DWR Division of Water Resources Pre -Construction Notification (PCN) Form October 26, 2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes r No Is this project a public transportation project?* C Yes IT No Change only if needed. BIMS # Assigned 20210216 Is a payment required for this project?* r No payment required r Fee received 6 Fee needed - send electronic notification Reviewing Office * Wilmington Regional Office - (910) 796-7215 Information for Initial Review Version#* 1 What amout is owed?* r $240.00 6 $570.00 Select Project Reviewer* Robb Mairs:eads\rlmairs2 1a. Name of project: Boiling Spring Lakes Hurricane Florence EWP - Engineering Assistance 1a. Who is the Primary Contact?* Jeff Repp 1b. Primary Contact Email:* 1c. Primary Contact Phone:* jrepp@cityofbsl.org (910)363-0025 Date Submitted 3/1 /2021 Nearest Body of Water Patricia Lake Basin Cape Fear Water Classification B;Sw Site Coordinates Latitude: Longitude: 34.03159966863578-78.06767420661026 Pre -Filing Meeting Information ID# Version Pre -fling Meeting or Request Date* 1 /29/2021 Attach documentation of Pre -Filing Meeting Request here:* DWR Pre -Filing Meeting Request Form.pdf 51.86KB A. Processing Information C^U County (or Counties) where the project is located: Brunswick Is this a NCDMS Project r Yes r No Is this project a public transportation project?* r Yes r No la. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* r Yes r No Please provide the date of the previous submission.* 2/9/2021 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 37 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 11. Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: CITY OF BOILING SPRING LAKES 2b. Deed book and page no.: 242:541 * r Yes r No r Yes r No 2c. Responsible party: 2d.Address Street Address 9 E Boiling Spring Rd Address tine 2 CKY Southport Postal / Zip Code 28461 2e. Telephone Number: (910)363-0025 2g. Email Address:* jrepp@cityofbsl.org 4. Agent/Consultant (if applicable) 4a. Name: Jonathan Hinkle 4b. Business Name: LDSI, Inc. 4c.Address Street Address 1308 US 258 Address tine 2 City Kinston Postal / Zip Code 28504 4d. Telephone Number: (704)337-8329 4f. Email Address:* jhinkle@ldsi-inc.com Agent Authorization Letter* AGENT AUTHORIZATION FORM.pdf State / Province / legion NC Oxntry US 2f. Fax Number: (910)363-0029 State / Province / legion NC Country US 4e. Fax Number: (704)308-3153 74.2KB C. Project Information and Prior Project History C^U 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town: Southport 2. Project Identification 2a. Property Identification Number: Multiple 2c. Project Address Street Address 9 E Boiling Spring Rd Address tine 2 City Southport Postal / Zip Code 28461 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Patricia Lake 2b. Property size: Varies State / Province / Region NC Country us 3b. Water Resources Classification of nearest receiving water:* B;Sw 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300050701 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Eight (8) sites have been damaged by Hurricane Florence. This damage includes erosion, bank failures, streambank failures, and debris buildup within channels. The general land use around these sites is residential 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) USGS Topo Project Locations.pdf 1.95MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Project Locations Soils Map.pdf 1.19MB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 4360 4h. Explain the purpose of the proposed project:* The purpose of this project is to remove debris, stabilize banks, and restore streams to pre-hurricaneconditions. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The project Will include the repair and restoration of four (4) stream and drainage courses throughout the city of Boiling Spring Lakes. These repair and restorations will include stream stabilization, channel bank grading, the installation of in stream structures, and native vegetation planting. Grading shall be accomplished With an excavator and in stream structures shall be installed with an excavator with a hydraulic thumb. Additionally, the project includes clearing and snagging of debris blocking a channel. Finally, the project includes the repair of a small pond berm and the installation of a riser structure as well as an outlet barrel. 4j. Please upload project drawings for the proposed project. Binder2.pdf 27.2MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* t^ Yes r No O Unknown Comments: A preliminary site visit was conducted on July 29th, 2020 byGary Beecher 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved t^ Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are anyother NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity? NWP 37 D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries ❑ Buffers r Open Waters r Pond Construction 3. Stream Impacts F 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact (?) 