HomeMy WebLinkAboutWQ0035261_Staff Report_20210304State of North Carolina
Division of Water Resources
Water Quality Regional Operations Section
Environmental Quality Staff Report
To: ❑ NPDES Unit ® Non -Discharge Unit
Attn: Poonam Giri
From: Jane Bernard
Raleigh Regional Office
Application No.: WQ0035261
Facility name: 1834 Pullium-Tingen Mine Rd SFR
Note: This form has been adapted from the non -discharge facility staff report to document the review of both non -
discharge and NPDES permit applications and/or renewals. Please complete aII sections as they are applicable.
I. GENERAL AND SITE VISIT INFORMATION
1. Was a site visit conducted? ® Yes or ❑ No
a. Date of site visit: February 9.202I
b. Site visit conducted by: Jane Bernard
c. Inspection report attached? ❑ Yes or ® No
d. Person contacted: Rainey Wilkerson and their contact information: 9( 19) 336-514-2435 ext.
e. Driving directions:
2. Discharge Point(s):
Latitude: Longitude:
Latitude: Longitude:
3. Receiving stream or affected surface waters:
Classification:
River Basin and Subbasin No.
Describe receiving stream features and pertinent downstream uses:
H. PROPOSED FACILITIES: NEW APPLICATIONS
1. Facility Classification: _ (PIease attach completed rating sheet to be attached to issued permit)
Proposed flow:
Current permitted flow:
2. Are the new treatment facilities adequate for the type of waste and disposal system? ❑ Yes or ❑ No
If no, explain: ,
3. Are site conditions (soils, depth to water table, etc) consistent with the submitted reports? ❑ Yes ❑ No ❑ NIA
If no, please explain:
4. Do the plans and site map represent the actual site (property lines, wells, etc.)? ❑ Yes ❑ No ❑ NIA
If no, please explain:
5. Is the proposed residuals management plan adequate? ❑ Yes ❑ No ❑ NIA
If no, please explain:
FORM: WQROSSR 04-14 Page I of
6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable? ❑ Yes ❑ No ❑ NiA
If no, please explain:
7. Are there any setback conflicts for proposed treatment, storage and disposal sites? ❑ Yes or ❑ No
If yes, attach a map showing conflict areas.
8. Is the proposed or existing groundwater monitoring program adequate? ❑ Yes ❑ No ❑ N..-'A
If no, explain and recommend any changes to the groundwater monitoring program: .
9. For residuals, will seasonal or other restrictions be required? ❑ Yes ❑ No ❑ NIA
If yes, attach list of sites with restrictions (Certification B)
Describe the residuals handling and utilization scheme:
10. Possible toxic impacts to surface waters:
11. Pretreatment Program (POTWs only):
III. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS
1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑ No N N.--A
ORC: Certificate #: Backup ORC: — Certificate #:
2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal
system? N Yes or ❑ No
If no, please explain:
Description of existing facilities:
Proposed flow:
Current permitted flow:
Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important
for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership,
etc.)
3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately
assimilating the waste? N Yes or ❑ No
If no, please explain:
4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance
boundary, new development, etc.)? ❑ Yes or N No
If yes, please explain:
5. Is the residuals management plan adequate? N Yes or ❑ No
If no, please explain:
6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? N Yes or ❑ No
If no, please explain:
7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No N NIA
If no, explain and recommend any changes to the groundwater monitoring program:
8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or N No
If yes, attach a map showing conflict areas.
9. Is the description of the facilities as written in the existing permit correct? N Yes or ❑ No
If no, please explain:
10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No N NIA
If no, please explain:
FORM: WQROSSR 04-14 Page 2 of
11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® NIA
If no, please complete the following ex and table if necess
Monitoring Well Latitude Longitude
O 1 B O , /,
O 1 if O , ,/
O , I, , of
O , if o , it
O , 1, O I 11
12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ❑ Yes or ❑ No
Please summarize any findings resulting from this review:
Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable.
13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No
If yes, please explain: .
14. Check all that apply:
® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC
❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium
Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.)
If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been
working with the Permittee? Is a solution underway or in place?
Have all compliance dates/conditions in the existing permit been satisfied? ® Yes ❑ No ❑ NIA
If no, please explain: _
15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit?
❑ Yes ® No ❑ N/A
If yes, please explain:
16. Possible toxic impacts to surface waters:
17. Pretreatment Program (POTWs only):
l . Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No
If yes, please explain:
2. List any items that you would Iike the NPDES Unit or Non -Discharge Unit Central Office to obtain through an
additional information request:
FORM: WQROSSR 04-14 Page 3 of
3. List specific permit conditions recommended to be removed from the permit when issued:
4. List specific special conditions or compliance schedules recommended to be included in the permit when issued:
Condition
Reason
5. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office
❑ Hold, pending review of draft permit by regional office
❑ Issue upon receipt of needed additional information
® Issue
❑ Deny {Please state reasons: �)
6. Signature of report preparer:
Signature of regional supervisor:
Date: 3/4/2021 LB2916E6AB32144F.
IV. ADDITIONAL REGIONAL STAFF REVIEW ITEMS
FORM: WQROSSR 04-14 Page 4 of