MEMORANDUM
TO
FROM
SUBJECT
Applicant
Project Location
Proposed Project
Karen Higgins Webscape Unit Supervisor
Division of Water Quality Raleigh
Doug Huggett
Major Permits Processing Coordinator
CAMA Permit Application Review
NC Aquarium on Roanoke Island
374 Airport Road Manteo Dare County
201 2068 2
Resources
Dee Freeman
Secretary
L
2 2012 1
DENR
e8 "8 �ATgR
nwA, !4111y
Pier gazebo educational platform, kayak launch walkways storage
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by 07/31/12 to 400 Commerce Avenue, Morehead City, NC 28557 If you have any
questions regarding the proposed project please contact Kelly Russell at (252) 264 3901 When
appropriate in depth comments with supporting data are requested
REPLY This agency has no objection to the project as proposed
This agency has no comment on the proposed project
This agency approves of the project only if the recommended changes are
incorporated See attached
This agency objects to the project for reasons described in the attached
comments
SIGNED DATE
1367 US 17 South Elizabeth City NC 27909
Phone 252 264 3901 1 FAX 252 264 3723 Internet www nccoastalmanagement net NorthCarollna
An Equal Opportunity 1 Affirmative Action Employer AaAmallb,
1
2
3
4
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME NC Aquarium on Roanoke Island
LOCATION OF PROJECT SITE NC Aquarium Airport Rd Manteo Dare County on
the Croatan Sound
Photo Index — 2006 181 -7272 F 7)
1984 142 1575 (0 20)
State Plane Coordinates X 2975800
INVESTIGATION TYPE CAMA
2000 181 2169 (R 19) 1989 54 -4 (F 10)
Y 804500
INVESTIGATIVE PROCEDURE Dates of Site Visit — 6/26/2012
Was Applicant Present no
5 PROCESSING PROCEDURE Application Received Complete - 6/22/2012
Office - Elizabeth City
6 SITE DESCRIPTION
(A) Local Land Use Plan - Dare
Land Classification From LUP conservation
(B) AEC(s) Involved Estuarine Waters Public Trust Estuarine Shoreline
(C) Water Dependent yes
(D) Intended Use public
(E) Wastewater Treatment Existing — LPP individual system
Planned -none
(F) Type of Structures Existing — aquarium and associated structures and
parking area rip rap
Planned - public access pier storage building
(G) Estimated Annual Rate of Erosion n/a
Source — n/a
7 HABITAT DESCRIPTION [AREA]
DREDGED FILLED Shaded
(A) Estuarine Waters Public Trust
Area (EW PTA)
625 sq ft
(temporary
impacts)
4676 sq ft
(B) Estuarine Shoreline (ES)
2450 sq ft
(D) Total Area Disturbed 7751 sq ft
(E) Primary Nursery Area no
(F) Water Classification SA Open no
8 PROJECT SUMMARY The NC Aquarium proposes to construct a 220 ft by 8 ft pier
with 3 268 sq ft of platform area The applicant also proposes to construct a 450 sq ft
storage building and approximately 2000 sq ft of concrete walkways more than 30 ft
away from NWL
Field Investigation Report
NC Aquarium
Page 2
Project Setting
The North Carolina Aquarium on Roanoke Island is located on approximately 25 acres of
land between Airport Road and the Croatan Sound on the northern end of the Island The
property is approximately 10 ft above normal water level (NWL) and is vegetated mostly
with typical lawn grasses common landscaping plants and pine trees The Aquarium site
consists of the Aquarium building several support warehouses and a paved parking area
The tract has approximately 1298 ft of shoreline that is stabilized with rip rap There are no
known areas of archaeological significance associated with the project site No submerged
aquatic vegetation was observed in the project area Water depths in the Croatan Sound in
the area range from -2 ft nearshore to -3 8 ft approximately 180 ft offshore In the area of
this project the Croatan Sound is classified as SA by the NC Division of Environmental
Management and is closed to shellfish harvesting
Development Proposal
The North Carolina Aquarium proposes to construct a 220 ft by 8 ft pier to improve public
access and to be used for educational programs fishing and other specials events The
pier would consist of a 44 ft by 8 ft sectional over land and over the existing rip rapped
shoreline leading to a 176 ft by 8 ft section over water The pier would have six platform
areas totaling 3 268 sq ft The platform areas consist of a 3 ft by 60 ft kayak launch a 17 ft
by 11 ft floating dock a 25 ft by 33 ft educational platform a 37 ft by 16 ft and 26 ft by 16 ft
platform at the end of the pier two T platforms both of which are 28 ft by 8 ft and 11 ft by
11 ft and three bump out sections of platform area each of which are 4 ft by 22 ft In
order to construct the pier an approximately 25 ft area of rip rap will have to be temporarily
removed along the shoreline to allow for the pilings to be driven The rip rap will be
mechanically removed and stored 30 ft away from NWL until the pilings are driven and then
will be put back in place The proposal also includes the construction of a 450 sq ft storage
building and an 8 ft wide concrete walkway leading to the storage building pier and back to
the existing brass sea turtle statue all of which total approximately 2000 sq ft and are more
than 30 ft away from NWL The site plan also references a 1792 sq ft turtle exhibit building
and 950 sq ft of paved parking areas and walkways that are proposed in a 2 "d phase of the
construction and are all well outside of any areas of environmental concern
Anticipated Impacts
The proposed project will shade 4 676 sq ft of Public Trust Area (PTA) and Estuarine Water
(EW) Areas of Environmental Concern (AEC) The project will also temporarily disturb
approximately 625 sq ft of shallow bottom PTA and EW AEC due to the removal and then
replacement of the rip rap along the shoreline The upland development will fill
approximately 2 450 sq ft of Estuarine Shoreline (ES) AEC Temporary water turbidity will
occur in the project location
Submitted by Kelly Russell
Date 7/6/2012
MAJOR PERMIT FEE MATRIX
Applicant N c AFL AR f K 4'1 R a A N o KC T s 6A iv-Z>
Selection
Development Type
Fee
DCM %
DWQ %
(14300 1601 435100093 1625 6253)
(24300 1602 435100095 2341)
I Private non commercial
development that does not
$250
100%($250)
0%($0)
involve the filling or
excavation of any wetlands
or open water areas
II Public or commercial
