Loading...
HomeMy WebLinkAbout20120210 Ver 1_DCM Permit_20120711i s 11 {lay J r"r 1 1 er t IN + o, nienT it ai Ar -i t giro u lta Ccre.e n f a tilt to NC(iS 1 -) A 11 X Excavation ardor filling pu Swart to NCGS 113 220 Y issued to Conscience Bay LLC 232 W Beatfort Road, Beaufort, NC 28516 _ Authorizing dev elopment in Carteret County at ad1 to Town Creek at 232 West Beaufort Road. in Beaufort as requested in the permittee s application dated 1/-, 1/12 (MP 1 and VIP 4) and 6/21 12 (MP 2) including the attached drawings (5) 3 dated revised 2/6/12 1 dated revised 11/30/11 all 1 dated revised 6/20/12 r This permit issued of July 11, 2012 is subject to compliance with the application (where consistent with the ptimit) all applicable regulations special conditions and notes set forth below Any violation of these terms may be subject to fines imprisonment or civil action or may cause the permit to be null and void U S Army Corps of Engineers �I i 1) In consultation with the U S Army Corps of Engineers in addition to the dredging area shown in work plan drawing 4 of 4 dated revised 2/6/12 the permittee shall also dredge an area located outside the federal entrance channel as shown on the Corps of Engineers drawing dated May 31 2012 a copy of which i�, attaches' hereto (referred to as "Additional Dredge Area ) Unless otherw se approved by the Corps the Additional Dredge Area shall be dredged to l Oft NLW 2) The permittee shall maintain the Additional Dredge Area for so long as any permanent structure permitted herein is located within the federal entrance channel to Town Creek Harbor (See attached sheets for Additional Conditions) F This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DUvR i d the other qualified persons within twentv (20) days of the issuing Chairman of the Coastal Resources Commission Fite An appeal i.,quires resolution prioi to work initiation or continuance as the case may be This permit shall be accessiole on site to Department ppe sonnel when the project is msoected for compliance { Any maintenance woik or project modification not covered hereunder requnes further Division approval All work shall cease when the permit expires on December 31, 2015 In issuing this permit the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program Braxton C Davis Diiector Division of Coastal Mdr ignment This permit and its conditions are hereby accepted Signature of Permittee .v.•,+..x .., ,,..++ .Q,x, Jr° Ile ..�. -s-+a -srfr ,�.,. n.i,. rr- r' r s< M o- .+� r.�- o- r .� r..ti — Co Ea , LLC Pe n 119 80 1 2 of 5 %r,L P i it 114 7 pe"IP 't > LC + - V I I L IL t t( J )Cr u t ' �T 'ac L 1l L, T C '-r1 ? l , CC t% t�e ti i -tcrl i �+ t tic --ter i h t +l I C_ '"+t_ ' ELI r dr,r Vi a it t,�,e' (1 ,, 1 T + Cu i Ti i C? 1 1 1, as5a an i21av bt satrs °d by prop rdr ,�- a pe ioln irct ho id 11tr- of rted t or( rhti ,3sardrt.P , 16 a- cett,btc- tv the Corps cf Er- eeis T it a-rour t U t e � o -t' l-t,e of cr -di or o,hc. -Issi -1, F- s'-all be 10000 of the contract piece for such dredc, nQ it rerrnittti,e ha ) w filler r r Tact vi +n a con' ac o1 to perform sucn work or if not the amount shall be coordinated with and appro ed by Vie V ilmington District Corps of Engineers but in no event shall the same exceed 125 °io of the estimated cost of the t work mil) Upon notification by the Corps of Engineers that the federal Government is going to be performing maintenance dredging within Town Creek Harbor and that such maintenance dredging is going to extend to within twenty five (25) feet of any permanent structure installed by permittee under this permit Permittee agrees that it shall remove all such affected permanent structures prior to any federal dredging activities of Town Creek Harbor The permittee shall hold the Corps of Engineers harmless for any removal of or damage to structures resulting from federally authorized maintenance dredging After the completion of any such maintenance dredging activity permittee shall be allowed to reinstall any pilings related to slips 45 51 to the extent located outside Town Creek Harbor 5) The permidee shall provide two copies of an as built hydrographic survey of the Additional Dredge Area to the Wilmington District Corps of Engineers within 45 days after completion of the dredging and every five vears thereafter Wasured from March 31 2014 If the District Engineer determines that shoaling has occurred in the