Loading...
HomeMy WebLinkAbout20210489 Ver 1_Meeting Request Review Doc Attachment_20210302Lyons 1201 1100 1196 Wilkins Rd. Colonial Pi e dm o n t T w i n Cir c l e WashingtonSt.W. B. Clark A e r i a l A v e . Telecom Dr.E. LYON STATIONRd.Rd.StationLyonRd.SuittRd.Ga t e TwoSOUTHERNRAILWAY ASt.DE.St.S. 2 7 t h S t . S t . S . 2 8 t h S . 2 6 t h St . N . 3 3 t h St . N . 3 1 t h S t . N. 2 5 r d N . 2 6 r d N . 2 7 r d N . 2 8 r d S t . S t . S t . S t . N . 2 9 r d N . 3 0 r d S t . St . N . 2 4 r d S t . N . 3 2 r d S t .ESt.56 85 1244 1186 1186 Butner - StemElem. Sch. FN 72 GRA 31 LYONS B u t n e r C r e e d m o o r R d . 56 85 RAILWAY SRAILWAY SOUTHERN SSRAILWAYSOUTHERN SOUTHERN SOUTHER N RAILWAY SOUT H E R N RAILWAY SOUTHERN RAILWAY SOUTHERN RAILWAY SOUTH ER N RAILWAY SOUTHERNRAILWAY SOUTHERNRAILWAY SOUTH ER N RAILW AY SOUTHER N RAILWA Y SOUTHE RN RAILWA Y SOUTHERNRAILWAYSOUTHERNRAILWAYSOUT H E R N RAILWAYSOUTHERN RAILWAY SOUT HER N RAILWAYNorth Carolina One-Call Center 1-800-632-4949 (336) 855-5760 (Greensboro Area) Call Two Working Days Before You Dig It's The Law ALTEC INDUSTRIES, INC. 1550 AERIAL AVE. CREEDMOOR, NC 27522 (P): (919) 528-8029 CONTACT: MR. TOKSO PAK · CAPRINE ENGINEERING, PLLC 200 OFFICE PARK DRIVE, STE. 215 BIRMINGHAM, AL 35223 (P): (205) 423-5082 CONTACT: E. CHRIS ECKROATE, P.E. NC PE LICENSE #038850 · Contact Information Civil Engineer Owner C0.0 1 of 42 CREEDMOOR OXFORD STEM BUTNER STOVALL FOR PERMIT 06.23.2020 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082 TOWN OF BUTNER 415 CENTRAL AVENUE BUTNER, NC 27509 (P): (919) 575-3032 CONTACT: MR. MICHAEL CIRIELLO, DIRECTOR ·Municipality CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629) ALTEC INDUSTRIES INC. FOR SITE IMPROVEMENTS PLANS 1550 AERIAL AVE., AND 1515 IVAC WAY CREEDMOOR, NORTH CAROLINA 27522 GRANVILLE COUNTY PROPERTY ID'S #088703106437, #088601186750 AND #0886098369 FOR A CHASSIS STORAGE LOT PARCEL NO./MAP NO.:088703106437 088601186750 AND 0886098369 DEED REFERENCE: DB 616/ PG 783 DB 1681/ PG 36 PB 768/ PG 50 PB 47/ PG 155 PB 9/ PG 105 ZONING: LI - LIGHT INDUSTRIAL TYPE OF DEVELOPMENT/ PROPOSED USE: MANUFACTURING/ MANUFACTURING PROPERTY SIZE 100.03 AC.± EXISTING BUA 1,470,072 SF PARKING LOT 1,143,932 SF ROOF 326,140 SF DISTURBED AREA 811,200 SF± PROPOSED BUA 647,553 SF PARKING LOT - PH 1 248,834 SF PARKING LOT - PH 2 278,395 SF PARKING LOT - PH 3 120,324 SF WATERSHED UPPER FALLS LAKE WATERSHED CLASSIFICATION WS-IV NSW-P WATERSHED PROTECTION OVERLAY GENERAL AREA (WPO-GA) PROPERTY OWNER ALTEC INDUSTRIES, INC. PROPERTY OWNER ADDRESS 1550 AERIAL AVE. CREEDMOOR, NC 27522 PROJECT NOTES Benchmark BM ELEV. 380.05 RAILROAD SPIKE IN POWER POLE. AERIAL AVENUE AT NORTH END OF GRAVEL PARKING LOT. ALONG WEST RIGHT-OF-WAY LINE ALONG & FRONT LOT EXPANSION OVERALL SITE AREA SUMMARY TOTAL SITE AREA:4,357,307 SF EXEMPT BUA:1,470,072 SF [EXISTED PRIOR TO ADOPTION OF WSW & FALLS LAKE RULES] NET SITE AREA:2,887,235 SF [TOTAL SITE AREA - EXEMPT BUA] MAX. ADDITIONAL BUA ALLOWED ON SITE: 2,021,065 SF [70% OF NET SITE BUA] PROJECT SPECIFIC AREA SUMMARY TOTAL PROJECT LIMITS AREA: 811,200 SF EXISTING BUA WITHIN DISTURBED AREA: 1,028 SF DEMOLISHED BUA: 1,028 SF PROPOSED BUA: 648,581 SF TOTAL IMPERVIOUS AREA: 648,581 SF [EXISTING - DEMO + PROPOSED] NET BUA CHANGE (THIS PROJECT ONLY): 647,553 SF [PROPOSED - DEMO] NET BUA CHANGE (OVERALL SITE): 647,553 SF [NET BUA CHANGE FROM PREVIOUS PROJECTS + PROPOSED - DEMO] CURRENT DENSITY WITHIN NET SITE AREA: 15.70% [70% MAX. NET BUA CHANGE/ NET SITE AREA. NEGATIVE VALUES = 0] SHEET INDEX SHEET NO.SHEET NAME SHEET C0.0 TITLE SHEET SHEET C0.1 EXISTING CONDITIONS SHEET C0.2 PHASE PLAN SHEET C0.3 LANDSCAPING DETAIL PLAN SHEET C1.0 SITE PLAN - OVERALL VIEW SHEET C1.1 SITE PLAN - PHASE 1 SHEET C1.2 SITE PLAN - PHASE 2 SHEET C1.3 SITE PLAN - PHASE 3 SHEET C2.0 GRADING & DRAINAGE PLAN - OVERALL VIEW SHEET C2.1 GRADING & DRAINAGE PLAN - PHASE 1 SHEET C2.2 GRADING & DRAINAGE PLAN - PHASE 2 SHEET C2.3 GRADING & DRAINAGE PLAN - PHASE 3 SHEET C2.4 STORM PIPE PLAN & PROFILE PHASE 1 SHEET C2.5 STORM PIPE PLAN & PROFILE PHASE 1 & 2 SHEET C2.6 STORM PIPE PLAN & PROFILE PHASE 2 SHEET C2.7 STORM PIPE PLAN & PROFILE PHASE 2 CONTINUED SHEET C2.8 STORM PIPE PLAN & PROFILE PHASE 3 SHEET C3.0 HYDROLOGIC PLAN WETLAND POND C SHEET C3.1 HYDROLOGIC PLAN - OVERALL SITE PRE DEVELOPMENT SHEET C3.2 HYDROLOGIC PLAN - PHASE 1 POST DEVELOPMENT SHEET C3.3 HYDROLOGIC PLAN - PHASE 2 POST DEVELOPMENT SHEET C3.4 HYDROLOGIC PLAN - PHASE 3 POST DEVELOPMENT SHEET C3.5 HYDROLOGIC PLAN - OVERALL SITE POST DEVELOPMENT SHEET C3.6 STORMWATER CONTROL MEASURES AND LANDSCAPING PLAN SHEET C3.7 STORMWATER & MAINTENANCE EASEMENT DEDICATION MAP SHEET C4.0 EROSION & SEDIMENT CONTROL NOTES SHEET C4.1 EROSION & SEDIMENT CONTROL PLAN - PHASE 1 - CLEARING SHEET C4.2 EROSION & SEDIMENT CONTROL PLAN - PHASE 1 - GRADING SHEET C4.3 EROSION & SEDIMENT CONTROL PLAN - PHASE 1 - FINAL SHEET C4.4 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 - CLEARING SHEET C4.5 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 - GRADING SHEET C4.6 EROSION & SEDIMENT CONTROL PLAN - PHASE 2 - FINAL SHEET C4.7 EROSION & SEDIMENT CONTROL PLAN - PHASE 3 - CLEARING SHEET C4.8 EROSION & SEDIMENT CONTROL PLAN - PHASE 3 - GRADING SHEET C4.9 EROSION & SEDIMENT CONTROL PLAN - PHASE 3 - FINAL SHEET C4.10 EROSION & SEDIMENT CONTROL PLAN NOTES SHEET C4.11 EROSION & SEDIMENT CONTROL GROUND STABILIZATION AND MATERIALS HANDLING DETAILS SHEET C4.12 EROSION & SEDIMENT CONTROL SELF-INSPECTION, RECORD KEEPING AND REPORTING DETAILS SHEET C5.0 CONSTRUCTION DETAILS SHEET C5.1 CONSTRUCTION DETAILS - SAND FILTER 1 SHEET C5.2 CONSTRUCTION DETAILS - SAND FILTER 2 SHEET C5.3 CONSTRUCTION DETAILS EROSION CONTROL ENGINEER/APPLICANT CAPRINE ENGINEERING, PLLC. E. CHRIS ECKROATE, PE ENGINEER/APPLICANT ADDRESS 200 OFFICE PARK DRIVE SUITE 215 BIRMINGHAM, AL 35223 LOCATION MAP SEE SHEET BUILDING SETBACKS FRONT - 40 FT. SIDE - 35 FT. REAR - 40 FT. ACTUAL BUILDING HEIGHT EXISTING 26 FT. NEW ADDITION NONE EXISTING BUILDING AREA 190,412 SF ADDITION AREA N/A FLOOD INFO ZONE X. FIRM NO. 3720088600J ZONE X. FIRM NO. 3720088700J ADDITIONAL NOTES: 1. THIS PROJECT IS NOT WITHIN FIVE (5) MILES OF A PUBLIC AIRPORT. 2. THERE ARE NO NEW BUILDINGS ASSOCIATED WITH THIS RE-DEVELOPMENT PROJECT. 3. ALL SIGNS TO BE SUBMITTED SEPARATELY. SHEET _____ OF_____ C0.1EXISTING CONDITIONSCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=60' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 2 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 SHEET _____ OF_____ C0.2PHASE PLANCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: VARIES PROJECT NO. 19.007DATEFOR PERMITDRAWN: NJO REVIEW: CE 3 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)PHASING PLAN - PHASE 1 SCALE: 1"=100' PHASING PLAN - PHASE 2 SCALE: 1"=100' PHASING PLAN - PHASE 3 SCALE: 1"=50' CLEARING ONLY CLEARING ONLY EXCESS STRUCTURAL FILL AREA CONST. WETLANDS & DET. POND PHASE 1 BUA PHASE 1 BUA CLEARING ONLY EXIST ING IMPROVEMENTS EXISTING IMPROVEMENTS PHASE 1 BUA SAND FILTER F SAND FILTER A PHASE 2 BUA EXISTING IMPROVEMENTS EXISTING IMPROVEMENTS EXISTING IMPROVEMENTSEXIST ING IMPROVEMENTS EXCESS STRUCTURAL FILL AREA SAND FILTER D TREATMENT SWALE SAND FILTER J PHASE 3 BUA EXISTING IMPROVEMENTS EXISTING IMPROVEMENTS AERIAL AVENUEAERIAL AVENUEAERIAL AVENUE06.23.2020 SHEET _____ OF_____ C0.3LANDSCAPING DETAIL PLANCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=100' PROJECT NO. 19.007DATE DRAWN: HB REVIEW: CE 4 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)PROPOSED ASPHALT STORAGE/PARKING PROPOSED ASPHALT STORAGE/PARKING EXISTING ASPHALT PARKING EAST LYON STATION RD.AERIAL AVE.FOR PERMITEXISTING TREES IN THIS AREATO REMAIN (TREE PROTECTIONNOT REQUIRED)EXISTING TREES TO REMAIN (TREE PROTECTION NOT REQUIRED) TREE PROTECTION REQUIRED FOR EXISTING TREES IN THIS AREA. SEE ENLARGED VIEW. EXISTING GREEN GIANT TREES TO REMAIN (SEE EX. LANDSCPAING SCREEN TABLE) EXISTING GREEN GIANT TREES TO REMAIN EXISTING 10' CHAIN LINK FENCE W/ PRIVACY SLATS TO REMAIN. EXISTING TREE PROTECTION ENLARGED VIEW SCALE: 1"=20' NOTE: NO LAND CLEARING, STORING EQUIPMENT OR CONSTRUCTION MATERIALS, STOCKPILING, PARKING OR DRIVING VEHICLES WITHIN THE TREE PROTECTION ZONE. PROTECTED TREE ID TABLE R.O.W. R.O.W. LANDSCAPING PLAN SCALE: 1"=100' 180' WI D E D U K E ENERGY R . O . W . EXISTING TREE ENLARGED VIEW SCALE: 1"=40' 92 93 94 EAST LYON STATION RD. TREE PROTECTION ZONE DETAIL R.O.W. FURNISH AND INSTALL GALVANIZED 10' CHAIN LINK FENCE W/ PRIVACY SLATS TO MATCH EXISTING FENCE. FURNISH AND INSTALL GALVANIZED 10' CHAIN LINK FENCE W/ PRIVACY SLATS TO MATCH EXISTING FENCE. “” 06.23.2020 SHEET _____ OF_____ C1.0SITE PLAN - OVERALL VIEWCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=60' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 5 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082SHEET _____ OF_____ C1.1SITE PLAN - PHASE 1CHASSIS STORAGE LOT & FRONT LOT EXPANSION ALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: NO REVIEW: CE 6 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082SHEET _____ OF_____ C1.2SITE PLAN - PHASE 