Loading...
HomeMy WebLinkAbout20181249 Ver 6_Pre-Filing Meeting Information_20210304 (2) Harris, Jennifer H From: Ridings, Rob Sent: Friday, December 18, 2020 9:56 AM To: Harris, Jennifer H Cc: Riffey, Deanna; Rochelle, Rodger D;Thomson, Nicole J; Nikki Thomson; Rivenbark, Chris; Gray, Jared S;Alsmeyer, Eric C CIV USARMY CESAW (USA) Subject: RE: [External] RE: Bridge 10 Trestle Modifications - R-2828; DA# SAW-2009-02240. Jennifer, I don't foresee any issues with this modification, either. I think this draft works for me as far as pre-app coordination and I have no problems with it. I'm glad you checked with Gary first, of course. Thank you! Rob Ridings Environmental Specialist 401/Buffer Transportation Permitting (DOT Divisions 4, 5, 8) Division of Water Resources, NC Department of Environmental Quality rob.ridings(@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees ore working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations ore limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From:Alsmeyer, Eric C CIV USARMY CESAW (USA)<Eric.C.Alsmeyer@usace.army.mil> Sent:Thursday, December 17, 2020 2:45 PM To: Harris,Jennifer H <jhharrisl@ncdot.gov>; Ridings, Rob<rob.ridings@ncdenr.gov> Cc: Riffey, Deanna <driffey@ncdot.gov>; Rochelle, Rodger D<rdrochelle@ncdot.gov>;Thomson, Nicole J <njthomson2@ncdot.gov>; Nikki Thomson <NThomson@kleinfelder.com>; Rivenbark, Chris<crivenbark@ncdot.gov>; Gray,Jared S<jgray@ncdot.gov> Subject: [External] RE: Bridge 10 Trestle Modifications- R-2828; DA#SAW-2009-02240. CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Jennifer: I don't see any particular issues with the draft mod you sent. I do not see a need for further coordination before you submit the mod. Thank you for the information. Please reply or call if you have any questions or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0. Eric i Eric Alsmeyer Work Cell: 919.817.1570 Project Manager Regulatory Division Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Office Tel: (919) 554-4884, x23 (I am working out of the office, but I try to check my voicemails daily) Regulatory Homepage: http://www.saw.usace.army.miI/Missions/RegulatorVPermitProgram.aspx From: Harris,Jennifer H <jhharrisl@ncdot.gov> Sent:Thursday, December 17, 2020 2:10 PM To:Alsmeyer, Eric C CIV USARMY CESAW (USA)<Eric.C.Alsmeyer@usace.army.mil>; Ridings, Rob <rob.ridings@ncdenr.gov> Cc: Riffey, Deanna <driffey@ncdot.gov>; Rochelle, Rodger D<rdrochelle@ncdot.gov>;Thomson, Nicole J <nithomson2@ncdot.gov>; Nikki Thomson<NThomson@kleinfelder.com>; Rivenbark, Chris<crivenbark@ncdot.gov>; Gray,Jared S<jgray@ncdot.gov> Subject: [Non-DoD Source] FW: [External] Bridge 10 Trestle Modifications- R-2828 Hi Eric and Rob, Thanks for your time this afternoon discussing the 540 projects. As discussed, see attached package of information regarding a minor permit modification we anticipate submitting for the R-2828 project. Jared first shared this information with Gary Jordan for him to review from a BA/BO standpoint. I understand Gary copied Eric on his response to Jared indicating that USFWS does not have any objections to the proposed modification and he didn't need a meeting to discuss. I am attaching the information package so you have it and can review it. If you'd like us to set up a call with the contractor to walk through the information prior to submitting the permit mod request, we can do that if you'd like. Just let us know. Thanks for your time, Jennifer Jennifer Harris, P.E.,CPM North Carolina Turnpike Authority North Carolina Department of Transportation 919-707-2704(office) 919-656-7003 (mobile) 1 South Wilmington Street Raleigh, NC 27601 1578 Mail Service Center Raleigh, NC 27699-1578 '-,+t5h�l 2 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Gray,Jared S<igray@ncdot.gov> Sent: Monday, December 14, 2020 8:10 AM To: Harris,Jennifer H <ihharrisl@ncdot.gov> Cc: Rochelle, Rodger D<rdrochelle@ncdot.gov>; Riffey, Deanna <driffev@ncdot.gov>;Thomson, Nicole J <nithomson2@ncdot.gov>; Miller, Eben T<etmillerl@ncdot.gov>; Hoffman, Robert J <rihoff man @ncdot.gov>;Jernigan, Dennis W<dwiernigan@ncdot.gov>;Shapiro,Alan W<awshapiro@ncdot.gov> Subject: RE: [External] Bridge 10 Trestle Modifications- R-2828 Jennifer, I sent the bridge trestle package to Gary this morning. He said he was out the end of last week, but that he would try to look at it this afternoon. He said he needed to review the information that was in the BA/BO,to see how we needed to move forward, now that he has the bridge trestle information. I will send out an email as soon as I hear back from Gary. From: Harris,Jennifer H <jhharrisl@ncdot.gov> Sent: Friday, December 11, 202011:40 AM To: Gray,Jared S<igray@ncdot.gov> Cc: Rochelle, Rodger D<rdrochelle@ncdot.gov>; Riffey, Deanna <driffev@ncdot.gov>;Thomson, Nicole J <nithomson2@ncdot.gov>; Miller, Eben T<etmillerl@ncdot.gov>; Hoffman, Robert <rihoffman@ncdot.gov>;Jernigan, Dennis W<dwiernigan@ncdot.gov>;Shapiro,Alan W<awshapiro@ncdot.gov> Subject: FW: [External] Bridge 10 Trestle Modifications- R-2828 Hi Jared, Please see attached revised package regarding Lane Blythe JV's proposed trestle modification at Bridge 10. When we last discussed with you a couple of months ago,you were going to coordinate with Gary Jordan to set up a call to discuss this with the group, including the Design-Build Team, once we had this information package together. Also, I assume Eric Alsmeyer and Rob Ridings would be part of the call, but please also confirm that with Gary. Once you get some potential days/times for a call, I can help with getting a meeting invite out for this group. Please let Rodger or I know if you have any questions and/or want to discuss. Thanks for your help, Jennifer Jennifer Harris, P.E.,CPM North Carolina Turnpike Authority North Carolina Department of Transportation 919-707-2704(office) 919-656-7003 (mobile) 1 South Wilmington Street Raleigh, NC 27601 1578 Mail Service Center Raleigh, NC 27699-1578 3