Loading...
HomeMy WebLinkAbout20210481 Ver 1_Perquimans_29_Permit_Drawings_2021-02-03_20210304INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION (BRIDGE 29) PROJECT LOCATION -L- POT STA 16+63.00 BEGIN BRIDGE -L- POT STA 17+53.00 END BRIDGE (BETHANY CHURCH RD) -L- SR 1200SR 1001 (SANDY CROSS RD) -L- POC STA 12+75.11 BEGIN PROJECT 17BP.1.R.93 -L- POT STA 20+10.00 END PROJECT 17BP.1.R.9309/08/99LOCATION: TYPE OF WORK: DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED P.E. HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NA4 RIGHT OF WAY DATE: LETTING DATE: 2018 STANDARD SPECIFICATIONS NCDOT CONTACT ROADWAY PROJECT DESIGN ENGINEER PROJECT MANAGER L. KEVIN AUSTIN, PE STEPHEN C. BROWDE, PE SIGNATURE: SIGNATURE: P.E. V = MPH ADT FUNC CLASS = 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTHDESIGN DATAGRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 11/19/2020R:\Hydraulics\PERMITS_Environmental\Drawings\B5416_HYD_prm_TSH.dgnJR.HopsonCONTRACT:LIMITS ESTABLISHED BY METHOD II. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. THERE IS NO CONTROL OF ACCESS ON THIS PROJECT. RYAN SHOOK DIVISION 1 HIGHWAY EDENTON, NC 27932 113 AIRPORT DR, SUITE 100501002550 50 1002550 10 20510 MINOR COLLECTOR SUBREGIONAL TIER 60= TTST = 19 2016 280 VICINITY MAP (NOT TO SCALE) DETOUR ROUTE (APPROXIMATE LENGTH = 6 MILES) BETHANY CHURCH RD SR 1200 SANDY CROSS RDSR 1001LOUIS SPIVEY RD SR 1214 PERQUIMANS RIVER UP RIVER RDSR 1208 PERRYS BRIDGE RDSR 1202BAY BRANCH RDSR 1213 NAD 83/ 2011 JUNE 23, 2021 37 = 0.123 MILES = 0.139 MILES = 0.016 MILES (UP RI VER RD)TO SR 1208TO PASQUOTANK COUNTY (UP RIVER RD) TO SR 1208 17BP.1.R.93 17BP.1.R.93LENGTH ROADWAY STATE PROJECT 17BP.1.R.93 LENGTH STRUCTURES STATE PROJECT 17BP.1.R.93 TOTAL LENGTH STATE PROJECT 17BP.1.R.93 WETLAND AND SURFACE WATER IMPACTS PERMIT 6 PREPARED BY:PREPARED FOR: PERQUIMANS COUNTY BRIDGE NO.29 OVER BRANCH OF PERQUIMANS RIVER ON SR 1200 (BETHANY CHURCH RD) GRADING,DRAINAGE,PAVING,AND STRUCTURE SITE 1 SITE 2 SITE 3PROJECT:PERQUIMANS RIVERBRANCH OF THE WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 1 OF 9 PERMIT DRAWING T TT TO PASQUOTANK COUNTY (UP RIVER RD) TO SR 1208 SR 1001 (SANDY CROSS ROAD) 18.2’ BST SR 1001 (SANDY CROSS ROAD) 18.2’ BST WOODS W D PO ST SHED4W1200 R2W113 W101 102 104 103 WOODSSR 1200 (BETHANY CHURCH ROAD) 17.0’ BSTGRV12" R C P INV = 8 . 6 2IN V = 8 . 6 2 WD POSTSWD POSTSWD POSTSWD POSTS CONC R EM A IN SSH ED COOP OLD CHICKEN (VACANT)2S FR D REMAINSHOUSETEL MKRTEL MKR6 " PVC 6 " PVC 6 " PVC 6 " PVC6 " PVC24’ - 12" CASING 6 " HDPE 6 " PVC BRIDGE #29 ELEV=6.68 TOP OF PIER ELEV=6.64 TOP OF PIER ELEV=7.93 TOP OF PIER ELEV=7.78 TOP OF PIER ELEV=7.61 TOP OF PIER ELEV=7.48 TOP OF PIER ELEV=6.64 TOP OF PIER ELEV=6.63 TOP OF PIER WOODS WOODS WOODS 2S FR D "CUT OFF" 6" PVC EXPOSED 17.0’ BST SR 1200 (BETHANY CHURCH ROAD) EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/WEXISTING R/WEXI STI NG R/ W EXISTING R/W EXISTING R/W JANIE F. OWENS ALBERTA HOPKINS & SALLIE M. RIDDICK, JAMES L. FELTON, WILLIE P. FELTON, DB 41 PG 509 & H.S. REYNOLDS NAN W. REYNOLDS DB 321 PG 696 DB 64 PG 567 LEONA J. WINSLOW PERCY L. WINSLOW & JANIE F. OWENS ALBERTA HOPKINS & SALLIE M. RIDDICK, JAMES L. FELTON, WILLIE P. FELTON, DB 41 PG 509 DB 129 PG 817 PERCY L. WINSLOW JR. DB 129 PG 817 PERCY L. WINSLOW JR. DB 321 PG 696 & H.S. REYNOLDS NAN W. REYNOLDS WETLAND DENOTES FILL INFF 0433’10’10’5.5’5.5’-L- STA. 16+52.00 BEGIN APPROACH SLAB -L- STA. 17+64.00 END APPROACH SLAB SR 1200 OVER BRANCH OF THE PERQUIMANS RIVER BRIDGE AND ROADWAY RELATIONSHIP SKETCH (NOT TO SCALE) -L- STA. 16+63.00 BEGIN BRIDGE -L- STA. 17+53.00 END BRIDGE 0403020202000102060706060504I NC27’+02.11+25.11TO EXIST 50’ TAPER +60.0002030201020202+35.00TO EXI ST50’ TAPERINC 27’20’20’NR ELIGIBLE -L- STA. 16+62.94 BEGIN BRIDGE -L- STA. 17+52.55 END BRIDGE 12’12’ 025025 -L- POT STA 20+10.00 END PROJECT 17BP.1.R.93 -L- POC STA 12+75.11 BEGIN PROJECT 17BP.1.R.93 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.2/2/2021R:\Hydraulics\PERMITS_Environmental\Drawings\B5416_HYD_prm_PSH_04.dgnDavid.Bocker8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 4 NAD 83/ 2011 TYPE-III TYPE-III TYPE-III TYPE-III SEE SHEETS S-? THRU S-? FOR STRUCTURE PLANS SEE SHEET 5 FOR -L- PROFILE NOTES: 17BP.1.R.93 STREAM & WETLAND IMPACTS CLEARING DENOTES MECHANIZED* * * * ** * ** * * TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN SITE 2 SITE 1SITE 1 SITE 3 FOR BORE EXCAVATION CENTURYLINK APPROX. FOR BORE EXCAVATION CENTURYLINK APPROX. CENTURY LINK APPROX. PROP. PI Sta 14+57.97 D L = 360.36’ T = 182.86’ R = 860.00’ D 1520-L- -L- PT Sta. 21+52.82 -L- POT Sta. 21+58.45 TYPE-III TYPE-III TYPE-III TYPE-III GREU TL-3 GREU TL-3 -L- PC Sta. 20+56.82 SE = 06 SE = EXIST V = 50 mph V = EXIST -L- PT Sta. 16+35.47 AT-1 PI Sta 10+62.50 D L = 62.83’ T = 40.00’ R = 40.00’ -DR- -DR- POT Sta. 11+15.00 -DR- PT Sta. 10+85.33 PI Sta 10+62.50 L = 62.83’ T = 40.00’ R = 40.00’ GR R 20’ GR R 20’ AT-1 10-DR2- POT Sta. 11+55.00 PI Sta 10+65.14 D L = 51.40’ T = 29.93’ R = 40.00’ -DR2- -DR2- PC Sta. 10+35.21 -DR2- PT Sta. 10+86.61 -DR2- POT Sta. 10+00.00 -DR- POT Sta. 10+00.00 = -L- POT STA. 18+50.00 = Sta. 10+22.50 -DR- PC PE PE PEPEC CCC C C C C C F C F F F C F F F C C C C F F F FFF C F NO DECK DRAINS ON BRIDGE PERQUIMANS RIVERBRANCH OF THE SHEET 2 OF 9 PERMIT DRAWING TB 2GI TB 2GI 0402 04010400 15" -DR2- STA. 11+25 TO STA. 11+55 RT FROM -L- STA. 12+75.11 TO STA. 15+75 LT EMBEDDED RIP RAP AT EMBANKMENT -DR2- 11+55 RT, 11 Tons CL I, 16 SY Geotextile -L- 17+50 LT, 11 Tons CL I, 16 SY Geotextile DETAIL 4-C Type of Liner= CL I Rip-Rap (Embedded) 15" T TT TO PASQUOTANK COUNTY (UP RIVER RD) TO SR 1208 SR 1001 (SANDY CROSS ROAD) 18.2’ BST SR 1001 (SANDY CROSS ROAD) 18.2’ BST WOODS W D PO ST SHED4W1200 R2W113 W101 102 104 103 WOODSSR 1200 (BETHANY CHURCH ROAD) 17.0’ BSTGRV12" R C P INV = 8 . 