11.1uriscliction* length* S1 Repair of hurricane damage Temporary Bank Stabilization Cherry Road Perennial Corps 9 1,276 Average (feet) (lir�rfeet) g2 Repair of hurricane damage Temporary Bank Stabilization J Hunters Road Perennial Corps 14 1,603 Average (feet) (lir�rfeet) S3 Repair of hurricane damage Temporary Bank Stabilization JPine Lake Road Perennial Corps 11 615 Average (feet) (lir�rfeel) H Repair of hurricane debris Temporary Bank Stabilization Tributary to Allen Creek Perennial::] Corps 6 916 Average(feet) (linear feet) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 31. Total temporary stream impacts: 0 4,410 31. Total stream and ditch impacts: 1533 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Impacts to the channel will be temporary for the repair of damage caused by Hurricane Florence. Work will be done from the top of bank with no/minimal work being done from within the channel. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Work will be done from the top of bank with no/minimal work being done from within the channel. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Repair from hurricane damage F. Stormwater Management and Diffuse Flow Plan (required by DWR) C^U 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: Repair from hurricane damage 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)? r Yes r No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? r Yes r No r WA - project disturbs < 1 acre Comments: Multiple sites, repair from hurricane damage G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPAUSEPA)? * r Yes r No Comments:* NRCS approved CPA 52 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15ANCAC 21-1.0500), Isolated Wetland Rules (15A NCAC 21-1.1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Channel repair and restoration following Hurricane Florence 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No What Federal Agency is involved? USDA-NRCS 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No r Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Critical Habitat for Threatened or Endangered Species online map Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Historic Preservation Office 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: Flood study is being prepared, flood elevation is controlled by Sanford Dam. The proposed work within this project will not alter flood elevations 8c. What source(s) did you use to make the floodplain determination?* FRIS Miscellaneous Comments Miscellaneous attachments not previously requested. Signature * W By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Jonathan D. Hinkle Signature ,37AWAV,O� 47, /-0-.S Date 3/1/2021 v AGENT AUTHORIZATION FORM The City of Boiling Spring Lakes does hereby authorize, Jonathan Hinkle, PE of LDSI to act on its behalf and take all actions necessary for processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. This authorization is for the project entitled USDA – NRCS – Hurricane Florence EWP Assistance. City Contact Information: Address: 9 East Boiling Springs Road Southport NC 28461 Phone Number: 910.363.0025 Email: jrepp@cityofbsl.org LDSI Contact: Address: 1308 HWY 258 N Kinston NC 28504 Phone Number: 910.663.4123 Email: jhinkle@ldsi-inc.com Signed: Jeff Repp City Manager Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS,FAO, NPS, NRCAN, GeoBase, IGN , Kadaster NL, Ordnance Survey, Esri Japan,METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GISUser Community M A P T I T L EMAP L O C A T I O N M A P T Y P E ® Path: Date: 2/9/2021201 West 29th StreetCharlotte, NC 28206704.337.8329www.ldsi-inc.com 1 "=2,556 ' PR OJECT 19 2 PR OJECT 08 1 PR OJECT 19 1 PR OJECT 08 4 PR OJECT 08 2 PR OJECT 08 5 PR OJECT 08 3 PR OJECT 19 0 M A P T I T L EMAP L O C A T I O N M A P T Y P E ® Path: Date: 2/9/2021201 West 29th StreetCharlotte, NC 28206704.337.8329www.ldsi-inc.com 1 "=2,556 ' PR OJECT 19 2 PR OJECT 08 1 PR OJECT 19 1 PR OJECT 08 4 PR OJECT 08 2 PR OJECT 08 5 PR OJECT 08 3 PR OJECT 19 0 Legend BDC BaB CT DO Fo GoA KrB Lo Ly Ma Mk Mu Pn Ra To W DWR Pre-Fil ing Meeting Req u est Form Contact Name * Contact Email Addre ss * Proje ct Owne r * Proje ct Name * Proje ct County * Owne r Addre ss:* Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* Please give a couple of dates you are available for a meeting. JonathanHinkle jhinkle@ldsi-inc.com City of Boiling Spring Lakes USDA - NRCS - Hurricane Florence EWP Assistance Brunswick City Southport State / Province / Region NC Postal / Zip Code 28461 Country Burnswick Street Address 9 East Boiling Spring Road Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No This project is an NRCS Emergency Watershed Protection Project that falls under 7 CFR Part 624. The project includes debris removal, bank stabilization, stream restoration, pond perm stabilization across eight (8) sites within Boiling Spring Lakes. All eight sites should experience positive environmental effects via water quality enhancements, repair bank failures, and stabilize currently eroding banks. Additional construction shall be done in a manner which avoids and minimizes adverse effects to the Waters of the United States. 2/3/2021 Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature * Submittal Date 2/4/2021 2/5/2021 2/10/2021 2/11/2021 BOILING SPRING LAKES HURRICANE FLORENCE EWP - ENGINEERING ASSISTANCE.pdf 45.18MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an application. 1/29/2021 © 2020 Microsoft Corporation © 2020 HERE No.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:NOT FORCONSTRUCTIONSEALNo.