2CHASSIS STORAGE LOT & FRONT LOT EXPANSION ALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: NO REVIEW: CE 7 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)SITE PLAN - PHASE 2 SCALE: 1"=50' FILL AREA - PHASE 2 SCALE: 1"=50' FILL AREA KEY MAP - PHASE 2 NOT TO SCALE 06.23.2020 SHEET _____ OF_____ C1.3SITE PLAN - PHASE 3CHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 8 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 SHEET _____ OF_____ C2.0GRADING & DRAINAGE PLAN - OVERALL VIEWCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=60' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 9 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082SHEET _____ OF_____ C2.1GRADING AND DRAINAGE PLAN - PHASE 1CHASSIS STORAGE LOT & FRONT LOT EXPANSION ALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: NJO REVIEW: CE 10 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020GRADING EDGE ADJUSTMENTS 08.27.2020 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082SHEET _____ OF_____ C2.2GRADING AND DRAINAGE PLAN - PHASE 2CHASSIS STORAGE LOT & FRONT LOT EXPANSION ALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: NJO REVIEW: CE 11 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)PHASE 2 GRADING FILL PLAN SCALE: 1"=50' GRADING PLAN - PHASE 2 SCALE: 1"=50' FILL AREA KEY MAP - PHASE 2 NOT TO SCALE 06.23.2020 SHEET _____ OF_____ C2.3GRADING AND DRAINAGE PLAN - PHASE 3CHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 12 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 SHEET _____ OF_____ C2.4STORM PIPE PLAN AND PROFILESCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 13 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)SCALE: 1"=30' H 1"=5' V SCALE: 1"=30' H 1"=5' V SCALE: 1"=30' H 1"=5' V SCALE: 1"=30' H 1"=5' V PHASE 1SCALE: 1"=30' H 1"=5' V 06.23.2020 SHEET _____ OF_____ C2.5STORM PIPE PLAN AND PROFILESCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 14 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)SCALE: 1"=30' H 1"=5' V SCALE: 1"=30' H 1"=5' VSCALE: 1"=30' H 1"=5' V SCALE: 1"=30' H 1"=5' V PHASE 1 & 206.23.2020 SHEET _____ OF_____ C2.6STORM PIPE PLAN AND PROFILESCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=30' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 15 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)SCALE: 1"=30' H 1"=5' V PHASE 206.23.2020 SHEET _____ OF_____ C2.7STORM PIPE PLAN AND PROFILESCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 16 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)SCALE: 1"=30' H 1"=5' V SCALE: 1"=30' H 1"=5' V SCALE: 1"=30' H 1"=5' V PHASE 2 CONTINUED06.23.2020 SHEET _____ OF_____ C2.8STORM PIPE PLAN AND PROFILESCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 17 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)SCALE: 1"=30' H 1"=5' V PHASE 306.23.2020 2730 19TH STREET S. BIRMINGHAM, ALABAMA 35209 O:(205)423-5082SHEET _____ OF_____ C3.0HYDROLOGIC PLAN WETLAND POND CCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=40' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 18 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)STORMWATER WETLAND PLAN - PHASE 1 SCALE: 1"=40'06.23.2020 Cl e a n O u t C O G a s M e t e r G M S c r e e n e d P o r c h S P C o v e r e d P o r c h C P D e c k D K H. V . A . C . H V R e t a i n i n g W a l l R W A s p h a l t P a v e m e n t A P Br i c k P a v e r s B P St o n e P a v e r s S P C o n c r e t e C C C u r b I n l e t C I Y a r d I n l e t Y I Dr a i n a g e P i p e D P W a t e r V a l v e Fi b e r O p t i c F O F O M a r k e r P o s t F P Fi b e r O p t i c V a u l t F V T e l e p h o n e C a b l e - - - - - T - - - - Pr o p e r t y L i n e Ri g h t o f W a y L i n e D e e d o r P l a t L i n e Pr o p e r t y L i n e T i e O v e r h e a d U t i l i t y L i n e Fi r e D e p a r t m e n t C o n n e c t i o n F D C G a s V a l v e G V C o r r u g a t e d P l a s t i c P i p e C P P Fi r e P r o t e c t i o n V a l v e F P V 2730 19TH STREET S. BIRMINGHAM, ALABAMA 35209 O:(205)423-5082SHEET _____ OF_____ C3.1HYDROLOGIC PLAN - OVERALL SITEPRE DEVELOPMENTCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=120' PROJECT NO. 19.007DATEFOR PERMITDRAWN: NO REVIEW: CE 19 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)POST-2 PRE-1A PRE-1B PRE-1C PRE-1D PRE-1F PRE-1Y PRE-1Z PRE-1X PRE-1W PRE-1V PRE-1U 06.23.2020 Cu r b I n l e t C I Ya r d I n l e t Y I Dr a i n a g e P i p e D P W a t e r V a l v e Fi b e r O p t i c F O F O M a r k e r P o s t F P Fi b e r O p t i c V a u l t F V 2730 19TH STREET S. BIRMINGHAM, ALABAMA 