HomeMy WebLinkAbout20120489 Ver 1_Response to DWQ COE Shelter Creek_201207197332 Cotesworth Drive
Wilmington, NC 28405
(910) 619 -9990
PLANNING - ENGINEERING - PROJECT MANAGEMENT
July 18, 2012
NCDENR - DWQ
Ms. Joanne Steenhus
127 Cardinal Drive Extension
Wilmington, NC 28405
RE: Shelter Creek BAA, Burgaw
Pender County
Dear Ms. Steenhaus;
This letter is in response to your concerns about wetland disturbances associated
with our proposed ramp replacement at the above stated site, Upon meeting with
you and Mr. David Timpy at the site this afternoon I give you the following,
1. It was determined that no wetlands will be disturbed on the site based on the
scope of this project,
2, Attached to this letter is a map showing more detailed delineation of the project
footprint.
Should you have further questions concerning this proposed project please do not
hesitate to call,
Sincerely yours;
Brad Sedgwick, PE
Project Engineer
Copy: USCOE
Mr. Dave Timpy
Project Manager
69 Darlington Avenue
Wilmington, NC 28403
<� �n
u � N m rnU
cr
m z n
rz
°° z a�
0zm
"
uu
w c< m d z
o
U) w
o �w z z z
CZ)
W
<
°z
WQ d
O J U U
t� � < x x Z
1 aQ w w d
IN rA
f c� ri v Sri . i
�J
iS '� o Ndl4bdl
Z:<
M3-A4
Nviaadi
I U cn
CY cry C?
1f �a Q �)M
nw2�
`n
f oz O r
r