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:NOT FORCONSTRUCTIONSEALHURRICANE FLORENCE EWP - ENGINEERING ASSISTANCEISSUE FOR REVIEW & PERMITTING DRAWINGS FOR HURRICANE FLORENCE EWP - ENGINEERING ASSISTANCE PREPARED BY LDSI, INC FOR THE CITY OF BOILING SPRING LAKES LOCATION MAP NTS. PROJECT DESCRIPTION: THIS PROJECT IS AN NRCS EMERGENCY WATERSHED PROTECTION PROJECT THAT FALLS UNDER 7 CFR PART 624. THE PROJECT INCLUDES DEBRIS REMOVAL, BANK STABILIZATION, STREAM RESTORATION, AND POND BERM STABILIZATION ACROSS EIGHT (8) SITES WITHIN BOILING SPRING LAKES. ALL EIGHT SITES SHOULD EXPERIENCE POSITIVE ENVIRONMENTAL EFFECTS VIA WATER QUALITY ENHANCEMENTS, AND BANK STABILIZATION. ADDITIONAL CONSTRUCTION SHALL BE DONE IN A MANNER THAT AVOIDS AND MINIMIZES ADVERSE EFFECTS TO THE WATERS OF THE UNITED STATES. BRUNSWICK COUNTYSUE GISSU R V EYIN G GNIREENIGN E CHARLOTTE OFFICE: 201 WEST 29TH STREET CHARLOTTE NC 28206 KINSTON OFFICE: 1308 HIGHWAY 258 KINSTON NC 28504 PHONE: 704.337.8329 | FAX: 704.308.3153 WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-1925 PROJECT SITE PROPERTY LOCATION LAT: 35° 01' 37.60"N"; LONG: 78° 04' 28.70"W. BRUNSWICK COUNTY, NORTH CAROLINA JDH NAEJDHJDH2020/06/25G:\2019\4519049\09-construction drawings\09a - working drawings\GENERAL.dwg, 3/1/2021 8:33:48 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCEGENERAL NOTES 12 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925GENERAL PROJECT SPECIFICATION AND NOTES 1. DEFINITIONS: 1.1. CONSTRUCTION DOCUMENTS: THE CONTRACT AND APPLICABLE PLAN SHEET(S), DETAILS, SPECIFICATIONS, PERMIT(S), AND/OR ANY OTHER DOCUMENTS (MEETING MINUTES, PUNCH LISTS, BID TABS, ETC.) FOR COMPLETE INFORMATION ABOUT THE REQUIRED WORK. ANY ONE OF THESE PARTS MAY NOT CONTAIN ALL OF THE INFORMATION REQUIRED TO COMPLETE THE PROJECT WORK. 1.2. PROJECT OWNER:CITY OF BOILING SPRING LAKES 1.3. ENGINEER: LDSI 2. THE WORK ON THIS PROJECT SHALL ADHERE TO THE FOLLOWING SPECIFICATIONS, STANDARDS AND/OR REGULATIONS: 2.1. NC DEQ'S "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (2013) 2.2. NC DOT'S "2018 STANDARD PROVISIONS" 2.3. NC DOT'S "2018 SPECIFICATIONS AND SPECIAL PROVISIONS" 2.4. UNITED STATES ARMY CORPS OF ENGINEERS NATIONWIDE PERMIT NUMBER 37 2.5. THE CONSTRUCTION DOCUMENTS STREAM RESTORATION SPECIFICATIONS AND NOTES 3. NOT ALL EXISTING UTILITIES ARE SHOWN. SOME LOCATIONS MAY BE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY LOCATION AND COORDINATION. ANY UTILITIES SHOWN ON THE CONSTRUCTION DOCUMENTS ARE FOR INFORMATIONAL PURPOSES ONLY AND IN NO WAY RELIEVES THE CONTRACTOR FROM COORDINATING, VERIFYING AND PROTECTING EXISTING UTILITIES. THE CONTRACTOR SHALL ADHERE TO THE PROVISIONS OF THE 1985 UNDERGROUND DAMAGE PREVENTION ACT, NORTH CAROLINA GENERAL STATUTES 887, CHAPTER 785, SENATE BILL 168, ARTICLE 3. TO ASSIST THE CONTRACTOR AND UTILITY OWNERS IN MEETING THE REQUIREMENTS OF THIS LAW, THERE IS A "ONE-CALL SYSTEM" CALLED "NC ONECALL." MOST MAJOR UTILITIES WITH UNDERGROUND FACILITIES IN THE STATE SUBSCRIBE TO THIS SERVICE. 4. CONTRACTOR SHALL COORDINATE WITH LANDOWNER'S CONTRACTOR FOR UTILITY COORDINATION AND DELIVERY/TRAFFIC SCHEDULING. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. 5. THE CONTRACTOR IS RESPONSIBLE FOR THE PROJECT AREA UNTIL COMPLETION AND FINAL ACCEPTANCE BY THE CITY. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY AND SHALL BEAR ALL RISK OF LOSS OR DAMAGE. THE CONTRACTOR WILL FURNISH ALL NECESSARY EQUIPMENT, TOOLS, LABOR, TRANSPORTATION, AND SUPERVISION TO COMPLETE THE WORK ACCORDING TO THESE SPECIFICATIONS AND APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. THE CONTRACTOR SHALL CONFINE ALL ACTIVITIES, INCLUDING EQUIPMENT STORAGE, TO THE LIMITS OF DISTURBANCE, STAGING AREAS, AND DESIGNATED CONSTRUCTION ACCESS POINTS. 6. THE MANNER IN WHICH THE CONTRACTOR DEALS WITH PEOPLE AND THEIR PROPERTIES WHILE PERFORMING THIS WORK IS EXTREMELY IMPORTANT TO THE CITY. THEREFORE, THE CONTRACTOR AND THE CONTRACTOR'S REPRESENTATIVES SHALL MANIFEST A SPIRIT OF FRIENDLINESS AND COOPERATION WHEN DEALING WITH PROPERTY OWNERS AND THE GENERAL PUBLIC WHILE PERFORMING WORK UNDER THIS SPECIFICATION. 7. EXTREME CARE AND DILIGENCE SHALL BE EXERCISED BY THE CONTRACTOR TO ASSURE THE SAFETY OF PERSONS, ANIMALS, AND PROPERTY. IF AT ANY TIME THE CITY OR ENGINEER DETERMINES THAT THE CONTRACTOR'S METHODS OR EQUIPMENT ARE INADEQUATE FOR SECURING THE SAFETY OF THE CONTRACTOR'S EMPLOYEES OR THE PUBLIC, THE DESIGNATED REPRESENTATIVE MAY DIRECT THE CONTRACTOR TO TAKE SPECIFIC ACTIONS TO ENSURE SAFETY. THE CONTRACTOR SHALL IMPROVE METHODS AS DEEMED APPROPRIATE BY THE DESIGNATED REPRESENTATIVE WITHOUT ADDITIONAL COST TO THE CITY, SO AS TO ASSURE COMPLIANCE WITH SAFETY CONCERNS. FAILURE OF THE DESIGNATED REPRESENTATIVE TO MAKE THIS DEMAND SHALL NOT RELIEVE THE CONTRACTOR OF ANY OBLIGATION TO ENSURE THE SAFE CONDUCT OF ITS WORK. 8. THE CONTRACTOR SHALL MAINTAIN ALL LIGHTS, GUARDS, SIGNS, TEMPORARY PASSAGES, OR OTHER PRECAUTIONS NECESSARY FOR THE SAFETY OF ALL PERSONS. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY RULES AND CONSTRUCTION CONDITIONS REQUIRED BY GOVERNMENTAL AUTHORITIES AND OTHER ENTITIES, INCLUDING RAILROADS, SO THE PUBLIC IS SAFEGUARDED FROM ACCIDENTS AND DELAYS. GUARDS AND FLAGS REQUIRED BY GOVERNMENTAL OR RAILROAD AUTHORITIES SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE, UNLESS DIRECTED OTHERWISE BY THE DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL AT NO TIME COMPROMISE EITHER SAFETY OR ENVIRONMENTAL REQUIREMENTS. 