HomeMy WebLinkAbout540049_Plan of Action_20210302PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERM- NC I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID) : Martha Smith Date: 54-49 2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard a. Current liquid level according to marker b. Designed 25 yr/24 hr. storm & structural freeboard c. Line b - line a (inches in red zone) d. Top of dike surface area according to design (area at below structural freeboard elevation) e. (Line c/12) x (line d) x (7.48 gallons/ft3) State University A&T State University COOPERATIVE EXTENSION Empowering People • Providing Solutions 3/1/2021 17 19 2 62500 77916.7 3. Projected volume of waste liquid produced during draw down period f. Temporary storage period according to structural de g. Volume of waste produced according to design h. Actual waste produced= (current herd #/certified herd #) x line g current herd: 2272 certified herd 2240 180 302400 306720 i. Volume of wash water according to structural design j. Excess rainfall over evaporation according to design k. (line h + line i + line j) x 7.48 x (30 days/line f) = 4. Total PAN to be land applied during draw down period I. Current waste analysis dated M M/ D D/YYYY m. (lines e + k)/1000 x (line I) = 2/8/2021 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE 0 15120 401227.2 1.39 666.009975 inches inches inches ft2 gallons days ft3 ft3 ft3 ft3 gallons Ib/1000 gal lb PAN PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILIT 1. structure ID: line m= 2. structure ID: line m= 3. structure ID: line m= 4. structure ID: line m= 5. structure ID: line m= 6. structure ID: line m= n. lines 1 + 2 + 3 + 4 + 5 + 6 = 666.009975 666.009975 lb PAN lb PAN lb PAN lb PAN lb PAN lb PAN total lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERII o. tract # p. field # q, crop r, acres s. PAN balance t, total PAN u. application (lb/acre) column r x s window 2580 1 overseed 4 90 360 MAR-SEPT 2580 2 overseed 8 65 520 MAR-SEPT 2580 3 overseed 9.9 67 663 MAR-SEPT State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.) IV. FACILITY'S POA OVERALL PAN BALANCE W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II) X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III) Y. OVERALL PAN BALANCE (W-X) 1543 666.009975 1543 -876.99003 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: New waste analysis taken 2.8.21 PERSON COMPLETING THIS DOCUMENT: EVE H. HONEYCUTT NC COOPERATIVE EXTENSION LENOIR AND GREENE COUNTIES Date Completed: 3/2/2021 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD -Y DD.