Creek Stream & Wetland / Project No 857 UTCC - US (2,455 feet)
Parameter
Regional Carte
Pre- ESdsting Condition
Reference Reach Data
DesIgo
As Built/ Baseline
Dlmenslon &Substrate MMe
LL
UL
I F4
Min
IMean
Med
Max
SD
N
Mean
Med
Max
SD
N
Min
Mean
Mu
Min
Mean
Med
Man
SD
N
Baokfull Width(ft)
176
204
198
245
291
4
623
623
649
NA
2
240
250
267
265
287
NA
3
Floodptom Wtdth(ft)
65
>g0
4
248
248
296
NA
2
340
>200
>200
>200
>200
NA
3
Bankftr0 M® Depth (ft)
140
165
1 70
1 80
0 17
4
3 35
I J5
3 40
NA
2
1 4
140
1 3J
150
1 70
NA
3
BankfuO Max Depth (R)
240
276
275
320
033
4
r33
340
540
580
NA
2
2J
240
250
250
260
NA
3
Benkfu0 Cross $eaiortat Ar® ftr)
39 0
30 8
III
lJ 7
74 2
157
4
208 0
208 0
218 0
NA
2
34 2
37 0
40 5
42 l
42 4
NA
3
Width/Depth Ratio
100
127
113
179
752
4
186
191
171
147
177
190
193
NA
J
Entrenchment Ratio
7 1
>4 1
4
4 0
5 0
2 3
>7 0
>7 5
>7 5
>8 0
NA
3
Bank Hutt Ratio
1 0
1 1
1 0
1 2
0 10
4
1 0
1 0
1 0
10
NA
1 0
10
1 0
1 0
I I
NA
I
d50 ([an)
38
44
41
36
8 29
4
Ptome
RrtRe LeVh(ft)
149
605
649
1000
2255
19
ROL Slope (ft/ft)
00201
00421
1
0015
0029
0027
0048
0012
5
0014
0045
0006
0 013
001210
021
0005
19
Pool Lengh(ft)
290
530
210
1050
107
460
527
1035
2473
19
Pool Max Depth (ft)
30
31
JI
33
NA
3
19
27
29
29
30
NA
2
Pool Spacmg(ft)
930
1160
1900
1610
1880
9370
4
450
1360
717
130 7
1132
2417
5231
IB
Pool Vole— ft')
Pattern
Channd Bch Width (ft)
130
43 0
500
NA
I
75 0
211 0
54 7
101 7
102 5
172 8
23 59
IS
Rndws of Curvature (ft)
00
• 51
551
NA
1
430
128 0
37 5
51 I
42 5
146 7
26 21
16
Rc BmrkfuO Width(ftl
•'00
••29
08810
088
088
17
51
IS
19
16
51
NA
NA
M eanda WavclmBh (ft)
31 3
159 0
61 6
540 0
213 0
5
20 0
228 0
204 4
238 7
234 4
314 2
32 62
13
Meander Width Ratio
05
24
80
80
80
80
NA
30
84
1 36
1 39
1 39
1 41
NA
3
S abstmte Bed and Transport Peraenete
Rt %/ Ru / /P-/ / G% / S%
47% /9%132%/12/.10-/.
SC•/Sa% /G/. /C% /B % /Bc%
'0//1/0/62 % /36 % / <I % /0%
0//IS %/5 %/48 %/18%/11/
dl6 /D35 /d50 1d84 /d93 /dr" /drp (rmn)
11/23/44/104/150 / /
14/ /1441512/
Reach Sheen stress Ca eten ) INRr
089
073
071
Max Pmt Size (non) Mobdrzed at Baokftr0
130
125
118
$realm Power nns ort C eca ) W/mr
Additional Rena Parameter'
D Area mr)
165
248
Impervious Cover Est®me ( %)
R.Sm Classificanon
C4
C3
C4
C
Bankfull Velomy (fps)
3 3 3 8
3 3
BmkfjH Dtdww(cfs)
197
III 130
117
Valley LcVh (ft)
Channel Thahveg Length (ft)
2086
1 034
2 403
2 455
Smuosay
104
120
120
121
Water Surf= Slope (ft/ft 1
0 0090
00098
00080
1 0 0080
Bankful) Slope (ft/ft)
00083
Bankfu0 Floodplam A— (at>•s)
Proportion Over Wide ( %)
Fntrendmeu Class (ER Range)
3 1 41
3 1 50
Incision Class (BHR Range)
BEHI
Htgh (33 8)
Channd Stabrhty or Habitat Metnc
Bwlogwl or Other
Information ma —lahle
NIA Item don not apply
N—ben reported are the mean percentage, from the raffle arface pebble cows
Exam dream has been channeltad and don not have a natural meander proem wth drama pool and nMe fetus&
UT Crab Creek Stream & Wetland Final 20 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitonng Year 0
i i r
Table 6 Basehne Morphology & Hydrauhc Momtonng Summary
UT Crab Creek Stream & Wetland / Project No 857 - UT1 - Upper (500 Feet)
Parameter
Cross Section l
lime
Cross Section 2
Pool
Cross Section 3
Rime
Dimension
Base
MYl
MY2
MY3
MY4
MY5
Base
MYl
MY2
MY3
MY4
MY5
Base
MYl
MY2
MY3
MY4
MY5
Bankfull Width (ft)
157
Floodprone Width (ft)
1 184
148
Floodprone Width (ft)
>100
>100
>100
26
Bankfull Mean Depth (ft)
1 3
1 9
188
1 6
17 6
Bankfull Max Depth (ft)
24
148
32
7 5
25
Bankfull Entrenchment Ratio
>6 0
Bankfull Cross Sectional Area (ftZ)
203
>8 7
343
Bankfull Bank Height Ratio
10
240
1 0
Bankfull Width/Depth Ratio
122
Cross Sectional Area between End Pms ft2
189
99
21 1
92
d50 (mm)
N/A
Bankfull Entrenchment Ratio
>641
N/A
>54
>6 7
Bankf ill Bank Height Ratio
1 0
11
11
Cross Sectional Area between End Pins ftZ
203
343
24 3
d50 (mm)
N/A
I
I
N/A
N/A
N/A - Item does not apply
Table 6 Baseline Morphology & Hydrauhc Momtonng Summary
UT Crab Creek Stream & Wetland / Project No 857 - UT1 - Lower (397 Feet)
Parameter
Cross Section 4
Pool
Cross Section 5
Rime
Dimension
Base
MYl
MY2
MY3
MY4
MY5
Base
MYI
MY2
MY3
MY4
MY5
Bankfull Width (ft)
167
l 1 5
Floodprone Width (ft)
>100
>100
Bankfull Mean Depth (ft)
1 1
15
Bankfull Max Depth (ft)
26
2 5
Bankfull Cross Sectional Area (fl2)
188
17 6
Bankfull Width/Depth Ratio
148
7 5
Bankfull Entrenchment Ratio
>6 0
>8 7
Bankfull Bank Height Ratio
10
1 0
Cross Sectional Area between End Pms ft2
189
21 1
d50 (mm)
N/A
N/A
N/A - Item does not apply
UT Crab Creek Stream & Wetland Final 21 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
Table 6 Baseline Morphology & Hydraulic Momtonng Summary
UT Crab Creek Stream & Wetland / Project No 857 - UTCC -US (2,455 Feet)
Parameter
Crass Section 6
lime
Cross Section 7
Pod
Cross Section 8
Riffle
Cross Section 9
Pool
Cross Section 10
Rime
Dimension
Base
MYI
MY2
MY3
MY4
MY5
Base
MYI
MY2
MY3
MY4
MY5
Base
MYI
MY2
MY3
MY4
MYS
Base
MYI
MY2
MY3
MY4
MY5
Base
MYI
MY2
MY3
MY4
MYS
Bankfull Width (fl)
250
277
2871
23 5
265
Floodprone Width (fl)
>200
>200
>200
>200
>200
Bankfull Mean Depth (fl)
1 7
17
1 5
1 7
14
BankfiII Max Depth (fl)
26
3
25
27
24
Bankf ill Cross Sectional Ares (ft')
424
473
42 1
407
370
Bankfull Width/Depth Ratio
147
163
195
13 5
190
Bankfu0 Entrenchment Ratio
>8 0
>7 2
>7 0
>8 5
>7 5
Bankfull Bank Height Batto
1 0
11
1 1
10
1 0
Cross Sectional Area between End Pms ft=
42 4
473
4321
41 5
386
d50 (inm)
N/A
N/A
N/A
N/A
NA
N/A Item does not apply
UT Crab Creek Stream & Wetland Final
Project No 857
Baseline Monitoring Year 0
22 Equinox Environmental Consultation and Design, Inc
February 2011
Table 7 Vegetation Plot Attribute Data
UT Crab Creek Stream & Wetland / Project No 857
Plot ID
Community Type
Planting
Zone ID
Reach ID
Associated
Gauges
CVS
Le%el
VP I
Swamp Forest Bog Flood lam
B
UT1
N/A
I
VP 2
Swamp Forest Bog Flood lam
B
UT1
N/A
I
VP 3
1 Swamp Forest Bog Flood lam
B
UTI
N/A
I
VP 4
Southern Appalachian Bog Flood lam
C
UT / UTCC -US
UTC -1
I
VP 5
Southern Appalachian Bog Flood lam
C
UTCC -US
UTC -2
I
VP 6
Southern Appalachian Bog Flood lam
C
UTCC -US
UTC -3
I
VP 7
Southern Appalachian Bog Flood lam
C
UTCC -US
UTC4
I
VP 8
Montane Alluvial Forest
E2
Wetland #7
UTC -7
I
VP 9
Montane Alluvial Forest
E2
Wetland #7
UTC -8
I
UT Crab Creek Stream & Wetland Final 23 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
Table 8. CVS Vegetation Plot Metadata
UT Crab Creek Stream & Wetland / Project No. 857
Report Prepared By
Sarah Marcmko
Date Prepared
4/28/2010 l 12 54 PM
Database Name
UT- CrabCk -v2 2 7 mdb
Database Location
Z \ES \S &WM\EEP Momtonn \EEP -UT Crab Ck \UTC- MYO- 2009\Data \Ve
Computer Name
D 16TNK71
File Size
37613568
DESCRIPTION OF WORKSHEETS IN THIS
DOCUMENT
Metadata
Description of database file, the report worksheets, and a summary of project(s) and
project data
Project Planted
Each project is listed with its PLANTED stems per acre, for each year This
excludes live stakes
Project Total Stems
Each project is listed with its TOTAL stems per acre, for each year This includes
live stakes, all planted stems, and all natural/volunteer stems
Plots
List of plots surveyed with location and summary data (live stems, dead stems,
missing, etc
Vi or
Frequency distribution of vigor classes for stems for all plots
Vigor b Spp
Frequency distribution of vigor classes listed by species
Damage
List of most frequent damage classes with number of occurrences and percent of
total stems impacted by each
Damage by Spp
Damage values tallied by e for each species
Damage by Plot
Damage values tallied by e for each plot
Planted Stems by Plot and Spp
A matrix of the count of PLANTED living stems of each species for each plot, dead
and missing stems are excluded
Project Summary
Project Code
857
Project Name
UT -Crab Creek Stream & Wetland Restoration
Description
River Basin
New
Length ft
Stream to Ede Width ft
Area (sq rm
Required Plots calculated
Sampled Plots
9
UT Crab Creek Stream & Wetland Final 24 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
Table 91 Planted and Total Stem Counts (Species by Plot with Annual Means)
UT Crab Creels Stream & Weiland / Project No 857
Current Plot D.I. (MW 7010)
Annual Means
Scientific Name
Common Name
Species
I vpe
857 -01 -0001
857 -01-0002
857 -01 -0003
857 -014004
857 -01 -0005
857 -01 -0006
857 -01 -0007
857 -01 -0008
857 -01.0 09
MYO(2M0)
P IS
Ptill
T
P 1S
P41
T
PLSIP411
T
P IS
Py11
T
PIS
Pall
T
P IS
PW]
T
P IS
Pall
T
P 1S
Pull
T
P IS
Pall
T
P IS
P WI
T
Alou --Iata
H=1 alder
Staub 1—
3
3
2
2
1
I
2
2
2
2
1
1
11
11
Amon arbutr(olm
Red cMb�hShnib
Shmb
6
6
6
6
Betula kmta var lento
Sxect
T—
1
1
1
1
9
9
4
4
15
15
Carpmus corohnona var vugmuma
Intend
Shmb Tne
I
1
4
4
7
7
1
1
4
4
1
1
3
3
4
4
22
22
11—ert -Hato
CommShmb
1 rce
3
3
2
2
1
I
1
1
7
7
Imdem beomm var beoarm
NonhShmb
T.,
3
3
4
4
1
1
3
3
2
2
10
10
23
23
Vibumumnudum
PossuShmb
Trce
7
7
1
1
a
8
Unknoxn
unlmowo
5
5
5
5
bhmcom
sum (ues
Slre(ACRES )
Species -roan
Stml*rACREI
0
11
11
0
16
16
0
13
13
0
4
4
0
3
3
0
7
7
0
II
II
0
1761
0
19
19
0
97
97
I
I
I I
I
1
1
I
9
002
002
002
002
002
002
002
002
002
022
0
3
3
0
5
5
0
LL-1
0
3
3
0
2
0
4
4
0
4
4
0
T 4
T 4
0
4
4
0
8
8
0
1445214452
0
1647 5
647 51
0
1526 11526
11
1
0
12833129331
0
1445.2144521
0
647 5
647 5
0
1768 9
768 9
0
1 436
436
UT Crab Creek Stream & Wetland Final 25 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
6.0 REFERENCES
Lee, M T, R K Peet, S D Roberts, and T R Wentworth 2008 CVS -EEP Protocol for
Recording Vegetation Version 4 2
NCEEP (North Carolina Ecosystem Enhancement Program) 2009 New River Basin
Restoration Priorities Raleigh, NC
NCEEP (North Carolina Ecosystem Enhancement Program) December 2007 UT to Crab
Creek Restoration Site Alleghany County, North Carolina Restoration Plan Raleigh,
NC
NRCS (Natural Resources Conservation Service) Accessed October 2009 Climate Analysis
for Wetlands by County http / /www wcc nres usda gov /climate /wetlands html
Rosgen, D L 1997 A Geomorphological Approach to Restoration of Incised Rivers In
Wang, S S Y, E J Langendoen, and F D Shields, Jr (Eds ) Proceedings of the
Conference on Management of Landscapes Disturbed by Channel Incision pp 12 -22
Schafale, M P and A S Weakley 1990 Classification of Natural Communities of North
Carolina, 3`d Approximation North Carolina Natural Heritage Program, NCDEHNR,
Division of Parks and Recreation Raleigh, NC
UT Crab Creek Stream & Wetland Final
Project No 857
Baseline Monitoring Year 0
26 Equinox Environmental Consultation and Design, Inc
February 2011
U
,1
Appendix A
Monitoring Plan View
Plan view
Prepared for IProject: UT to Crab Creek Stream and Wetland Restoration I Notes: 1) Base Map from CAD file "Crab—base—final" Provided by KCI Associates of NC P.A. I Prepared by
rA"",-3
E aamemcht
PROGRAM
Monitoring Plan View
Alleghany County, North Carolina
Sheet 3 of 4
Date
January 2011
2) 2005 Aerial Photo
Project Number
NCEEP # 857
EQUINOX
ENP RONME awuaw
Monitoring Plan View
•'�
' t
,Y'{:
•C's .