35209 O:(205)423-5082SHEET _____ OF_____ C3.2HYDROLOGIC PLAN - PHASE 1POST DEVELOPMENTCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=100' PROJECT NO. 19.007DATEFOR PERMITDRAWN: NO REVIEW: CE 20 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)POST-2 1A HYDROLOGIC PLAN KEY MAP NOT TO SCALE 1B.1 1B.2 1B.3 1B.4 1B.5 1B.6 1B.7 1B.8 1B.9 1C 1D 1E 1F 1U 1V 1W 1X 1Y 1Z 1F 1B.7A 06.23.2020 Cu r b I n l e t C I Ya r d I n l e t Y I Dr a i n a g e P i p e D P W a t e r V a l v e Fi b e r O p t i c F O F O M a r k e r P o s t F P Fi b e r O p t i c V a u l t F V 2730 19TH STREET S. BIRMINGHAM, ALABAMA 35209 O:(205)423-5082SHEET _____ OF_____ C3.3HYDROLOGIC PLAN - PHASE 2POST DEVELOPMENTCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=100' PROJECT NO. 19.007DATEFOR PERMITDRAWN: NO REVIEW: CE 21 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)POST-2 2A 2B.3 2B.2 2B.1 2B.8 2B.5 2B.6 2B.7 2A.1 2A.2 2A.3 2C 2E.1 2A.4 2A.5 2A.6 2A.7 2A.8 2B.4 HYDROLOGIC PLAN KEY MAP NOT TO SCALE 2E 2F 1U 1V 1W 1X 1Y 1Z 1F 2B.9 2D 2B.7A 06.23.2020 Cu r b I n l e t C I Ya r d I n l e t Y I Dr a i n a g e P i p e D P W a t e r V a l v e Fi b e r O p t i c F O F O M a r k e r P o s t F P Fi b e r O p t i c V a u l t F V 2730 19TH STREET S. BIRMINGHAM, ALABAMA 35209 O:(205)423-5082SHEET _____ OF_____ C3.4HYDROLOGIC PLAN - PHASE 3POST DEVELOPMENTCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=100' PROJECT NO. 19.007DATEFOR PERMITDRAWN: NJO REVIEW: CE 22 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)POST-2 3A 3B.3 3B.2 3B.1 3B.8 3B.6 3B.7 3A.1 3A.2 3A.3 3C 3D 3F 3E 3E.1 3A.4 3A.5 3A.6 3E.23E.33E.4 3A.7 3A.8 3B.5 3B.4 HYDROLOGIC PLAN KEY MAP NOT TO SCALE 1U 1V 1W 1X 1Y 1Z 1F 3B.9 3B.7A 06.23.2020 Cl e a n O u t C O G a s M e t e r G M S c r e e n e d P o r c h S P C o v e r e d P o r c h C P D e c k D K H. V . A . C . H V R e t a i n i n g W a l l R W A s p h a l t P a v e m e n t A P Br i c k P a v e r s B P St o n e P a v e r s S P C o n c r e t e C C C u r b I n l e t C I Y a r d I n l e t Y I Dr a i n a g e P i p e D P W a t e r V a l v e Fi b e r O p t i c F O F O M a r k e r P o s t F P Fi b e r O p t i c V a u l t F V T e l e p h o n e C a b l e - - - - - T - - - - Pr o p e r t y L i n e Ri g h t o f W a y L i n e D e e d o r P l a t L i n e Pr o p e r t y L i n e T i e O v e r h e a d U t i l i t y L i n e Fi r e D e p a r t m e n t C o n n e c t i o n F D C G a s V a l v e G V C o r r u g a t e d P l a s t i c P i p e C P P Fi r e P r o t e c t i o n V a l v e F P V 2730 19TH STREET S. BIRMINGHAM, ALABAMA 35209 O:(205)423-5082SHEET _____ OF_____ C3.5HYDROLOGIC PLAN - OVERALL SITEPOST DEVELOPMENTCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=120' PROJECT NO. 19.007DATEFOR PERMITDRAWN: NJO REVIEW: CE 23 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)POST-2 3X 3Z 3Y 3F 3W 3V 3U 3C 3A 3A.1 3A.2 3D 3E 3E.1 3E.2 3E.3 3E.4 3B.8 3B.9 3B.7 3B.6 3B.5 3A.6 3B.33A.3 3A.5 3A.4 3A.8 3A.7 3B.2 3B.1 3B.4 3B.7A 06.23.2020 2730 19TH STREET S. BIRMINGHAM, ALABAMA 35209 O:(205)423-5082SHEET _____ OF_____ C3.6STORMWATER CONTROL MEASURES ANDLANDSCAPING PLANCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=30' PROJECT NO. 19.007DATEFOR PERMITDRAWN: NJO REVIEW: CE 24 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)STORMWATER WETLAND LANDSCPAING PLAN SCALE: 1"=30' TREATMENT SWALE ENLARGED VIEW SCALE: 1"=20'06.23.2020 2730 19TH STREET S. BIRMINGHAM, ALABAMA 35209 O:(205)423-5082SHEET _____ OF_____ C3.7STORMWATER & MAINTENANCEEASEMENT DEDICATION MAPBUILDING C PLANT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=60' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 25 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 SHEET _____ OF_____ C4.0EROSION AND SEDIMENT CONTROL NOTESCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: NONE PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 26 42 Shrub, Vine and Ground cover Plantings Tree Planting on Disturbed Areas Sodding Temporary Seeding Permanent Seeding Erosion Control Blanket Grounds keeping Preservation of Vegetation Retaining Wall Mulching Top soiling Chemical Stabilization Dune Sand Fence Dune Vegetation Planting Dune Walkover Dust Control Land Grading Fabric Drop Inlet Protection Excavated Drop Inlet Protection Brush/Fabric Barrier Block and Gravel Inlet Floating Turbidity Barrier Straw Bale Sediment Trap Temporary Sediment Trap Rock Doughnut Inlet PrtectionRDP TST SB SBN SST Sediment Barrier Sediment Basin EIP FS FIP FB BFB BIP Filter Sack Channel Stabilization Stream bank Protection Temporary Stream