HomeMy WebLinkAbout20120601 Ver 1_Approval Letter_20120712NC®ENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue
Governor
Mr Tommy Herrin
Union Electric Membership Corp
1525 Rocky River Rd
Monroe NC 28111
Subject Twelve Mile Creek Electrical Substation
Charles Waklld P E
Director
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr Herrin
Dee Freeman
Secretary
July 12 2012
DWQ# 12 0601
Union County
You have our approval in accordance with the general certification and those conditions listed below to Impact
65 linear eet (If) of unnamed stream to Twelve Mlle Creek in order to construct the substation in Union County as
described in your application received by the Division of Water Quality (DWQ) on June 18 2012 After reviewing your
application we have determined that this project is covered by Water Quality General Certification Number 3884 which
can be viewed on our web site at http //portal ncdenr org /web /wq /swp /ws /401 The General Certification allows you to use
Nationwide Permit Number 12 once it is Issued to you by the U S Army Corps of Engineers Please note that you should
get any other federal state or local permits before proceeding with your project including those required by (but not
limited to) Sediment and Erosion Control Non Discharge and Water Supply Watershed regulations
The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the
General Certification This approval is only valid for the purpose and design that you described In your application If you
change your project you must notify us in writing and you may be required to send us a new application for a new
certification If the property is sold the new owner must be given a copy of the Certification and approval letter and is
thereby responsible for complying with all conditions
In addition to the requirements of the certification you must also comply with the following conditions
1 The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has
commenced
2 Culverts placed in streamstwetlands shall be installed in the dry Immediately upon completion of the installation
water flow shall be returned to its natural course Existing stream dimensions (including the cross section dimensions
pattern and longitudinal profile) must be maintained (or restored via constructed benches) above and below locations
of each culvert If any of the existing pipes are or become perched the appropriate stream grade shall be re
established or if the pipes Installed in a perched manner the pipes shall be removed and re installed correctly
3 Use of native vegetation and other soft stream bank stabilization techniques must be used where practicable instead of
riprap or other bank hardening methods If riprap is necessary it shall not be placed in the streambed unless approved
by DWQ
4 Stormwater discharge structures at this site shall be constructed in a manner such that discharge shall not be within 30
feet of top of bank and the potential receiving streams will not be impacted due to sediment accumulations scouring or
erosion of the stream banks
Mooresville Regional Office One
Location 610 East Center Avenue Suite 301 Mooresville NC 28115 N i fC/y�� arolina
Phone (704) 663 1699 \Fax (704) 663 6040\ Customer Service 1 877 623 6748 G/ „�K` Q
Internet htt //portal ncdenr org/webtwq y
An Equal Opportunity /Affirmative Action Employer - 50 / Recycled /10 / Post Consumer Paper
5 No waste spoil solids or fill of any kind shall occur in wetlands waters or riparian areas beyond the footprint of the
impacts depicted in the Preconstruction Notification application All construction activities associated with this project
shall meet and /or exceed those requirements specified in the most recent version of the North Carolina Sediment and
Erosion Control Manual and shall be conducted so that no violations of state water quality standards statutes or rules
occur
6 Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable If
placement of sediment and erosion control devices in wetlands and waters is unavoidable they shall be removed and
the natural grade restored within two months of the date the Division of Land Resources has released the project
7 Upon completion of the project the applicant shall complete and return the enclosed Certificate of Completion form to
the 401/Wetlands Unit of the NC DWQ
8 Continuing Compliance The applicant (Union Electric Membership Corp ) shall conduct all activities in a manner so as
not to contravene any state water quality standard (including any requirements for compliance with section 303(d) of the
Clean Water Act) and any other appropriate requirements of state and federal law If DWQ determines that such
standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or
federal law is being violated or that further conditions are necessary to assure compliance DWQ may reevaluate and
modify this certification to include conditions appropriate to assure compliance with such standards and requirements in
accordance with 15 A NCAC 2H 0507(d) Before codifying the certification DWQ shall notify the applicant and the US
Army Corps of Engineers provide public notice in accordance with 15A NCAC 2H 0503 and provide opportunity for
public hearing in accordance with 15A NCAC 2H 0504 Any new or revised conditions shall be provided to the applicant
in writing shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to
Section 404 of the Clean Water Act and shall also become conditions of the 404 Permit for the project
If you do not accept any of the conditions of this certification you may ask for an adjudicatory hearing You must
act within 60 days of the date that you receive this letter To ask for a hearing send a written petition that conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings 6714 Mail Service Center
Raleigh N C 27699 6714 This certification and its conditions are final and binding unless you ask for a hearing
This letter completes the review of DWQ under Section 401 of the Clean Water Act If you have any questions please
telephone Mr Alan Johnson in the Mooresville Regional Office at 704 663 1699 or Ms Karen Higgins in the Central Office
in Raleigh 919 807 6360
Sincerely
for Charles Wakdd P E
Attachments
cc Army Corps of Engineers Asheville
Karen Higgins Wetlands Unit
MRO Land Quality
MV r Notice Of Initiation of Construction
x
To be completed by DWQ
D`VQ Project No r Z 10k County C) t17
Applicant
Project Name
Date of Issuance of 401 Water Quality Certification � � s � Z� t2-
Upon initiation of impacts approti ed by the issuance of this 401 Water Quality Certification/Buffer
4uthorization the applicant is required to return this notice (condition # 1 per approval) to
DVv Q SWP Section Mooresville Regional Office
610 East Center Atienue Suite 301
Mooresville NC 28115
Or
Fax to the attention of Alan Johnson at 704 663 6040
AppllcandAuthori z ed Agent's Certification
1 hereby state that to the best of my abilities due care and
diligence the approved impacts hax e begun to be constructed The proposed imparts are to be
installed/constructed /completed Aithin substantial compliance and intent of the 401 Water Quart~
Certification/Buffer Rule Authorization the approved plans and specifications and other supporting
materials
Date of initiation of Construction
Signature
Title
Date