r
.. • 14 � .• Y Cq--� iR M `` •F. h4�'F„ •.
••
,.Cn s^
G'S �� .i �,.
-
.. Rte'
f
1 1 5 5 • r
•A
00 jk-
10 dl
f {'i -..- �. -
fA 44
�� {
' ,� -
-mss , i w �o ' ;�' "� , ••r
t
� �
r...
1 '• w a S .r
� 9
•
'- Y r
` �,
t
Legend
t
''-
`, •;•
' . ,
•r ••
— • - Easement Boundary
��� r
• •,� wl,y `R ,� `
�. Structures
I A
+
•�,
Power Line ROW
�
.. ,
Roads
G Control Points
Stream Alignment
a"
Restoration
--- Enhancement II
Preservation
'
•
{ f
�'?
1
Wetlands
�
' ' "7
4 'r�,1 5� u
�J 7••
n:+ "'s�`f�i, t�, �r C
G ��� s_
;�
�
;
® Creation
0 Restoration
y
'�. ' 't
•�
�%:
_+ a
�
Enhancement
ti,• •:d;; r•
�,
® Preservation
Monitoring Features
.
}
Vegetation Plots
•� };� 1 h' ", �,,��• ��
��-- •�•
� ,, �
— — Longitudinal Profiles
Profile Longitudinal
o e Begin /End
• �
i
1�
Cross Sections
_ �r
0 Wetland Gauges
i EE
f , ,+
, +. NSi
18
'
;k*
E
• Crest Gauges
0 Rain Gauge
� •
` �
`4
* Photo Points
Prepared for
Project: UT to Crab Creek Stream and Wetland Restoration
Monitoring Plan View
Notes: 1) Base Map from CAD file "Crab—base—final"
2) 2005 Aerial Photo
Provided
by KCI Associates of NC P.A.
Prepared by
Alleghany County, North Carolina
Sheet 1 of 4
o stem
Earement
EQUINOX
ENS PN UIM o.: ,..1,
Date
Project Number
PROGRAM
January 2011
NCEEP # 857
Plan View
Prepared for (Project: UT to Crab Creek Stream and Wetland Restoration I Notes: 1) Base Map from CAD file "Crab—base—final" Provided by KCI Associates of NC P.A. I Prepared by
Y
ERaffffleht
PROGRAM
Monitoring Plan View
Alleghany County, North Carolina
Sheet 2 of 4
Date
January 2011
2) 2005 Aerial Photo
Project Number
NCEEP # 857
EQUINOX
ENV RONM'oNTAL
Plan View
Prepared for (Project: UT to Crab Creek Stream and Wetland Restoration I Notes: 1) Base Map from CAD file "Crab—base—final" Provided by KCI Associates of NC P.A. I Prepared by
Y
ante ent
PROGRAM
Monitoring Plan View
Alleghany County, North Carolina
Sheet 3 of 4
Date
January 2011
2) 2005 Aerial Photo
Project Number
NCEEP # 857
EQUINOX
ENVIRONMENTAL
o.
Plan View
Prepared for IProject: UT to Crab Creek Stream and Wetland Restoration I Notes: 1) Base Map from CAD file "Crab—base—final" Provided by KCI Associates of NC P.A. I Prepared by
ERag"emeht
PROGRAM
Monitoring Plan View
Alleghany County, North Carolina
Sheet 4 of 4
Date
January 2011
2) 2005 Aerial Photo
Project Number
WEEP # 857
EgUINOX
ENV ROHM' NTT ox
Appendix B
As -Built Plan View
AS —BUILT SURVEY OF
UT TO CRAB CREEK STREAM & WETLAND RESTORATION
SCO# 06- 06784 -01 A
I DAVID S TURNER, AS A DULY REGISTERED PROFESSIONAL LAND
SURVEYOR IN THE STATE OF NORTH CAROLINA, HEREBY CERTIFY THAT
THE DATA SHOWN ON THIS DRAWING WAS OBTAINED UNDER MY
SUPERVISION, IS AN ACCURATE AND COMPLETE REPRESENTATION OF
WHAT WAS CONSTRUCTED IN THE FIELD, AND THAT THE PHYSICAL
DIMENSIONS OR ELEVATIONS SHOWN THUS ARE AS -BUILT CONDITIONS
EXCEPT WHERE OTHERWISE NOTED HERON WITNESS MY_QRIGINAL
SIGNATURE REGISTRATION NUMBER, AND SEAL THIS DAY OF
_"JP___ 2010
/f/ \������► C A R Ol /��i
P i 'Ices i0 - 9%
4- SEAL r.
• r L -4551 a; _
I, DAVID S TURNER, CERTIFY THAT THESE PLANS WERE
DRAWN UNDER MY SUPERVISION FROM AN ACTUAL
SURVEY MADE UNDER MY SUPERVISION AND THAT THE
RATIO OF PRECISION AS CALCULATED IS 1 10 000 +
WITNESS MY ORIGINAL SIGNATURE, REGISTRATION
NUMBER, AND SEAL THIS 301�4' DAY OF !Zj�,,e__
2010
C A RO � /ii
`�� OQ; • ESS /0 5.
—Z t
- .4 SEAL
• r L -4551 Qr
- y _
D S •T I 0
GALAX
Jos SITE
ALLEGHANY CO
SURRY CO
VICINITY MAP
NOT TO SCALE
SHEET INDEX
SHEET 1 - TITLE
MT AI RY
�4
GENERAL NOTES
1 ALL DISTANCES ARE HORIZONTAL UNLESS
OTHERWISE NOTED
2 THE VERTICAL DATUM IS NAVD 88
3 THE BASIS OF BEARINGS IS NCGS STATE PLANE GRID
COORDINATES NAD83 DATUM
4 THIS MAP IS NOT FOR RECORDATION SALES OR
CONVEYENCES AND DOES NOT COMPLY WITH G S 47 -30
MAPPING REQUIREMENTS
5 SEE SHEETS 7 -10 FOR LONGITUDINAL
PROFILE DATA
6 REPRESENTATIVE CROSS-SECTIONS ARE PRESENTED ON
THE SHEET WHERE THE CROSS-SECTION WAS TAKEN
ALL GROSS-SECTIONS ARE SHOWN FROM LEFT BANK TO
RIGHT BANK
7 THE 30' POWER LINE EASEMENT DEPICTED IS CENTERED ON
EXISTING & RELOCATED POWER POLES AND IS SHOWN FOR
REFERENCE ONLY THIS AS -BUILT SURVEY IS NOT INTENDED
TO ADJUST OR RELOCATE THE EASEMENT LINE NOR MODIFY
THE EASEMENT AGREEMENT ANY CHANGES TO THE EASEMENT
SHOULD BE PERFORMED UNDER A SEPERATE DOCUMENT
SHEET 2 - SITE PLAN VIEW - SMALL TRIB
SHEET 3 - SITE PLAN VIEW - MAIN STEM & SMALL TRIB
SHEET 4 - SITE PLAN VIEW - MAIN STEM
SHEET 5 - SITE PLAN VIEW - MAIN STEM
SHEET 6 - SITE PLAN VIEW - WETLAND AREAS 5 & 6
SHEET 7 - LONGITUDINAL PROFILE - SMALL TRIB
SHEET 8 - LONGITUDINAL PROFILE - SMALL TRIB
SHEET 9 - LONGITUDINAL PROFILE - MAIN STEM & SMALL TRIB
SHEET 10 - LONGITUDINAL PROFILE - MAIN STEM
SHEET 11 - STRUCTURE POINT TABLE
REFERENCES.
DEVELOPERIOWNER,
NORTH CAROLINA ECOSYSTEM ENHANCEMENT
PROGRAM
1652 MAIL SERVICE CENTER
RALEIGH NC 27099 -1652
(919)715 -0476
EEP PROJ MGR HARRY TSOMIDES
EEP REVIEW COORDINATOR SALAM MUTADA
PROPERTY OWNERSHIP
WILLOW INVESTMENTS LLC
GALAX VA
DEED BOOK 305, PAGE 165 (ALLEGHANY CO NC
REGISTER OF DEEDS)
PLAT BOOK 9 PAGE 456
PIN 4022 -25-6M & 4022 -05 -9623
CONSTRUCTION BY,
CAROLINA ENVIRONMENTAL CONTRACTING INC
MT AIRY NC
(336)320 -3849
EXISTING CONDITIONS INFORMATION &
BOUNDARY PROVIDED BY DESIGNER.
KCI ASSOCIATES OF NC
RALEIGH NC
(919)783 -9214
U A
J
a 8
mt�Z°
> z
fa
Z UJ
g A�
w:
0
Z;
qO
[L a
0 $
w
w
U- Cl
OZ
J
�otSo
�Q(o
G7
(DwU)
Q w
U
m
O
F-
U
E
IDATE aenorzmo
SURVEYED BY DSrIEGT
DRAM BY
DST/EGT
REVIEWED BY
DST
E
-E aaa CRmc
WA T.
SCALE
NOT TO SCALE
SHEET
1 of 11
g1�Dg5MOlN P�R43 20 G O
PIN: 4012-aa-
CONSERVATION OF
EASEMENT
WILLOW INVESTMENTS, LLC
DB 291, PG 330
PIN: 4022 -17 -2762
i
60
S2
Id
00
TR�BUTAR
100 +72.76
STEP POOL
;EL. 2615.82
EL. 2615.33
EL. 2614.71
G
WILLOW gg INVESTMENTS, LLC
CONSERVAT16NP EASEMENT
DB 305, PG 165
P8 9,, PG 4256
PIN: 4022 25!6945
2608
�o
57
103 +07.PO
1 110
'T
2608
2606
X -(Z E C T I ON 1
RIFFLE
101 44.36
'F-L. 2609.65
STEP POOL
'o
EL. 2 14.02
2605
EL. 26 3.58
2607
EL. 261'2.93
M
)
1
1 1 +90.85 j
n
S P POOL 'I
EL 2608.17
EL'^ 2613.18
'�? °m
EL. 612.59y
o 40
EL. 611.60 =1
LIMITS
OF
DISTURBANCE
N a
CONSERVATION OF
EASEMENT
WILLOW INVESTMENTS, LLC
DB 291, PG 330
PIN: 4022 -17 -2762
i
60
S2
Id
00
TR�BUTAR
100 +72.76
STEP POOL
;EL. 2615.82
EL. 2615.33
EL. 2614.71
G
WILLOW gg INVESTMENTS, LLC
CONSERVAT16NP EASEMENT
DB 305, PG 165
P8 9,, PG 4256
PIN: 4022 25!6945
2608
1
57
103 +07.PO
1 110
EP
STOL
2608
2606
X -(Z E C T I ON 1
RIFFLE
2
'F-L. 2609.65
2607o
'o
m
2605
�°c
2607
n
R
M
)
n N
ri o
n
o
EL 2608.17
2606N
'�? °m
°m o m
o 40
N
2606
o
0 Mo N
O
N a
a
EL. 2607.65
2605
N
N N
o
M
2605
O
N
N too
N ui
0
ry6o 1 0 TH LWEG
w N
� tib
+6 57
1 N
P OOL
f
2604
N
O
o NI `�
N
0
2604
2603
EL. 2604.33
O
N
O
2603
2602
�N
X -S TION 1
2602
2602
O
O
Lo
N M
M
\N
EL. 2602.44
+
o
+ +
N
+ + + +
It a
+ + +
Lon
+
Lo
+
\
1
57
103 +07.PO
1 110
EP
STOL
2606
EL. 2610.98
\
2
'F-L. 2609.65
cob
m
103 +54.98 STEP POOL
2605
�
L. 2609.52
w
2608.58
2605
EL 2608.17
00
0
�
10
261 1 1 4+13.39
o
0 Mo N
S P POOL
`°
N
EL. 2607.65
lip
N
o EL. 606.54
o
�
N
O
N
N too
ry6o 1 0 TH LWEG
w N
� tib
+6 57
1 N
P OOL
f
05.70
p
2604.87
EL. 2604.33
O
N m
W
�N
X -S TION 1
2602
. 107 +07.99
0
m n
\
STEP POOL
/
Z
\N
EL. 2602.44
2601
rno
6m
O L. 2601.87
a
N „
L. 2601.07
2601
rn
Oi ch
MATCHLINE
THIS SHEET
SECTION 2
107 *72.13
72.13
STEP\, POOL
MATCHLINE�I
N
THIS SHEE T0
IN
2606
1
10 +20.10
1 110
STE POOL
2606
N
X- SECTION 2
POOL
L. 2 96.11
cob
m
2605
�
w
Lo
2605
N
ri
0
�
m
2604 N
o
0 Mo N
r
`°
N
2604
lip
N
W
Z
;?