Additional Dredge Area which is disparate to the typical depths of the natural or maintained channel between Gallants Channel and Town Creek Harbor and that the same poses a hazard to the safe and efficient navigation to the harbor The notification will specify (i) an area within the Additional Dredge Area that must be dredged (ii) the depth to which it must be dredged (not to exceed 10' NLW) and (iii) a time frame which dredging must reasonably begin taking into account any applicable dredging moratoriums (at least 120 days advance notice is required) The permittee shall be required to cause the area specified by the Corps of Engineers to be dredged in a manner and within the time frame specified in the Corps notice The d sposal plan for all dredged material must be approved by the North Carolina Division of Coastal Management and the Corps of Engineers prior to dredging Excavation 6) Unless specifically altered herein the dimensions of the area to be excavated shall not exceed the areas that are expressly and specifically set forth in the attached permit application and workplan drawings Any piouosal to change the area to be excavated shall require permit modification Excavation shall not exceed —10 0 feet below the normal low water level In no case shall the depth of excavation exceed the depth of connecting waters 8) In order to protect juvenile shrimp and finfish populations no excavation shall take place between April 1St and September 30th of any year without the prior approval of the Division of Coastal Management in consultation with the Division of Marine Fisheries t s f Pine 3 f'+ E IT L 3 r31 ner" -, c v t 'r ]t Lam° — r s 10, The tei -i orary pi-i-.empr f r & uoii. h r(Ji t Ot L i 1l r t'i vlrirZ" r tic g a eel 4eLla i", n-t ai.rl (.rite i $ Socii Dispo,,al 11) The spoil areas shall be inspected and approved by the Division of Coastal Management piinr to the beginning of any excavation activity 12) All excavated materials shall be confined above normal high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters 13) 14) 15) No portion of disposal area shall be located within 30 feet of the normal high water level Marina Piior to the occupancy of any new slips authorized under this permit a marine pumpout sewage disposal facility shall be installed in an easily accessible location and a representative of the Division of Coastal Management shall rivet on site with the permittee to ensure that the required pumpout facility is in place and operable The pi rnpout facility shall be operable and maintained for the life of the marina The marina shall display a sign showing the location of the on site pumpout facility including other appropriate waste disposal information at the entrance and exit from each of the main piers 16) No sewage whether treated or untreated shall be discharged at any time from any boats using the marina Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible This prohibition shall be applied and enforced throughout the entire existence of the permitted structure 17) Unless specifically altei ed herein this permit authorizes only the reconfiguration of the docks piers and other structures and the addition of the high ground wooden slatted boardwalks and fuel pumps and uses located i or over the water that are expressly and specifically set forth in the permit application No other giructure whether floating or stationary shall become a permanent part of this marina facility without permit modification No non water dependent uses of structures may be conducted on in or over public trust waters without permit modification 18) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor as depicted on the attached workplan drawing 19) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work Y `^Y,aMM.. oY *' Pv hn^ Y'Gs'^Y+rY✓th'}" ^�.r v.