development that does not
$400
100%($400)
0%($0)
involve the filling or
excavation of any wetlands
or open water areas
III For development that
involves the filling and /or
excavation of up to 1 acre
of wetlands and /or open
water areas determine if A
B C or D below applies
III(A) Private non
commercial development if
$250
100%($250)
0%($0)
General Water Quality
Certification No 3490 (See
attached ) can be applied
III(B) Public or commercial
development if General
$400
100%($400)
0%($0)
Water Quality Certification
No 3490 (See attached)
can be applied
III(C) If General Water
Quality Certification No
$400
60%($240)
40%($160)
3490 (see attached) could
be applied but DCM staff
determined that additional
review and written DWQ
concurrence is needed
because of concerns
related to water quality or
aquatic life
III(D) If General Water
❑
Quality Certification No
$400
60%($240)
40%($160)
3490 (see attached) cannot
be applied
IV For development that
El
involves the filling and /or
$475
60%($285)
40%($190)
excavation of more than
one acre of wetlands and /or
o en water areas
North Carolina Aquarium on Roanoke Island
Pier & Gazebo Addition Narrative
SCO Project # 10- 08739 -01 A
June 2012
The North Carolina Aquarium on Roanoke Island intends to construct a 220 foot long
pier with a Gazebo lower educational platform fishing areas and kayak launch in the
Croatan Sound west of the existing Aquarium facility The pier will be used for
interpretation educational programs fishing special events and other programs
administered by the NC Aquarium staff and others The project will also include a
small storage building to contain items used for educational programs including
kayaks dip nets PFD s paddles and other program related materials
The project will include removal and replacement of some existing armor stone in
order to install wooden pilings for the pier foundation This armor stone will be
carefully removed using mechanical equipment and stored on the upland area near
the new storage budding until it can be replaced upon completion of the piling
installation These are large (550 #) clean stones with little to no fine materials
expected to be excavated
The pier will have interpretive stations benches and a gazebo It will also have two
branching fishing areas with ADA compliant benches at each end The pier will have a
lower- platform to be -used for educational programs and ADA compliant kayak and -
water access This will include a small floating dock and a kayak launch Listed below
are the sizes of the various platforms
• Gazebo platform
• Lower platform
• Floating dock
• Fishing tees
• Benches
• Total Platform Area
1004 s f
825 s f
187sf
476sf x(2) =952sf
40sf x(3) =120sf
3 088 sf
The pier will be open to the general public during the Aquariums hours of operation
and it will also be utilized for weddings and special events held after normal hours of
operation The pier and lower platform is not intended to be used for mooring by the
Land Planning - Engineenng - Environmental - Construction Management
P O Box 3989 115 W Saint Clair St Kill Devil Hills North Carolina 27948
North Carolina License No C 1027
Phone 252 441 2113 www AlbemarleAssoaates corn Fax 252 4410965
North Carolina Aquarium on Roanoke Island
Pier & Gazebo Addition Narrative
SCO Project # 10-0739 -01A
June 2012
Page 2 of 2
general public but will accommodate Aquarium organized kayak tours of the Sound
and surrounding waters
The pier will be constructed of wood piles girders Joists and decking The pier will
have power water electrical services and WIFI capability The kayak launch is a
narrow wooden pile supported chute which will assist in getting kayaks from the top of
the bank to the water It is not intended for pedestrian use and kayaks will be raised
and lowered to the water using ropes This chute is intended to protect the kayaks
from damage while placing them into and out of the water and to avoid having to use
the pier itself for kayak transfers The water ward end will terminate at the normal
water level Stormwater management for the storage shed and the onshore
improvements will utilize the existing stormwater management basin permeable
pavers and infiltration areas along the proposed pathway
o-
� �6 Q
ICE NFLI
APPLICATIONfor
Major Development Permit Cow,
(last revised 12127106) E L I L � B F H t i
North Carolina DIVISION OF COASTAL MANAGEMENT
1 Primary Applicant Landowner Information
Business Name
Project Name (if applicable)
North Carolina Aquarium On Roanoke Island
NC Aquanum on Roanoke Island Pier
Albemarle & Associates Ltd
Applicant 1 First Name
MI
Last Name
Agentl Contractor 1 First Name
Maylon
L
White Director
Applicant 2 First Name
MI
Last Name
DeLucia PE
If additional applicants please attach an additional page(s) with names listed
Agent/ Contractor 2 First Name
Mailing Address
Last Name
PO Box 967
PO Box
Crry
State
967
Manteo
NC
ZIP
Country
Phone No
NC
FAX No
27954 0967
Dare
252 473
3494 ext
252 473 1980
Street Address (if different from above)
City
State
ZIP
374 Airport Rd
Manteo
NC
27954
Email
252 441 0965
White Maylon L [ maylon white @ncaquanums com]
Street Address (if different from above)
2 AgentContractor Information
Business Name
Albemarle & Associates Ltd
Agentl Contractor 1 First Name
MI
Last Name
John
M
DeLucia PE
Agent/ Contractor 2 First Name
MI
Last Name
Mailing Address
PO Box
State
PO Box 3989
EKdI vil Hills
NC
ZIP
ZIP
Phone No 1
Phone No 2
252 441
2113 ext
ext
FAX No
Contractor #
252 441 0965
Street Address (if different from above)
City
State
ZIP
115 West St Clair
Kill Devil Hills
NC
27948
Email
)ohnd @albemadeassociates corn
<Form continues on back>
Form DCM MP 1 (Page2Lof1)
YO- 11ATION f r
Major Development Pern it
3 Project Location
a Total length of shoreline on the tract (ft)
b Size of entire tract (sq It )
1298
730718
County (can be multiple)
Street Address COATI
Dare
374 Airport Road L
4Z§ UY
Subdivision Name
City
State
Zip
buildings storage buildings and equipment which supports the Aquarium
Manteo
NC
27954
Phone No
Lot No (s) (if many attach additional page with list)
252 —473 3494 ext
j Is the proposed project consistent with the applicable zoning?