� J
O
N
N too
v
260
1 N
2603
°o
LPL
2602
N m
W
LL p
2602
w
0
m n
/
Z
CO29 9
g
2601
rno
6m
j
a
o
2601
rn
Oi ch
U
QDO
U
NN
O
p w
2600
SURVEYED BY:
DSiIEGT
DRAWN BY: DSTIEOT
REVIEWED BY:
DST]
PROJECT. TLS4M.W4
FILE: CRAB CFM
FW& A24MTAM/O
2600
2599
2599
o Lo
o n o Ln o Ln
o
n
o
Ln
o
O o
N N M 17
O
c0
2601
2601
X -SECT I ON
3 R I F F L E
2600 v
2600
N
ao
°n°.
_
G N
25994 °n N u,
n
m
rn n
2599
Omi m cn
N
N
O
ko C) "�
2598 N
N
N
2598
N
m
co o 2597
,n °v 1
N
2597
Lo
mu') L'in
2596 N N
2596
2595
2595
O O O N
N
n
M
g
a
+ + + + +
+
+
+
+
+
-EL. 2000.61
-EL. 2599.80 (SILL NOT FOUND)
-EL. 2549.39
0'CK SILL
L. \\ 2598.47
1 O 1
1
10 +20.10
1 110
STE POOL
L.
N
21596.56
L. 2 96.11
cob
,X- CTION 3
LEGEND:
- THALWEG
-TOB -TOP OF BANK
- BOTTOM OF BANK
- CENTERLINE FLOW
I
I, N
O
i
WILLOW INVESTMENTS, LLC
DB 291, PG 330
PIN: 4022 -17 -2762
X
( �O
oho
�
s
PGA
Nl-
! 1 S�
MATCHLINE SHEET 3
-RIP RAP STABILIZATION
I � - -OPEN WATER AREA*
-EDGE OF WATER*
- LIMITS OF DISTURBANCE
- EASEMENT MARKER POST
(*AT TIME OF SURVEY)
N:11
U.Z1L
6.56
6.11
_ CTION 3
109 +89.67 STEP OOL
EL: 2594.38 2595.20
( ONLY TOP
ILL FOUND)
e
110+67.28
STEP POOL
EL. 2593.35
EL. 2592.60
cv
THALW G
00
N U J
0
N
N � V
�an
ro a`aCO
CO o = I
F N
Zoo
p0 0�.�
� �oz
J Q
2591 m
113+25,.88
U58112 86.84
2 86.03
H LWEG
NOTES
1. SEE SHEET 1 FOR GENERAL NOTES.
2. ELEVEN (11) PAGE DOCUMENT IS NOT VALID
WITHOUT TITLE SHEET.
AS -BUILT SURVEY BY:
TURNER LAND SURVEYING, PLLC
SURVEYED APRIL 20 -23, 2010
80' 0' 80' 160'
SCALE 1 " =80'
1' CONTOUR INTERVAL
J
cob
�
w
N
r
:5
lip
W
Z
;?
� J
v
s
O
LPL
F-
U)
W
LL p
OZ
w
w3
/
Z
CO29 9
g
w
j
a
o
lnWN
Q W
U
QDO
U
O
p w
DAIS OBHO/1070
SURVEYED BY:
DSiIEGT
DRAWN BY: DSTIEOT
REVIEWED BY:
DST]
PROJECT. TLS4M.W4
FILE: CRAB CFM
FW& A24MTAM/O
SCALE: 1'-w
HEE 2 of 11
LIMITS OFD
DISTURBANCE
�i
MIATI LINE SHEET 2
M ATC H LI N E
I TH LWEG 2573 2573 THIS S H EE
X— SECTION 4 POOL
2572A�,' 2572 . ■
rn
2571^ " N n N n 2571 2s�
2570 N N N ° uni N 2570 \ s\
N N
2569 2569
OF
CONSERVATION
EASEMENT
116+55.00
STEP POOL
EL. 2581.20
EL. 2580.68
EL. 2580.38
co co 0 1 W +97
2568 m o6 m 2568 NOTES RO S VA
10 N N N 1. SEE SHEET 1 FOR GENERAL NOTES. DEL. 2572.
25670 0 ° " 0 N °n n 0 2567 2. ELEVEN (11) PAGE DOCUMENT IS NOT VALID
clj WITHOUT TITLE SHEET. o
+ + + + + + + + + + 0121 68.)
1 LGSH
L. 572.'
2573 X— SECTION 5 RIFFLE 2s73 12 0 6.
73
C 2578 X —SECT ION 1 1 2578 2572 m 2572 7
po
2577 N o 2577 N ° -- ao 00 w "
N an,,,� 2571 a m ,`R 2571 N
n m nan n N n " N - -'n
2576 ui N ao fO 2576 00 M n n
N r " nao `n° 2570 N o o wi ;`° o 0 2570
2575 N N a n� N N "' 2575 2569 N N 1O °° " N C-4
N h^ a rl
< rii'n �N, vci', 2569 N
2574 � �, N ah 2574 N J 1.33'
N rN 2ss8 2ss8 VANE
t=� 2573 O 0 I N N N M n °2573 2567 2567
L .29
O + + a O ° N N n a a + + + + + + + O n
+ + + + + + + + + +
LIMITS 0
nISTIJRRANCF
m
p0
_,0
/
119
2574
WILLOW INVESTMENTS, LLC
DB 291, PG 330
y
BILLY SMITH FARMS, LLC
DB 101, PG 438
PIN: 4022 -17 -2762
OpO0,�
PIN: 4012 -88 -3420
MATCHLIN
�vaA \v
s�ys���
8
RIFFLE
_
THIS SHEET
123 +67�
N
po
cb
X , SECTION 11
2568
/
_,0
/
2574
?s
%
2573
X— SECTION
2568
X— SECTION
7 POOL
X—
SECTION
8
RIFFLE
2573
123 +67�
N
po
cb
2 2572
124+ 1. 3
/ J
END TRI
TARY I
A
M
2567e
ui
°v
Lq n
2572
v
0
rl
2567
N
2571
N
0
2570 o
Lo
N
O
25660
N
N
N
2570
N
N
cq^
fCN
°0
2566
N
N
v'o
2569
N
'�40
n N
N
"
2565
2569
ao
n
v
0
2568
2565
N
ria N
n
Oivi'i
2568
2567
in O " O "
a n u') lD 0
o in
n n
+ +
N
+ + + +
+
2567
o n
O O
o
o
N
u) o "
N n n
o " o
a a "
2564
o to
n
N�
n
X00
+ + +
+ + +
+
2564
+
N
N
�N
N
2563
2563
O n
O_ "_
o N
O in
u)
O N o
in
Lo
o
Lo
O O
+ +
+ +
N N
+ +
n n It
+ + +
<
+
" " O
+ + +
to
+
n n
+ +
00
+
co
+
2573
/
_,0
/
2574
?s
%
2573
X— SECTION
6
X— SECTION
7 POOL
2573
v
0
2572
2573
123 +67�
N
po
°
2 2572
124+ 1. 3
/ J
END TRI
TARY I
=MAIN S
M
n
2571a
n °
N n
Lq n
2572
IN
-- a___�
N 2571
N
2571
no
0
2570 o
c
O
N ° °pDp0
N
a
0
N
2570
N
N
cq^
fCN
°0
N
N
rl
N
v'o
2569
N
'�40
n N
N
"
2569
2569
Qm
n
Lo ro
0
2568
2568
N
N m
"
o "
o o
O "
2568
2567
in O " O "
a n u') lD 0
o in
n n
+ +
N
+ + + +
+
2567
o n
O O
o
o
N
u) o "
N n n
o " o
a a "
-n
"
o to
n
+ +
+
+ +
+ + +
+ + +
+
+ +
+
LEGEND:
— THALWEG
—TOB —TOP OF BANK
— BOTTOM OF BANK
— CENTERLINE FLOW
—RIP RAP STABILIZATION
—OPEN WATER AREA*
—EDGE OF WATER*
— LIMITS OF DISTURBANCE
—EASEMENT MARKER POST
(* AT TIME OF SURVEY)
CONSERVATION
EASEMENT
0' 80'
SCALE 1 " =80'
1' CONTOUR INTERVAL
WILLOW INVESTMENTS, LLC
DB 291, PG 330
PIN: 4022 -17 -2762
2574
/
_,0
/
2574
?s
%
/
I
I
X— SECTION
6
RIFFLE
4
2573
v
0
00
X569
2573
123 +67�
N
po
°
N
124+ 1. 3
/ J
END TRI
TARY I
=MAIN S
M
2572 o
4n
n °
N n
Lo
2572
IN
-- a___�
- -� O
rl
N
2571
zs I
O
f /
/
2571
cn
a
LL
2570
z
ogQ
W
cq^
2570
Z
oiS
v'o
��
2569
In w
N
N
"
2569
Qm
N
U
0
2568
H
DATE-
2568
o "
o o
O "
O in O "
N N n n
o
a
in O " O "
a n u') lD 0
o in
n n
+ +
+ +
+ + + +
+
+ + + + +
+ +
X—, SECTION 11
72
/
_,0
/
/
?s
%
/
I
I
EL. 256 .3
I
N
"2 0
W �I
U
/
256
00
X569
co CF I zo
�W
123 +67�
N
L0514
°
.L. 68
124+ 1. 3
/ J
END TRI
TARY I
=MAIN S
M
STA 14
5. N
14 +44.93
SINGLE V N RM
EL. 2565
I
BILLY SMITH FARMS. LLC
DB 101, PG 438
PIN: 401 2-- 88 -3420
J M AKIN STEM
1 <
i
1 �9
I TOP 0
BANK \
�THAL G II
I
/X— SECTION
Zoe
11+58.34
m A
OSS VANE o -`
EL. 568.61 N° z
{— SECTIO 7
N
0
'I M LOOF BANK
��1i1 ►,
N 8
IC
1
o_ I
/ v
I z�mR,
m
o'00 M
p�too
I o
IV
1'
1
l
LA
J V
LLC
Q -16) PB 9, P 4256
PIN: 4022 2 #6945
' 2569-_
LINE SHEET 4
m
1 +1999
CRO S
V NE
EL. 256 .3
I
W �I
U
/
256
00
X569
co CF I zo
�W
/
Z
/
/ J
0:
s6s
X
O
t Y
e
zs I
O
f /
/
co
N
cn
I
BILLY SMITH FARMS. LLC
DB 101, PG 438
PIN: 401 2-- 88 -3420
J M AKIN STEM
1 <
i
1 �9
I TOP 0
BANK \
�THAL G II
I
/X— SECTION
Zoe
11+58.34
m A
OSS VANE o -`
EL. 568.61 N° z
{— SECTIO 7
N
0
'I M LOOF BANK
��1i1 ►,
N 8
IC
1
o_ I
/ v
I z�mR,
m
o'00 M
p�too
I o
IV
1'
1
l
LA
J V
LLC
Q -16) PB 9, P 4256
PIN: 4022 2 #6945
' 2569-_
LINE SHEET 4
U
J �
0-
C7°'
0 $
Z
xI8
NE
5 -w
co CF I zo
�W
Z
0:
O
t Y
e
zs I
O
0
cn
W
LL
z
ogQ
W
w jo
X�
�
Z
oiS
a
W
In w
Q W
U
Qm
U
0
H
DATE-
SURVEYED BY:
DSTIEGT
DRAWN BY' DSVEGT
REVIEWED BY:
DST
PROJECT: 1LSOP004
FILE: oa�e a+ffx
F�NL A4AIIRT.DWO
SCALE:
HEE 3 of 11
LEGEND:
— THALWEG
—10e —TOP OF BANK
— BOTTOM OF BANK
— CENTERLINE FLOW
—RIP RAP STABILIZATION
® —OPEN WATER AREA*
f —EDGE OF WATER*
— LIMITS OF DISTURBANCE
— EASEMENT MARKER POST
(* AT TIME OF SURVEY)
CONSERVATION
EASEMENT
m�
La tl
z
WILLOW INVESTMENTS, LLC 0
DB 291, PG 330
PIN: 4022 -17 -2762 1
T
D
40' OF 36" CMP
IN= 2560.03
OUT= 2559.57
SHEET 3
NOTES
1. SEE SHEET 1 FOR GENERAL NOTES.
2. ELEVEN (11) PAGE DOCUMENT IS NOT VALID
WITHOUT TITLE SHEET.