6 2IN V = 8 . 6 2 WD POSTSWD POSTSWD POSTSWD POSTS CONC R EM A IN SSH ED COOP OLD CHICKEN (VACANT)2S FR D REMAINSHOUSETEL MKRTEL MKR6 " PVC 6 " PVC 6 " PVC 6 " PVC6 " PVC24’ - 12" CASING 6 " HDPE 6 " PVC BRIDGE #29 ELEV=6.68 TOP OF PIER ELEV=6.64 TOP OF PIER ELEV=7.93 TOP OF PIER ELEV=7.78 TOP OF PIER ELEV=7.61 TOP OF PIER ELEV=7.48 TOP OF PIER ELEV=6.64 TOP OF PIER ELEV=6.63 TOP OF PIER WOODS WOODS WOODS 2S FR D "CUT OFF" 6" PVC EXPOSED 17.0’ BST SR 1200 (BETHANY CHURCH ROAD) EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/WEXISTING R/WEXI STI NG R/ W EXISTING R/W EXISTING R/W JANIE F. OWENS ALBERTA HOPKINS & SALLIE M. RIDDICK, JAMES L. FELTON, WILLIE P. FELTON, DB 41 PG 509 & H.S. REYNOLDS NAN W. REYNOLDS DB 321 PG 696 DB 64 PG 567 LEONA J. WINSLOW PERCY L. WINSLOW & JANIE F. OWENS ALBERTA HOPKINS & SALLIE M. RIDDICK, JAMES L. FELTON, WILLIE P. FELTON, DB 41 PG 509 DB 129 PG 817 PERCY L. WINSLOW JR. DB 129 PG 817 PERCY L. WINSLOW JR. DB 321 PG 696 & H.S. REYNOLDS NAN W. REYNOLDS WETLAND DENOTES FILL INFF-4-4-3-3-2-2-2-1-1-11111111 1 1111111 111111111 111 1 2 2222222 22 22 222222222222 22222 222 222 22 2 22222 2 2 222222 2222233 3 33333333 33 3 3 333333 333333333333 3 3 3 333 3 3 3 3333 3 3333333 333 3 44444444 4 444 4444 4 444444444 4 4 4 4 4 44444 4444 6666 6 6 6 6 66 666666 66666666 6 6 66666667777777 7777777777 7 777 7 7 7 7 7 777777778 8 88 8888888888 88888 8 88888888888 888 88 8 88 88 88 8 88899999999 99999 99999 99999 9 99999 9 999 99 9 11111111111111 111111 111111 11 111111 1111 111111 111212121212121212131 3 13131313131313 00000000 555555555555555 5 5555555 5555555 5 5 55 5555 5 5 5 5 5 5 5 5 5 5 55555555 5551010101010101010101 0 10101010101010101010 10 10 10 10 1010101010 10 10 10 10 10101010 10 10 10 1010 1010 1010 10101010100433’10’10’5.5’5.5’-L- STA. 16+52.00 BEGIN APPROACH SLAB -L- STA. 17+64.00 END APPROACH SLAB SR 1200 OVER BRANCH OF THE PERQUIMANS RIVER BRIDGE AND ROADWAY RELATIONSHIP SKETCH (NOT TO SCALE) -L- STA. 16+63.00 BEGIN BRIDGE -L- STA. 17+53.00 END BRIDGE 0403020202000102060706060504I NC27’+02.11+25.11TO EXIST 50’ TAPER +60.0002030201020202+35.00TO EXI ST50’ TAPERINC 27’20’20’NR ELIGIBLE -L- STA. 16+62.94 BEGIN BRIDGE -L- STA. 17+52.55 END BRIDGE 12’12’ 025025 -L- POT STA 20+10.00 END PROJECT 17BP.1.R.93 -L- POC STA 12+75.11 BEGIN PROJECT 17BP.1.R.93 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.2/2/2021R:\Hydraulics\PERMITS_Environmental\Drawings\B5416_HYD_prm_PSH_04_CONT.dgnDavid.Bocker8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 4 NAD 83/ 2011 TYPE-III TYPE-III TYPE-III