HomeMy WebLinkAboutNCC205670_MODIFICATION Supporting Documents_20210304TOWN of
WAKE FOREST
EROSION AND SEDIMENT CONTROL
LAND DISTURBING PERMIT
LETTER OF APPROVAL
NVR, Inc
ATTN: Joe Schmidtke
5734 Trinity Road, Suite 200
Raleigh, NC 27607
RE: Project Name: Mason Oaks Lots: 10, 9, 257 & 263
Permit No: 2021-00000519
Location: Hwy US 1 at Mason Oaks Drive
Acres Approved: 0.65
Submitted By: Morris and Ritchie Associates of NC, PC
Date Approved: March 3, 2021
Dear Mr. Schmidtke:
301 S. Brooks Street
Wake Forest, NC 27587
t 919.435.9400
www.wakeforestnc.gov
March 3, 2021
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. Final signature copies shall be submitted to the
Town of Wake Forest, as well as, a digital copy at least one week prior to the preconstruction
meeting. The land disturbance permit will be issued at the pre -construction meeting. The land
disturbance permit shall expire two (2) years from the date of issuance and can be renewed in one-
year increments.
Per Section 12.3.2 of the Unified Development Ordinance (UDO), a copy of the approved erosion
control plan shall be on file at the job site. Also, this letter gives the notice of our right to
periodically inspect the jobsite to ensure compliance with the approved plan as outlined in the
UDO.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection
of existing natural resources and adjoining properties. If , following the commencement of this
project, it is determined that the erosion and sedimentation control plan is inadequate to meet the
requirements of the Sedimentation Pollution Control Act of 1973, this office may require revisions
to the plans and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and
Local water quality laws, regulations, and rules. This approval does not supersede any other permit
or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form. You are requested to file an amended form if there are any changes
in the information. Please set up a preconstruction conference with all parties involved through the
Public Works Department. A preconstruction meeting must be held with the Town prior to starting
any, work, including installation of erosion control measures, demolition, any clearing and grubbing
or earth moving activities.
Be aware that your project is subject to the NPDES General Stormwater Permit NCGO1000
(Construction Activities). The Town will no longer distribute the NCG01 permit, you will have to
obtain the permit from NC DEMLR. To receive a Certificate of Coverage, you must submit an
electronic Notice of Intent with this approval letter. You must obtain the Certificate of Coverage
prior to scheduling the pre -construction meeting. You will also need to have copies of the
compliance plans sheets, (Ground Stabilization and Material Handling, and Inspection,
Recordkeeping, and Reporting), if they were not included in the approved erosion and sediment
control plan. The NCG01 permit require that the following documentation be kept on file at the job
site:
• The approved E&SC plans as well as any approved deviations
• The NCG01 permit and the Certificate of Coverage
• Records of inspections made during the previous 12 months
Sincerely,
Carrie Mitchell, PE
Environmental Engineer