AS —BUILT SURVEY BY:
TURNER LAND SURVEYING, PLLC
SURVEYED APRIL 20 -23, 2010
80 0' 80' 160'
SCALE 1"=80'
1' CONTOUR INTERVAL
J
J
U,
(L
W
E
�
U
W°
Z
� J
0
s
C+
LL
O =
w
LL
OZ
ga
}
wwo
>
g
Iwo
a
5
ca co
co
u)w
Qw
U
Qm
U
0
DATE pgndpt0
SURVEYED BY:
DSTIEGT
DRAWN BY: DSTIEGT
REVIEWED BY:
DST
PROJECT: TLS-09-004
FINAL ASaKTDM
SHE 4 of 11
2556
J
rl
2556
o
X— SECTION 9 POOL
�
o
25554
,4
N
N�/
�
�
2555
Lo
�
N
0 8
�
N
N
N
255 N
N
,' N 'o N
-
-�
2554
2553
a
Aa ci -n o
lo
n
rn
F_ �f
W=W
F
2553
O
N
N N �$ N N MN a
N
N
2552
0
`� N LnG N W,
In
€a
O g
2552
I`
N NN N
NW
I.L
LL 11 ,,
2551
g Q
W
w�
2551
o n
o o
_o
n o
N
o o p o 4 o o o
N M n v a Ln in to
4
w
o
n
o o
n a0
o
a0
o
0,
+ +
+
+ +
+
+ + + + + + +
+
+
+ +
+
+
2555
U
qm
U
2555
0
X— SECTION 10 RIFFLE
DATE
08H02070
SURVEYED BY:
2554
DRAWN BY' DSTiEGT
REVI SY:
DST
an
N`O o��
FILE: cRoo anmc
RWIL A9lURT.DMq
SCALE: v ��,
2554
a0
n
a0
�� N 00
,nn �, nj n ao
T
m
T
a0
2553
v
u?
N n rn v `O N M ri N
u'�i
n
2553
�n
N
U)
w)
N
N
N M N � ,.� h 0) N
N
N
N
N
2552
N
N
0) N N 'o N Ln N
2552
N N
2551
Lo
n
2551
lo lo
2550
r N lo
2550
o
o
�n
O
o_ u)
o
N
n o n o u) o Lo o
N M M It in u) t0
in
(0
o
n
in
n
o
a0
+
+
+ +
+
+ + + + + + + +
+
+
+
+
LEGEND:
— THALWEG
—TOP OF BANK
— BOTTOM OF BANK
— CENTERLINE FLOW
—RIP RAP STABILIZATION
—OPEN WATER AREA*
—EDGE OF WATER*
goo — LIMITS OF DISTURBANCE
■ I — EASEMENT MARKER POST
(* AT TIME OF SURVEY)
- OHE
WILLOW INVESTMENTS, LLC
DB 291, PG 330
PIN: 4022 -16 -2071
WILLOW INVESTMENTS, LLC,
DB 291, PG 330
PIN: 4022 -17 -2762
0ff-05° -9623 ON��
--- .._...... .... -
oN�/ / WILLOW
S
❑HE ❑HE / CONDB
SEEP STABILIZATION
STRUCTURES
.... ...... _... -- - -._... PB 9. PG 456
TRACT #2 \� /
PIN: 4022-25 -6945
CE
NOTES
1. SEE SHEET 1 FOR GENERAL NOTES.
2. ELEVEN (11) PAGE DOCUMENT IS NOT VALID
WITHOUT TITLE SHEET.
' Ld
1
AS —BUILT SURVEY BY:
TURNER LAND SURVEYING, PLLC
SURVEYED APRIL 20 -23, 2010
80' 0' 80' 160'
SCALE 1 " =80'
1' CONTOUR INTERVAL
J
- a t .
m 8
�
W �
N
N�/
0 8
5
Z
F_ �f
W=W
F
O
Zo
ZS I
0
€a
O g
I`
NW
I.L
LL 11 ,,
O
g Q
W
w�
>
w (�
U) 2 9
Z
g
oo
a
= o
(AWE
Q W
U
qm
U
0
DATE
08H02070
SURVEYED BY:
DSTIEGT
DRAWN BY' DSTiEGT
REVI SY:
DST
PROJECT:
FILE: cRoo anmc
RWIL A9lURT.DMq
SCALE: v ��,
SHEET:
5 of 11
/' \
IDY W' SEXTON WYATT
D8 110, PG 456
PIN: 4022 -06 -3257
2552—
CONSERVATION
EASEMENT
STABILIZATION \ \\
STRUCTURE
o,
/ r v
WILLOW INVESTMENTS, LLC
\ DB 291, PG 330 rLFjA
CONS &R30 ;IONPGEA STENT
\P8 9, PG 456
TRACT
PIN: 4022-011-9623
-9623
<''O
LEGEND:
- THALWEG
—TOa -TOP OF BANK
- BOTTOM OF BANK
- CENTERLINE FLOW
-RIP RAP STABILIZATION
-OPEN WATER AREA*
-EDGE OF WATER*
- LIMITS OF DISTURBANCE
- EASEMENT MARKER POST
(* AT TIME OF SURVEY)
WETLAND AREAS 5 & 6
DR FA M RD
— CE
NOTES
1. SEE SHEET 1 FOR GENERAL NOTES.
2. ELEVEN (11) PAGE DOCUMENT IS NOT VALID
WITHOUT TITLE SHEET.
AS -BUILT SURVEY BY:
TURNER LAND SURVEYING, PLLC
SURVEYED APRIL 20 -23, 2010
S66
CONSERVATION 25g6 2584
EASEMENT
2582
- -uu,
258
/ WILLOW INVESTMENTS, LLC
DB EE 291, NNPC 33EE0
!� CONDBRVA5O PGE 165MENT
PB RR9q,, PC p 456
� 2is�A PIN: 4022 T05- 9623
\ SEEP
�Fj1� 2
STRUCTURES
ON
S)
WILLOW INVESTMENTS, LLC
D9 291. PC 330 �S�O nRM Flo
PIN: 4022 -16 -2071
L0
N
0
rn
rn
WILLOW INVESTMENTS, L
DB 291, PG 330
�$ PIN: 4022 -16 -2071
7C I O
m�
�0
o�
\ N
�s
�s
\ ss
50' 0' 50' 100'
SCALE 1"=50'
1' CONTOUR INTERVAL
U
m
J
z_
a
m
U.
09
cm
co
2551
22
WILLOW INVESTMENTS, LLC
DB 291, PG 330
O
PIN: 4022-16-2071
DR FA M RD
— CE
NOTES
1. SEE SHEET 1 FOR GENERAL NOTES.
2. ELEVEN (11) PAGE DOCUMENT IS NOT VALID
WITHOUT TITLE SHEET.
AS -BUILT SURVEY BY:
TURNER LAND SURVEYING, PLLC
SURVEYED APRIL 20 -23, 2010
S66
CONSERVATION 25g6 2584
EASEMENT
2582
- -uu,
258
/ WILLOW INVESTMENTS, LLC
DB EE 291, NNPC 33EE0
!� CONDBRVA5O PGE 165MENT
PB RR9q,, PC p 456
� 2is�A PIN: 4022 T05- 9623
\ SEEP
�Fj1� 2
STRUCTURES
ON
S)
WILLOW INVESTMENTS, LLC
D9 291. PC 330 �S�O nRM Flo
PIN: 4022 -16 -2071
L0
N
0
rn
rn
WILLOW INVESTMENTS, L
DB 291, PG 330
�$ PIN: 4022 -16 -2071
7C I O
m�
�0
o�
\ N
�s
�s
\ ss
50' 0' 50' 100'
SCALE 1"=50'
1' CONTOUR INTERVAL
U
m
J
a
cm
W
14
o
a ��
t
W
Z
J
Z
0
Zs Z
O
2
O
H
U)
W
U-
0 z
}ga
H �
WW o
W
cp
Z
co 9
a
O
m
(A w
QW
Ix
U
Qm
U
O
DATE:
OS/,IY20,o
SURVEYED BY:
DSTIEGT
DRAWN BY' DSTIEGT
REVIEWED BY:
DST
PROJECT:
FILE: CRAB CIrEEIc
RNK 118- BUILT.DWO
SCALE:
HEE 6 of 11
C/0000 '0
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N N
(T
(r
U1
UI
m
m
0)
01
O
2606 1
�
�
- -- -
- - - -
-- 2
261 5 -20-
O
O
0
0
O
O
O
TA 105 +65 STEP-PO
2605 70
N
(o
01
OD
O
N
0
--
(3)
OD
O
N
0) OD
2617 9
105 +00
+20
+40
+60
+80
106 +00
+20
+40
+60
+80
107 +00
+20
+40
+60
+80
108 +00
+20
m
O y
9 ? m +40
v
comma +60
2
M
M
r +80
m
Z
�n M 109 +00
Z y
O
+20
v
C +40
C �u
<z
x cn +60
m I
0 5;W
D ZC
X +80
F CC
O < < 110+00
N Z�
C.I � <
2593 18
259520 1
STA 109 +89 67
- -- 2593 95 - —
2594 38
�- 1
100 +00 - - -
2616 68
26173
261172
+20 -- -- - -- -261699 —
7 2616185
+40 - - - -- - -� 261658
261644
2616 113
OL +60 - -- - - - - - -- 261603
26156 STEP POOL
261491 2615 821
+80 - - 261495 STA 100 +72 76
1
261466
26143 2615 33
101+00 -- -- -- --- - 1- 2614153 - --
1
261471
+20 - - - -- - - - - - -- - �- - -
2613 98
+40 -- -- -STEP- POOL --
2612 85 2614 02
STA 101 +44 36
2613 35
+60 - -- - -- 2613 11 261358 _
2612193
1
+80 - - 2613 06
STEP POOL
26113 18
2611 38 STA 101+9 85
102 +00 - -- I -2-61-1-5-9 - -- -
261 1 93
2611103 I
261 1 49
2611 60 X
I ED
+40 - -- 261 1 51- C
2611 23
+60 - 2610 68 -- --
2610 25 O
+80 - - -- - - 2610 81 -- - - - Z
103 +00 - -- -- 2610187_ STEP POOL X
2610 98 Q
2609 36 STAB 103 +07 57
+20
26085 9 _
60873
260965
+40 260935
STEP POOL
260753 2609 52
+60 STA- 103 +54 98 - -L- --
2608 22
2607 62 2608 58
+80 - 2607-14 -- - - - - - - - -
2607 17 1 2608 17
104 +00 -
i�lm7
2607 9P POOL
65
+20 260"'r-
260669 STA-104 + -13 39 - --
2606 54
+40 2606 39 _ _ 1
I
2601 87
-2606 73 -I
+60 2606 16
-
260603
+80 !`
260524 I
105 +00 - 26j 5 19
260556
tv +20 +20 - I - - -- - - - -- --
N N N N N N N N N N N N N N N
O N N
�r
cn cn cn Ln rn rn rn rn rn rn rn rn rn rn rn rn rn
O C7 N 0) 00 O N 00) OD O O O
0 0) 0 00 rn 00
REVI KM DATE AND INFRAL
TRIBUTARY - LONGITUDINAL PROFILE
o AS BUILT SURVEY OF
TURNER LAND SURVEYING, PLLC
UT TO CRAB CREEK STREAM & WETLAND RESTORATION
3201 C�nrldpe OAlle RalalQh NC 27604 — (91675.1376
SCO# 06-06784 -01A _ L ,Q.,.am - oti,,,,�,1e�mcm
EMICE AU EGHANY COUNTY NORTH CAROLINA . www TURNEFUMMURVEYM mm
2605 56
605 51
2606 1
I
-- -
- -
- -- -
- - - -
-- 2
261 5 -20-
2605 02
TA 105 +65 STEP-PO
2605 70
260439
2604 141
260471
-- -- —
— -
- - -
-- 2603 -83 26014 87
260414
I
260411
---2603-7v
i
260433
603 71
2603 10
- - - - -
-- - -
- -- - -
-26021 90 - -- -
1
2602 95— —
- - I
2602 63
I
260265
260251
STEP POOL
2601 1
18 2602 44
- -- - - 2
2601 4
43 S
- - -- -
2601 3
26011 2
28
2601 07�
2600149
-- - -
�-
-- -
- 2600 77 �
- -- - _
__259925
STEP1 P
POOL
13
2599 61 2600 10
i
2599 69
-- - -
- —
— 2599 -59 -
-
2599 39 -
- -- -- -
STEP -POOL OOL
- 2
- --
I I
I 2
2598 73 2598 81
— - - 2
2597 77 259868- -
-
91
- - 2
2597 34 _I 2598 31
--
2597 51
259732
2597 1
11
597 1
14
- 2
2596 38
92_STEP P
POOL -
--
2596 46 S
56
2595 3
33 I
—
____25959 —
2596 11
I - -- —
59569
- -
-
2595 2
24
_ 2
100 +00 - - -
2616 68
26173
261172
+20 -- -- - -- -261699 —
7 2616185
+40 - - - -- - -� 261658
261644
2616 113