a In which NC river basin is the project located?
b Name of body of water nearest to proposed project
Pasquotank
Croatan Sound
c Is the water body identified in (b) above natural or manmade?
d Name the closest major water body to the proposed project site
®Natural []Manmade ❑Unknown
Croatan Sound 1
e Is proposed work within city limits or planning jurisdiction?
f If applicable list the planning jurisdiction or city limit the proposed
®Yes []No
work falls within
Dare
4 Site Descnption
a Total length of shoreline on the tract (ft)
b Size of entire tract (sq It )
1298
730718
c Size of individual lot(s)
d Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
(If many lot sizes please attach additional page with a list)
10 ❑NHW or ®NWL
e Vegetation on tract
Landscaping and Native Flora
f Man made features and uses now on tract
North Carolina Aquarium on Roanoke Island consists of the Aquarium building parking lots outdoor exhibits support
buildings storage buildings and equipment which supports the Aquarium
g Identify and describe the existing land uses adjacent to the proposed project site
N Residential
S Dare County Airport
E Dare County (Undeveloped)
W Croatan Sound
h How does local government zone the tract?
j Is the proposed project consistent with the applicable zoning?
11
(Attach zoning compliance certificate jf applicable)
®Yes []No []NA
I Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k Hasa professional archaeological assessment been done for the tract? If yes attach a copy ❑Yes ®No ❑NA
If yes by whom?
I is the proposed project located in a National Registered Historic District or does d involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
<Form continues on next page>
Form DCM MP 1 (Pase oft)
�- r ,� P ATION f
M Major Developmen Perrr it
m (i) Are there wetlands on the site?
IY_es._ ®No
(o) Are there coastal wetlands on the site?
YjRj� 70NO '-'IrilT
EI I'f r' H CITY
(in) If yes to either (i) or (u) above has a delineation been conducted?
❑Yes []No
(Attach documentation if available)
n Describe existing wastewater treatment facilities
Secondary Treatment ninth LPP Drainfield Subsurface Disposal
o Describe existing drinking water supply source
County Water System
p Describe existing storm water management or treatment systems
Existing BMP s and State SWpermd SW7971022
5 Activities and Impacts
a Will the project be for commercial public or private use? ❑Commercial ®PubliclGovemment
❑Pnvate /Community
b Give a brief description of purpose use and daily operations of the project when complete
To be used for eductional passive recreatioanal active recreatioanal and specad events Pier will be multifunctional but will
not be used for docking or mooring boats other than educational program related kayaks and small boats Pier will be used
for fishing and crabbing
c Describe the proposed construction methodology types of construction equipment to be used during construction the number of each type
of equipment and where it is to be stored
Driven wood piles with heavy wood frame constrcution fo the pier decking and gazebo
d List all development activities you propose
Clearing grading concrete paving underground utilities pier construction
e Are the proposed activities maintenance of an existing project new work or both? New
f What is the approximate total disturbed land area resulting from the proposed project? 3000 ®Sq Ft or ❑Acres
g Will the proposed project encroach on any public easement public accessway or other area ❑Yes ®No ❑NA
that the public has established use of?
h Describe location and type of existing and proposed discharges to waters of the state
None
i Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No []NA
If yes will this discharged water be of the same salinity as the receiving water? ❑Yes []No []NA
j Is there any mitigation proposed? ❑Yes ®No ❑NA
If yes attach a mitigation proposal
<Form continues on back>
Form DCM MP 1 (Pagevofv)
-- — - LICA ION for
Mayor Deve pme it Permit
6 Additional Information
In addition to this completed application form (MP 1) the following items below if applicz ble must _ b r i ► the appin ation
package to be complete Items (a) — (t) are always applicable to any major development
instruction booklet on how to properly prepare the required items below
a A project narrative
b An accurate dated work plat (including plan view and cross - sectional drawings) drawn to scale Please give the present status of the
proposed project is any portion already complete? if previously authorized work clearly indicate on maps plats drawings to distinguish
between work completed and proposed
c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site
d A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties
e The appropriate application fee Check or money order made payable to DENR
f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mad Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management
Name Dare County Phone No 252 475 5000
Address PO Box 1000 Manteo NC 27954
Name Larry & Maxine Thonasson Phone No 252 473 2234
Address 359 Airport Rd Manteo NC 27954
Name Phone No
Address
g A list of previous state or federal permits issued for work on the project tract Include permit numbers permittee and issuing dates
SW7971022 Stormwater DWQ
h Signed consultant or agent authorization form d applicable
i Wetland delineation if necessary
I A signed AEC hazard notice for projects in oceanfront and inlet areas (Must be signed by property owner)
k A statement of compliance with the N C Environmental Policy Act (N C G S 113A1 10) if necessary If the project involves expenditure
of public funds or use of public lands attach a statement documenting compliance with the North Carolina Environmental Policy Act
7 Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow-only the development-described in the application
The project will be subject to the conditions and restrictions contained in the permit
I certify that I am authorized to grant and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow up
monitoring of the project
I further certify that the information provided in this application is truthful to the best of my knowledge
Date 30 ZU i - Print Name 1(119YCOA) Z- 76
Signature
Please indicate application attachments pertaining to your proposed project
❑DCM MP 2 Excavation and Fill Information ❑DCM MP 5 Bridges and Culverts
®DCM MP 3 Upland Development
®DCM MP-4 Structures Information
Form DCM MP -3 I ,
UPLAND
DEVELOPMENT �--
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Mayor Permit Form DCM MP 1 Be sure to complete all other sections of the Joint
Application that relate to this proposed project Please include all supplemental information
GENERAL UPLAND DEVELOPMENT
a Type and number of buildings facilities units or structures
proposed
450 sf Storage Burlidng to be used to store teaching aids
for programs on the new pier
c Density (give the number of residential units and the units per
acre)
N/A
e If the proposed project will disturb more than one acre of land the
Division of Land Resources must receive an erosion and
sedimentation control plan at least 30 days before land- disturbing
activity begins
(i) If applicable has a sedimentation and erosion control plan been
submitted to the Division of Land Resources?
