HomeMy WebLinkAboutNCG030321_2020 DMR_20210301NCDEQ Division of Energy, Mineral and Land Resources
Stormwater Discharge Monitoring Report (DMR) Form for NCG030000
Metal Fabrication
Click here for instructions
Complete, sign, scan and submit the DMR vial the Stormwater NPDES Permit Data Monitoring Report (DMR) Upload form within
30 days of receiving sampling results. Mail thle original, signed hard copy of the DMR to the appropriate DENILR Regional Office.
Certificate of Coverage No. NCG03LO L_3T_2T_1_1 Person Collecting Samples: Joey DeHart
Facility Name: W&W-AFCO Steel LLC Laboratory Name: Waypoint Analytical
Facility County: Guilford Laboratory Cert. No.: 402
Discharge during this period: 0 Yes (] No (if no, skip to signature and date)
Has your facility implemented manda :ory Tier response actions for any benchmark exceedances? 0 Yes ❑ No
If so, which Tier (I, If, or III)? III
I
Analytical Monitoring Requirements for Outfalls with Industrial Activities — Benchmarks in (Red)
Parameter
Code
Parameter
Outfall2
Outfall
Outfall
Outfall
Outfall
N/A
Receiving Stream Class
WS-IV
N/A
Date Sample Collected MIVI/DD/YYYYi
12/10/2020
46529
24-Hour Rainfall in inches
0.1
00552
Non -Polar Oil & Grease in rng/L (15)
C0530
TSS in mg/L (100 or 50*)
00400
pH in standard units (6.0 --. 9.0) I
NCOIL
New Motor/Hydraulic Oil Usage in
gal/month
01119
Copper, total recoverable in mg/L
(0.010 FW, 0.005 SW)
01051
Lead, total recoverable in mg/ L
(0.075 FW, 0.220 SW)
01094
Zinc, total recoverable in rng/ L (0.126
FW, 0.095 SW) I
0.220
78141
Total Toxic Organics (TTOI in mg/L(1)
* Outfalls to Outstanding Resource Waters (ORW),
have a benchmark TSS limit of 50 mg /, All other
;h Quality Waters (HOW), Trout Waters (Tr) and Primary Nursery Areas (PNA)
ter classifications have a benchmark of 100 rng/t.
Notes (optional): As required by Tier III of their general permit. W&W-AFCO Steel samples monthly for zinc.
"I certify by my signature below, under penalty o
supervision in accordance with a system designer
submitted. Based on my inquiry of the person or
gathering the information, the information subm
aware that there are significant penalci=_s for sub
knowin lations."
Sioture of Permittee or Delegated Authorized
law, that this document and all attachments were prepared under my direction or
to assure that qualified personnel properly gather and evaluate the information
ersons who manage the system, or those persons directly responsible for
ted is, to the best of my knowledge and belief, true, accurate, and complete. I am
sitting false information, including the possibility of fines and imprisonment for
dividual
_-Z`.2�
Date