TYPE-III SEE SHEETS S-? THRU S-? FOR STRUCTURE PLANS SEE SHEET 5 FOR -L- PROFILE NOTES: 17BP.1.R.93 STREAM & WETLAND IMPACTS CLEARING DENOTES MECHANIZED* * * * ** * ** * * TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN SITE 1SITE 1 SITE 3 SITE 2 FOR BORE EXCAVATION CENTURYLINK APPROX. CENTURY LINK APPROX. PROP. FOR BORE EXCAVATION CENTURYLINK APPROX. PI Sta 14+57.97 D L = 360.36’ T = 182.86’ R = 860.00’ D 1520-L- -L- PT Sta. 21+52.82 -L- POT Sta. 21+58.45 TYPE-III TYPE-III TYPE-III TYPE-III GREU TL-3 GREU TL-3 -L- PC Sta. 20+56.82 SE = 06 SE = EXIST V = 50 mph V = EXIST -L- PT Sta. 16+35.47 AT-1 PI Sta 10+62.50 D L = 62.83’ T = 40.00’ R = 40.00’ -DR- -DR- POT Sta. 11+15.00 -DR- PT Sta. 10+85.33 PI Sta 10+62.50 L = 62.83’ T = 40.00’ R = 40.00’ GR R 20’ GR R 20’ AT-1 10-DR2- POT Sta. 11+55.00 PI Sta 10+65.14 D L = 51.40’ T = 29.93’ R = 40.00’ -DR2- -DR2- PC Sta. 10+35.21 -DR2- PT Sta. 10+86.61 -DR2- POT Sta. 10+00.00 -DR- POT Sta. 10+00.00 = -L- POT STA. 18+50.00 = Sta. 10+22.50 -DR- PC PE PE PEPEC CCC C C C C C F C F F F C F F F C C C C F F F FFF C F NO DECK DRAINS ON BRIDGE PERQUIMANS RIVERBRANCH OF THE SHEET 3 OF 9 PERMIT DRAWING TB 2GI TB 2GI 0402 04010400 15" SPECIAL CUT V DITCH -DR2- STA. 11+25 TO STA. 11+55 RT FROM -L- STA. 12+75.11 TO STA. 15+75 LT DETAIL 4-A 15" DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.2/2/2021R:\Hydraulics\PERMITS_Environmental\Drawings\B5416_PERQUIMANS_RIVER.dgnDavid.BockerINCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 4 SEE SHEETS S-? THRU S-? FOR STRUCTURE PLANS SEE SHEET 5 FOR -L- PROFILE NOTES: 17BP.1.R.93 17+0016+0015+00 18+00 19+00 20+00 0 10 20 -10 CENTER LINE PROFILE ALONG UPSTREAM NATURAL GROUND DOWNSTREAM NATURAL GROUND BRIDGE REMOVE EXISTING LOW STEEL ELEV. = 6.80’ PROPOSED LOWEST 2.5’ DEEP CAP 1.5:1 SLOPE 1.5:1 SLOPE 2.5’ DEEP CAP 2 SPANS 1@35’, 1@55’ 21" CORED SLAB BRIDGE SKEW = 105 G.P. ELEV. 9.65 -L- STA 17+08 (-)0.4372%(+)0.6868% (+)0.3000%(-)0.4372% 2.0 FT THICK, KEYED 3.5 FT DEEP CLASS ’II’ RIPRAP W/ GEOTEXTILEKEYED 3.5 FT DEEP 2.0 FT THICK W/ GEOTEXTILE CLASS ’II’ RIPRAP GRADE PROPOSED ROADWAY GRADE EXISTING ROADWAY ELEV. = 6.6’ PROP. 100 YR ELEV. = 5.6’ PROP. 25 YR RECENT DRIFT = 4.9’ ELEV. 8.7’ STA. 19+38 PROP. OT DDE = 388 CY TO EL. 4.0 EXCAVATE BERM 100 YR THEORETICAL SCOUR 500 YR THEORETICAL SCOUR -L- STA. 20+10.00, ELEV = 9.01’END GRADEEL = 10.57’ PI = 14+98.00 EL = 8.60’ PI = 19+50.00 NWS=2.6’ 1.5:1 W/ CLASS II RIP RAP REMOVE TIMBER ABUTMENTS AND ARMOR BANKS AT 1.5:1 W/ CLASS II RIP RAP REMOVE TIMBER ABUTMENTS AND ARMOR BANKS AT SITE 1 -L- 17+08 - 2 SPANS 1 @ 35’, 1 @ 55’ RCBC WITH THE EXISTING STRUCTURE. FLOODPLAIN IS WOODED WITH A GRASS CORRIDER PARALLEL STABLE BANKS. BED MATERIAL IS SANDY CLAY. CHANNEL IS 35’-50’ WIDE W/ 1-3’ HIGH BANKS ABOVE NWS; STREAM NOTE: -15 CLEARANCE