Loading...
HomeMy WebLinkAbout20210434 Ver 1_Meeting Request Review_20210224ID#* 20210434 Version* 1 Regional Office* Wilmington Regional Office - (910) 796-7215 Reviewer List* Holley Snider Pre -Filing Meeting Request submitted 2/24/2021 ...................................................................................................................................................................................................................... Contact Name * DANA A LUTHERAN Contact Email Address* dlutheran@segi.us Project Name* Hammock Watch Boat Facility Project Owner* Hammock Watch HOA, Inc. Project County* Pender Owner Address: Street Address 5315 South College Road Address Line 2 Suite E City State / Province / Fegion Cape Carteret NC Postal / Zip Code Country 28412 United States Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit F- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Holley Snider Please give a brief project description below. The project consist of replacing and repairing 910 LF of dock and constructing an 85' x5' , fixed platform, with three 34' x4' fixed finger piers, which would provide for 5 additional boat slips, at this location. Boat lifts are included in the proposal. There are currently 5 slips available. The nearest 10 slip boating facility, to this project, is located approximately 210' north. Dredging is not required. The area is not PNA and, while SAVs are mapped in the area, there is no evidence that SAVs exist within the footprint of the proposed structures and/or slips. Please give a couple of dates you are available for a meeting. 2/26/2021 3/1 /2021 3/4/2021 3/8/2021 Please attach the documentation you would like to have the meeting about HAMMOCK WATCH CAMA MAJOR SITE 2.44MB PLANS. pdf Hammock Watch HOA Project Narrative DRAFT 228.11 KB without Attach 2-24-21.pdf pdF only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 2/24/2021 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No D1 D2 D3 – SEC 1 D3 – SEC 2 COMPONENTS B-E ❖ D1 – DOCK FROM ACCESS POINT TO UPLAND -105’ (TO BE REPLACED) ❖ D2 – DOCK FROM UPLAND TO ISLAND 80’ (TO BE REPLACED) ❖ D3 – SEC 1 – DOCK FROM ISLAND TO FIRST BEND 555’ (TO BE REPLACED) ❖ D3 – SEC 2 – FROM FIRST BEND TO GAZEBO 170’ (TO BE REPAIRED) ❖ COMPONENTS B-E (SEE SHEETS 2 & 3 OF 3) MAINLAND UPLAND ISLAND HAMMOCKS WATCH CAMA MAJOR PERMIT SITE PLAN SHEET 1 OF 3 (NOT TO SCALE) 2/22/21 SOURCE 2016 GOOGLE EARTH N HAMMOCK PIER PLAN GRID.dgn 85'FINGER PIERS (3) 4' X 34' FINGER PIERS (3) 4' X 34' 52 260 85 425 EXISTING PLATFORM AREA = 549 SF PROPOSED PLATFORM AREA = 475 SF TOTAL PLATFORM AREA = 1024 SF NUMBER OF EXISTING SLIPS/LIFTS = 5 PROPOSED NUMBER OF SLIPS/LIFTS = 5 TOTAL NUMBER OF SLIPS/LIFTS = 10 TOTAL NUMBER OF FINGER PIERS = 6 3 @ 4' X 24' 3 @ 4' X 34' * * * * *INDICATES THE COMPONENT IS CONSIDERED PLATFORM AREA COMBINED 5460 17 17 289 HAMMOCK WATCH HOA, INC.2/21/21 2 3 COMPONENT A3-SEC2 EXISTING FIXED DOCK 170' X 6' COMPONENT A3-SEC1 EXISTING FIXED DOCK 555' X 6'Distance:170.56 ft 17' x 17' FROM THE DRIP LINE HAMMOCK PIER PLAN GRID.dgn Southern Environmental Group, Inc. 5315 South College Road, Suite E Wilmington, NC 28412 Hammock Watch HOA Boating Facility CAMA Major Project Narrative Prepared for: Hammock Watch HOA, Inc. Date: 24 February 2021 Hammock Watch HOA CAMA Major Permit PN SEGi Page 1 of 13 (2/24/21) 1) Project Information: a) Applicant: Hammock Watch HOA, Inc. b) Pender Co. Parcel ID #: 3291-05-1744-0000 The project site is accessed via a 30’ easement, through Lot 11R-2. The easement and property deed were recorded at the Pender County Register of Deeds at Map Book 55 Page 53 and Book (see Attachments 1 and 2). c) Project Size: +/- 5.8 AC (see Attachment 1) d) Waterbody: Topsail Sound & Middle Sound ORW Area / Intracoastal Waterway (Attachment 3) e) DWR Water Classification: SA;ORW (see Attachment 3) f) Primary Nursery (PNA): This area is neither classified as PNA nor Secondary PNA (see Attachment 4) g) Submerged Aquatic Vegetation (SAV): SAVs have been mapped in the project area (see attachment 5) 2) Proposed Project: The Applicant is seeking approval to replace three section of fixed dock (i.e., A1, A2 and A3-Sec 1), repair one section of fixed dock (i.e, A3-Sec 2), expand the existing, 5 slip, fixed, docking facility to provide 10 slips, as well as install 5 boat lifts, and repair the existing covered, 17’ x 17’ fixed, gazebo. Please see Attachment 6 for details. 