❑Yes []No ®NA
(u) If yes list the date submitted
g Give the percentage of the tract within the coastal shoreline AEC to
be covered by impervious and /or built upon surfaces such as
pavement budding rooftops or to be used for vehicular driveways
or parking
832%
i Give the percentage of the entire tract to be covered by impervious
and /or built upon surfaces such as pavement budding rooftops
- -- -or to be used for vehicular dnveways or parking -- --
34 2%
I Describe proposed method of sewage disposal
Exisrtng Secondary Treatment system with LPP Subsurface
Disposal
I Describe location and type of proposed discharges to waters of the
state (e g surface runoff sanitary wastewater industrial/
commercial effluent "wash down and residential discharges)
None
b Number of lots or parcels
1
d Size of area to be graded filled or disturbed including roads
ditches etc
3000SF
f List the materials (such as marl paver stone asphalt or concrete)
to be used for impervious surfaces
Paverstones and Concrete
h Projects that require a CAMA Mayor Development Permit may also
require a Stormwater Certification
(i) Has a site development plan been submitted to the Division of
Water Quality for review?
❑Yes ®No ❑NA
(n) If yes list the date submitted
k Have the facilities described in Item (i) received state or local
approval?
®Yes ❑No ❑NA
If yes attach appropriate documentation
m Does the proposed project include an innovative stormwater
design?
[]Yes ®No [_]NA
If yes attach appropriate documentation
C -J--- Z '64 V);1 �qJ .)a" ,�-1 ( rte; ,. - e
m Describe proposed drinking water supply source (e g well
community public system etc)
Public Water Supply
o When was the lot(s) platted and recorded?
�zZ //Z
Date 1 ,
�iGv-
Prolect Namet
NRYLOA) G CJ�rT�
Applicant Name
ApplicanfSi*&ture
n (i) Will water be impounded?
(u) If yes how many acres?
J-) r- �, _,. t -
taL .
Vo ❑NA
J
r� T
L
p If proposed development is a subdivision will additional utilities be
installed for this upland development?
❑Yes []No ®NA
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
i
rn
—k
Attach this form to Joint Application for CAMA Major Permit Form DCM MP 1 Be sure to complete all other sections of the Joint
Application that relate to this proposed project Please include all supplemental information
1 DOCKING FACILITY /MARINA CHARACTERISTICS
a (i) Is the docking facility /manna
❑Commercial ®Public/Govemment ❑Pnvate /Community
c (i) Dock(s) and /or pier(s)
(ii) Number
1
(iii) Length
220 Total ( 176 over water)
(n►) Width
80
(v) Floating
❑Yes ®No
e (i) Are Platforms included? ®Yes [_-]No
If yes
(ii) Number Severa See Narrativel
(iii) Length 3,088 SF
(m) Width See Plan
(v) Floating ®Yes ®No
Note Roofed areas are calculated from dnphne dimensions
g (i) Number of slips proposed
0
(ii) Number of slips existing
0
i Check the proposed type of siting
❑ Land cut and access channel
❑Open water dredging for basin and /or channel
®Open water no dredging required
[]Other please describe
El This section not apphcab/e
b (i) Will the facility be open to the general public?
®Yes []No
d (i) Are Finger Piers included? []Yes ®No
If yes
(u) Number
(in) Length
(iv) Width
(v) Floating ❑Yes []No
f (i) Are Boatlifts included? []Yes ®No
If yes
(ii) Number
(in) Length
(iv) Width
h Check all the types of services to be provided
❑ Full service including travel lift and /or rail repair or
maintenance service
❑ Dockage fuel and marine supplies
❑ Dockage (`beet slips ) only number of slips
❑ Dry storage number of boats
❑ Boat ramp(s) number of boat ramps
® Other please describe _
Aquarium Teaching /fishing pier
I Describe the typical boats to be served (e g open runabout
charter boats sail boats mixed types)
Kayaks
k Typical boat length 12 1 (1) Will the facility be open to the general public?
J
Fr " ?" - --W" SAP -�* is r -,- Cgr -, -J �ia,. �, , q e)
m (i) Will the facility have tie pilings?
®Yes ❑No
(n) If yes number of he pilings?
5 to support floating platform only
r
r, E r r- , )
®Yes ❑No
y
t ,M
2 DOCKING FACILITY /MARINA OPERATIONS [I This section not applicable
a Check each of the following sanitary facilities that will be included in the proposed project
❑ Office Toilets
® Toilets for patrons Number Location Provided within Aquarium
❑ Showers
❑ Boatholdmg tank pumpout Give type and location
b Describe treatment type and disposal location for all sanitary wastewater
No wastewter is intended for the pier or storage budding
c Describe the disposal of solid waste fish offal and trash
Trash Receptacles will be used at the Storage Budding and on the pier
d How will overboard discharge of sewage from boats be controlled?
Not Permitted
e (i) Give the location and number of No Sewage Discharge signs proposed
N/A
(u) Give the location and number of Pumpout Available signs proposed
f Describe the special design if applicable for containing industrial type pollutants such as paint sandblasting waste and petroleum products
N/A
g Where will residue from vessel maintenance be disposed of?
N/A
h Give the number of channel markers and No Wake signs proposed N/A
I Give the location of fuel handling facilities and describe the safety measures planned to protect area water quality
N/A
1 What will be the manna policy on overnight and live- aboard dockage?
Not Permitted
k Describe design measures that promote boat basin flushing?