9. CONTRACTOR SHALL FIELD VERIFY ALL SURVEY CONTROL POINTS WITHIN THREE (3) WEEKS OF RECEIPT OF THE NOTICE TO PROCEED. CONTRACTOR SHALL CONTACT PROJECT ENGINEER WITHIN FOUR (4) WEEKS OF RECEIPT OF NOTICE TO PROCEED WITH ANY CONTROL POINT DISCREPANCIES, AFTER SUCH TIME HAS PASSED IT WILL BE THE ASSUMPTION THAT ALL CONTROL POINTS AS SHOWN ON THE PLANS ARE IN GOOD STANDING AND CONTRACTOR AGREES WITH PUBLISHED COORDINATES. 10. SEE SHEETS 5-12 FOR DETAILED EROSION AND SEDIMENTATION CONTROL PLAN, SEQUENCE AND DETAILS. 11. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY THE CITY AND ENGINEER PRIOR TO USE. 12. NO FILL IN WETLANDS MAY OCCUR. ALL EXCESS SOILS FROM STREAM STABILIZATION AND CHANNEL WORK SHALL BE DISPOSED OF IN OLD STREAM CHANNEL TO OTHER AREAS APPROVED BY THE CITY AND ENGINEER. 13. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY AND WORK WEEK. 14. MATERIAL SHALL BE SUITABLE SOIL OBTAINED FROM THE EXCAVATION OF ALL PROJECT COMPONENTS AS SHOWN ON THE CONSTRUCTION DRAWINGS AND/OR BORROW AREA. BORROW AREA SHALL BE APPROVED BY PROJECT ENGINEER PRIOR TO USE, NO ADDITIONAL COMPENSATION WOULD BE GIVEN FOR BORROW AREA. NOR WOULD ANY ADDITIONAL FUNDS BE GIVEN FOR HAULING, BORROWING, REMEDIATION, OR STABILIZING AFOREMENTIONED BORROW AREA. 15. MAINTAIN, RELOCATE OR REPLACE EXISTING SURVEY MONUMENTS, CONTROL POINTS AND STAKES WHICH ARE DISTURBED OR DESTROYED. PERFORM THE WORK TO PRODUCE THE SAME LEVEL OF ACCURACY AS THE ORIGINAL MONUMENT(S) IN A TIMELY MANNER AND AT THE CONTRACTORS EXPENSE. 16. EXISTING TOPOGRAPHY, STRUCTURES AND SITE FEATURES ARE SHOWN SCREENED AND/OR LIGHT-LINED . NEW FINISHED GRADE, STRUCTURES AND SITE FEATURES ARE SHOWN AS HEAVY-LINED. 17. ELEVATIONS GIVEN ARE TO SETTLED GRADE UNLESS OTHERWISE SHOWN 18. ALL SLOPES SHALL BE 5:1 OR FLATTER UNLESS OTHERWISE SPECIFIED. SLOPE UNIFORMLY BETWEEN CONTOURS AND SPOT ELEVATIONS SHOWN. 19. CONTRACTOR SHALL REMEDIATE ALL; HAUL ROADS, FARM PATHS AND OTHER ON FARM UTILITIES TO PRE-CONSTRUCTION OR BETTER CONDITION PRIOR TO DEMOBILIZATION. 20. ELECTRONIC SURVEY DATA, BASE DRAWINGS AND SITE DATA WERE CURATED BY LDSI. 21. HORIZONTAL DATUM IS NAD83(2011) & VERTICAL DATUM IS NAVD88. ALL COORDINATES ARE BASED ON NAD83(2011) AND ALL ELEVATIONS ARE BASED ON NAVD88. 22. EXISTING GROUND SURFACES ARE BASED ON A SURVEY COMPLETED IN MAY 2019. SOME CHANGES MAY HAVE OCCURRED SINCE THE SURVEY WAS COMPLETED, PARTICULARLY IN AREAS EXPERIENCING CHANNEL DEGRADATION AND BANK EROSION. 23. ALL ELEVATION DATA SHALL BE FIELD VERIFIED BY THE CONTRACTOR AND THEN COORDINATED WITH THE ENGINEER. THESE PLANS WERE PREPARED WITH THE FIELD INFORMATION AT THE TIME OF PROJECT SURVEY. IT IS POSSIBLE THAT FIELD CONDITIONS AT THE TIME OF CONSTRUCTION VARY FROM THESE PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY FIELD CONDITIONS SUCH AS ELEVATIONS, DEPTHS, ETC PRIOR TO PROCEEDING WITH WORK. SURVEY DATA COLLECTION WAS VERY SPARSE DUE TO FIELD CONDITIONS, THEREFORE, ALL ELEVATIONS SHOULD BE CHECKED IN THE FIELD BY CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT PROJECT ENGINEER IMMEDIATELY UPON DISCOVERING ELEVATIONS WHICH ARE DIFFERENT THAN THOSE SHOWN ON THE PLANS. 24. THE PROPOSED ELEVATIONS AND GRADES SHOWN HEREIN ARE BASED ON THE LDSI SURVEY THAT ENCOMPASSES THE EXISTING GROUND SURFACE FROM WHICH ALL COMPUTATIONS OF CUT AND FILL ARE BASED. SLIGHT DISCREPANCIES BETWEEN THE EXITING GROUND AND DIGITAL SURFACE AND FIELD CONDITIONS CAN RESULT IN VARIATIONS OF TOTAL EXCAVATED QUANTITIES. THUS, QUANTITIES OF MATERIAL EXCAVATED SHOULD BE COMPARED TO THOSE SHOWN ON THE PLANSHEETS TO MANAGE THE MOVEMENT OF MATERIAL ACROSS THE SITE. 25. THE INTENT OF THE CHANNEL AND FLOODPLAIN GRADING PLAN IS TO MAINTAIN A "LIVE SURFACE" THAT CAN BE ADJUSTED QUICKLY DURING CONSTRUCTION AND INCORPORATED INTO A 3D SURFACE FOR CONSTRUCTION USING SURVEY GRADE GPS EQUIPMENT. 26. FIELD CONDITIONS AND PROJECT VARIABILITY MAY REQUIRE ADAPTATION OF THE PLANSHEETS AND/OR DETAILS PROVIDED IN THE CONSTRUCTION DOCUMENTS DEPENDING ON SITE CONDITIONS OR PROJECT NEEDS. MINOR VARIATION(S) OR ADAPTATION(S) OF THE PROPOSED WORK SHOWN ON THE PLANSHEETS AND/OR DETAILS ARE CONSIDERED INCIDENTAL TO THE WORK. 27. WHERE PRACTICABLE, EXISTING TREES AND VEGETATION SHOULD BE LEFT IN PLACE TO FACILITATE NATURAL REGENERATION AND SOIL STABILIZATION. 28. THE CONTRACTOR SHALL STAKE OUT THE PROPOSED STREAM CENTERLINE IN APPROXIMATELY 500 FT SECTIONS USING SURVEY GRADE GPS EQUIPMENT FOR REVIEW BY THE ENGINEER BEFORE BEGINNING EXCAVATION AND GRADING. DEPENDING ON ENCOUNTERED CONDITIONS SOME SHIFTING OF THE STREAM ALIGNMENT MAY BE NECESSARY. STAKING MAY BE OMITTED FOR PORTIONS OF THE STREAM WHEN SURVEY-GRADE GPS IS USED TO CONSTRUCT THE CHANNEL. 29. PRIOR TO CLEARING AND GRUBBING, THE CONTRACTOR SHALL MARK THE LIMITS OF CLEARING NEAR TREES FOR VERIFICATION OF INTENT BY THE ENGINEER. SOME MINOR ADJUSTMENT OF CHANNEL ALIGNMENT MAY BE REQUIRED TO PRESERVE TREES OR MINIMIZE IMPACT TO TREES. 30. ANY HARVESTING OF TREES FROM ONSITE MUST BE APPROVED BY THE ENGINEER. 31. CONTRACTOR SHALL MINIMIZE, TO THE MAXIMUM EXTENT POSSIBLE, IMPACTS TO THE ADJACENT TREES. 32. CONSTRUCTION EQUIPMENT TRACKS AND ACCESS PATHS SHALL BE GRADED AND RE-CONTOURED AFTER CONSTRUCTION TO PREVENT RILL AND GULLY EROSION. 