Loading...
HomeMy WebLinkAbout20201620 Ver 1_More Info Received_20210302Strickland, Bev From: Mairs, Robb L Sent: Tuesday, March 2, 2021 2:18 PM To: Snider, Holley Subject: FW: New CAMA Major Permit Application - Jacking Realty Holdings LLC Attachments: Narrative.docx; Revised Sheet 3.pdf, MP-2 Revised.pdf, MP-3.pdf, dcm-mp4 Revised.pdf Follow Up Flag: Follow up Flag Status: Flagged Fyi From: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Sent: Tuesday, March 2, 2021 10:33 AM To: Cannon, Amanda J <Amanda.Cannon@ncdenr.gov>; Kate Winsler <kate@ntbnc.org>; Austin Brinkley <Austin_Brinkley@onslowcountync.gov>; Sammie Rogers <Sammie_Rogers@onslowcountync.gov>; Christenbury, Mike <mike.christenbury@ncdenr.gov>; Liz Hair <Sarah.E.Hair@usace.army.mil>; Zeigler, Mark D <mzeigler@nccommerce.com>; DCR - Environmental_ Review <Environmental.Review@ncdcr.gov>; Cox, Heidi <heidi.cox@ncdenr.gov>; Harding, Kimberlee k <Kimberlee.Harding@ncdenr.gov>; Harris, David B <davidharris@ncdot.gov>; Jenkins, Shannon <shannon.jenkins@ncdenr.gov>; Gupton, Sharon <sharon.gupton@ncdenr.gov>; Walton, Tim <tim.walton@doa.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Hilliard, Wanda <wanda.hilliard@doa.nc.gov>; Montalvo, Sheri A <sheri.montalvo@ncdenr.gov>; Sams, Dan <dan.sams@ncdenr.gov>; Hall, Christine <Christine.Hal I@ncdenr.gov>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Butler, Rodney A <Rodney.Butler@ncdcr.gov> Cc: Connell, Brad <brad.connell@ncdenr.gov>; Brownlow, Roy <roy.brown low@ncdenr.gov> Subject: RE: New CAMA Major Permit Application -Jacking Realty Holdings LLC Morning all, After consultation with multiple resource agencies the applicant has revised the proposal to extend the ramp into the waterbody and revised the fixed pier adjacent to the ramp. In addition, gravel is now proposed landward of the boat ramp. Finally, the power lines have been added to the workplan Sheet 3 of 4. Please see the above attachments that replace previously submitted portions of the application. After review of these changes, if previously submitted comments require update comments please provide those comments as soon as possible. Thanks as always, G regg From: Cannon, Amanda J <Amanda.Cannon@ncdenr.gov> Sent: Tuesday, December 15, 2020 11:03 AM To: Kate Winsler <kate@ntbnc.org>; Austin Brinkley <Austin Brinkley@onslowcountync.gov>; Sammie Rogers <Sammie Rogers@onslowcountync.gov>; Christenbury, Mike <mike.christenbury@ncdenr.gov>; Liz Hair <Sarah.E.Hair@usace.army.mil>; Zeigler, Mark D <mzeigler@nccommerce.com>; DCR - Environmental —Review <Environmental. Review@ncdcr.gov>; Cox, Heidi <heidi.cox@ncdenr.gov>; Harding, Kimberlee k <Kimberlee.Harding@ncdenr.gov>; Harris, David B <davidharris@ncdot.gov>; Jenkins, Shannon <shannon.ienkins@ncdenr.gov>; Gupton, Sharon <sharon.gupton@ncdenr.gov>; Walton, Tim <tim.walton@doa.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Hilliard, Wanda <wanda.hilliard@doa.nc.gov>; Montalvo, Sheri A <sheri.montalvo@ncdenr.gov>; Sams, Dan <dan.sams@ncdenr.gov>; Hall, Christine <Christine.Hal I@ncdenr.gov>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.olg>; Butler, Rodney A <Rodney.Butler@ncdcr.gov> Cc: Connell, Brad <brad.connell@ncdenr.gov>; Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Brownlow, Roy <roy. brown low@ ncden r.gov> Subject: New CAMA Major Permit Application - Jacking Realty Holdings LLC Hello All! Please accept this correspondence as the official distribution of CAMA Major Permit Application for Jackie Realty Holdings LLC in North Topsail Beach, Onslow County. Attachments include: Field Investigative Report, work plans, comment sheet, and any other documents intended for you. NOTE: Please complete the bottom portion of the comment sheet with your information and signature. *RETURN TO GREGG BODNAR at gregg.bodnar(i ,ncdenr.gov* * * *No oversized plans have been submitted by applicant* * * For questions or concerns, please contact Gregg Bodnar at gregg.bodnargncdenr.gov or (252) 808-2808 ext. 215. Avvt t �l a� C,a oA%o-w Division of Coastal Management Department of Environmental Quality 252.808.2808 Ext. 206 252.247.3330 Fax Amanda.Cannon(a)ncdenr.gov 400 Commerce Ave Morehead City, NC 28557 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Narrative Revised 2/27/21 As acting agent for Teena Koury, who owns Lot 23 Marina Way, North Topsail Beach, in Onslow County, N.C, I am submitting the enclosed CAMA Major Permit Application for a proposed private docking facility adjacent to the AIWW. Ms. Koury would like to construct a pier (6' x 55') a partially covered platform (12' x 18') which will be located in between 2 boathouses (13' x 23' each). Each boathouse will contain a boatlift (13'x 13') and will have a 3' wide walkway around the outside of three sides of the boathouses. These structures are proposed to be located in existing water depths of approx. -3' to 3.5' @ NLW and would extend approx. 