HomeMy WebLinkAbout310124_Plan of Action_20210305PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-124 Facility Name: J&R Farm County: Duplin Certified Operator Name: Jason Cavenaugh Operator Number: AWA 18735 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: Lag 1 Lag 2 Spillway(Y or N): N N Level (inches): 11.5 13 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Jason Cavenaugh Phone: Facility Owner/Manager (print) Date: Facility Owner/Manager ' nature) 910-289-7659 3/5/2021 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 902.6 lb PAN 2. Structure ID: Lag 2 line m = 1435.0 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 2337.6lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RF APPI IFn rnlPudr; THIS'tn nAV PFRIr)n o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 1 Bermuda 35.47 169.00 5994.4 March -Sept State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 5994.4 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 2337.6 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 5994.4 lb. PAN y. Overall PAN balance (w - x) _ -3657 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. Bermuda yeilds have been increased because producer will be cutting for hay. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period I. temporary storage period according to structural design 13.0 inches 19.5 inches 6.5 inches 67375 ft2 272981 gallons 180 days g. volume of waste produced according to structural design 80705 ft3 h. current herd # 2448 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1/13/2021 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 53803 ft' Offs 39302.1 ft3 116071 gallons 2.32 Ibs/1000 gal. 902.6 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Lag 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 11.0 inches 19.0 inches 8.0 inches 96100 ftZ 479219 gallons 180 days g. volume of waste produced according to structural design 121058 W h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1/13/2021 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 121058 ft' OW 56058 ft' 220805 gallons 2.05 1 Ibs/1000 gal. 1435.0 Ibs. PAN PoA (30 Day) 2/21/00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: Lagoon 1 2. structure ID: Lagoon 2 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. lines 1 + 2 + 3 + 4 + 5 + 6 = o. line n / 27154 = line I = 21809 gallons line I = 71550 gallons line I = gallons line I = gallons line I = gallons line I = gallons 93359 gallons 3.44 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD''2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (Ib/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) 1 Woodin ton Small Grain 35.47 15.00 0.4 1 2 Foreston Small Grain 13.88 8.00 0.5 1 sub3 Noboco Bermuda 11.05 262.00 0.5 1 1 Wo Bermuda 35.47 169 0.4 1 x. total acres available during 5 day draw down (sum of column t) _ 95.87 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE PoA y Da 2/ line= 0.04 inches per acre to be applied within 5 days l5 y) line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new h draulic load based on new information. Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field, does irrigation equipment mar down in field "trafficabilit " across soils will soils absorb application without runoff, etc. z. uate and amount of last ralntall event? DATE: 4. Given optimum soil and weather co wua�rn AMOUNT: Dinches equipment capable of applying the volume in application rates per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts and any other information for consideration. PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Lagoon 1 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 0 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # I. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 11.5 inches 12.0 inches 0.5 inches 67375 ft2 20999 gallons 180 days 80705 ft3 ft3 0 ft3 3902.1 ft3 811 gallons 21809 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Lagoon 2 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/W 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 0 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 11.0 inches 12.0 inches 1.0 inches 96100 ft2 59902 gallons 180 days �ft3 W Oft3 56058 W 11648 gallons 71550 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00