OL +60 - -- - - - - - -- 261603
26156 STEP POOL
261491 2615 821
+80 - - 261495 STA 100 +72 76
1
261466
26143 2615 33
101+00 -- -- -- --- - 1- 2614153 - --
1
261471
+20 - - - -- - - - - - -- - �- - -
2613 98
+40 -- -- -STEP- POOL --
2612 85 2614 02
STA 101 +44 36
2613 35
+60 - -- - -- 2613 11 261358 _
2612193
1
+80 - - 2613 06
STEP POOL
26113 18
2611 38 STA 101+9 85
102 +00 - -- I -2-61-1-5-9 - -- -
261 1 93
2611103 I
261 1 49
2611 60 X
I ED
+40 - -- 261 1 51- C
2611 23
+60 - 2610 68 -- --
2610 25 O
+80 - - -- - - 2610 81 -- - - - Z
103 +00 - -- -- 2610187_ STEP POOL X
2610 98 Q
2609 36 STAB 103 +07 57
+20
26085 9 _
60873
260965
+40 260935
STEP POOL
260753 2609 52
+60 STA- 103 +54 98 - -L- --
2608 22
2607 62 2608 58
+80 - 2607-14 -- - - - - - - - -
2607 17 1 2608 17
104 +00 -
i�lm7
2607 9P POOL
65
+20 260"'r-
260669 STA-104 + -13 39 - --
2606 54
+40 2606 39 _ _ 1
I
2601 87
-2606 73 -I
+60 2606 16
-
260603
+80 !`
260524 I
105 +00 - 26j 5 19
260556
tv +20 +20 - I - - -- - - - -- --
N N N N N N N N N N N N N N N
O N N
�r
cn cn cn Ln rn rn rn rn rn rn rn rn rn rn rn rn rn
O C7 N 0) 00 O N 00) OD O O O
0 0) 0 00 rn 00
REVI KM DATE AND INFRAL
TRIBUTARY - LONGITUDINAL PROFILE
o AS BUILT SURVEY OF
TURNER LAND SURVEYING, PLLC
UT TO CRAB CREEK STREAM & WETLAND RESTORATION
3201 C�nrldpe OAlle RalalQh NC 27604 — (91675.1376
SCO# 06-06784 -01A _ L ,Q.,.am - oti,,,,�,1e�mcm
EMICE AU EGHANY COUNTY NORTH CAROLINA . www TURNEFUMMURVEYM mm
r )
co
o
�
�
m
�
�
o
TRIBUTARY — LONGITUDINAL PROFILE
N
(p
N N N N N N
(T U Ln Ln Ln Ln
N N N N N N
Ln Ln Ln (T U Ln
N
Ln
TURNER LAND SURVEYING, PLLC
V
V V OD 00 00 00
0) 00 O N O
00 OD OD to (D (O
4� rn 00 O N
t0
rn
115+00
1 -
110 +00
2593 95
2584 2411" 1
125943 8
+20
25841 2
+20
12594 28
258371
2593 75i
+40
- - -'I -- -
1
2584 09
+40
1 259323
-258390
2583 55
+60
- - -- - 258360
+60
STEP POOL
2582 97 2 183 26
1 2 59256 259335
1
1
STA 110 +7 28
2592 186
+80
- -
2582513 2582 86
+80
--
259271
258231
1 259260
116 +00
a
- I
111+00
1 259208
2582 1�5
2592148
2 581
64 1
2591 97 I
1
2592 35
+20
i
i
+20
2592 31
2581
52
1
I 592 35
2581 53 I
2592 04
+40
-
- 2581 14 - -�
+40
2591 07
258 8 2580 93 1
STEP POOL
2591 63
59150
258120
259101
+60
- - -
2580113
- -ST A 1 -16 +55 00 --
+60
- 2591 12
1
2580 68
2590 417
2580 10
1 259066
+80
- _ L-
- 2580 38
i
+80
2590150
'
2580 118
2579 98
2589 87
117 +00
_
112 +00
I 2580 12
258908
1
+20
t _ _
_ 96 1
+20
2589 -83,-
X
I 2579
1 257982579
10 7
2590 O6
C
+40
-1
-
257927
- -
+40
"f
-08-
I
2579 23
2590
D
2579 0 2579 48 i
258961 1
X
2578
E- 2589 51. 1
+60
'2578 -29 -
-
+60
r
21589621
2589 19 1
' O
I
257823
Z
+80
-
- 2578 -17
- - -j
I
+80
2588'85 - 1
G)
12578 2571139
27
2589 13
X
118 +00
� 2578 14
1 257802
_ ; _ _
113 +00
L 2588 47 -
1258818 1
O
N
2577 48 1
2588 6 2589 08
%
t� m
2577 76
258852
C7
= m
+20
- - - 2577 -70
- -; -
+20
h -' 2588 40 -
2588 10
0
O
S Z
577 67
2587 84 2588 10
Z
+40
' 1
+40
1 - 2587 731
-n
;
258785
O
=
c
I
58786
I
mX
m 0 m
+60
,
- -i v
--
--
- -
- -- -
+60
C m
1 is
258746
STEP
Z
113+075
z
+80
orb-
-
1
+80
2587 10 STA 88 - ,
258740
O N
1 19 +00
w, 0
'
���
- -- - - -
- -- -
-- -
114 +00
258699
2587 07
2586 J78 258732
2586 46
��o
1 258677
258684
_
o1m
I
2586 23
+20
r
+20
- 2586-37 — - -
1
2586 03�
10
58553
c c +40
-Z I ; -
—
+40
--
< M D
x (n
i
I
1 258539
m 1
+60
- t j
F
+60
D Zc:
-0 o
2575 56 i
258498
N
+80
-
+80
I - -
- --
C
257,477
N
o <
i
2574 0
2584
584
58
148
I � �
120 +00
G
2574148 - � - i - -�
- -
115 +00
-
N -
257429
1
W C) W
57442
1
2573 89 I
I
258'+1_4
p _u
+ 0
J
- -- - - --
+20
- -- - -
r
r
N
(T
N N N N N N
(r L1i Ln Ln Ln Ln
N N N N N N
Ln 0 Ln Ln U Ln
N
Ln
P,
OD OD 00 w
O) 00 O N 46 O)
00 00 OD (D (D (D
O) OD O N 4�
(D
()
co
o
�
�
m
�
�
o
TRIBUTARY — LONGITUDINAL PROFILE
REV1810N6 DATE AND DiIiIAL
AS -BUILT SURVEY OF
UT TO CRAB CREEK STREAM & WETLAND RESTORATION
SCO# 06- 06784 -01A
ENNICE ALIEOHANY COUNTY NORTH CAROLINA
L
TURNER LAND SURVEYING, PLLC
_
X01 ,C ffcm _ DNC 38
uwur 7URNEMAWDSURVEYING OOm
POINT #
NORTHING
EASTING
ELEVATION
DESCRIPTION
STRUCTURE #
1216
1028624 9643
1422606 4586
261582
TW /RS
TRIBUTARY
STEP POOL 1
1222
1028607 2108
1422613 5467
261533
TW /RS
1227
1028590 4341
1422611 1613
261471
TW /RF
1234
1028558 3151
1422598 6776
261402
TW /RS
TRIBUTARY
STEP POOL 2
1238
10285451222
1422595 8207
261358
TW /RS
1242
1028536 8258
1422590 2809
261293
TW /RF
1252
1028514 5093
1422593 4060
2613 18
TW /RS
TRIBUTARY
STEP POOL 3
1257
1028497 0886
1422599 9612
261259
TW /RS
1262
1028482 4430
1422602 0187
2611 60
TW /RF
1277
1028412 1411
1422641 2430
261098
TW /RS
TRIBUTARY
STEP POOL 4
1285
1028400 4511
1422663 1176
260965
TW/RF
1291
1028394 4046
1422683 3923
260952
TW /RS
TRIBUTARY
STEP POOL 5
1294
1028387 5129
1422696 9876
260858
TW /RS
1300
1028368 6639
1422705 6676
260817
TW /RF
1304
1028347 2289
1422707 0195
2607 65
TW /RS
TRIBUTARY
STEP POOL 6
1311
1028329 8882
1422710 9862
260654
TW /RF
1341
10282356642
1422701 1710
260570
TW /RS
TRIBUTARY
STEP POOL 7
1352
1028212 7652
1422684 1965
260487
TW /RS
1372
1028187 7165
1422682 6270
260433
TW /RF
1385
1028123 2797
1422733 5426
260244
TW/RS
TRIBUTARY
STEP POOL 8
1390
1028111 5121
1422736 7255
260187
TW /RS
1395
1028097 7849
1422741 0698
2601 07
TW /RF
1400
1028063 1417
1422737 4171
2600 61
TW /RS
TRIBUTARY
STEP POOL 9
1412
1028028 8625
1422751 7725
259939
TW /RF
1418
1028018 7159
1422776 0444
259881
TW/RS
TRIBUTARY
STEP POOL 10
1424
1028008 3493
1422788 2254
259831
TW/RS
1431
1027993 1815
1422793 3759
259751
TW /RF
1442
1027946 2561
1422791 0664
259692
TW /RS
TRIBUTARY
STEP POOL 11
1445
1027935 8953
1422790 4839
259656
TW /RS
1450
1027924 9648
1422797 6429
259611
TW /RF
1460
1027891 4352
1422826 5366
2595 20
TW /RS
TRIBUTARY
STEP POOL 12
1578
1027875 4955
1422839 1255
259438
TW /RF
1595
1027819 6319
1422828 3030
259335
TW /RS
TRIBUTARY
STEP POOL 13
1603
1027792 7390
1422827 2700
259260
TW /RF
1797
1027562 9642
1422883 5788
258769
TW /RS
TRIBUTARY
STEP POOL 14
1808
1027553 2702
1422868 9681
258732
TW/RS
1816
1027543 1811
1422864 8108
258684
TW /RS
1820
1027528 8698
1422867 6680
258603
TW /RF
1877
1027313 8163
1422909 7218
258120
TW /RS
TRIBUTARY
STEP POOL 15
1882
1027303 6419
1422917 3965
258068
Thy
1889
1027287 9387
1422916 8514
1 258038
TW
NOTES
1 SEE SHEET 1 FOR GENERAL NOTES
2 ELEVEN (11) PAGE DOCUMENT IS NOT VAUD
WITHOUT TITLE SHEET
AS -BUILT SURVEY BY
TURNER LAND SURVEYING, PLLC
SURVEYED APRIL 20 -23, 2010
10466
1026949 4558
1423086 7771
257410
TBR/XV
TRIBUTARY
CROSS VANE 16
10498
1026961 6449
1423083 9098
257273
TW /XV
10501
1026958 5756
1423093 3163
257342
BBUXV
10642
1026952 2554
1423098 7527
257448
XV
10517
1026898 4942
1423089 9632
257220
BBULS
TRIBUTARY
LOG SILL 17
10518
1026901 7364
1423083 9346
257220
BBR/LS
10520
1026899 7498
1423086 9648
257212
TW /LS
10529
1026866 0962
1423070 6710
2571 09
TW /LS
TRIBUTARY
LOG SILL 18
10530
1026869 0401
1423068 1258
257132
BBR/LS
10531
1026866 0505
1423074 1754
257131
BBULS ,
10552
1026784 8851
1423075 0180
256929
TW/XV
TRIBUTARY
CROSS VANE 19
10553
1026770 1873
1423075 9480
257098
XV
10554
1026776 9093
1423081 7558
257034
XV
10559
1026772 5550
1423073 7487
257097
BBR/XV
10577
1026738 2246
1423129 1468
256843
TW /LS
TRIBUTARY
LOG SILL 20
10580
1026735 1722
1423126 1253
256862
BBR/LS
10581
1026741 0481
1423130 0715
