HomeMy WebLinkAboutNCC200981_NOT Closeout Documents_20210302North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
Eastover North, Section One, Phase
County: Cumberland Project: Two - Lot 56 River basin: Cape Fear
Person financially responsible: H&H Constructors, Inc. — Project #: CUNME-2020-099
Brian Walker, Division Manager &Agent NGGOI COC• NCC200981
Address: 2919 Breezewood Avenue, Suite 400, Fayetteville, NC 28303
1. Project Location: Buckley Drive & Rayburn Drive, Eastover
Pictures: No
2. Weather and soil conditions: mostly cloudy, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: August 07, 2020
10. Comments:
Permanent ground cover sufficient to restrain erosion has been established. No additional self monitoring or self
inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater
Permit for Construction Activities should be requested by the permittee via a Notice of Termination.
Reported by: Lori Britt Others present:
Date of inspection: August 05, 2020 Time arriving on site: 10:01 AM Time leaving site: 10:11 AM
cc: