Loading...
HomeMy WebLinkAbout20210232 Ver 1_Pre-Filing Meeting Request_20210202ID#* 20210232 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 2/2/2021 ............................................................................................................................................................................................................................................................. Contact Name * Joey Lawler Contact Email Address* jlawier@smeinc.com Project Name* PNG Line 373 Speed Excusriosn Project Owner* Project County* Owner Address: Piedmont Natural Gas Mecklenburg Street Address 4720 Piedmont Row Drive Address Line 2 aty Charlotte Fbstal / Zip Code 28210 Is this a transportation project?* r Yes r No State / Province / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below. PNG is planning to conduct work at 12 separate areas along the existing Lien 373 natural gas pipeline. Line 373 originates at an existing station site north of Hovis Road near Stanly in Gaston County and extends generally northeast for approximately 21.8 miles before terminating at an existing PNG station at the junctions of Lines 372 and 257 west of Coffee Point Drive in Charlotte in Mecklenburg County, North Carolina. The proposed work will be conducted entirely within the existing 50- foot wide easement and will entail a variety of activities necessary to address potential speed excursions, or areas where the existing pipe geometry may create conditions that prohibit an in -line inspection device (aka "smart pig) from collecting the necessary data. Such work may entail replacement of pends, elbows or segments of pipe, and may involve temporary impacts to wetlands or streams located in the project area. Accordingly, the work may require authorization under NWP-12 and WQC 4133. Please give a couple of dates you are available for a meeting. 2/26/2021 Please attach the documentation you would like to have the meeting about. Topo.pdf Aerial.pdf pdf only 460.38KB 321.67KB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 2/2/2021 USG S TOPOGRAPHIC M AP EXHIBIT PNG LINE 373 SPEED EXCURSION SITES Legend Excurs ion 8 mi N➤➤N Image Lands at / Copernic us Image Lands at / Copernic us Image Lands at / Copernic us AERIAL PHOTOGRAPH EXHIBIT PNG LINE 373 SPEED EXCURSION SITES Legend Excurs ion 8 mi N➤➤N Image Lands at / Copernic us Image Lands at / Copernic us Image Lands at / Copernic us