MIN. 4’ JS LIMITS BORING PROFILE APROXIMATE CENTURYLINK DDE = 196 CY TO EL. 4.0 EXCAVATE BERM SHEET 4 OF 9 PERMIT DRAWING 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 11/19/2020R:\Hydraulics\PERMITS_Environmental\Drawings\B5416_HYD_prm_XPL.dgnJR.HopsonPROJ. REFERENCE NO.SHEET NO.0 6/23/165 5 10 10 15 15 17+50.00 5 5 10 10 15 15 17+75.00 5 5 10 10 15 15 18+00.00 5 5 10 10 15 15 18+25.00 5 5 10 10 15 15 18+50.00 X-5 -L- 2.5 5 17BP.1.R.93 SITE 2 SITE 2 SITE 2 SITE 2 8.36 0.0400.040 8.09 2:13:1 0.0400.040 CLEARING LIMIT8.06 2:13:1 0.0400.040 CLEARING LIMIT8.06 2:13:1 0.0310.031 CLEARING LIMIT8.16 2:13:1 0.0210.021 CLEARING LIMITWLBWLBWLBWLBWLBWLBSHEET 5 OF 9 PERMIT DRAWING 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 11/19/2020R:\Hydraulics\PERMITS_Environmental\Drawings\B5416_HYD_XPL_DR.dgnJR.HopsonPROJ. REFERENCE NO.SHEET NO.0 6/23/165 5 10 10 15 15 10+25.00 5 5 10 10 15 15 10+50.00 5 5 10 10 10+75.00 5 5 10 10 11+00.00 X-817BP.1.R.93 -DR- 2.5 5 SITE 3 SITE 3 SITE 3 SITE 3 3:13:1 0.0250.025 3:13:1 0.0250.025 CLEARING LIMIT3:13:1 0.0250.025 CLEARING LIMIT3:16:1 0.0250.025 CLEARING LIMITWLBWLBWLBSHEET 6 OF 9 PERMIT DRAWING 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 11/19/2020R:\Hydraulics\PERMITS_Environmental\Drawings\B5416_HYD_XPL_DR2.dgnJR.HopsonPROJ. REFERENCE NO.SHEET NO.0 6/23/165 5 10 10 15 15 20 20 0 0 10+25.00 5 5 10 10 15 15 0 0 10+50.00 5 5 10 10 15 15 0 0 10+75.00 5 5 10 10 0 0 11+00.00 X-11 -DR2- 2.5 5 17BP.1.R.93 SITE 2 SITE 2 SITE 2 SITE 2 4.44 3:1 0.0250.025EX RWCLEARING LIMIT2.56 3:13:1 0.0250.025 EX RWCLEARING LIMIT1.76 3:13:1 0.0250.025 RWCLEARING LIMIT2.13 3:13:1 0.0250.025 RWCLEARING LIMITWLBWLBWLBWLBWLBWLBWLBSHEET 7 OF 9 BUFFER DRAWING 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 11/19/2020R:\Hydraulics\PERMITS_Environmental\Drawings\B5416_HYD_XPL_DR2.dgnJR.HopsonPROJ. REFERENCE NO.SHEET NO.0 6/23/165 5 10 10 15 15 0 0 11+25.00 5 5 10 10 15 15 0 0 11+48.84 5 5 10 10 15 15 0 0 11+55.00 X-12 -DR2- 2.5 5 17BP.1.R.93 SITE 2 SITE 2 3.34 3:13:1 0.0250.025 2.21 RW3:1CLEARING LIMIT5.34 3:1 0.0250.025 2.14 3:13:1RW3:1CLEARING LIMIT5.28 RW2.12 WLBWLBSHEET 8 OF 9 BUFFER DRAWING Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 16+80/17+45 Bank Stabilization < 0.01 106 2 -DR2- 11+55/-L- 18+71 Roadway Fill 0.09 0.03 3 -DR- 10+45/11+04 Roadway Fill < 0.01 < 0.01 TOTALS*:0.10 0.04 < 0.01 106 0 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 9OF 9Site 1 (Bank Stabilization): 222 sq. ft. Permanent SW ImpactsSite 2: 3821 sq. ft. Permanent Fill in Wetlands; 1394 sq. ft. Clearing in WetlandsSite 3: 392 sq. ft. Permanent Fill in Wetlands; 353 sq. ft. Clearing in Wetlands WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSPERQUIMANS COUNTY17BP.1.R.93 NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS2/3/2021