Loading...
HomeMy WebLinkAbout310041_Compliance Evaluation Inspection_20210217v1% Division of Water Resources Facility Number - O Division of Soil and Water Conservation O Other Agency Type of Visit: Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance treason for Visit: ® Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: 1 Arrival Time: r Departure Time: County: Farm Name: CrOA' liv_v_ Owner Email: Owner Name: % Mailing Address: Physical Address: Phone: Facility Contact: (( Title: Onsite Representative: +rC,h, ,V(Ai Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer I I --d Non -Layer Design Current nry Pnnitry C'anacity Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other Region: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No D<A ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No E? A ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ A ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes NA ❑ NE 3. Were there an observable adverse impacts or potential adverse impacts to the waters Yes No ❑ NA ❑ NE Y P p P ❑ of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes E3<o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No E�/NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 1— 7-1 Spillway?: _ Designed Freeboard (in): p _ Observed Freeboard (in):� _ 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No ❑ NA ❑ NE ❑ Yes El -No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environm�;Noal th eat, notify DWR Y P ❑ 17. Does the facility lack adequate acreage for land application? ❑ Yes o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes�No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ,--,� I-i o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑,*NO ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [3] No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [:]No E3/NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - Date of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? [:]Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check E]--�'es ❑ No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels 7 Non -compliant sludge levels in any lagoon _ ���p p� List structure(s) and date of first survey indicating non-compliance: � Ct�.�S w ✓�` 1 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes to 0 NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No []- -5AB ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes to ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes i to ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA �E ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes Q o ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ,�o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). I Reviewer/InspectorName' ��, l Phone: 9to �, Reviewer/Inspector Signature: � Date: 7,117)vl Page 3 of 3 21412015