Loading...
HomeMy WebLinkAbout20110896 Ver 1_More Info Received_20120712ICI- n+illan, Ian From Dorney John R [John Dorney@atkinsglobal com] Sent Thursday July 12 2012 1 10 PM To Mcmlllan Ian Cc Steve Morrison Subject FW temp imparts Attachments doc20120712115101 pdf Ian — here are the numbers for and map of the temporary impacts (the non fill impacts) at Orton The map entitled Orton Plantation Rice Field Exclusion Areas (Revised 5/31/12) (A B C D E) = 46 8 Acres prepared by Land Management Group is the map which depicts the minimization efforts agreed upon by the Corps and the applicant As the attached email says the total extent of temporary Impacts will be 283 9 acres You should have the numbers for the permanent Impacts from before as well as the EEP mitigation for those permanent Impacts but please advise if not 111 call this afternoon to discuss but think you should have everything now Thankx From Steve Morrison jmailto smornsonCablmciroup net] Sent Thursday, July 12, 2012 12 23 PM To Dorney, John R Subject temp Impacts John The temporary wetland Impact area is calculated by taking the entire rice fields area of 333 74 acres as depicted on Norris & Tunstall sheet CO 1 attached then subtracting 46 8 acres for the Rice Field Exclusion Areas A through E (revised 5/31/12 attached) 12 acres for the permanent Impacts associated with the 13 field access points and structure replacements (figure 7 attached) 37 acres for the permanent Front Rice Field dike Improvement encroachment into the rice field wetland (per Olsen Associates sheets 1 15) 2 55 acres for the Front Rice Field dike improvement encroachment into the rice field canals (per Olsen Associates sheets 1 15) =283 90 acres total of temporary impacts Let me know if there are any questions Thanks Steve Morrison I Environmental Consultant Direct 452 0001 x 00 1 E 'ix 9 10 452 0060 1 Niobi e 010 471 3,)0) -mad smorrison(aNmgroup net Land Management Group Inc I Lrr ronrre ial Cor, opts 805 Wrightsville Avenue VJilmington N C 2840 1 www Imgroup net 5 � Q F z } el M t ol J 19 NORRIS & TUNSTALL µ m m n O Il CONSULTING ENGINEERS, P.C. Aµ m r �" +�+« �^^m ORTON PLANTATION j ° m° wwu¢ron..c. uw ra o: 2) sas -oao. �rti�a E rur xo. c -xsi r m Rg11NRWif`K MI INTY. N(1pTH (:lpM INA 1 m A V m {,4a fQ Z ° CID W M M O S m O O ° ol J 19 NORRIS & TUNSTALL DIKE WORK VICINITY MAP O Il CONSULTING ENGINEERS, P.C. axrax awrt�iwn �aancs. uc Q inn FL wi �1,, (- ru -w� �" +�+« �^^m ORTON PLANTATION j C wwu¢ron..c. uw ra o: 2) sas -oao. �rti�a - rur xo. c -xsi Rg11NRWif`K MI INTY. N(1pTH (:lpM INA 7