N/A
I If this project is an expansion of an existing marina what types of services are currently provided - T
No
m Is the manna/docking facility proposed within a primary or seconds area?
❑Yes ®No secondary nursery
n Is the manna/docking facility proposed within or adjacent to any shellfish harvesting area?
[]Yes ®No
o Is the manna/docking facility proposed within or adjacent to coastal wetlands /marsh (CW) submerged aquatic vegetation (SAV) shell bottom
(SB) or other wetlands (WL)? If any boxes are checked provide the number of square feet affected
❑CW ❑SAV ❑SB
OWL ®None
p Is the proposed manna/docking facility located within or within close proximity to any shellfish leases? []Yes ®No
If yes give the name and address of the leaseholder(s) and give the proximity to the lease
3 BOATHOUSE (including covered lifts) ®This section not applicable
a (i) Is the boathouse structure(s)
❑Commercial ❑PubliclGovernment ❑Private /Community
(u) Number
(m) Length
(iv) Width
Note Roofed areas are calculated from dnplrne dimensions
4 GROIN (e g wood sheetprle etc If a rock groin use MP 2 Excavation and Fill) ID This section not applicable
a (Q Number
(u) Length
(m) Width
5 BREAKWATER (e g wood sheetprle etc) ®This section not applicable
a - Length -- -- — - - - -- - — - — — - - -b- Average distance from NHW NWL or wetlands--- - - - --
c Maximum distance beyond NHW NWL or wetlands
6 MOORING PILINGS and BUOYS ®This section not applicable
.. u uic au ua,iwc \ar
❑Commercial ❑Public/Government ❑Pnvate /Community
c Distance to be placed beyond shoreline
Note This should be measured from marsh edge if present
b Number
d Description of buoy (color inscription size anchor etc)
m
e Arc of the swing
7 GENERAL
a Proximity of structure(s) to adjacent riparian property lines
427 to South PL & 759 to North PL
Note For buoy or mooring piling use arc of swing including length
of vessel
c Width of water body
19,000 ft
e (i) Will navigational aids be required as a result of the project?
❑Yes []No [DNA
(n) If yes explain what type and how they will be implemented
f
I
b Proximity of structure(s) to L,--n"decking-faddies-
490 Emergency Ferry Dock to south
d Water depth at waterward end of structure at NLW or NWL
4 5 NWL
8 OTHER [I This section not applicable
a Give complete description
This pier will be used for educationsi recreational and fishing opportunities and will pnmanliy be used by patrons of the
Aquarium or those leasing the facility for private events
t✓C12 ZA z--
Date
Project Name
YLM yyo AJ L GJK� T�
Applicant Name � /
Y, /J� 7 ::._ L)
Applicant Signature
ROANOKE, ISLAND AQUARIUNI.
BOARDWALK, PIER, & GAZE�B
1 if - III
COV COVER SHEET
A -1.41 PLAN: PIER
BUILDING ELEVATIONS: PIER GAZEBO & STORAGE BUILDING
S-1.01 PIER PILE PFJ1
PIER DETAILS
NO SCALE
north
VICINITY MAP
NO SCALE
ALEMARLE & ASSOCIATES, Ltd. Civil / Structural
115 West St. Clair Street
Kill Devil Hills, NC 27948
252.441.2113
SGE SOLUTIONS PC
215 Glenwood Ave., Suite A
Raleigh NC 27603
919 -821 -3886
CONSULTANTS
north
Plumbing / Electrical
XX COLUMN LINE
PLAN EQUIPMENT SYMBOL X Ax.xx X INTERIOR ELEVATION
SEE CHAPTER 100 DRAW111GS SEE CHAPTER 400 DRAWINGS
T -0 TOILET ACCESSORY NOTE X
SEE CHAPTER 200 DRAWdNGS
D ## ROOF DETAIL REFERENCE
ROOM NUMBER SEE CHAPTER 300 DRAWINGS
SEE CHAPTER 600 DRAWNGS FOR ROOM
FINISH SCHEDULE
xOOtX DOOR NUMBER zx BUILDING ELEVATION
SEE CHAPTER 600 DRAWl.'A"GS FOR DOOR SEE CHAPTER 400 DRAWINGS
SCHEDULE
HM —# HOLLOW METAL FRAME: NUMBER
SEE CHAPTER 600 DRAW1fG5 X X BUILDING SECTION
AX.XX AX.XX
SEE CHAPTER 500 DRAWINGS
XX ALUMINUM FRAME NUMBER
SEE CHAPTER 600 DRAVffiGS
000.00 ELEVATION A xx WALL SECTION
SEE CHAPTER 500 DRAWINGS
00.00 FFE FINISH FLOOR ELEVATION
X CASEWORK ELEVATION
A7.OX
SPOT ELEVATION SEE CHAPTER 700 DRAWINGS
00.00
(),RT It -CAROL IN A,
, . AU5
SCO ID #: 10-08739-01A
01 JUNE 2012
s anson +steVYal i
architects, p.a.
400 west morgan st., suite 204
raleigh, north carolina 27603
(t) 919.326.8820
(e) BarryS @SandSarchitects.com
01 JUNE 2012
Q
N
N
N
N
O
N
N
N
cr
3
z
Q
a
w
T-
0
i
0)
i�
0
0
Q
C)
i
U)
0
CL
O
r7
O
E
O
D-
a
z
0
0
V
.V
0
n
N
U
Q
v
VyyJq q � ADDITION -iy 1 TURTLE
y A14 p
( r �y� ) '
\ q ��� SO C, BY OTHERS _ \• • ..
