Loading...
HomeMy WebLinkAboutNCG030321_2020 DMR_20210301NCDEQ Division of Energy, Mineral and Land Resources Stormwater Discharge Monitoring Report (DMR) Form for NCG030000 Metal Fabrication Click here for instructions Complete, sign, scan and submit the DMR vial the Stormwater NPDES Permit Data Monitoring Report (DMR) Upload form within 30 days of receiving sampling results. Mail thle original, signed hard copy of the DMR to the appropriate DENILR Regional Office. Certificate of Coverage No. NCG03LO L_3T_2T_1_1 Person Collecting Samples: Joey DeHart Facility Name: W&W-AFCO Steel LLC Laboratory Name: Waypoint Analytical Facility County: Guilford Laboratory Cert. No.: 402 Discharge during this period: 0 Yes (] No (if no, skip to signature and date) Has your facility implemented manda :ory Tier response actions for any benchmark exceedances? 0 Yes ❑ No If so, which Tier (I, If, or III)? III I Analytical Monitoring Requirements for Outfalls with Industrial Activities — Benchmarks in (Red) Parameter Code Parameter Outfall2 Outfall Outfall Outfall Outfall N/A Receiving Stream Class WS-IV N/A Date Sample Collected MIVI/DD/YYYYi 12/10/2020 46529 24-Hour Rainfall in inches 0.1 00552 Non -Polar Oil & Grease in rng/L (15) C0530 TSS in mg/L (100 or 50*) 00400 pH in standard units (6.0 --. 9.0) I NCOIL New Motor/Hydraulic Oil Usage in gal/month 01119 Copper, total recoverable in mg/L (0.010 FW, 0.005 SW) 01051 Lead, total recoverable in mg/ L (0.075 FW, 0.220 SW) 01094 Zinc, total recoverable in rng/ L (0.126 FW, 0.095 SW) I 0.220 78141 Total Toxic Organics (TTOI in mg/L(1) * Outfalls to Outstanding Resource Waters (ORW), have a benchmark TSS limit of 50 mg /, All other ;h Quality Waters (HOW), Trout Waters (Tr) and Primary Nursery Areas (PNA) ter classifications have a benchmark of 100 rng/t. Notes (optional): As required by Tier III of their general permit. W&W-AFCO Steel samples monthly for zinc. "I certify by my signature below, under penalty o supervision in accordance with a system designer submitted. Based on my inquiry of the person or gathering the information, the information subm aware that there are significant penalci=_s for sub knowin lations." Sioture of Permittee or Delegated Authorized law, that this document and all attachments were prepared under my direction or to assure that qualified personnel properly gather and evaluate the information ersons who manage the system, or those persons directly responsible for ted is, to the best of my knowledge and belief, true, accurate, and complete. I am sitting false information, including the possibility of fines and imprisonment for dividual _-Z`.2� Date