Crossing Storm Water Detention Basin Temporary Slope Drains Drop StructureDS Grass Swale Lined Swale Outlet Protection Riprap-lined Swale Subsurface Drain RS SD TDS GS LS OP Diversion Channel Rock Check Dam DV RCD TSC CS SP BZ Buffer Zone SDB PP Porous Pavement Bonded Fiber Matrix ST Sediment Tube BG Baffle Grid HDPE Inlet FilterHIF Flocculant/ Floc Log Temporary Inlet Riser ExtensionTRE SO TS TP PS PV RW SVG M ECB GK DSF DVP DW DC CHS BFM Site Preparation Surface Stabilization Runoff Conveyance Sediment Control Storm water Management Stream Protection Flexible Growth Media/MatrixFGM Turf Reinforcement MatTRM RD Rock Filter Dam SBO Sediment Barrier Outlet Hardware Cloth and Gravel Inlet ProtectionHCG F To DurhamTo OxfordI-85NBI-85SBB U T N E R C R E E D M O O R R D .E. LYON STATION RD.A E R I A L A V E . TELECOM DR. EXIT 191 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082SHEET _____ OF_____ C4.1EROSION & SEDIMENT CONTROL PLAN -CHASSIS STORAGE LOT & FRONT LOT EXPANSION ALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 27 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)PHASE 1 - CLEARINGDISTRUBED AREA (CONT'D) SCALE: 1"=50' Shrub, Vine and Ground Tree Planting on Disturbed Areas Sodding Temporary Seeding Permanent Seeding Erosion Control Blanket Grounds keeping Preservation of Vegetation Retaining Wall Mulching Top soiling Chemical Stabilization Dust Control Land Grading Fabric Drop Inlet Protection Excavated Drop Inlet Protection Brush/Fabric Barrier Block and Gravel Inlet Floating Turbidity Barrier Straw Bale Sediment Trap Temporary Sediment Trap Rock Doughnut Inlet PrtectionRDP TST SB SBN SST Sediment Barrier Sediment Basin EIP FS FIP FB BFB BIP Filter Sack Storm Water Detention Basin Temporary Slope Drains Drop StructureDS Grass Swale Lined Swale Outlet Protection Riprap-lined Swale Subsurface Drain RS SD TDS GS LS OP Diversion Channel Rock Check Dam DV RCD SDB PP Porous Pavement Bonded Fiber Matrix ST Sediment Tube Temporary Inlet Riser ExtensionTRE SO TS TP PS PV RW SVG M ECB GK DC CHS BFM Site Preparation Surface Stabilization Runoff Conveyance Sediment ControlStorm water Management Flexible Growth Media/MatrixFGM Turf Reinforcement MatTRM RD Rock Filter Dam SBO Sediment Barrier Outlet Hardware Cloth and Gravel Inlet ProtectionHCG cover Plantings SB SB SB SB SB RCD RCD CEP PS M PS M PS M PS M PS M M M SBN SBN SBN SBN SBN SBN SBN TS M TS M TS TS M TS M TS M TS DV DV DV DV DV DV DVDV DV DV DV DV DV DV DV DV DVDV CEP PS PS DV TS TS TS TS PS M TS TS Sediment Control (Cont'd) SBO SBO SBO SBO SBO SBO SBO SBO SBO SB RD 06.23.2020 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082SHEET _____ OF_____ C4.2EROSION & SEDIMENT CONTROL PLAN -CHASSIS STORAGE LOT & FRONT LOT EXPANSION ALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 28 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)PHASE 1 - GRADINGDISTRUBED AREA (CONT'D) SCALE: 1"=50' Shrub, Vine and Ground Tree Planting on Disturbed Areas Sodding Temporary Seeding Permanent Seeding Erosion Control Blanket Grounds keeping Preservation of Vegetation Retaining Wall Mulching Top soiling Chemical Stabilization Dune Sand Fence Dune Vegetation Planting Dune Walkover Dust Control Land Grading Fabric Drop Inlet Protection Excavated Drop Inlet Protection Block and Gravel Inlet Floating Turbidity Barrier Straw Bale Sediment Trap Rock Doughnut Inlet PrtectionRDP SB SBN SST Sediment Barrier Sediment Basin EIP FS FIP FB BIP Filter Sack Storm Water Detention Basin Temporary Slope Drains Drop StructureDS Grass Swale Lined Swale Outlet Protection Riprap-lined Swale Subsurface Drain RS SD TDS GS LS OP Diversion Channel Rock Check Dam DV RCD SDB PP Porous Pavement Bonded Fiber Matrix ST Sediment Tube Temporary Inlet Riser ExtensionTRE SO TS TP PS PV RW SVG M ECB GK DSF DVP DW DC CHS BFM Site Preparation Surface Stabilization Runoff Conveyance Sediment ControlStorm water Management Flexible Growth Media/MatrixFGM Turf Reinforcement MatTRM RD Rock Filter Dam SBO Sediment Barrier Outlet Hardware Cloth and Gravel Inlet ProtectionHCG cover Plantings DC DC DC DC DC PS PS SB SB SB SB SB SB SB SB RCD RCD CEP ECB ECB PS ECB PS ECB PS ECB PS ECB PS ECB PS ECB PS M PS M PS M ECB PS RD RD Check Dam WattleCDW CDW CDW CDW CDW CDW BIP FIP BIP FIP BIP FIP BIP FIP BIP FIP BIP FIP CEP ECB PS ECB PS ECB PS ST ST CEP SBO SBO SBO SBO SBO SBO SBO SBO SBO SBO SBO SBO DC DC SBN DV DV DV SBO BIP FIP PS M ECB ECB M MM M M M M M M M M M M PS DV DV DV RD Surface Stabilization (Cont'd) ECB 06.23.2020 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082SHEET _____ OF_____ C4.3EROSION & SEDIMENT CONTROL PLAN -CHASSIS STORAGE LOT & FRONT LOT EXPANSION ALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 29 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)PHASE 1 - FINALDISTRUBED AREA (CONT'D) SCALE: 1"=50' Shrub, Vine and Ground Tree Planting on Disturbed Areas Sodding Temporary Seeding Permanent Seeding Erosion Control Blanket Grounds keeping Preservation of Vegetation Retaining Wall Mulching Top soiling Chemical Stabilization Dune Sand Fence Dune Vegetation Planting Dune Walkover Dust Control Land Grading Fabric Drop Inlet Protection Excavated Drop Inlet Protection Brush/Fabric Barrier Block and Gravel Inlet Floating Turbidity Barrier Straw Bale Sediment Trap Temporary Sediment Trap Rock Doughnut Inlet PrtectionRDP TST SB SBN SST Sediment Barrier Sediment Basin EIP FS FIP FB BFB BIP Filter Sack Storm Water Detention Basin Temporary Slope Drains Drop StructureDS Grass Swale Lined Swale Outlet Protection Riprap-lined Swale Subsurface Drain RS SD TDS GS LS OP Diversion Channel Rock Check Dam DV RCD SDB PP Porous Pavement Bonded Fiber Matrix ST Sediment Tube Temporary Inlet Riser ExtensionTRE SO TS TP PS PV RW SVG M ECB GK DSF DVP DW DC CHS BFM Site Preparation Surface Stabilization Runoff Conveyance Sediment ControlStorm water Management Flexible Growth Media/MatrixFGM Turf Reinforcement MatTRM RD Rock Filter Dam SBO Sediment Barrier Outlet Hardware Cloth and Gravel Inlet ProtectionHCG cover Plantings SBO SBO SBO SBO SBN CEP SB SBN SBN PS M PS M PS M PS M SB SB SB PS PS ECB PS ECB PS ECB PS ECB PS ECB PS ECB PS ECB PS ECB PS ECB PS ECB PS ECB PS ECB PS ECB PS ECB ECB 06.23.2020 SHEET _____ OF_____CHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 30 42 Shrub, Vine and Ground Tree Planting on Disturbed Areas Sodding Temporary Seeding Permanent Seeding Erosion Control Blanket Grounds keeping Preservation of Vegetation Retaining Wall Mulching Top soiling Chemical Stabilization Dune Sand Fence Dune Vegetation Planting Dune Walkover Dust Control Land Grading Fabric Drop Inlet Protection Excavated Drop Inlet Protection Brush/Fabric Barrier Block and Gravel Inlet Floating Turbidity Barrier Straw Bale Sediment Trap Temporary Sediment Trap Rock Doughnut Inlet PrtectionRDP TST SB SBN SST Sediment Barrier Sediment Basin EIP FS FIP FB BFB BIP Filter Sack Channel Stabilization Stream bank Protection Temporary Stream Crossing Storm Water Detention Basin Temporary Slope Drains Drop StructureDS Grass Swale Lined Swale Outlet Protection Riprap-lined Swale Subsurface Drain RS SD TDS GS LS OP Diversion Channel Rock Check Dam DV RCD TSC CS SP BZ Buffer Zone SDB PP Porous Pavement Bonded Fiber Matrix ST Sediment Tube BG Baffle Grid HDPE Inlet FilterHIF Flocculant/ Floc Log Temporary Inlet Riser ExtensionTRE SO TS TP PS PV RW SVG M ECB GK DSF DVP DW DC CHS BFM Site Preparation Surface Stabilization Runoff Conveyance Sediment Control Storm water Management Stream Protection Flexible Growth Media/MatrixFGM Turf Reinforcement MatTRM RD Rock Filter Dam SBO Sediment Barrier Outlet Hardware Cloth and Gravel Inlet ProtectionHCG Fcover Plantings 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)BIP C4.4EROSION & SEDIMENT CONTROL PLAN -PHASE 2 - CLEARINGSBO CEP BIP BIP SBO ST ST 06.23.2020 SHEET _____ OF_____CHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 31 42 Shrub, Vine and Ground Tree Planting on Disturbed Areas Sodding Temporary Seeding Permanent Seeding Erosion Control Blanket Grounds keeping Preservation of Vegetation Retaining Wall Mulching Top soiling Chemical Stabilization Dune Sand Fence Dune Vegetation Planting Dune Walkover Dust Control Land Grading Fabric Drop Inlet Protection Excavated Drop Inlet Protection Brush/Fabric Barrier Block and Gravel Inlet Floating Turbidity Barrier Straw Bale Sediment Trap Temporary Sediment Trap Rock Doughnut Inlet PrtectionRDP TST SB SBN SST Sediment Barrier Sediment Basin EIP FS FIP FB BFB BIP Filter Sack Channel Stabilization Stream bank Protection Temporary Stream Crossing Storm Water Detention Basin Temporary Slope Drains Drop StructureDS Grass Swale Lined Swale Outlet Protection Riprap-lined Swale Subsurface Drain RS SD TDS GS LS OP Diversion Channel Rock Check Dam DV RCD TSC CS SP BZ Buffer Zone SDB PP Porous Pavement Bonded Fiber Matrix ST Sediment Tube BG Baffle Grid HDPE Inlet FilterHIF Flocculant/ Floc Log Temporary Inlet Riser ExtensionTRE SO TS TP PS PV RW SVG M ECB GK DSF DVP DW DC CHS BFM Site Preparation Surface Stabilization Runoff Conveyance Sediment Control Storm water Management Stream