N.T.S. IX SEPTIC, j f p
u r
+ u
' \ ( V r— f PLw HaJSE
q °� �L �`- ;'� PROPOSED 10' WIDE
1. OWNER: NORTH CAROLINA PUBLIC AQUARIUM r / s \ D q PROPOSED WATER AND CONCRETE ACCESS DRIVES
�' �( GaNGRETE q D ELECTRIC SERVICES ,, 0 (BY OTHERS)
2. PROPERTY ADDRESS: 374 AIRPORT ROAD � ` D 1 ' ,q p q ! \ � a
MANTEO, N °
C 27954
q
. p / '`•�-
3. THE OWNER INTENDS TO CONSTRUCT A SOUNDFRONT PIER WITH GAZEBO AND \0 V) D
l
A BOAT STORAGE BUILDING AND ASSOCIATED IMPROVEMENTS.
10 • Ex �n
t
4. PROPERTY RECORDED IN D.B. 200, PG. 397 \ :T a. i> q 3 q • ° {,
p D �Q 4 q x 9 `tJ\RTLE STA�TL� E . ��,r p ;� . .� . / —\ p K Q ^ q • D' ° °® D
q i qD
i
q
/� %\ DARE COUNTY PIN #: 9870 11 55 5186 q p q
° q q D D
—
p
4 �
E X GONGREM D .
D
4 5. PROPERTY ZONED: INDUSTRIAL DISTRICT (I
6. SETBACKS PER CURRENT ZONING: FRONT 15 / . D q 4
q Vp q i ATCH EXISTING D
q
REAR 10'
SIDES 20' PROPifSED PAVER +
ADJOINING RESIDENTIAL 75' * "° r
wor AREA
\o
D
PROPOSED
7. PROPERTY LOCATED IN A FLOOD ZONE AE (7) AND SHADED X AS PER FIRM ° ` "•\ \�.\' r';; t` EXISTING PINE STORAGE _ _ _
r4 –� TO BE REMOVED BUILDING _ — 9_ �h+V \��; +
MAP 3720987000J, DATED SEPTEMBER 20, 2006. _ ' y , ' "\ _ %��% 4 ? _ a _ — _ — FFE - a s'— /
PROPOSED KAYAK \` \�
' � _ _ — �� PRACTICE OSPREY
�
(SUBJECT TO CHANGE BY FEMA -lo- �-�_: �a �a ._.._..- � :,:. \ \; \s \\y ,;:,,. �,; CE AREA NEST _ _ _ — — a.,� `«, ", >,� ✓% - _
m
IIMrrY MA
N.T.S.
GRAPHIC SCALE
20 0 10 20 40 :0
(IN FEET)
1 INCH = 20 FT.
+ /40
+ /0
N
+
+
+
+ i1
n1�
PROPOSED
PIER
o
+
PROPOSED
ADA COMPLIANT
FISHING AREAS (TYP)
0 0
PROPOSED
GAZEBO /mt?�
+
+
a 0 1 0 a
aqo
+
a
+
+
Nw
RW MONUMENT FOUND
in + S r 'y
EXISTING TREELINE
145
PK NAIL SET
X
EXISTING FENCE
qw
IRON ROD FOUND
4J y --10-
NEW TRAFFIC FLOW ARROWS
gc.�,r
CONCRETE MONUMENT FOUND
&
+
qpt=
i
rx
EXISTING FIRE HYDRANT
PROPOSED h
RIGHT OF WAY
LANDING = 4.66'
+
EXISTING WATER VALVE
+
+ /40
+ /0
N
+
+
+
+ i1
n1�
PROPOSED
PIER
o
+
PROPOSED
ADA COMPLIANT
FISHING AREAS (TYP)
0 0
PROPOSED
GAZEBO /mt?�
+
+
a 0 1 0 a
aqo
+
a
+
+
Nw
RW MONUMENT FOUND
' ' 'y ' "_ -1'..v `,'r_l
EXISTING TREELINE
145
PK NAIL SET
X
EXISTING FENCE
qw
IRON ROD FOUND
4J y --10-
NEW TRAFFIC FLOW ARROWS
gc.�,r
CONCRETE MONUMENT FOUND
&
NEW HANDICAP PARKING SPACE
qpt=
IRON PIN FOUND
rx
EXISTING FIRE HYDRANT
— —
RIGHT OF WAY
X
EXISTING WATER VALVE
BOUNDARY LINE
❑
EXISTING WATER METER
EXISTING POWER POLE
Qo /o
EXISTING SANITARY CLEANOUT
EXISTING GUY WIRE
gRa
EXISTING IRRIGATION VALVE
OVERHEAD ELECTRIC
EXISTING DRAINAGE PIPE
O
EXISTING TELEPHONE PEDESTAL
"-------- - - - -'-
EXISTING DITCH /SWALE /POND
EXISTING LIGHT POLE
d ,
EXISTING CONTOURS
a. a`
EXISTING CONCRETE
\klvi
EXISTING SPOT ELEVATIONS
::
EXISTING PAVEMENT
9&flf"-] no] iv, I k a CAI
j 9 f
a
�
be'nnarle
& ASSOCIATES, LTD.
Engineering - Environmental -Land Planning
115 West Saint Clair
St. Phone: (252) 441.2113
P.O. Box 3989
Fax: (252) 441 -0965
Kill Devil Hills, NC 27948
w .AlbemarleAssociates.com
Certificate of Licensure No. C -1027
SCALE: 1 " = 20'
01
Un��1�ii►�
VERTICAL CEMENT
BOARD SIDING
(PAINTED)
O
I
0
I
d-
M
O
I
i�
N
IN
O
I
M
0
I
i�
N
O
I
107
MEN
WEST ELEVATION (EAST REVERSED): STORAGE BUILDING
WOOD BRACKETS (PAINTED)
CEMENT BOARD CORNER
BOARDS & TRIM (PAINTED)
CEMENT BOARD SIDING
(PAINTED)
WOOD LOUVERS (PTD.) OVER
FIBERGLASS SCREENING
I I 1 12
VERTICAL CEMENT (�
BOARD SIDING, 9
CORNER BOARDS & _
TRIM (PAINTED)
ASPHALT SHINGLES
ON ROOFING PAPER
ON 3/4" MARINE
GRADE PLYWOOD
24 "x24" CASED
- OPENING
03 SOUTH ELEVATION (NORTH REVERSED): PIER GAZEBO
ASPHALT SHINGLES
ON ROOFING PAPER
ON PRESSURE
TREATED WOOD 2X6
T &G ROOF DECK
WOOD KNEE BRACEEI
(PAINTED)
SCALE: 1/4"=l'-O"
i
a1 AQUARIUM EXCHIBIT DISPLAY STAND ATTACHED TO PIER RIM JOIST.