33. CONTRACTOR SHALL USE AN EXCAVATOR WITH A HYDRAULIC THUMB TO INSTALL IN-STREAM STRUCTURES. 34. ELEVATIONS OF TRIBUTARIES AT CONFLUENCES MAY NEED TO BE ADJUSTED TO MEET CONSTRUCTED CONDITIONS. ADJUSTMENTS SHALL BE MADE IN CONJUNCTION WITH THE ENGINEER. 35. PROFILES MAY NEED TO BE ADJUSTED TO AVOID ABRUPT CHANGES IN ELEVATION. ADJUSTMENTS SHALL BE MADE IN CONJUNCTION WITH THE ENGINEER. 36. CHANNEL REALIGNMENT WORK SHALL BE COMPLETED AND STABILIZED PRIOR TO ALLOWING FLOW TO ENTER INTO THE NEWLY CONSTRUCTED STREAM CHANNEL. THE CONTRACTOR SHALL NOT OPEN UP MORE THAN 200 FEET OF CHANNEL WITHOUT EROSION CONTROL MATTING IN PLACE OR BY APPROVAL OF THE ENGINEER. IF THE CHANNEL REALIGNMENT WORK IS NOT COMPLETED PRIOR TO ABANDONING THE OLD CHANNEL, A TEMPORARY SYSTEM SHALL BE USED ACCORDING THE APPROVED E&SC PLAN AND DETAIL. IN-LINE CHANNEL WORK SHALL UTILIZE THE TEMPORARY PUMP AROUND SYSTEM AT ALL TIMES. 37. BANKFULL CHANNEL DIMENSIONS WILL BE HELD TO THE DIMENSIONS SHOWN ON THE TYPICAL CROSS-SECTION PLANSHEETS. ELEVATIONS SHALL BE CONSTRUCTED WITHIN 0.1' (VERTICAL). WIDTHS AND DEPTHS MUST FALL WITHIN RANGES SHOWN IN THE PLANSHEETS. CHANNEL CROSS-SECTION DIMENSIONS SHALL BE WITHIN 0.2' (HORIZONTAL). 38. IF THE EXISTING GROUND IS LESS THAN 0.2' HIGHER THAN THE PROPOSED BANKFULL ELEVATION, IT IS NOT NECESSARY TO EXCAVATE TO THE PROPOSED ELEVATIONS AND GRADES IN THE CONSTRUCTION DOCUMENTS. 39. IN-STREAM STRUCTURES SHALL BE INSTALLED AS THE CHANNEL IS BEING CONSTRUCTED. IN-STREAM STRUCTURES SHALL BE FINISHED TO A SMOOTH SURFACE IN ACCORDANCE WITH THE LINES, GRADES AND ELEVATIONS SHOWN IN THE CONSTRUCTION DOCUMENTS. THE FINISHED STRUCTURE SLOPES AND PROFILE ELEVATIONS SHALL BE WITHIN 0.1' (VERTICAL) OF THE CONSTRUCTION DOCUMENTS. 40. WOOD AND ROCK STRUCTURES MAY BE SUBSTITUTED TO FIT FIELD CONDITIONS AND AVAILABLE MATERIALS. 41. COIR LOG TOE PROTECTION MAY BE UTILIZED WHERE ADDITIONAL BANK REVETMENT IS NEEDED OR SUBSTITUTED FOR TOE WOOD REVETMENT. 42. FILTER FABRIC SHALL BE USED BENEATH ALL ROCK ARMORING AND WITH SPECIFIED STREAM AND STORMWATER STRUCTURES. ALL FILTER FABRIC SHALL BE 8OZ. NON-WOVEN GEOTEXTILE UNLESS OTHERWISE SPECIFIED IN STRUCTURE DETAILS OR SPECIFICATIONS. FILTER FABRIC SHALL BE TRIMMED TIGHT TO THE SURFACE OF THE STRUCTURE AND SHOULD NOT BE OBSERVED BY VISUAL INSPECTION. 43. LOG STRUCTURES SHALL BE CONSTRUCTED FROM LOGS THAT ARE INTACT, WITH BRANCHES TRIMMED AND IN NON-DECOMPOSED CONDITION AND APPROVED BY ENGINEER. 44. AFTER THE STRUCTURE IS COMPLETE AND FLOW IS RESTORED TO THE CHANNEL, SOME ADJUSTMENT TO THE STRUCTURE OR ADDITIONAL STABILIZATION MEASURE MAY BE NECESSARY TO ACHIEVE THE DESIRED FUNCTION. 45. THE CONSTRUCTED CHANNEL SHALL BE STABILIZED AS SOON AS POSSIBLE BY TEMPORARY AND PERMANENT SEEDING, ADDING STRAW MULCH TO BARE SOIL AND INSTALLING EROSION CONTROL MATTING FROM THE TOE OF THE BANKFULL CHANNEL TO 4' BEYOND THE BANKFULL STAGE. PRIOR TO INSTALLING THE EROSION CONTROL MATTING, PREPARE THE SOIL SURFACE BY LOOSENING 3 -6" OF SOIL OR APPLYING 3 - 6" OF TOPSOIL TO THE PROPOSED ELEVATIONS AND APPLY SEED AND THEN STRAW MULCH. SEED SHALL BE BROADCAST EVENLY OF THE AREA USING A BROADCAST SPREADER PRIOR TO COVERING WITH THE EROSION CONTROL MATTING. THE MATTING SHALL BE ROLLED OUT IN THE DIRECTION OF ANTICIPATED RUNOFF FLOW. INSTALL MATTING IN ACCORDANCE WITH THE DETAIL INCLUDED IN THE CONSTRUCTION DOCUMENTS. REWORKING OF AREAS THAT DO NOT ESTABLISH VEGETATION OR BECOME UNSTABLE SHALL BE NECESSARY IF THE MATTING SEPARATES FROM THE SOIL. 46. IF THE TIMING OF CONSTRUCTION IS SUCH THAT PERMANENT RIPARIAN SEED CANNOT BE PLACED UNTIL THE FALL OR WINTER, THEN THE CONTRACTOR SHALL SEED WITH TEMPORARY SUMMER COVER (MILLET - UROCHLOA RAMOSA) AND RETURN THE FOLLOWING SPRING TO INSTALL THE PERMANENT RIPARIAN SEED. 47. THE HARVESTING AND INSTALLATION OF LIVE STAKES SHALL BE PREFORMED ONLY DURING THE DORMANT SEASON, TYPICALLY BETWEEN DECEMBER 1 AND MARCH 1. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 7 DAYS PRIOR TO HARVESTING TO REVIEW AND APPROVE ALL HARVESTING SITES AND SPECIES. 48. LIVE STAKES SHALL BE INSTALLED ALONG THE TOE OF SLOPE ON OUTSIDE MEANDER BENDS OF POOLS AND IN RIFFLES WHERE SHOWN ON THE RE-VEGETATION PLAN. LIVE STAKES SHALL BE INSTALLED THROUGH THE EROSION CONTROL MATTING TO A DEPTH THAT REACHES THE WATER TABLE. QUANTITIES AND MATERIALS SPECIFICATIONS 53. CONTRACTOR SHALL SPREAD EXCESS SPOIL ACROSS FIELD AREAS AND PROVIDE DRAINAGE TO SWALES ALONG DRIVEWAY 54. TOPSOIL SHALL BE REMOVED FROM EXCAVATION AND FILL AREAS PRIOR EXCAVATION AND GRADING AND RE-APPLIED TO AREAS AFTER ROUGH GRADING IS COMPLETE. 2 - 4" OF TOPSOIL SHALL BE PLACED ON DISTURBED AREAS TO THE ELEVATIONS AND GRADES INCLUDED IN THE CONSTRUCTION DOCUMENTS. 55. FILL AREAS SHALL BE SEEDED WITH TEMPORARY VEGETATION WITHIN 14 DAYS OF GRADING. THE PLACEMENT OF STRAW MULCH SHALL OCCUR WITHIN 48 HOURS OF SEEDING. MULCH SHALL BE SPREAD TO COVER DISTURBED CHANNEL AND FLOODPLAIN AREAS. MULCH SHALL BE KEPT OUT OF THE CROWNS OF SHRUBS AND GROUND COVER. 