Protection Flexible Growth Media/MatrixFGM Turf Reinforcement MatTRM RD Rock Filter Dam SBO Sediment Barrier Outlet Hardware Cloth and Gravel Inlet ProtectionHCG Fcover Plantings 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)BIP BIP BIP BIP BIP ECB SB SB SB ECB ECB DC DC DC DC BIP BIP BIP M TS M TS M TS TS PS MU PS ECB SBO SBO SBO BIP C4.5EROSION & SEDIMENT CONTROL PLAN PHASE 2 - GRADINGFIP FIP FIP FIP FIP ECB FIP CEP FS CEP SBO 06.23.2020 SHEET _____ OF_____ C4.6EROSION & SEDIMENT CONTROL PLAN -PHASE 2 - FINALCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 32 42 Shrub, Vine and Ground Tree Planting on Disturbed Areas Sodding Temporary Seeding Permanent Seeding Erosion Control Blanket Grounds keeping Preservation of Vegetation Retaining Wall Mulching Top soiling Chemical Stabilization Dune Sand Fence Dune Vegetation Planting Dune Walkover Dust Control Land Grading Fabric Drop Inlet Protection Excavated Drop Inlet Protection Brush/Fabric Barrier Block and Gravel Inlet Floating Turbidity Barrier Straw Bale Sediment Trap Temporary Sediment Trap Rock Doughnut Inlet PrtectionRDP TST SB SBN SST Sediment Barrier Sediment Basin EIP FS FIP FB BFB BIP Filter Sack Channel Stabilization Stream bank Protection Temporary Stream Crossing Storm Water Detention Basin Temporary Slope Drains Drop StructureDS Grass Swale Lined Swale Outlet Protection Riprap-lined Swale Subsurface Drain RS SD TDS GS LS OP Diversion Channel Rock Check Dam DV RCD TSC CS SP BZ Buffer Zone SDB PP Porous Pavement Bonded Fiber Matrix ST Sediment Tube BG Baffle Grid HDPE Inlet FilterHIF Flocculant/ Floc Log Temporary Inlet Riser ExtensionTRE SO TS TP PS PV RW SVG M ECB GK DSF DVP DW DC CHS BFM Site Preparation Surface Stabilization Runoff Conveyance Sediment Control Storm water Management Stream Protection Flexible Growth Media/MatrixFGM Turf Reinforcement MatTRM RD Rock Filter Dam SBO Sediment Barrier Outlet Hardware Cloth and Gravel Inlet ProtectionHCG Fcover Plantings 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)ECB ECB TS PS ECB ECB PS M PS M PS M PS M ECB 06.23.2020 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082SHEET _____ OF_____ C4.7EROSION & SEDIMENT CONTROL PLAN -CHASSIS STORAGE LOT & FRONT LOT EXPANSION ALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=30' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 33 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)PHASE 3 - CLEARINGShrub, Vine and Ground Tree Planting on Disturbed Areas Sodding Temporary Seeding Permanent Seeding Erosion Control Blanket Grounds keeping Preservation of Vegetation Retaining Wall Mulching Top soiling Chemical Stabilization Dune Sand Fence Dune Vegetation Planting Dune Walkover Dust Control Land Grading Fabric Drop Inlet Protection Excavated Drop Inlet Protection Brush/Fabric Barrier Block and Gravel Inlet Floating Turbidity Barrier Straw Bale Sediment Trap Temporary Sediment Trap Rock Doughnut Inlet PrtectionRDP TST SB SBN SST Sediment Barrier Sediment Basin EIP FS FIP FB BFB BIP Filter Sack Channel Stabilization Stream bank Protection Temporary Stream Crossing Storm Water Detention Basin Temporary Slope Drains Drop StructureDS Grass Swale Lined Swale Outlet Protection Riprap-lined Swale Subsurface Drain RS SD TDS GS LS OP Diversion Channel Rock Check Dam DV RCD TSC CS SP BZ Buffer Zone SDB PP Porous Pavement Bonded Fiber Matrix ST Sediment Tube BG Baffle Grid HDPE Inlet FilterHIF Flocculant/ Floc Log Temporary Inlet Riser ExtensionTRE SO TS TP PS PV RW SVG M ECB GK DSF DVP DW DC CHS BFM Site Preparation Surface Stabilization Runoff Conveyance Sediment Control Storm water Management Stream Protection Flexible Growth Media/MatrixFGM Turf Reinforcement MatTRM RD Rock Filter Dam SBO Sediment Barrier Outlet Hardware Cloth and Gravel Inlet ProtectionHCG Fcover Plantings CEP SBO SBO 06.23.2020 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082SHEET _____ OF_____ C4.8EROSION & SEDIMENT CONTROL PLAN -CHASSIS STORAGE LOT & FRONT LOT EXPANSION ALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=30' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 34 42 CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)PHASE 3 - GRADINGShrub, Vine and Ground Tree Planting on Disturbed Areas Sodding Temporary Seeding Permanent Seeding Erosion Control Blanket Grounds keeping Preservation of Vegetation Retaining Wall Mulching Top soiling Chemical Stabilization Dune Sand Fence Dune Vegetation Planting Dune Walkover Dust Control Land Grading Fabric Drop Inlet Protection Excavated Drop Inlet Protection Brush/Fabric Barrier