SEE DETAIL A- 4.01/XX FOR ADDITIONAL INFORMATION.
02 REMOVABLE PROJECT WORK TABLE LOCATION.
0
SEE DETAIL A- 4.01/XX FOR ADDITIONAL INFORMATION.
03 BUILT -IN WOOD BENCH.
SEE DETAILS A- 4.01 /XX FOR ADDITIONAL INFORMATION.
04 - --
� 05 - --
as - --
EQUIPMENT LEGEND
1. ALTERNATE BID ITEMS ARE SUMMARIZED IN THE PROJECT MANUAL,
2. ALL EXTERIOR CONCRETE SIDEWALKS AND /OR SURFACES SHALL BE FLUSH WITH
FINISHED FLOOR ELEVATIONS AND SLOPE AWAY FROM THE BUILDING AT
MINIMUM OFY4" PER FOOT FORA MINIMUM OF 8' -0 ", FROM THIS 8' -0" DISTANCE TO
THE END OF THE SURFACE, THE MINIMUM SLOPE SHALL BE %" PER FOOT TO A
MAXIMUM OF Y2" PER FOOT. REFER TO CIVIL DRAWINGS FOR EXTENT OF PAVED
AREAS AND SPOT ELEVATIONS.
3. PIER PLAN DIMENSIONS ARE SHOWN TO INSIDE FACE OF RIM JOISTS. SEE
CIVIL /STRUCTURAL DRAWINGS FOR SECTIONS AND DETAILED PLAN DIMENSIONS.
4. BOATHOUSE EXTERIOR PLAN DIMENSIONS ARE TYPICALLY SHOWN TO EXTERIOR
FACE OF FRAMING. INTERIOR PLAN DIMENSIONS ARE TYPICALLY SHOWN FROM
INSIDE FACE OF FRAMING TO INSIDE FACE OF FRAMING. ALL DIMENSIONS SHOWN
ARE NOMINAL,
5. SEE COVER SHEET FOR SYMBOL LEGEND.
6. SEE CIVIL & STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
7. SEE ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
02 GENERAL PLAN NOTES
RAWINGS
LAYOUT &
LOCATION
PLAN: SOUNDSIDE PIER 11 SCALE: 1/8 " =1' -0" 01
Q
N
N
Ln
00
N
O
N
O
On
3
a
z
Q
J
d
X
W
0-
Z
QO
O
t7
Q0
O
1
U
_U
Li
O
O
U
C
tT
N
Q)
O
a
i
O
Q0
O
E
0
a
Q
U
z
I
O
LO
0
U
N
O
li
N
U
Q
Y
B C D E F G H I J K L M N 0 P TQ R TS T U TV W TX 1'
8' -0" 8' -0" 8' -0" 8' -0" 7' -Q" 8' -6" 10' -0" 10' -0" 10' -0" 10' -0'" 10' -Q" 1 Q' -Q" 10' -0" 101-011 10' -0" 10' -Q" 10' -0" 10' -0" 10' -Q" 10' -0" 10' -0" 10' -0" 10' -0"
2' -0"
10"0 PILES
�.01 NTS
PLAN: SOUNDSDE PIER
❑o
'IER ELEV. 8.6'
be marle
& ASSOCIATES, LTD.
Engineenng - Environmental - Land Planning
115 West Saint Clair St. Phone: (252) 441 -2113
north P.C. Box 3989 Fax: (252) 441.0965
Kill Devil Hills, NC 27948 www.Albemar]eAssociates.com
Certificate of Licensure No. C -1027
(I SCALE: 1/8 " =1' -0" 01
Q
N
0
M
00
N
0
N
e
z
Q
I
CL
w
a
i
_
c0
0
0
0
0
Q
U
c
N
0
i
T_
CD
0
r7
c0
0
L.
O
6
Q
U
z
i
0
0
U
N
O
L
d
qJ
U
a
a
y
STRUCTURAL NOTES
1. WHERE A DETAIL IS SHOWN ON STRUCTURAL DRAWINGS FOR ONE COR iTION, IT
SHALL APPLY TO ALL SIMILAR OR LIKE CONDITIONS UNLESS NOTED OF SHOWN
OTHERWISE ON PLANS.
2. ALL ITEMS SHALL BE TIGHTLY ANCHORED OR ATTACHED SQUARE, PLUMB /'.ND TRUE,
OR IN OTHER PLANES AND SHAPES AS SHOWN ON THE DRAWINGS. JOIK7S SHALL
BE TIGHT, EVEN AND FREE OF OFFSETS. NO FIELD ALTERING OF ANY MEMEEERS WILL
BE ALLOWED THAT WILL CAUSE THEM NOT TO BE IN ACCORDANCE 'KITH THE
DRAWINGS AND SPECIFICATIONS WITHOUT WRITTEN APPROVAL OF THE PROJECT
ENGINEER.
3. IF THE CONTRACTOR FINDS A DIFFERENCE BETWEEN THESE DRAWINGS AND EXISTING
ELEVATIONS OR OTHER CONDITIONS THAT PROHIBIT EXECUTION OF THE WORK AS
DIRECTED IN THESE DRAWINGS, THE CONTACTOR SHALL NOTIFY THE ENGINEER
IMMEDIATELY.
4. TIMBER PILES SHALL BE A MINIMUM OF 2.5 CCA UC58 AND SHALL MEET OR
EXCEED AWPA STANDARDS (C -18) FOR PRESERVATION TREATMENT AS APPLICABLE.
PILES SHALL ACHIEVE A MINIMUM OF 18' PENETRATION INTO SUITABLE SUBSURFACE
MATERIAL.
5. STRUCTURAL FRAMING BE #2 SYP, TREATMENT AS SHOWN, AND SHALL (MEET OR
EXCEED AWPA STANDARDS (UC4C) FOR PRESERVATION TREATMENT AS APPLICABLE.
6. DECKING SHALL BE #1 SYP, TREATMENT AS SHOWN, AND SHALL MEET OR EXCEED
AWPA STANDARDS (UC4B) FOR PRESERVATION TREATMENT AS APPLICABLE.
7. ALL CROSS BRACING SHALL BE #2 GRADE MATERIAL WITH A MINIMUM OF 2.5 CCA
UC5B (MOISTURE CONTENTS <19 %) AND SECURED WITH (2) 1 "0 HDG BOLTS IN
PRE - DRILLED HOLES.
8. ALL FASTENERS SHALL BE HIP -DIP ZINC COATED IN ACCORDANCE WITH AST,1 A 153.
WOOD
BENCHES
(NOT SHOWN)
(2) 1" HDG
MARINE BOLTS
6x6 HAUCH
BRACES UC513
(1) 1" HDG _
MARINE BOLT
14" 6x6 LEDGER
W/ (3) 1" HDG
MARINE BOLTS
�--- -- 7' -0" -�
1 PIER SECTION
NTS
30'-'0"0 TIP CLASS B TIMBER
PILIN (18' MIN. PENETRATION)
ALL PILES "0 BE TREATED
Tn 1) 5 C(".'. 1 1C5R PFR MC:
2 "x6" CAP
Rim
M7-AL
NTS
RECESS UPPER RAIL BETWEEN
POSTS WHERE HANDRAIL IS
PROVIDED
4.1(C)(6) -RAMP HANDRAILS
12�� SHALL BE 1j" TO 14" IN.
1 WIDTH OR DIAMETER WITH THE
OUTSIDE FACE OF THE
HANDRAIL A MAXIMUM 3j"
FROM THE WALL OR BUILDING
7j" FACE
HANDRAIL 2" X 8" 34" MIN. TO 38"
MAX TO FINISHED RAMP WALKING
SURFACE ALL SURFACES ON HANDRAIL
TO BE ROUTED AND SANDED
STAGGER 2x12
JOIN *TS 2x8
2x6
2x4 TIES
!,EACH GIRDER
(TYP)
CAD 8" O.C.
12 STAGGER
3 JOINTS
2x10 SET INTO POLE
UC48 ON LAND
UC5B BELOW 1.0' MSL
PION
ADA COMPLIANT RAMP
WITH HANDRAILS
2 "x6" #1 DECKING UC413 DETAIL)
SCREWED W /3" STAINLESS
STEEL DECK SCREWS (2 /JOISTS)
3' 4" 2 "x8" JOISTS ELEV. = 4.66'
I 2x8 BAND 12" O.C. UCB4 2x8 BAND
ELEV. = 3.00'
o-
i ®i
2 "x6" #1 DECKING UC4B
SCREWED W /3" STAINLESS
STEEL DECK SCREWS (2 /JOISTS)
2 "x10" JOISTS 12" O.C.
i m i
-5' -4"
(4) 2"02" GIRDERS UC4B
TWO ON EACH SIDE OF PILING
W/ (3) 1 " HDG MARINE
BOLTS EACH PILING (SEE DETAIL)
NORMAL WATER LEVEL ±1.0'
4x8 CROSS
BRACING UC58 (2) 3/a" HDG MARINE BOLTS
EACH BENT 0 EACH CONNECTION
N5'
L_
i-• 7'-0" --)
30' -10 "0 TIP CLASS B TIMBER
PILING (18' MIN. PENETRATION)
ALL PILES TO BE TREATED
TO 2.5 CCA UC5B PER NC
BUILDING CODE PRESCRIPTION
18'
-28'
i : i
18"
6' -11"
SIMPSON H10 HURRICANE
® EACH TRUSS
2x6 STUDS ® 16" O.C.
HORIZONTAL BRIDGING 0 EACH COURSE
8" CMU
N4" ALLTHREAD W /IN 24" OF EACH
CORNER AND SPACED ® 48" MAXIMUM
IN GROUTED CELLS
#3 GR60 REBAR ® 32" O.C.
i
(3) #4 GR60 REBAR
(CONTINUOUS)
2 "x6" #1 DECKING UC4B
ELECTRIC AND SCREWED W /3" STAINLESS
WATER SERVICE STEEL DECK SCREWS (2 /JOISTS)
CONDUITS
—L XIV JVIJIJ I
12" O.C. UC411 -5' -4"
(4) 2"x12" GIRDERS UC4B
TWO ON EACH SIDE OF PILING
W/ (3) 1 " HDG MARINE
• BOLTS EACH PILING (SEE DETAIL)
7N X7 NORMAL WATER LEVEL ±1.0'
4x8 CROSS
BRACING UC513 (2) 3/a" HDG MARINE BOLTS
EACH BENT 9 EACH CONNECTION
-5'
BOTTOM
MEN
• .
30' -10 "0 TIP CLASS B TIMBER
PILING (18' MIN. PENETRATION)
n
ALL PILES TO BE TREATED
30 2.5 CCA UC5B PER NC
BUILDING CODE PRESCRIPTION
N28'
3 PER SECTION I r I e
NTS &ASSOCIATES, LTD.
Engineering - Environmental -Land Planning
115 West Saint Clair St. Phone: (252) 441 -2113
P.O. Box 3989 Fax: (252) 441-0965
Kill Devil Hills, NC 27948 www.AlbemarleAssociates.com
Certificate of Licensure No. C -1027
SCALE: AS SHOWN 01
16 APRIL 2012