HomeMy WebLinkAbout20210483 Ver 1_Pre-Filing Meeting Information_20210302DWR Pre-Fil ing Meeting Req u est Form
Contact Name *
Contact Email Addre ss *
Proje ct Owne r *
Proje ct Name *
Proje ct County *
Owne r Addre ss:*
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
Please give a couple of dates you are available for a meeting.
Troy Murphy
tmurphy@quible.com
Amit Gupta
988 Cruz Bay Ct
Currituck
City
Kill Devil Hills
State / Province / Region
NC
Postal / Zip Code
27948
Country
USA
Street Address
PO Box 90
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Chris Pullinger
This Pre-Filing notification is being submitted in conjunction with a
Nationwide 18 application. The subject site is currently undeveloped
uplands and wetlands. Adjacent parcels include single family
residences and undeveloped uplands and wetlands. The proposed
project will consist of filling 0.069 acres of wetlands using dump
trucks, skid steer, and silt fencing to contain the proposed fill. The
proposed fill of 0.069 acres of wetlands is to accommodate a single
family residential development.
3/4/2021
3/8/2021
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature *
Submittal Date
P99006-lot31-NAT18-2021-02-19.pdf 365.22KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
3/2/2021