Loading...
HomeMy WebLinkAbout20120479 Ver 1_DCM Permit_20120712�. .�+:, r- r,- ,-,. ., v ., ,. .. o.•.n. nn. r .0 r �->. rf .�nvr ...�.w� ,c- ,.r W .� ro-rao- � it P. 1 At limber % S� 82 Y, v r h f f %1-tjoi D, -,,,. r L in an r, i o E iioi rren,a' Cn -ic 7 pur.,uarit to �,+CC 1 -)A 1 " 3 Y Ex,-avat on and/oi filling pursuant to N C G S 113 229 Issued to Nlargaret A Crag, Trustee, 8434 Portal Rozd, Norfolk, VA 23503 Authorizing development in Currituck Countv at adt to North River, at 129 S Riverland Road, in Jarvisburg requested in the permittee s application dated 4/24/12, including the attached workplan drawings (3), all dated 4/24/12 This permit issued on July 122012 is subject to compliance with the application (where consistent with the permit) all applicable iegulations special conditions and notes set forth below Any violation of these terms may be subject to fines imprisonment or civil action or may cause the permit to be null and void Shoreline Stabilization 1) The authorized alignment of the bulkhead shall be constructed in straight line between the corners of the two adjaLent bulkheads 2) 1 he bulkhead alignment shall be staked by the permittee and approved by a representatiti e of the Division of Coastal Management prior to the start of construction 3) The bulkhead shall be constructed prior to any backfilling activities 4) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure (See attached sheet for Additional Conditions) z This pen-nit action may be appealed by the permittee or othei qu ilificO persons within twenty (20) days of the issuing date An appeal requires resolution prior to work initiation or ontinuance as the case may be This permit must be accessible on site to Dep irtment personnel when the project is inspected for compliance Any maintenance woik or project modification not co%ered hetcundei requires further Division approval All work must cease when the permit expires on December 31, 2015 In issuing this permit the State of North Caiolina agrees that your project is consistent with the North Carolina Coastal Management Program Signed by the authority of the Secretary of DENR and the Ch,iu min of Vie Coastal Resources Commission f Braxton C Davis Director Division of Coastal Management This permit and its conditions aie hereby accepted Signatuie of Permittee 11- largaret A "_raig Trui, 2e \ L1 � 1 o � - Cif , Pe v,P 212 Zn t z f u'k L-i( rr s oc un 4 'r t° - t t'& 1 , C M C' 1-0 4 ^ t t (,I r' liial it S iLa per1t r y `'r tl" it 1i I r"'a e l eC t C r C v t l t I 1 l i i T i 1 1 It C 1 o )riZt nti e% °° a r L 1 a l r 1 r 1 i ?C n poll a ,t e 6� All ou . > 1 mater, s 1 b' c e a x'! Ii..., o po �� e�,, i`1 to � qi u t � .. �) All backfl' mate ial shill be oLti nea from a high grcurd souace and cont ncd behind th., permitted b>lkhead 8) No backfill material is to be placed within 30 feet of the normal water line except that which will be used to backfill the area behind the permitted bulkhead 9) All fill material to be placed below normal water level will be confined behind the permitted bulkhead Sedimentation and Erosion Control 10) In order to protect water quality runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters 11) Appropriate sedimentation and erosion control devices measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands watercourses and property (e g silt fence diversion swales or berms etc ) At a minimum a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities 12) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion General 13) The permittee understands and agrees that if future operations by the United States requires the removal relocation or other alteration of the structure or work authorized by this permit or if in the opinion of the Secretary of the Army or his authorized representative said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters the permittee will be required upon due notice from the Corps of Engineers to remove relocate or alter the structural work or obstructions a caused thereby without expense to the United States or the state of North Carolina No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration 14) This permit shall not be assigned trarrierred sold or otherwise disposed of to a third party without the written approval of the Division of Coa tal Management 15) The permittee and /or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit 7 r y Ndar, ,iret A cram, +Flustee JTI Y I 'NOTE z 4 k T d �Y i e oert A "Al S l It TL e (It' 0C C t� 1 rr" r } a i '� l} t Contact a of th Ltv c (2 -,_) p -)r t,, tht -)Y 1 i- L~ , of inv � bu b al, rw i foi trill �-ett nii -ati in ^ he pP 1" t i t n- aU'v ' Cd t 1 - ap i ror, afn dt,, -en,-°-1 t a,-tiv ties ai, nil auth( z.d i 1, 1 -)J kt- Lre i ,rr - c tee 1 vel The U S Army Corps of Engineers ata *horized the proposed project under COE Action Id No S,kW 201200818