73' into the AIWW which measures approximately 408' wide at the location of the proposed project thus, conforming to the'/4 width of the waterbody limitation and will not encroach into either of the adjacent 15' riparian corridor setbacks. Ms. Koury is also proposing to install a new boat ramp (12' x 48' overall, 12' x 34' will be below NHW) at the waterward end of the existing road. Existing water depths at the waterward end of the proposed boat ramp are -3' @ NLW. A bulkhead (15' long each with a 4' section parallel to the AIWW) will be installed adjacent to the boat ramp on each side on the high ground. Adjacent to the boat ramp on the west side will be a fixed dock (3' x 28') to assist in the launching and retrieving of boats. There will also be approx. 520 sq. ft. of gravel placed in an area of the existing road footprint measuring approx. 20'- 30' x 22' to fill in holes at the approach of the boat ramp. It should be noted that no wetlands will be filled with any gravel. The DWR pre -filing meeting request has been filled out on the website and a copy of the return email resulting from that submittal is included in this CAMA Major Permit application. • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. Please feel free to contact me if you need any additional information or have any questions. O� N (a) N �m >,-a-0 C6— ' ,-0 Nb cn mpg C'7 N O �N N N cz �N F— J z 0 0 co Q) c) 4-a Cn U) O Q 0 n M c J L U O � E O N N a VJ L w 0 L nnQ� LL vi / X O Q Q c� J � Q � % O a- C�CD c N V O LL X N � W CL z J 0 as 100, 4- L � / �Y) L O a. m N -0 U) cn ON Op - 0 05 X ON O LLJ p m (M r Fixed 3' x 28' M N J (CS X N 6' x 5 5' O vi CD C? / ,0 _ N >, O -N O (1) D (1) cy) ch to O Q � - N U O p (� /� �% -� O O a-m Q '� UJ Width of Waterbody = 408' �- U) N E J LO z N -� O N O N > L > o Y) � N � U) O CD Q U) p Q w O N Z c� Q Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length 48' Width 12' Avg. Existing NA NA Depth 2' Final Project NA NA Depth 3' 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. 5 cu. yd. c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas: Boat ramp installation Sand d. High -ground excavation in cubic yards. 10 cu. yd. 2. DISPOSAL OF EXCAVATED MATERIAL [I This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Contractor's property (Ennett Marine) at 252 Ennett Lane, Sneads Ferry c. (i) Do you claim title to disposal area? ®Yes ❑No ❑NA Jerry Ennett, Contractor (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of disposal in these areas: 60 acres d. (i) Will a disposal area be available for future maintenance? ❑Yes ®No ❑NA (ii) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ®No ❑NA (ii) If yes, how much water area is affected? 252-808-2808 :: 1-888-4RCOAST ;; vvvvW.nccoastalmana�mon�.net +z,,::a. % ;ic Fo 'en DC1A MP-2 (Excavation and F'iim, Page 2 of 2) 3. SHORELINE STABILIZATION El This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: %Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: c. Average distance waterward of NHW or NWL: 0' e. Type of stabilization material: Vinvl Sheathina g. Number of square feet of fill to be placed below water level. Bulkhead backfill 0 Riprap Breakwater/Sill Other i. Source of fill material. N/A b. Length: 38' (total) Width: 1' d. Maximum distance waterward of NHW or NWL: 0' f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ®No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. Clean sand 4. OTHER FILL ACTIVITIES El This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brouqht to the site? ®Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW). If yes, (ii) Amount of material to be placed in the water 408 sq. ft. (iii) Dimensions of fill area 12' x 34' (iv) Purpose of fill Concrete slabs for boat ramp submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? Silt fence Backhoe and / or excavator. C. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. None planned but if it becomes necessary, mats will be used. 10/1/20 Revised 2/27/21 Teena Koury Date Applicant Name Lot 23 Marina Way 9. 2,i Agent Project Name Applicant Signature 252-808-2808 :: 1-883-41RC AS7 .: www.nccoastalmanagement.net r _-e7: 11 J!2'64"" Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. 1 Road reDair c. Density (give the number of residential units and the units per acre). N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes ®No RNA (ii) If yes, list the date submitted: g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. Less than 1 % i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. Less than 1 % j. Describe proposed method of sewage disposal. N/A I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). Surface runoff d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. Varies from 20' to 30' in width x 22' within existing road footprint. f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. Gravel approx. 520sq. ft. h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes []No ®NA (ii) If yes, list the date submitted: k. Have the facilities described in Item (i) received state or local approval? ❑Yes ®No ❑NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ❑Yes ❑No ®NA If yes, attach appropriate documentation. m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) N/A o. When was the lot(s) platted and recorded? 1969 2/27/21 Date Lot 23 Marina Way Project Name Debbie Wilson, Agent for Teena Koury Applicant Name 9 Applicant Signature n. (i) Will water be impounded? ❑Yes ®No ❑NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes ❑No ®NA Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1, DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Government ®Private/Community ❑This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ®Yes ❑No (ii) Number 2 If yes: (iii) Length 55' & 28' (ii) Number 2 (iv) Width 6' & 3' (iii) Length 47' (v) Floating Yes ®No (iv) Width (v) Floating ❑Yes ®No e. (i) Are Platforms included? ®Yes ❑No f. (i) Are Boatlifts included? ®Yes ❑No If yes: If yes: (ii) Number 2 (ii) Number 2 (iii) Length 12' & 12' (iii) Length 13' (iv) Width 12' & 6' (iv) Width 13' (v) Floating ❑Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 2 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service p ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: 22' m. (i) Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout I. (i) Will the facility be open to the general public? ❑Yes ®No Fv,rm U ( P»4 (S-tructures. Page y of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? 252-808-2808 :; -1-838-4RCOAST www.nccoastallmanaRen�en2_net revf^scd; 121271i06 Faran D.C;V1 MP-4 (Stzuct.u:i�5s., Page 3 of 41, m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes [:]No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ❑This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Govemment ®Private/Community (ii) Number 2 (iii) Length 23' (iv) Width 13' Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. /f a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS 0This section not applicable a. Is the structure(s): b. Number ❑Commercial ❑Public/Government ❑Private/Comm unity C. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing 7�2-ttirSi;-'�$f+�i :: 4-t's;:f#-:tQ'Cti?;9 Y.:.v;7y.�w.lsr_c{ie�Ss`�IiP"drz��wrs„n}e_r.,sy�a a�visect; 72i�7�n6 Form 0CM MP-4 (st•rtrcgures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines 1,028 to the west & 1,418' to the east Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 408' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. Over 2 miles along the AIWW d. Water depth at waterward end of structure at NLW or NWL 3.5' 8. OTHER This section not applicable a. Give complete description: The 3' x "28' fixed dock located adjacent to the boat ramp is for launching and retrieving boats. 10/1/20 Revised 2/27/21 Date Lot 23 Marina Way Project Name Teena Koury Applicant Name 9.,4 2.�- , Agent Applicant Signature 252-308-2808 :: 1-888-4RCOA T :: vvvvvv.nccaastaBrnanagement.net revised. '! 2/2; /06