+r d r a h-F. +"„r' tr w v. �. f N.J-`- Y.' r,+ f v.v a ,� u yp� r1 T r-omic ence E iz U C Pern it 9 30 12 p Fay- 4 of i L- \L t ON D _ Th' r e- " i' I- a ti Lf � � , � i � 4� i c r 1r r - w _ I - NIQ tt arc' L I ors c t tr pP T T-) p, r 1 0 4 c o` << 5 c , tr i pf, n= ^t it t i1 5 t w ti c 8 " 1 fhis P. 1-P L does n) a itnoriz° tie 1i to ferenc, w to any eN i g o f opc5ed pi.:iec -t L' the p ?rr it'e,. shall -lot o° ei 1 11 d t, cor ; t7sat on r dairage t- t' jTc, cz ,-1 strl_, t ire cr v ork or injt that rna, be caused t orn e47s*,rg cL fu ue opc ideita(en by the L i,tew ScILes 11 the puhlic interest �2) The permittee shall install and maintain at his expense anv signal lights or signals prescribed by the U S Coast Guard through regulation or otherwise on the authorized facilities At a minimum permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather 23) This permit authorizes a maximum of 79 formalized docking spaces NOTE The permittee is advised that the discharge of human waste from vessels utilizing nearby marinas has contributed to the issuance of numerous swimming advisories in recent years Therefore the permittee is strongly encouraged to implement all available precautions to ensure that such discharges do not take place Shoreline Stabilization 24) The authorized bulkhead shall adhere to the alignment depicted on the attached workplan drawings 25) The alignment of the authorized bulkhead shall be staked by the permittee and approved by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of any construction Failure to initiate construction within 30 days or erosion of the shoreline by adverse weather conditions shall require the alignment to be restaked by the permittee and re approved by DCM within a maximum of 30 days prior to the new expected start of construction 26) The authorized bulkhead shall be located landward of all Coastal Wetlands at the time of construction 27) The bulkhead shall be constructed prior to any backfillmg activities 28) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure ?9) The bull head shall be solid and constructed of treated wood concrete slabs metal of vinyl sheet piles or other suitable materials approved by Department personnel 30) All backfill material shall be clean and free of any pollutants except in trace quantities 31) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead `^C^rR- Jr',+' w"�+V>WM�' ^'W 'r yr f rYJ- ,� W^'h.^° Y 3.Yr` YY r .� .ro Y v dJ n✓W /�- # F r^ h -ons�.ienet Bay, Ef.0 re nit:; g) 2 a P age 5 of 5 r DD IT, �' �d �r A 1.11: + i ry r 30 Iii r V c Zti to a-att 1 L} 1 t i i Y ill t) be I ^a 1 11 1 T 1 1 1 1- ( art 3. i t y 1 h L r L a La emet t .)4) The permittee may be requned to apply for a subm °rged land lease f om the DepartMLnt of Administrations State Property Office Contact the Department of Administration s Stare Property Office directly at (919) 807 460 for this determination Should it be determined that an Easement is required the permittee shall supply a copy of the easement to the Division within 30 da) s of issuance of the Easement General 35) The permittee understands and agrees that if future operations by the United States requires the removal relocation or other alteration of the structure or work authorized by this permit or if in the opinion of the Secretary of the Army or his authorized representative said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters the permittee shall be required upon due notice from the Corps of Engineers to remove relocate or alter the structural work or obstructions caused thereby without expense to the United States or the state of North Carolina No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration 36) No Coastal Wetlands shall be excavated or filled even temporarily 37) This permit does not authorize new impervious surface within 30 feet of the normal high water level 38) The permittee and/or his contractor shall meet with a representative of the Division of Coastal Management prior to project initiation in order to discuss the conditions set forth in this permit NOTE This permit does not eliminate the need to obtain any additional state federal or local permits approvals or authorizations that may be required including any local approvals or approvals from the North Carolina Department of Transportation NOTE Fi pure development of the permittee s property may require a modification of this permit Contact a representative of the Division of Coastal Management at (252) 808 2808 prior to the commencement of any such activity for this determination The permittee is further advised that many non water dependent activities aie not authorized within 30 feet of the normal high water level NOTE The N C Division of Water Quality has authorized the proposed project under General Water Quality Certification No 3900 (DWQ Project No 2012 0210 Revised), which was issued on 7/3/12 NOTE The U S Army Corps of Engineers authorized the proposed project under COE Action Id No SAW 2009 01239 w r