Loading...
HomeMy WebLinkAbout20130710 Ver 2_Meeting Request Review_20210304ID#* 20130710 Version* 2 Regional Office* Wilmington Regional Office - (910) 796-7215 Reviewer List* Holley Snider Pre -Filing Meeting Request submitted 3/4/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jessi Baker jessi.baker@usmc.mil MCB Camp Lejeune - Boathouse replacement on Stones Creek US Government c/o Neal Paul, MCBCL Deputy Public Works Officer Onslow Street Address 1005 Michael Road Address Line 2 aty Camp Lejeune Rbstal / Zip Code 28547-0005 Is this a transportation project?* r Yes r No State / Frovince / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Holley Snider Please give a brief project description below. The Marine Corps proposes to demolish and reconstruct RR92 (Boathouse & Docks) under Project #19-0085. This project is needed to repair damage from Hurricane Florence and to bring RR92 into compliance with current codes and design standards. RR92 is a boathouse on the shore of Stones, Creek, northwest of the intersection of Range Road and Powder Lane. The structure includes a 623sf internal dock enclosed under a 1,221sf roof and three exterior walls which are supported by timber piles. Under the Proposed Action, the boathouse will be demolished and the timber piles will be removed. All demolished materials will be hauled offsite for disposal. A total of 24 new timber piles will be driven into the bottom of Stone Creek in the same footprint as the current boathouse. A new boathouse will be constructed on the pilings and will have the same footprint, orientation, and general architectural style as the current boathouse. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 3/4/2021 Reviewer Meeting Request Decision Has a meeting been scheduled?* C Yes r No