56. THE CONTRACTOR SHALL FURNISH ALL MATERIALS NECESSARY TO COMPLETE THE PROPOSED WORK UNLESS OTHER PROVISIONS HAVE BEEN AGREED UPON PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL DELIVER ALL MATERIALS TO THE DESIGNATED ACCESS POINTS AND STAGING AREAS OR TO A LOCATION SPECIFIED BY CONSTRUCTION DOCUMENTS. MATERIAL QUANTITIES, DIMENSIONS AND SIZES SHALL CONFORM TO THE NOTES AND SPECIFICATIONS PROVIDED IN THE CONSTRUCTION DOCUMENTS OR ON THE QUANTITIES AND MATERIALS LIST. THE ENGINEER MAY INSPECT AND APPROVE ALL MATERIALS PRIOR TO CONSTRUCTION. IF MATERIALS DO NOT MEET THE MINIMUM REQUIREMENTS SPECIFIED IN THE CONSTRUCTION DOCUMENTS, THE ENGINEER SHALL REJECT THE MATERIALS. 57. COSTS INCURRED DUE TO PROJECT DELAYS RESULTING FROM FAILURE OF THE CONTRACTOR TO MEET THE REQUIREMENTS OF THE GENERAL SPECIFICATIONS, CONSTRUCTION DOCUMENTS, OR CONSTRUCTION SPECIFICATIONS, SHALL BE THE EXPENSE OF THE CONTRACTOR. QUANTITIES LISTED ARE ESTIMATES ONLY AND SHALL BE CONFIRMED BY THE CONTRACTOR. 58. THE EROSION CONTROL MEASURES DEPICTED ON THE PLANS ARE TO BE INSTALLED AS NEEDED TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. ADDITIONAL EROSION CONTROL MEASURES (ABOVE THOSE SHOWN ON THE PLANS AND ON THE QUANTITIES AND MATERIALS LIST) MAY BE REQUIRED IN ORDER TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER AND THE CITY PRIOR TO INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES. 59. ANY ADDITIONAL GRADING OTHER THAN WHAT IS SHOWN ON THE PLANS SHALL REQUIRE PRIOR APPROVAL FROM THE ENGINEER. ANY ADDITIONAL AREAS OF DISTURBANCE (CHANGES IN ACCESS, GRADING, CLEARING, ETC.) WILL REQUIRE APPROVAL FROM THE ENGINEER AND THE CITY. 60. THE USE OF ANY BRAND NAMES/MANUFACTURERS OR MODELS IS INTENDED SOLELY TO DENOTE THE QUALITY STANDARD OF THE DESIRED PRODUCT. ANY USE OF BRAND NAMES IS NOT INTENDED TO RESTRICT BIDDERS TO A SPECIFIC BRAND, MAKE, MANUFACTURER, OR NAME. THE BRAND NAMES / MANUFACTURERS OF MODELS ARE INTENDED TO CONVEY THE GENERAL STYLE, TYPE, CHARACTER, AND QUALITY OF PRODUCT. EQUIVALENT PRODUCTS WILL BE ACCEPTABLE IF THE PROJECT OWNER OR ENGINEER HAS GIVEN APPROVAL OF THE SPECIFIC PRODUCT IN WRITING. 61. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING STORAGE AREAS FOR CONSTRUCTION MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT STORAGE SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS AND ALL LOCAL, STATE AND FEDERAL REGULATIONS THROUGHOUT THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL RESTORE THE STORAGE AREA TO ITS ORIGINAL (OR BETTER) CONDITION UPON COMPLETION OF THE PROJECT OR UPON SUCH TIME AS DIRECTED BY THE CITY OR ENGINEER. SUCH RESTORATION SHALL BE AT NO ADDITIONAL COST TO THE CITY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEGUARDING OF MATERIALS AND EQUIPMENT AGAINST FIRE, THEFT AND VANDALISM AND SHALL NOT HOLD THE CITY RESPONSIBLE IN ANY WAY FOR THE OCCURRENCES OF SAME. FOR MATERIALS AND EQUIPMENT STORAGE AREAS THE CONTRACTOR SHALL FURNISH AND ERECT, AT NO ADDITIONAL COST, WHATEVER WORKS MAY BE NECESSARY FOR THE PROTECTION OF THE PUBLIC, INCLUDING BUT NOT LIMITED TO BARRICADES, FENCES, ETC. PRIOR TO FINAL PAYMENT BEING MADE, THE CONTRACTOR SHALL OBTAIN A RELEASE FROM THE PROPERTY OWNER OF THE STORAGE AREA UTILIZED FOR THE PROJECT. 62. THE CONTRACTOR SHALL ESTABLISH, PROVIDE AND MAINTAIN AN EFFECTIVE QUALITY CONTROL PROGRAM THAT DETAILS THE METHODS AND PROCEDURES TO BE TAKEN TO ENSURE THAT ALL MATERIALS AND COMPLETED WORK, REQUIRED FOR THE PROJECT, CONFORM TO THE CONSTRUCTION DOCUMENTS. ALTHOUGH GUIDELINES ARE ESTABLISHED AND CERTAIN MINIMUM REQUIREMENTS ARE SPECIFIED HEREIN AND ELSEWHERE IN THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR IS FULLY RESPONSIBLE FOR DEVELOPING AND EXECUTING THEIR OWN QUALITY CONTROL PROGRAM. THE CONTRACTOR SHALL PERFORM INSPECTION, TESTING, AND MEASUREMENT OF ALL ITEMS OF WORK REQUIRED BY THE CONSTRUCTION DOCUMENTS AND TECHNICAL SPECIFICATIONS, INCLUDING THOSE PERFORMED BY SUBCONTRACTORS. REVIEW OF THE MATERIALS AND COMPLETED WORK BY THE CITY OR ENGINEER DOES NOT RELIEVE THE CONTRACTOR OF PERFORMING QUALITY CONTROL INSPECTIONS/REVIEW OF THE CONTRACTOR'S AND/OR SUBCONTRACTOR'S WORK. 63. THE CONTRACTOR SHALL WARRANTY ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE OF BY THE TOWN AND SHALL REPLACE ANY PORTIONS THAT FAIL DUE TO FAULTY MATERIALS OR WORKMANSHIP, AT NO ADDITIONAL COST TO THE THE CITY. A SIX (6) MONTH AND ELEVEN (11) MONTH INSPECTION WILL BE PERFORMED DURING THE WARRANTY PERIOD. THE CONTRACTOR SHALL IMMEDIATELY REPAIR ALL ITEMS DETERMINED BY THE PROJECT OWNER OR AUTHORIZED REPRESENTATIVE TO BE DEFECTIVE UPON NOTIFICATION. THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE FAILED ITEMS UPON NOTIFICATION BY DEQ/DWR. SEASONALLY INSTALLED ITEMS SHALL BE REPAIRED OR REPLACED DURING THE NEXT AVAILABLE INSTALLATION PERIOD. ITEMS REPAIRED OR REPLACED UNDER THIS PROVISION SHALL HAVE AN ADDITIONAL ONE (1) YEAR WARRANTY PERIOD FROM THE NEW DATE OF ACCEPTANCE. AREAS AND/OR OTHER WORK DISTURBED WHILE ACCESSING AND/OR REPAIRING/REPLACING WARRANTY COVERED ITEMS SHALL BE STABILIZED. LEGEND WRP SOIL BORING TEST HOLE LOCATION 5:1 TF TFTFTF2.35 150 SLOPE SPOT ELEVATION PROPOSED CONTOUR LINE EMBANKMENT AND SLOPE DRAINAGEWAY OR DITCH BENCHMARK BRUSH/TREE LINE WETLAND RESERVE PROGRAM CONSERVATION EASEMENT LIMITS CENTER LINE, BUILDING, ROAD, ETC. N 1000.00 E 1000.00 STRUCTURE, BUILDING OR FACILITY LOCATION POINT- COORDINATES DRAINAGE OR DITCH FLOW DIRECTION LIMITS OF DISTURBANCELOD LOD SILT FENCESF SF 250 EXISTING CONTOUR LINE TREE PROTECTION FENCING OVERHEAD ELECTRICAL LINEOHE OHE WRE WETLAND RESERVE EASEMENT LIMITS TH 0+0012.810.17STATION