3) Existing Conditions: Currently, the project contains the remnants of three sections of a 6’ wide dock, which provided access to a 5 slip docking facility. Part of the structures (i.e., A1, A2 and A3-Sec1) were severely damaged, during Hurricane Florence, which took place in 2018. The first section of dock (i.e., A1) is approximately 105 LF and extends from the access point, across a wetland area, to another area of uplands. The second section of dock (i.e., A2) is approximately 80 LF and extends from the upland area to an upland island, where a footpath extends across to the third section of dock (i.e., A3), which has been broken down into two sections (i.e., A3-Sec1 and A3-Sec2). A3- Sec1 is approximately 555 LF and has been severely damaged, while A3-Sec2 is approximately 170 LF and is in decent condition but needs repairs. A3-Sec2 terminates at a Component B, a 17’ x 17’ covered gazebo. Attached to Component B is Component C, a 52’ x 5’ fixed platform that provides access to three, 24’ x 4’ finger piers, which provide access to five boat lifts. Approximately 549 square feet of platform area is currently in place. Water depths, in the area of the existing docking facility and the area where the proposed slips are to be situated, range from -1.4’ to -2.6’ NAVD 88. While SAVs have been mapped in the area, a review of aerial photos revealed SAVs do not typically grow in the location of the existing or proposed boat slips (see Appendix 5). The project site is directly across the Intracoastal Waterway from Green Channel therefore, development is restricted by the US Army Corps of Engineers’ Navigational Channel Setback line. The Sewre, LLC 5 slip, docking facility is situated approximately 50’ south, and the Long Point Estates, 9 slip, docking facility is located approximately 210’ north of the Hammock Watch docking facility. Two pilings are located within the southern riparian corridor, while the northern riparian corridor is approximately 170 LF away from the proposed, northern most pilings. 4) Proposed Development: The proposed work consists of relacing approximately 740 LF of fixed dock, repairing 170 LF of fixed dock, as well as the fixed 17’ x 17’ gazebo and 52’ x 5’ fixed pier and associated finger piers, if needed. New work will consist of connecting a 10’ x 5’ fixed platform (i.e., Component D) to the northwest side of Component C. An 85’ x 5’, fixed platform (i.e., Component E) will be connected, at a 90 degree angle, to Component D. Component E will provide access to three 34’ x 4’ finger piers, which service 5 boat slips, with lifts. The new structure will add 475 square feet of platform area, for a total of 1024 square feet. The following table summarized the existing and proposed structures, as well as the proposed work: Component Description Length (Ft) Width (Ft) SF Existing/Proposed Proposed Work A1 Fixed Pier 105’ 6’ 630 Existing Replace Hammock Watch HOA CAMA Major Permit PN SEGi Page 1 of 13 (2/24/21) A2 Fixed Pier 80’ 6’ 480 Existing Replace A3-Sec1 Fixed Pier 555’ 6‘ 3330 Existing Replace A3-Sec2 Fixed Pier 170’ 6’ 1020 Existing Repair B *Covered Gazebo 17’ 17’ 289 Existing Repair C *Fixed Platform 52’ 5’ 260 Existing Repair D *Fixed Platform 10’ 5’ 50 Proposed New Work E *Fixed Platform 85’ 5’ 425 Proposed New Work 3 Fixed Finger Piers 24’ 4’ 3 Fixed Finger Piers *Indicates Platform Area Total Area 1024 All structures, crossing coastal wetlands, will be fixed, slatted, elevated at least 36” above the substrate, measured from the bottom of the stringer, and no wider than 6’ (please see Appendix 5, for profiles of the proposed structures). Equipment, such as a barge and pump will be used to install the pilings. Normal building materials will be used to construct the structures. The barge will be moored, when not in use, in an area where it will not rest on the bottom. 5) Threatened and Endangered Species: To ensure protection of the West Indian manatee (Trichechus manatus), the work will be undertaken between November 1 and May 31. If this is not possible, the Applicant will adhere to the US Fish and Wildlife’s guidance entitled “GUIDELINES FOR AVOIDING IMPACTS TO THE WEST INDIAN MANATEE, Precautionary Measures for Construction Activities in North Carolina Waters” (see Appendix I). 6) SAV Habitat: As noted previously, SAVs have not typically been found in the location of the project. However, it is the Applicant’s intention to protect the resource, by minimizing shading, has limited the width of Component E, to 5’, and has tried to orient the structure to face a close to due west as possible, which will allow for maximum sunlight exposure. Additionally, to prevent docking on the west side of Component E, additional pilings, with signage indicating docking is prohibited, will be used. 7) Adjacent Riparian Property Owner Notifications: In accordance with 15A NCAC 07J .0204(b)(5), the adjacent property owners, as identified in the permit application, have been notified via certified return mail. The notification included the application and site plan, for the proposed development, as this project requires a CAMA Major Development Permit Application. According to the Pender County GIS, the following are the adjacent riparian property owners: Map Number Parcel ID Owner Mailing Address 1 3291-06-2120-0000 Norman, Robert Alan 51 Long Point Lane, Hampstead, NC 28443 2 3281-95-6894-0000 Sewre, LLC 135 Dogwood Lane, Hampstead, NC 28443 1 2 Project Property Hammock Watch HOA CAMA Major Permit PN SEGi Page 1 of 13 (2/24/21) 8) DWR Pre-Filing Request Requirement: SEGi submitted a Pre-Filing Request Form to the DWR on 2/24/21 (see Attachment X). However, a 401 Water Quality Certification is not required, as the project will neither require a change in water classification nor impacts to wetlands and/or waters of the US or State. The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request, within the applicable reasonable period of time.