256858
BBULS
10712
1026846 4718
1423139 2560
257085
TBR/XV
MAIN STEM
CROSS VANE 1
10732
1026851 9957
1423163 8477
257059
TBUXV
10788
1026864 5720
1423159 6449
256861
TW /XV
10795
1026846 2716
1423141 4279
257093
XV
10799
1026845 9153
1423155 3036
256892
XV
11394
1026624 7859
1423164 8085
256535
TW /SAV
MAIN STEM
CROSS VANE 2
11457
1026600 4934
1423170 3925
256759
SAV
12617
1026600 8118
1423169 4844
256752
SINGLE ARM VANE
12618
1026606 1123
1423167 9438
256695
SINGLE ARM VANE
12619
1026608 9788
1423166 8704
256649
SINGLE ARM VANE
12620
1026613 3284
1423166 0287
256633
SINGLE ARM VANE
11469
1026567 3698
1423210 9937
256539
TW /XV
MAIN STEM
CROSS VANE 3
11471
1026554 7440
1423209 7874
256612
XV
11475
1026559 0939
1423224 8397
256707
XV
11299
1026202 3097
1422966 1934
256275
TBR/XV
MAIN STEM
CROSS VANE 4
2523
1026180 8651
1422976 1330
256280
TBUXV
2607
1026199 1644
1422985 5227
256059
TW /XV
12299
1025967 4056
1422745 1966
255731
TW /XV
MAIN STEM
CROSS VANE 5
12301
1025966 3025
1422729 2784
255799
XV
12307
1025952 3141
1422729 2290
255929
XV
2287
1025912 8698
--
1422512 0160
I-
255444
TW /XV
- — —
MAIN STEM
CROSS VANE 6
2338
102590.12519
1 1422290 5238
255270
j____TW/XV _
MAIN STEM
CROSS VANE 7
_
1
LEGEND
TW -
THALWEG
XV -
CROSS VANE
LS -
LOG SILL
RF -
RIFFLE
SAV
- SINGLE ARM VANE
TBR
- TOP OF BANK RIGHT
TBL
- TOB OF BANK LEFT
BBR
- BOTTOM OF BANK RIGHT
BBL
- BOTTOM OF BANK LEFT
J
Z
U
= z
U) i
all
W
H
Z
O
O
W
W
a
Q
�
oz
}gQ
Z
a(
W
co 12 1
H W o 0
J
U
m0) 0
fbWQ)
aw
N
U
QED
U
O
H
°A MM64070
SURVEYED BY DSTABOT
IDRAWN BY
REViEWED BY DIT
PROJECT TLSascoa
FDNL A54KMTDM
NOT TO ;DALE
SKEET
11 of 11
N N N N N N N N N N
(n (n (n (n Cn (n cn Cn cn cn
N 0) OD � OD
O � � OD O N
i
7 N N N N N N N
Ln cn cn cn cn cn cn
4 rn rn rn -4 � �
7 - - Oo - - o - -- N rn
5 120 +00 257429 257448
12574 18 2574 42
2573 46 12573 8
+20 - -- - -- - - -- - 2573 2 2555777333 3225
2257355
+40 - - _ - —2573 06
2572 98
2572 50 223895
+60 -- - - - 1 257269---
257239
2572153
+80 -- - - - _ _ _ - 2572 27
257264
257233 CROSS VANE,
121+00 - 257_1 74 1 257273
1 STA 1120 +97 55
257059 2571 70
+20 -_ -257_1 48 _ _ ---
_
12571 89
2571 39
+40 -
2571 25
25171 41
+60 _,_2 57_193 LoG L -
2570 8653 2572 112E -
2571 02 STA 121+68 72
+80 - - - -- - -- 11`--- 2571 61 - - - --
2571 09
1
D 122 +00 201 -LOG SILL
_ 570 6 2571 09
Z 2570 7 STA 122 +06 75
CD +20 2569 63 I- _ - - C
- -- -
m 257074
+40 I- - -- i - --
r
256952
O
256991 O
z +60 -- - -11 - -- - z
256938
I
O +80 - 2569 -26 - - -- —
2569 04 CRASS VANE
123 +00
25689 STA 69 2 2 +91 33 0
2568-2 O
2568 60 2568 71
+20 -
2568 92 - - - --
+40 - -- -- 2568 49 -- - -
2568 1 256839
+60 21567 84� -
12568 11 LOG SILL
2125 7 I 2568'43
STA 123 +67 66
+80 5680 4
256752
�E 256J23
124 +00 21567 -50 -- — - - - -
2567 50
+20 256 __-
2562567 48 25661 +40 - - -- -- - -- - - - - 6 56
6156
+60 - 41- - 5 STA 124 +61 93
+80 -L� - - - -- - -1
N N N N N N N
m Obi (n v J v V
D7 co O N m
N N N N N N N N N N
cn (n (n (n (n U1 (n Cn (n cn
O N t� m m 41 m OD O N
co
o
_r 25701
256560
2570 1
+20
- - 2564 -11-
2563 79
-
'
STA 15+19
CROSS VANE
2565-39-
99
+20
+40
- -- 2563 -63
L
-
256451
--
+40
+60
_256.4
i 9 -_
2564 64
+60
- --
-
+80
-- - -
- - --
�2569
2568 77
2568 47
25614-77—
+80
16 +00
-
--
2564138
- - -
2564
- - --
77
11 +00
+20
- - --
54
256845
256835
STA_
+20
-
256452
+40
56747
I
+40
+60
-
2563
86
+60
-1
2567 79
+80
-- - -�-
2567 96
-
+80
-�
256409
— 2567 20
17 +00
- - -
-
-
-
12 +00
N J
2563
21 2563
35
256689
+20
_ - -_�
2 563
12
+20
STA 14
95
TRIB CONFLUEN
TA
z=
256545
�
2564 -67—
564 52
256
3 46
2565
a +40
1
-2565-60-
256587
+40
1 2563
13
i�
m
m +60
- -- -
-- 256297
+60
A F
o+80
- --
2562
87
+80
2562
76
18 +00
- - --
-
13 +00
+20
256267
_F
-
+20
+40
- --
2562
19
+40
-- -�
2562132
-
+60
- - - -
_ 2562 50
2562 03
+60
+80
-- -
-2562 01
+80
N -419+00
2561 63
14 +00
C
2561 44
mD
;d Ln +20
- 2560 82—
+20
D ZC
O Ej +40
2560131
—
+40
F cn
2560 92
2561 08
p < +60
--
__
_
+60
rT<1
0
N Z
256
11
W �
< +80
-�
-
--
+80
2561
00
co
o�
20 +00
- - -�
256066
--
15 +00
l�n
6
_ 2560
7 N N N N N N N
Ln cn cn cn cn cn cn
4 rn rn rn -4 � �
7 - - Oo - - o - -- N rn
5 120 +00 257429 257448
12574 18 2574 42
2573 46 12573 8
+20 - -- - -- - - -- - 2573 2 2555777333 3225
2257355
+40 - - _ - —2573 06
2572 98
2572 50 223895
+60 -- - - - 1 257269---
257239
2572153
+80 -- - - - _ _ _ - 2572 27
257264
257233 CROSS VANE,
121+00 - 257_1 74 1 257273
1 STA 1120 +97 55
257059 2571 70
+20 -_ -257_1 48 _ _ ---
_
12571 89
2571 39
+40 -
2571 25
25171 41
+60 _,_2 57_193 LoG L -
2570 8653 2572 112E -
2571 02 STA 121+68 72
+80 - - - -- - -- 11`--- 2571 61 - - - --
2571 09
1
D 122 +00 201 -LOG SILL
_ 570 6 2571 09
Z 2570 7 STA 122 +06 75
CD +20 2569 63 I- _ - - C
- -- -
m 257074
+40 I- - -- i - --
r
256952
O
256991 O
z +60 -- - -11 - -- - z
256938
I
O +80 - 2569 -26 - - -- —
2569 04 CRASS VANE
123 +00
25689 STA 69 2 2 +91 33 0
2568-2 O
2568 60 2568 71
+20 -
2568 92 - - - --
+40 - -- -- 2568 49 -- - -
2568 1 256839
+60 21567 84� -
12568 11 LOG SILL
2125 7 I 2568'43
STA 123 +67 66
+80 5680 4
256752
�E 256J23
124 +00 21567 -50 -- — - - - -
2567 50
+20 256 __-
2562567 48 25661 +40 - - -- -- - -- - - - - 6 56
6156
+60 - 41- - 5 STA 124 +61 93
+80 -L� - - - -- - -1
N N N N N N N
m Obi (n v J v V
D7 co O N m
N N N N N N N N N N
cn (n (n (n (n U1 (n Cn (n cn
O N t� m m 41 m OD O N
co
o
_r 25701
2570 1
L
2569 7
12569 7
REVI910N8 DATE AND arnAL.
256912
256
-
- -
- 2569L02
3201 f3lenrldge DNve Relegh NC 27804 — (919761378
wm TURNERLANDSLIR SMG mn
-
2569 12
_2569 36
17
�2569
2568 77
2568 47
-2566 72_
25618 79
2568
54
256845
256835
STA_
1_1_+58 34 _2568 61
CROi VANE
56806
6708-1--
56747
I
256760
2567 79
2567 96
-
2�8
256738
-�
— 2567 20
I
2567 14
2566 3
2565-74--
2566131
-
256732
256689
2566
81
256575 _
x2565
_
14
STA 14
95
TRIB CONFLUEN
+05
256545
2564 -67—
564 52
SINGLE VANE ARM
256535 STA 14+4493
- 2564142
2565
01
-2565-60-
256587
7 N N N N N N N
Ln cn cn cn cn cn cn
4 rn rn rn -4 � �
7 - - Oo - - o - -- N rn
5 120 +00 257429 257448
12574 18 2574 42
2573 46 12573 8
+20 - -- - -- - - -- - 2573 2 2555777333 3225
2257355
+40 - - _ - —2573 06
2572 98
2572 50 223895
+60 -- - - - 1 257269---
257239
2572153
+80 -- - - - _ _ _ - 2572 27
257264
257233 CROSS VANE,
121+00 - 257_1 74 1 257273
1 STA 1120 +97 55
257059 2571 70
+20 -_ -257_1 48 _ _ ---
_
12571 89
2571 39
+40 -
2571 25
25171 41
+60 _,_2 57_193 LoG L -
2570 8653 2572 112E -
2571 02 STA 121+68 72
+80 - - - -- - -- 11`--- 2571 61 - - - --
2571 09
1
D 122 +00 201 -LOG SILL
_ 570 6 2571 09
Z 2570 7 STA 122 +06 75
CD +20 2569 63 I- _ - - C
- -- -
m 257074
+40 I- - -- i - --
r
256952
O
256991 O
z +60 -- - -11 - -- - z
256938
I
O +80 - 2569 -26 - - -- —
2569 04 CRASS VANE
123 +00
25689 STA 69 2 2 +91 33 0
2568-2 O
2568 60 2568 71
+20 -
2568 92 - - - --
+40 - -- -- 2568 49 -- - -
2568 1 256839
+60 21567 84� -
12568 11 LOG SILL
2125 7 I 2568'43
STA 123 +67 66
+80 5680 4
256752
�E 256J23
124 +00 21567 -50 -- — - - - -
2567 50
+20 256 __-
2562567 48 25661 +40 - - -- -- - -- - - - - 6 56
6156
+60 - 41- - 5 STA 124 +61 93
+80 -L� - - - -- - -1
N N N N N N N
m Obi (n v J v V
D7 co O N m
N N N N N N N N N N
cn (n (n (n (n U1 (n Cn (n cn
O N t� m m 41 m OD O N
co
o
3
L
MAIN STEM - LONGITUDINAL PROFILE
REVI910N8 DATE AND arnAL.
AS -BUILT SURVEY OF
UT TO CRAB CREEK STREAM & WETLAND RESTORATION
SCO# 06- 06784 -01 A
ENWE ALLWHAW COUNTY NORTH CAROLINA
-
- -
TURNER LAND SURVEYING, PLLC
3201 f3lenrldge DNve Relegh NC 27804 — (919761378
wm TURNERLANDSLIR SMG mn
N N N N
Ln Ln Ln Ln
O N 4� 0)
30 +00 i 7� CROSS VANE
2551 255270 1
1 STA 130 +07 09
2551 03 _
+20 --- 2551 38 -
2552 17
+40 --1 - -- __ -
2551 78
+60 2551 8
+80 -
2551 69
31+00 - 2551 94 -
255205
+20 - -� - - -�
255228
+40 - - - - 2552 26
+60 -- -2552 10-
2551 65
+80 - -
2551 69
2551 60
32 +00 - - -1
2550 93
+20 - 2551-02
2551 28
+40
2551 27
25150 95
+60 -- -- -
551 59
+80 2551 -451 '2551 78
33 +00 - -
N J
M +20 -- -- - - - -
O N 3: p
m 2951 13
J
�= +40 2551 -14
mD -
2
Ca m X 255084
m +60 - 255092 -
cm
x p 255058
m Z +80 - -
-1 0 2550 79
z ti
0 0 34 +00 -- 1
255049
+20 _2550 85__J____
255072
c� I
< I?D +40 2550 99
m I
D Z W +60 _2.5 0 90
255097
r C CA
C +80 - - END - MAIN -STEM-
p < < 255087
< m STA 34 +95138
N z�
W G) W 35 +00
cn Ln Ln Ln
r- O Ln N
I-
0)
or-
n
o
N
N N N N
(n
Ln Ln cn Ln
I
[Ull
cn
cp
cn
Ln
20 +00
--
- -t-2560
TURNER LAND SURVEYING, PLLC
� G^"� omm NC zzi - (919)875-1378
rroo
Llwnei921@ro.n corn — Dlumx179@mrt 00m
wwwTURNERLANDSURVEYINGDom
66
+20
O
N
+40
0)
OD
25 +00
1 256059
-
-
255848 STA 120 +43 44
- --
-
+20
+80
-
_
_
2555
96
+40
- - -- -1 -- -I
-
2560 071
02
-
+20
_ -_
125597
-
2556
+60
+40
- 1 1
2555-84
00
+60
- -J -- - 2559 63
-
+80
- - - - -255955
22 +00
- -' - - --
-
2556
255869 D
Z
+20
26 +00
- - --
2555
08
-
m
-�
2558 84
+20
r
(25539
554-04--
9
-- -- 25511 75 Z
-
+40
-
255868 G)
2555 -24-
+80
-
-
+60
255872 O
23 +00
- -
- -- - - -
2555 11
0
Z
- -
- --
+80
+20
-
_
v
+40
--
Iv
- 2557 -88-
-
--
2554
-
76
27 +00
25�57 10
255307
255771
-
C
2554144
R- VANE
+20
2552
78
255287
STA
27
+07
76
STA 24 +16
30 INV CULVERT
+40
-
_
_ -- 2i
53 29
-
-
255731 1
+60
STA 24 +216 10
255336
I
+40
- 2555
-
2555 88
+60
+80
—
2553
82
_
--
255639
25 +00
28+00
- -- -6 - - - -- -I
I
+20
255354
N
-
cn
cn cn cn cn
+20
cn cn 0) 0)
a) 00 O N
255303
-
+40
255330
J2553
81
-
+60
2552
255339
83
+80
2552
-
57
255300
29 +00
2552 14
2552
19
+20
-
255272
+40
--
2553
2515304
09-
--
+60
-
1
- 2552
-58-
-
+80
_2552
65
30 +00
2552
63
C2R5OSS
VANE
2551
27
1
STA
30 +07
09
+20
N
N
N
N
N
can
Ln
Ln
ccn
(Ln
O
N
_r�
01
0o
o
N
N N N N
(n
Ln Ln cn Ln
I
[Ull
MAIN STEM - LONGITUDINAL PROFILE
REVMXM DATE AND WML
4�
0) 00 O N
20 +00
--
- -t-2560
TURNER LAND SURVEYING, PLLC
� G^"� omm NC zzi - (919)875-1378
rroo
Llwnei921@ro.n corn — Dlumx179@mrt 00m
wwwTURNERLANDSURVEYINGDom
66
+20
-- -- -
- - - - - 256090
+40
--
- 2560 26 CROSS VANE
1 256059
255848 STA 120 +43 44
+60
-
1
- -2559.-16 --1-- -
2559 76
+80
-
- - 2559 5 30-
2558 88
21+00
- - -- -1 -- -I
-
2560 071
1
2560 08
+20
_ -_
125597
-
01
+40
- 1 1
l
255954
+60
- -J -- - 2559 63
+80
- - - --
- - - - -255955
22 +00
- -' - - --
-
255869 D
Z
+20
_ _2558 41 -
- - --
m
2558 84
r
+60
-- -- 25511 75 Z
-
255868 G)
i
+80
-
- - -- -I -
255872 O
23 +00
- -
- -- - - -
0
Z
2558 40
+20
-
_
v
+40
--
Iv
- 2557 -88-
12557 82
2557 89
25�57 10
255771
+80
+82 78 12558 62
STA 23
INV CULVERT
24 +00
- --
- - L - -
STA 24 +16
30 INV CULVERT
255746 1
+20
--
NE
25557
255731 1
STA 24 +216 10
I
+40
- 2555
-25- f - - -
2555 88
+60
- - -1- I
2556 i 5 1
i
—
2557 18
+80
_
255639
25 +00
- -- -6 - - - -- -I
I
+20
1
96
N
N N N N
cn
cn cn cn cn
cn
�
cn cn 0) 0)
a) 00 O N
o
9
F
Ig
1
y
I
[Ull
MAIN STEM - LONGITUDINAL PROFILE
REVMXM DATE AND WML
AS -BUILT SURVEY OF
UT TO CRAB CREEK STREAM & WETLAND RESTORATION
SCO# 06 -06784 -01A
ENNICE ALLEQNANYOOUNTY NORTHCAROLINA
a
TURNER LAND SURVEYING, PLLC
� G^"� omm NC zzi - (919)875-1378
rroo
Llwnei921@ro.n corn — Dlumx179@mrt 00m
wwwTURNERLANDSURVEYINGDom
Appendix C
Cross - Section Plots and Photos
Appendix C
2610
2609
2608
2607
2606
r~
0
z�
2605
W
2604
2603
2602
2601 +—
0+00
Cross - Section Plots and Photos
Unnamed Tributary 1- Upper
Cross - Section #1- Riffle
Station 106 + 83 73
0+05 0+10 0+15 0 +20 0+25 0 +30 0+35 0+40 0+45 0+50 0+55
Station (feet)
tAs- buat6f2f2010
UT Crab Creek Stream & Wetland Final 1 Equinox Environmental Consultation and Design, Inc
Project No 857 February 2011
Baseline Monitoring Year 0
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary 1 Upper — Cross - Section #I —Kittle
(Looking at Left Bank Descending)
Baseline — April 19, 2010
Unnamed Tributary 1 Upper— Cross - Section #1— Kittle
(Looking at Right Bank Descending)
Baseline —April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary 1 Upper — Cross - Section #1— Riffle
(Looking Downstream)
Baseline — April 19, 2010
Unnamed Tributary 1 Upper — Cross - Section #1— Riffle
(Looking Upstream)
Baseline — April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary 1 Upper — Cross - Section #2 — Pool
(Looking at Left Bank Descending)
Baseline — April 19, 2010
Unnamed Tributary 1 Upper — Cross - Section #2 — Pool
(Looking at Right Bank Descending)
Baseline —April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary 1 Upper — Cross - Section #2 — Pool
(Looking Downstream)
Baseline — April 19, 2010
Unnamed Tributary 1 Upper — Cross - Section #2 — Pool
(Looking Upstream)
Baseline — April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
2602
2601
2600
_ 2599
a~
0 2598
W
2597
2596
2595
2594 +-
0+00
0+05 0+10
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Unnamed Tributary 1- Upper
Cross - Section #3 - Riffle
Station 109 + 65.00
0+15 0 +20 0 +25 0+30
Station (feet)
— As -built 6/312010
7
Cross — Section Plots and Photos
0+35 0 +40 0+45
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary 1 Upper — Cross - Section #3 — Riffle
(Looking at Left Bank Descending)
Baseline — April 19, 2010
Unnamed Tributary 1 Upper— Cross - Section #3 — Riffle
(Looking at Right Bank Descending)
Baseline — April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary 1 Upper — Cross - Section #3 — Riffle
(Looking Downstream)
Baseline — April 19, 2010
Unnamed Tributary 1 Upper — Cross - Section #3 — Riffle
(Looking Upstream)
Baseline —April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Unnamed Tributary 1- Lower
Cross-Section #4 - Pool
Station 123 + 11.85
2575
2574
2573
2572
0
2571
Gi3
2570
2569
Cross - Section Plots and Photos
2568
0+00 0+05 0 +10 0+15 0 +20 0+25 0 +30 0+35 0 +40 0 +45 0 +50 0+55 0+60 0+65 0 +70 0+75 0+80
Station (feet)
- As -bn9t6 /3/2010 - ---Skf
UT Crab Creek Stream & Wetland Final 10 Equinox Environmental Consultation and Design, Inc.
Project No. 857 February 2011
Baseline Monitoring Year 0
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary 1 Lower — Cross - Section #4 — Pool
(Looking at Left Bank Descending)
Baseline —April 19, 2010
Unnamed Tributary 1 Lower — Cross - Section #4 — Pool
(Looking at Right Bank Descending)
Baseline — April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
11 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Cross- Section Plots and Photos
Unnamed Tributary 1 Lower — Cross - Section #4 — Pool
(Looking Downstream)
Baseline —April 19, 2010
Unnamed Tributary 1 Lower — Cross - Section #4 — Pool
(Looking Upstream)
Baseline —April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
12 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Unnamed Tribntary 1- Lower
Cross - Section #5 - Riffle
Satin 123 + 54.60
2574
2573
2572
a9i 2571
0
2570
W
2569
2568
Cross - Section Plots and Photos
2567
0+00 0+05 0 +10 0+15 0 +20 0 +2S 0+30 0 +35 0 +40 0+45 0+50 O+SS 0+60 0+65
Station (feet)
— f— As- bm1t65i2010 - - - -Bkf
UT Crab Creek Stream & Wetland Final 13 Equinox Environmental Consultation and Design, Inc.
Project No. 857 February 2011
Baseline Monitoring Year 0
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary 1 Lower — Cross - Section #5 — Riffle
(Looking at Left Bank Descending)
Baseline —April 19, 2010
Unnamed Tributary 1 Lower — Cross - Section #5 — Riffle
(Looking at Right Bank Descending)
Baseline — April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
14 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary 1 Lower — Cross - Section #5 — Riffle
(Looking Downstream)
Baseline — April 19, 2010
Unnamed Tributary 1 Lower — Cross - Section #5 — Riffle
(Looking Upstream)
Baseline — April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
15 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
2575
2574
2573
2572
r~
0
2571
w
2570
2569
2568 -1-
0+00
Cross - Section Plots and Photos
UT Crab Creek- Upstream
Cross - Section #6 - Riffle
Station 11 + 47.00
0+05 0 +10 0 +15 0 +20 0+25 0 +30 0+35 0+40 0 +45 0+50 0+55 0+60 0+65 0 +70 0+75
Station (feet)
- As -built 6/3n010 - - - - Bkf
UT Crab Creek Stream & Wetland Final 16 Equinox Environmental Consultation and Design, Inc.
Project No. 857 February 2011
Baseline Monitoring Year 0
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary Crab Creek Upstream — Cross - Section #6 — Riffle
(Looking at Left Bank Descending)
Baseline — April 19, 2010
Unnamed Tributary Crab Creek Upstream — Cross - Section #6 — Riffle
(Looking at Right Bank Descending)
Baseline —April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
17 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary Crab Creek Upstream — Cross - Section #6 — Riffle
(Looking Downstream)
Baseline — April 19, 2010
Unnamed Tributary Crab Creek Upstream — Cross - Section #6 — Riffle
(Looking Upstream)
Baseline —April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
18 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
2575
2574
2573
2572
2571
K
0
> 2570
a�
W
2569
2568
2567
2566
0+00
Cross - Section Plots and Photos
UT Crab Creek- Upstream
Cross - Section #7 - Pool
Station 12 + 02.03
0+05 0 +10 0+15 0 +20 0+25 0 +30 0 +35 0+40 0 +45 0+50 0+55 0+60 0+65 0 +70 0+75
Station (feet)
TAs- bn11t6 /3/2010
UT Crab Creek Stream & Wetland Final 19 Equinox Environmental Consultation and Design, Inc.
Project No. 857 February 2011
Baseline Monitoring Year 0
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary Crab Creek Upstream — Cross - Section #7 — Pool
(Looking at Left Bank Descending)
Baseline —April 19, 2010
Unnamed Tributary Crab Creek Upstream — Cross - Section #7 — Pool
(Looking at Right Bank Descending)
Baseline — April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
20 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Cross- Section Plots and Photos
Unnamed Tributary Crab Creek Upstream — Cross - Section #7 — Pool
(Looking Downstream)
Baseline —April 19, 2010
Unnamed Tributary Crab Creek Upstream — Cross - Section #7 — Pool
(Looking Upstream)
Baseline —April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
21 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
UT Crab Creek - Upstream
Cross - Section #3 - Riffle
Station 17 + 49.02
2570
2569
2568
2567
itv
2566
�i
w
2565
2564
2563
2562
A
i
Cross - Section Plots and Photos
0+00 0+05 0 +10 0 +15 0 +20 0 +25 0+30 0 +35 0 +40 0+45 0+50 0+55 0+60 0+65 0 +70 0+75 0 +90 0 +85
Station (feet)
— As -bnHt6 /3/2010 - - --Bkt
UT Crab Creek Stream & Wetland Final 22 Equinox Environmental Consultation and Design, Inc.
Project No. 857 February 2011
Baseline Monitoring Year 0
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary Crab Creek Upstream — Cross - Section #8 — Riffle
(Looking at Left Bank Descending)
Baseline — April 19, 2010
Unnamed Tributary Crab Creek Upstream — Cross - Section #8 — Riffle
(Looking at Right Bank Descending)
Baseline — April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
23 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary Crab Creek Upstream — Cross - Section #8 — Riffle
(Looking Downstream)
Baseline — April 19, 2010
Unnamed Tributary Crab Creek Upstream — Cross - Section #8 — Riffle
(Looking Upstream)
Baseline — April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
24 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
2556
2555
2554
6 2553
x
a
2552
2551
UT Crab Creek- Upstream
Cross - Section #9 - Pool
Station 32 + 30.85
Cross - Section Plots and Photos
2550 1 i i I I I I i I I I I I F I E i 4
0+00 0+05 0 +10 0 +15 0 +20 0+25 0 +30 0+35 0+40 0 +45 0 +50 0+55 0+60 0+65 0+70 0+75 0 +80 0 +85 0+90
Station (feet)
— As- bailt6 /4/2010
UT Crab Creek Stream & Wetland Final 25 Equinox Environmental Consultation and Design, Inc.
