HomeMy WebLinkAbout20110896 Ver 1_More Info Received_20120712ICI- n+illan, Ian
From Dorney John R [John Dorney@atkinsglobal com]
Sent Thursday July 12 2012 1 10 PM
To Mcmlllan Ian
Cc Steve Morrison
Subject FW temp imparts
Attachments doc20120712115101 pdf
Ian — here are the numbers for and map of the temporary impacts (the non fill impacts) at Orton The map entitled
Orton Plantation Rice Field Exclusion Areas (Revised 5/31/12) (A B C D E) = 46 8 Acres prepared by Land
Management Group is the map which depicts the minimization efforts agreed upon by the Corps and the applicant As
the attached email says the total extent of temporary Impacts will be 283 9 acres You should have the numbers for the
permanent Impacts from before as well as the EEP mitigation for those permanent Impacts but please advise if not
111 call this afternoon to discuss but think you should have everything now Thankx
From Steve Morrison jmailto smornsonCablmciroup net]
Sent Thursday, July 12, 2012 12 23 PM
To Dorney, John R
Subject temp Impacts
John
The temporary wetland Impact area is calculated by taking the entire rice fields area of 333 74 acres as depicted on Norris
& Tunstall sheet CO 1 attached then subtracting
46 8 acres for the Rice Field Exclusion Areas A through E (revised 5/31/12 attached)
12 acres for the permanent Impacts associated with the 13 field access points and structure replacements (figure 7
attached)
37 acres for the permanent Front Rice Field dike Improvement encroachment into the rice field wetland (per Olsen
Associates sheets 1 15)
2 55 acres for the Front Rice Field dike improvement encroachment into the rice field canals (per Olsen Associates
sheets 1 15)
=283 90 acres total of temporary impacts
Let me know if there are any questions Thanks
Steve Morrison I Environmental Consultant
Direct 452 0001 x 00 1 E 'ix 9 10 452 0060 1 Niobi e 010 471 3,)0)
-mad smorrison(aNmgroup net
Land Management Group Inc I Lrr ronrre ial Cor, opts
805 Wrightsville Avenue VJilmington N C 2840 1 www Imgroup net
5 �
Q
F z } el
M t
ol
J 19
NORRIS & TUNSTALL
µ m m
n
O
Il
CONSULTING ENGINEERS, P.C.
Aµ
m r
�" +�+« �^^m
ORTON PLANTATION
j
° m°
wwu¢ron..c. uw ra o: 2) sas -oao.
�rti�a
E
rur xo. c -xsi
r
m
Rg11NRWif`K MI INTY. N(1pTH (:lpM INA
1
m
A V
m {,4a
fQ
Z
°
CID
W
M
M
O
S m
O
O
°
ol
J 19
NORRIS & TUNSTALL
DIKE WORK VICINITY MAP
O
Il
CONSULTING ENGINEERS, P.C.
axrax awrt�iwn �aancs. uc
Q inn FL wi �1,, (- ru -w�
�" +�+« �^^m
ORTON PLANTATION
j
C
wwu¢ron..c. uw ra o: 2) sas -oao.
�rti�a
-
rur xo. c -xsi
Rg11NRWif`K MI INTY. N(1pTH (:lpM INA
7