HomeMy WebLinkAbout310041_Compliance Evaluation Inspection_20210217v1%
Division of Water Resources
Facility Number - O Division of Soil and Water Conservation
O Other Agency
Type of Visit: Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance
treason for Visit: ® Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: 1 Arrival Time: r Departure Time: County:
Farm Name: CrOA' liv_v_ Owner Email:
Owner Name:
% Mailing Address:
Physical Address:
Phone:
Facility Contact: (( Title:
Onsite Representative: +rC,h, ,V(Ai
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer I I --d
Non -Layer
Design Current
nry Pnnitry C'anacity Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Region:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No D<A ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No E? A ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ A ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes NA ❑ NE
3. Were there an observable adverse impacts or potential adverse impacts to the waters Yes No ❑ NA ❑ NE
Y P p P ❑
of the State other than from a discharge?
Page I of 3 21412015 Continued
Facility Number: - Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes E3<o ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No E�/NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: 1— 7-1
Spillway?: _
Designed Freeboard (in): p _
Observed Freeboard (in):� _
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ Yes No ❑ NA ❑ NE
❑ Yes El -No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environm�;Noal th eat, notify DWR
Y P
❑
17. Does the facility lack adequate acreage for land application?
❑ Yes
o
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes�No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
,--,�
I-i o
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
❑,*NO
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [3] No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [:]No E3/NA ❑ NE
Page 2 of 3 21412015 Continued
Facility Number: - Date of inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? [:]Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check E]--�'es ❑ No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
7 Non -compliant sludge levels in any lagoon _ ���p p�
List structure(s) and date of first survey indicating non-compliance: � Ct�.�S w ✓�` 1
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes to 0 NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No []- -5AB ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes to ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes i to ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes ❑ No ❑ NA �E
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes Q o ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ,�o ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
I
Reviewer/InspectorName' ��, l Phone: 9to
�,
Reviewer/Inspector Signature: � Date: 7,117)vl
Page 3 of 3 21412015