Project No. 857 February 2011
Baseline Monitoring Year 0
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary Crab Creek Upstream — Cross - Section #9 — Pool
(Looking at Left Bank Descending)
Baseline — April 19, 2010
Unnamed Tributary Crab Creek Upstream — Cross - Section #9 — Pool
(Looking at Right Bank Descending)
Baseline —April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
26 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary Crab Creek Upstream — Cross - Section #9 — Pool
(Looking Downstream)
Baseline — April 19, 2010
Unnamed Tributary Crab Creek Upstream — Cross - Section #9 — Pool
(Looking Upstream)
Baseline — April 19, 2010
LIT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
27 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
2556
2555
2554
e«;
0 2553
Y3
9
W
2552
2551
2550
Cross - Section Plots and Photos
UT Crab Creek- Upstream
Cross - Section #10 - Riffle
Station 33 + 08.78
0+00 0+05 0 +10 0+15 0 +20 0 +25 0 +30 0+35 0 +40 0 +45 0+50 0 +55 0+60 0+65 0 +70 0+75 0 +80
Station (feet)
+As-bnVt6 /4/2010 - - -•Bkf
UT Crab Creek Stream & Wetland Final 28 Equinox Environmental Consultation and Design, Inc.
Project No. 857 February 2011
Baseline Monitoring Year 0
— — — —
- --
- - --
- --
- --
- --
--------------------
--
--
- --
-- —
—
- - --
e
0+00 0+05 0 +10 0+15 0 +20 0 +25 0 +30 0+35 0 +40 0 +45 0+50 0 +55 0+60 0+65 0 +70 0+75 0 +80
Station (feet)
+As-bnVt6 /4/2010 - - -•Bkf
UT Crab Creek Stream & Wetland Final 28 Equinox Environmental Consultation and Design, Inc.
Project No. 857 February 2011
Baseline Monitoring Year 0
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary Crab Creek Upstream — Cross - Section #10 — Riffle
(Looking at Left Bank Descending)
Baseline — April 19, 2010
Unnamed Tributary Crab Creek Upstream — Cross - Section #10 — Riffle
(Looking at Right Bank Descending)
Baseline — April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
29 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix C
Cross - Section Plots and Photos
Unnamed Tributary Crab Creek Upstream — Cross - Section #10 — Riffle
(Looking Downstream)
Baseline — April 19, 2010
Unnamed Tributary Crab Creek Upstream — Cross - Section #10 — Riffle
(Looking Upstream)
Baseline — April 19, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
30 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix D
Longitudinal Profile Plots
Appendix D
2610'
3EOD
3601
3600
2605'
3604
3005
M �3
co
< 3401
4
O 2600'
25x51
]514
3515
3513
i511
2590'
UNNAMED TRIBUTARY 1 /UPPER
LONGITUDINAL PROFILE
AS -BUILT STATIONING 105 +63 - 110 +63
Longitudinal Profile Plots
2610'
26
3aae
2605'
—2 �
3601
2600' 0
4+
2�„ C5
0
vu W
3511
2595'
3514
3515
3513
2"1
2590'
•
•
_ -I
I
C/)
U1
Q
Q
O
O
0
UI
�
N
I
I
O
O
'
I
•
1
I
\xI�
CA
W
'1
1�
2610'
26
3aae
2605'
—2 �
3601
2600' 0
4+
2�„ C5
0
vu W
3511
2595'
3514
3515
3513
2"1
2590'
TW AS -BUILT 6/4/2010 WS -MYO • BKF -MYO ® Vane/ Structure -MYO
UTT Crab Creek Stream And Wetland Final Equinox Environmental Consultation and Design, Inc.
Project No. 857
Page 1 August LO10
Baseline Monitoring Year -0
Q
U1
Q
Q
O
O
0
UI
TW AS -BUILT 6/4/2010 WS -MYO • BKF -MYO ® Vane/ Structure -MYO
UTT Crab Creek Stream And Wetland Final Equinox Environmental Consultation and Design, Inc.
Project No. 857
Page 1 August LO10
Baseline Monitoring Year -0
Appendix U
rn
9
cr
3
(D
(D
2580'
35,
3s,e
35T
2575'
35,4
3s,5
3n2
3511
2570'
356,
2565'
UNNAMED TRIBUTARY 1 /LOWER
LONGITUDINAL PROFILE
AS -BUILT STATIONING 120 +36 - 124 +33
Longitudinal Profile Plots
2580'
35,0
35T
35'16
2575'
35,s
3s-r5
35,3
2570'
35M
35s6
3566
2565'
+ tJ UJ �a
ZN O O Q UJ
Station (feet)
TW AS -BUILT 6/4/2010 WS-MYO • BKF -MYO ® Vane /Structure --MYO
6
N
W
UT Crab Creek Stream And Wetland Final Equinox Environmental Consultation and Design, Inc.
Project No. 857 Page 2 August 2010
Baseline Monitoring fear -0
/V
• U7
i
1
1
1
2
Longitudinal Profile Plots
2580'
35,0
35T
35'16
2575'
35,s
3s-r5
35,3
2570'
35M
35s6
3566
2565'
+ tJ UJ �a
ZN O O Q UJ
Station (feet)
TW AS -BUILT 6/4/2010 WS-MYO • BKF -MYO ® Vane /Structure --MYO
6
N
W
UT Crab Creek Stream And Wetland Final Equinox Environmental Consultation and Design, Inc.
Project No. 857 Page 2 August 2010
Baseline Monitoring fear -0
Appendix D
2515'
27,4
25,7
26,2
2510'
25"
rn
� 2565'
9 25"
O M'
3 2762
271
2560'
277,
2770
277,
2W
2555'
2774
.JM
2672
2»I
2550'
UNNAMED TRIBUTARY CRAB CREEK UPSTREAM
LONGITUDINAL PROFILE (SHEET 1 OF 3)
AS -BUILT STATIONING 10 +02 - 34 +57
Longitudinal Profile Plots
5totlon (fact)
TW AS -BUILT 6/4/2010 WS-MYO • BKF -MYO ® Vane /Structure --MYO
0
2515'
25,4
25n
25,2
2510'
256,
2566 ate+
2565' �
2564
29"
2562 O
4--rtrt
2661 V
2560' O
> W
2776
277,
2776
2555'
2776
2557
255]
2ni
2550'
UT Crab Creek Stream And Wetland Final Equinox Environmental Consultation and Design, Inc.
Project No. 857 Page 3 August 2010
Baseline Monitoring Year -0
•
�
•
rte—
•
CD
�
t
CD
5totlon (fact)
TW AS -BUILT 6/4/2010 WS-MYO • BKF -MYO ® Vane /Structure --MYO
0
2515'
25,4
25n
25,2
2510'
256,
2566 ate+
2565' �
2564
29"
2562 O
4--rtrt
2661 V
2560' O
> W
2776
277,
2776
2555'
2776
2557
255]
2ni
2550'
UT Crab Creek Stream And Wetland Final Equinox Environmental Consultation and Design, Inc.
Project No. 857 Page 3 August 2010
Baseline Monitoring Year -0
Appendix D
2575'
2S,
2512
]S,i
2570'
]56D
]96l
4 aas
cr
O a65
]563
'\
t7 3561
2560'
�+
3534
ase
355,
a56
2555'
a55
a5]
a5i
2550'
Longitudinal Profile Plots
UNNAMED TRIBUTARY CRAB CREEK UPSTREAM
LONGITUDINAL PROFILE (SHEET 2 OF 3)
i N
+ O N N W 4 In 0
UT Crab Creek Stream And Wetland Final
Project No. 857
Baseline Monitoring Year -0
Station (feet)
TW AS -BUILT 6/4/2010 WS-MYO • BKF -MYO ® Vane /Structure -MYO
Page 4
2575'
a,+
a,5
2570'
35M
35ee
2565' �
]564 6L
YA5
3963 O
156 6
2560' �
2$1 W
355D
155,
3556
2555'
]554
3555
]55]
2551
2550'
Equinox Environmental Consultation and Design, Inc.
August 2010
Appendix D
25,5'
25,1
»r�
»,1
25,70'
»6,
236,
(4 2565'
4 ]364
c-r
O 2365
2561
Yi ]361
2560'
»56
»Sl
3N6
2555'
335s
2n2
kSrl J
Longitudinal Profile Plots
UNNAMED TRIBUTARY CRAB CREEK UPSTREAM
LONGITUDINAL PROFILE (SHEET 3 OF 3)
u' U1 U U1 UI U
+ + + O + N (+J 4'
Station (feet)
TW AS -BUILT 6/4/2010 WS-MYO • BKF -MYO ® Vane /Structure -MYO
25-75'
»,3
23n
25'10'
2!N
296D
236,
29M �
2565' �
»ea �
2565 �
23.2 O
.3
]361 6
2560'
2ND W
2"b
2!!7
as"
2555'
2334
2333
»52
2551
2550'
UT Crab Creek Stream And Wetland Final Equinox Environmental Consultation and Design, Inc.
Project No. 857 Page 5 August 2010
Baseline Monitoring Year -0
Appendix E
Vegetation Plot Photos
Appendix E
Vegetation Plot Photos
Vegetation Monitoring Plot #1
Baseline — April 13, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Vegetation Monitoring Plot #2
Baseline — April 13, 2010
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix E
Vegetation Plot Photos
Vegetation Monitoring Plot #3
Baseline — April 13, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Vegetation Monitoring Plot #4
Baseline — April 13, 2010
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix E
Vegetation Plot Photos
Vegetation Monitoring Plot #5
Baseline —April 13, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Vegetation Monitoring Plot #6
Baseline —April 13, 2010
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix E
Vegetation Plot Photos
Vegetation Monitoring Plot #7
Baseline — April 13, 2010
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Vegetation Monitoring Plot #8
Baseline —April 13, 2010
Equinox Environmental Consultation and Design, Inc.
February 2011
Ah
Appendix F
Permanent Photo Station Photos
Appendix F
Photo Station Photos
Unnamed Tributary 1 — Permanent Photo Station #1
Looking Upstream
UT Crab Creek Stream & Wetland Final 1 Equinox Environmental Consultation and Design, Inc.
Project No. 857 February 2011
Baseline Monitoring Year 0
Appendix F
Photo Station Photos
Unnamed Tributary 1
Pre- construction conditions in proximity to Photo Station #2
Unnamed Tributary 1— Permanent Photo Station #2
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Looking Upstream
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Unnamed Tributary 1
Pre - construction conditions in proximity to Photo Station #3
Unnamed Tributary 1 — Permanent Photo Station #3
Looking Upstream
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Unnamed Tributary 1
Pre - construction conditions in proximity to Photo Station #3
Unnamed Tributary 1— Permanent Photo Station #3
Looking Downstream
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc
February 2011
Appendix F
Photo Station Photos
Unnamed Tributary 1
Pre - construction conditions in proximity to Photo Station #4
Unnamed Tributary 1 — Permanent Photo Station #4
Looking Upstream
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Unnamed Tributary I — Permanent Photo Station #5
Looking Upstream
Unnamed Tributary I — Permanent Photo Station #6
Looking Upstream
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Unnamed Tributary 1
Pre - construction conditions in proximity to Photo Station #7
Unnamed Tributary 1 — Permanent Photo Station #7
Looking Upstream
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Unnamed Tributary Crab Creek Upper — Permanent Photo Station #7
Looking Upstream
Unnamed Tributary Crab Creek Upper — Permanent Photo Station #7
Looking Downstream
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Wetland Area 3 — Permanent Photo Station #8
Looking North
Wetland Area 3 — Permanent Photo Station #8
Looking Southwest
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Wetland Area 3
Pre - construction conditions in proximity to Photo Station #9
Wetland Area 3 — Permanent Photo Station #9
Looking North
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
10 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Wetland Area 3
Pre - construction conditions looking east towards Photo Station #9
Wetland Area 3 — Permanent Photo Station #9
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Looking West
11 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Unnamed Tributary Crab Creek Upper
Pre - construction conditions in proximity to Photo Station #10
Unnamed Tributary Crab Creek Upper — Permanent Photo Station # 10
Looking Upstream
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
12 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Unnamed Tributary Crab Creek Upper
Pre - construction conditions looking upstream from Photo Station #I I
Unnamed Tributary Crab Creek Upper — Permanent Photo Station #11
Looking Upstream
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
13 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Unnamed Tributary Crab Creek Upper
Pre - construction conditions looking downstream from Photo Station #11
Unnamed Tributary Crab Creek Upper — Permanent Photo Station #I I
Looking Downstream
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
14 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Unnamed Tributary Crab Creek Upper
Pre - construction conditions in proximity to Photo Station #12
Unnamed Tributary Crab Creek Upper — Permanent Photo Station # 12
Looking Upstream
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
15 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Unnamed Tributary Crab Creek Upper
Pre - construction conditions looking downstream towards Photo Station # 13
Unnamed Tributary Crab Creek Upper — Permanent Photo Station #13
Looking Upstream
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
16 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Wetland Area 7 — Permanent Photo Station #14
Looking West
Wetland Area 7 — Permanent Photo Station # 15
Looking Southwest
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
17 Equinox Environmental Consultation and Design, Inc.
February 2011
Appendix F
Photo Station Photos
Wetland Area 8
Pre - construction conditions in proximity to Photo Station #16
Wetland Area 8 — Permanent Photo Station #16
UT Crab Creek Stream & Wetland Final
Project No. 857
Baseline Monitoring Year 0
Looking South
18 Equinox Environmental Consultation and Design, Inc.
February 2011