Block and Gravel Inlet Floating Turbidity Barrier Straw Bale Sediment Trap Temporary Sediment Trap Rock Doughnut Inlet PrtectionRDP TST SB SBN SST Sediment Barrier Sediment Basin EIP FS FIP FB BFB BIP Filter Sack Channel Stabilization Stream bank Protection Temporary Stream Crossing Storm Water Detention Basin Temporary Slope Drains Drop StructureDS Grass Swale Lined Swale Outlet Protection Riprap-lined Swale Subsurface Drain RS SD TDS GS LS OP Diversion Channel Rock Check Dam DV RCD TSC CS SP BZ Buffer Zone SDB PP Porous Pavement Bonded Fiber Matrix ST Sediment Tube BG Baffle Grid HDPE Inlet FilterHIF Flocculant/ Floc Log Temporary Inlet Riser ExtensionTRE SO TS TP PS PV RW SVG M ECB GK DSF DVP DW DC CHS BFM Site Preparation Surface Stabilization Runoff Conveyance Sediment Control Storm water Management Stream Protection Flexible Growth Media/MatrixFGM Turf Reinforcement MatTRM RD Rock Filter Dam SBO Sediment Barrier Outlet Hardware Cloth and Gravel Inlet ProtectionHCG Fcover Plantings CEP SBO SBO DC DC DC DC 06.23.2020 SHEET _____ OF_____ C4.9CHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: 1"=50' PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 35 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)EROSION & SEDIMENT CONTROL PLAN -Shrub, Vine and Ground Tree Planting on Disturbed Areas Sodding Temporary Seeding Permanent Seeding Erosion Control Blanket Grounds keeping Preservation of Vegetation Retaining Wall Mulching Top soiling Chemical Stabilization Dune Sand Fence Dune Vegetation Planting Dune Walkover Dust Control Land Grading Fabric Drop Inlet Protection Excavated Drop Inlet Protection Brush/Fabric Barrier Block and Gravel Inlet Floating Turbidity Barrier Straw Bale Sediment Trap Temporary Sediment Trap Rock Doughnut Inlet PrtectionRDP TST SB SBN SST Sediment Barrier Sediment Basin EIP FS FIP FB BFB BIP Filter Sack Channel Stabilization Stream bank Protection Temporary Stream Crossing Storm Water Detention Basin Temporary Slope Drains Drop StructureDS Grass Swale Lined Swale Outlet Protection Riprap-lined Swale Subsurface Drain RS SD TDS GS LS OP Diversion Channel Rock Check Dam DV RCD TSC CS SP BZ Buffer Zone SDB PP Porous Pavement Bonded Fiber Matrix ST Sediment Tube BG Baffle Grid HDPE Inlet FilterHIF Flocculant/ Floc Log Temporary Inlet Riser ExtensionTRE SO TS TP PS PV RW SVG M ECB GK DSF DVP DW DC CHS BFM Site Preparation Surface Stabilization Runoff Conveyance Sediment Control Storm water Management Stream Protection Flexible Growth Media/MatrixFGM Turf Reinforcement MatTRM RD Rock Filter Dam SBO Sediment Barrier Outlet Hardware Cloth and Gravel Inlet ProtectionHCG Fcover Plantings PHASE 3 - FINALPS PS PS PS DC DCDC DC 06.23.2020 SHEET _____ OF_____ C4.10EROSION AND SEDIMENT CONTROL DETAILSCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: NONE PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 36 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)**q06.23.2020 SHEET _____ OF_____ C4.11EROSION AND SEDIMENT CONTROL DETAILSGROUND STABILIZATION AND MATERIALS HANDLINGCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: NONE PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 37 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 SHEET _____ OF_____ C4.12EROSION AND SEDIMENT CONTROL DETAILSSELF INSPECTION, RECORDKEEPING AND REPORTING SHEETCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: NONE PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 38 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 SHEET _____ OF_____ C5.0CONSTRUCTION DETAILSCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: NONE PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 39 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 SHEET _____ OF_____ C5.1CONSTRUCTION DETAILS - SAND FILTER 1CHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: NONE PROJECT NO. 19.007DATEFOR PERMITDRAWN: NJO REVIEW: CE 40 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 SHEET _____ OF_____ C5.2CONSTRUCTION DETAILS - SAND FILTER 2CHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: NONE PROJECT NO. 19.007DATEFOR PERMITDRAWN: NJO REVIEW: CE 41 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020 SHEET _____ OF_____ C5.3CONSTRUCTION DETAILS EROSION CONTROLCHASSIS STORAGE LOT & FRONT LOT EXPANSIONALTEC INDUSTRIES, INC.CREEDMOOR, GRANVILLE CO., NCPLAN ISSUESCALE: NONE PROJECT NO. 19.007DATEFOR PERMITDRAWN: HB REVIEW: CE 42 42 200 OFFICE PARK DRIVE, SUITE 215 BIRMINGHAM, ALABAMA 35223 O:(205)423-5082CAPRINE ENGINEERING, PLLC (NORTH CAROLINA REG.#P-1629)06.23.2020