Loading...
HomeMy WebLinkAbout20081540 Ver 1_Mitigation Evaluation_20110414�,, aer Uls►� 4-o C.�11 Mitigation Project Evaluations Information Table roacC VLas Sb� NC Division of Water Quality Date of Office Review A III Evaluator's Name(s) Date of Report ) C-4e-4e-r 2D10 Report for Monitoring Year 201 Date of Field Review Other Individuals /Agencies Present Weather Conditions (today & recent) Directions to Site I Office Review Information Project Number 20081540 Project Name Little Buffalo Buffer Mitigation Site County(ies) Johnston Basin & subbasm Neuse 03020201 Nearest Stream Little Buffalo Creek Water Quality Class of Nearest Stream Mitigator Type Full - Delivery (EEP) DOT Status Total Mdiaation on Site Wetland Stream 17 CH Buffer Nutr Offset 1�acres Approved mitigation plan available? Yes No Monitoring reports available? es No Problem areas identified in reports? Yes No Problem areas addressed on site? Yes No Mitigation required on site Associated impacts (if known) Evaluator's Name(s) Proiect History Event Event Date Project Instituted 7/1/2005 Construction Completed 9/6/2006 Report Receipt Monitoring 5/27/2008 Report Receipt Monitoring 10/29/2008 Site Visit - Buffer 4/23/2009 *Add significant project- related events reports, received, construction, planting, repairs, etc During office review, note success criteria and evaluate each component based on monitoring report results Record relevant data in Sections II and III On back of sheet, note other information found during office review and /or to be obtained during site visit II Summary of Results Monitoring Success Success Mitigation Component Year (report) (field) Resolved 20081540 -1 0 acres Nutrient Offset Restoration 6 n q4 Lo lQ L} Version 10 (August 22, 2007) Page 1 of 2 Mitigation Project Evaluations Information Table NC Division of Water Quality MITIGATION SUCCESS Compared to the approved mitigation plan, this project is successful partially successful unsuccessful List specific reasons for lack of success for this project Additional comments (e g DWQ follow -up actions, recommendations, etc) Version 10 (August 22, 2007) Page 2 of 2 J Buffer Mitigation Project Evaluations Information Table NC Division of Water Quality Component 18 5 acres Nutrient Offset Restoration Component ID 20081540 -1 Description Buffered ditches to Little Buffalo Creek Location within project 111 Buffer Site Details paean Buffer (Streams Only) Nutrient Offset (Streams o Ditches i Strea s verified by DWQ Ye No Buffer Width o2oc) Q n YYlM -\ Comments Total Acres Restored Acres idth 50' > 50' \ hered Site? (EEP Only) Yes IV Success Criteria Evaluation Comments Rafmjocr CL-W S (-q- 4- KIC Urfa Total Acres 1-1 Q y Restored Acres Enhanced Acres �u e�� (A -Lc - S ,� r'P -SDro Dc -Q-fxk rG � ATea 04 VEGETATION NOTE Success Criteria is 320 spa Dominant Plant Species Species Story TPA/"/ cover QLkp 31n22 -VPNA U3 0 0..-- `i C, 1 Monitoring report indicates success? fe No 30G Average TPA for entire site (per report) J 2G I , L �ou+� u-e�- qum (pp5 CQ�'Y�6L� Observational field data agrees? Yes No CA-0-ba-PPLL 3 $ Clro.r r1, kxv�k O 0.k. A- G �►1 a.!M Date of last planting Vegetation growing successfully? Yes No General observations on condition of riparian /buffer areas and associated stream bank (e g bank stability, overall health of vegetation, etc ) Version 12 (March 5, 2009) Page 1 of 2 nd.or, 1� � '� Buffer Mitigation Project Evaluations Information Table NC Division of Water Quality Specific vegetation plots or site locations with little to no vegetation Estimated acreage or site percentage of unvegetated areas Invasive species on site (species, location(s), and % cover) ace-eA- (*i,_M c'k0YY utia -C- c- C zRcgn-t\ Easement Marking Method List any remaining issues to address (e g plant survival, easement encroachment, etc ) pinol� �houT wyfvL mbr-e dealrabLz '412 cA&-o G-m •--no cOyylvat L31 C) rf\_0s -\ oy- "A'0-� Yk)'DV \&R- JCL` MITIGATION SUCCESS Compared to the mitigation plan, this component is successful partially successful not successful List specific reasons for lack of success for this component Additional Comments (e g DWQ follow -up actions, recommendations, etc) — During site visit, document representative conditions and areas of concern Label and attach photos to this report Attach maps showing photo locations, problem areas, and/or important field observations Additional notes related to evaluation of this component Vernon 12 (March 5, 2009) Page 2 of 2