PROPOSED ELEVATION EXISTING ELEVATION PROFILE PROPOSED FILL GRADE LAYDOWN AREA ALIGNMENT CURVE MARKER ALIGNMENT LINE MARKER TURBIDITY CURTAIN XX-LS-1 XX-LV-1 XX-CV-1 XX-RW-1 LOG SILL LOG VANE LOG CROSS VANE ROOT WAD L1 C1 XX-VD-1 LOG V-DROP GENERALISSUED FOR: REVIEW & PERMITTING XX-TW-1 TOE WOOD CONSTRUCTION FENCECF CF G:\2019\4519049\09-construction drawings\09a - working drawings\GENERAL.dwg, 3/1/2021 8:34:08 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCEGENERAL NOTES 23 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Site Area Description (a) Perimeter dikes, swales, ditches, and perimeter slopes (b) High Quality Water (HQW) Zones (c) Slopes steeper than 3:1 7 7 7 Timeframe variations None None (d) Slopes 3:1 to 4:1 14 (e) Areas with slopes flatter than 4:1 14 GROUND STABILIZATION SPECIFICATION PAINT AND OTHER LIQUID WASTE PORTABLE TOILETS EARTHEN STOCKPILE MANAGEMENT POLYACRYLAMIDES (PAMS) AND FLOCCULANTS HERBICIDES, PESTICIDES AND RODENTICIDES HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on-site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Do not discharge concrete or cement slurry from the site. Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Stabilize within this many calendar days after ceasing land disturbance If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm eventsor provide secondary containment. Repair or replace damaged wastecontainers. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. 1. Show stockpile locations on plans. Locate earthen-material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. 3. Provide stable stone access point when feasible. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 3. Contain liquid wastes in a controlled area. 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 9. On business days, clean up and dispose of waste in designated waste containers. 8. Dispose waste off-site at an approved disposal facility. 6. Anchor all lightweight items in waste containers during times of high winds. 1. Never bury or burn waste. Place litter and debris in approved waste containers. 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. 5. Store flocculants in leak-proof containers that are kept under storm-resistant cover or surrounded by secondary containment structures. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. Temporary Stabilization Permanent Stabilization ·Temporary grass seed covered with straw or other mulches and tackifiers ·Hydroseeding ·Rolled erosion products with or without temporary grass seed ·Appropriately applied straw or other mulch ·Plastic sheeting ·Permanent grass seed covered with straw or other tackifiers ·Geotextile fabrics such as permanent soil reinforcement matting ·Hydroseeding ·Shrubs or other permanent plantings covered with mulch ·Uniform and evenly distributed ground cover sufficient to restrain erosion ·Structural methods such as concrete, asphalt or retaining walls ·Rolled erosion control products with grass seed STA = STATION BM = BENCHMARK TBM = TEMPORARY BENCHMARK IP = IRON PIN (FOUND OR SET) ELEV / EL= ELEVATION INV = INVERT ELEVATION H = HEIGHT HDPE = HIGH-DENSITY POLYETHYLENE LF = LINEAR FOOT MAX = MAXIMUM MIN = MINIMUM No. / # = NUMBER TOB = TOP OF BANK TOS = TOE OF SLOPE DBT = DITCH BOTTOM RCP = REINFORCED CONCRETE PIPE CMP = CORRUGATED METAL PIPE GALV = GALVANIZED CF = CONSTRUCTION FENCE SF = SILT FENCE LOD = LIMITS OF DISTURBANCE WRP = WETLAND RESERVE PROGRAM WRE = WETLAND RESERVE EASEMENT CONC = CONCRETE W/ = WITH Wo/ = WITHOUT NCDOT = NORTH CAROLINA DEPARTMENT OF TRANSPORTATION USDA = UNITED STATES DEPARTMENT OF AGRICULTURE LDSI = LDSI INC. S&WCD= SOIL AND WATER CONSERVATION DISCTRICT BH = SOIL BORE HOLE DBKF = DEPTH AT BANKFULL NTS = NOT TO SCALE WCS = WATER CONTROL STRUCTURE WTS = WATER TRANSFER STRUCTURE SL = SLOUGH PC = POINT OF CURVATURE PT = POINT OF TANGENT PVI = POINT OF VERTICAL INTERSECTION PVE = POINT OF VERTICAL INTERSECTION EL R 20 = RADIUS OF 20.0' TYP. = TYPICAL ESMT = EASEMENT I.D. = INSIDE DIMENSION TH = SOIL BORING TEST HOLE MS = MAIN STEM LS = LOG SILL CL = COVER LOG LV = LOG VANE CV = LOG CROSS VANE RW = ROOT WAD HB = HABITAT STRUCTURE BMA = BRUSH MATTRESS LJ = LOG 'J' VANE LR = LOG ROLL LP = LEAF PACK RP = RIFFLE PLANTINGS BLDR = BOULDER LLDPE = LINEAR LOW-DENSITY POLYETHYLENE PVC = POLYVINYL CHLORIDE TC = TURBIDITY CURTAIN ABBREVIATIONS / ACRONYMS EQUIPMENT AND VEHICLE MAINTENANCE CONCRETE WASHOUTS GENERALISSUED FOR: REVIEW & PERMITTING G:\2019\4519049\09-construction drawings\09a - working drawings\GENERAL.dwg, 3/1/2021 8:34:22 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCEGENERAL NOTES 34 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925PART III PART IIISELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF-INSPECTION SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: · They are 25 gallons or more, · They are less than 25 gallons but cannot be cleaned up within 24 hours, · They cause sheen on surface waters (regardless of volume), or · They are within 100 feet of surface waters (regardless of volume). 2. Reporting Timeframes and Other Requirements NOTE: The rain inspection resets the required 7 calendar day inspection requirement. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically-available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard-copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] (a) This general permit as well as the certificate of coverage, after it is received. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site-specific exemption based on unique site conditions that make this requirement not practical: Self-inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self-inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. (b) Anticipated bypasses and unanticipated bypasses. (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. Inspect Frequency (during normal business hours Inspection records must include (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual-day rainfall information is available, record the cumulative rain measurement for those un-attended days (and this will determine of a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain-monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event ≥ 1.0 inch in 24 hours 1. Identification of measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken (3) Stormwater discharge outfalls (SDOs) At least once per 7 calendar days and within 24 hours of a rain event ≥ 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event ≥ 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event ≥ 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land-disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. Item to Document Documentation Requirements (a) Each E&SC Measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC Plan. Initial and date each E&SC Measure on a copy of the approved E&SC Plan or complete, date and sign an inspection report that lists each E&SC Measure shown on the approved E&SC Plan. This documentation is requires upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC Plan. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC Measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC Measures. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate the completion of the corrective action Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case-by-case basis. • If the stream is named on the NC 303(d) list as impaired for sediment related causes, the permitee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired-waters conditions. (b) Oil spills and release of hazardous substances per item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification • Within 7 calendar days, a report that includes an evaluation of the quality and efect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment [40 CFR 122.41(I)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6)]. • Division staff may waive the requirement for a written report on a case-by-case basis. GENERALISSUED FOR: REVIEW & PERMITTING G:\2019\4519049\09-construction drawings\09a - working drawings\GENERAL.dwg, 3/1/2021 8:34:33 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCEE&SC DETAILS5 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925NOTES: 1. CONTRACTOR SHALL SUBMIT DE-WATERING PLAN TO PROJECT ENGINEER TWO (2) WEEKS PRIOR TO COMMENCING WORK. 2. EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND / OR ISOLATED SECTIONS OF CHANNEL 3. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. 4. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE (1) WORK WEEK. A MAXIMUM OF 1000 FEET MAY BE DISTURBED AT ANY ONE TIME. 5. THE PUMP-AROUND PUMP SHOULD ADEQUATELY CONVEY A MINIMUM OF 450 GALLONS / MINUTE. 6. PERFORMANCE q=450 GPM ONLY. 7. DISCHARGE SHALL BE KEPT OUTSIDE OF WORK AREA SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND: 1. INSTALL STILLING BASIN AND STABILIZED OUTFALL USING CLASS A RIP-RAP AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK AREA TO THE STABILIZED OUTFALL. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND DEWATERING PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL ALSO BE PUMPED TO AN OUTFALL STABILIZED WITH CLASS A RIP-RAP. 5. THE CONTRACTOR WILL PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE PLANS AND FOLLOW THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. WHEN DEWATERING AREA, ALL DIRTY WATER MUST BE PUMPED THROUGH A SILT BAG. REMOVE IMPERVIOUS DIKES, PUMPS AND TEMPORARY FLEXIBLE HOSE / PIPING STARTING WIT THE DOWNSTREAM DIKE FIRST. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP-RAP AND IMPERVIOUS DIKES AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. FL O W FILTER FABRIC CLASS A STONE WORK AREA DEWATERING PUMP SILT BAG STABILIZED OUTFALL CLASS A STONE IMPERVIOUS DIKE IMPERVIOUS DIKE CLASS A STONE INTAKE HOSE (TYP) PUMP AROUND PUMP DISCHARGE HOSE (TYP) 8" CLASS A STONE FILTER FABRIC STABILIZED OUTFALL CLASS A STONE STREAM BED EXISTING GRADE DISCHARGE HOSE SILT BAG 15' TO 20' BAG 1' MIN.FLOWSTREAM BED STABILIZED OUTFALL CLASS A STONE FILTER FABRIC EXISTING GRADE SILT BAG FILTER FABRIC 8" CLASS A STONE STREAM DIVERSION PUMP AROUND DETAIL (NTS.) PUMP AROUND (NTS.) DEWATERING SECTION (NTS.) SECTION A-A (NTS.)AAIMPERVIOUS DIKE . DEAD TREES AND SCRUB OR INDER GROWTH SHALL BE CUT FLUSH WITH ADJACENT GRADE. NO GRUBBING ALLOWED UNDER DRIP LINE. TREE PROTECTION FENCE DETAIL (NTS.) NOTES: 1. REMOVE ALL BARRIERS UPON COMPLETION OF PROJECT. 2. SEDIMENT AND EROSION CONTROL PLAN SHALL SHOW THE LOCATION OF ALL TREE PROTECTION FENCES. 3. REFER TO PLANTING SPECIFICATION FOR PLANTING DIRECTION. ONE FOOT FOR EACH INCH OF TRUNK DIAMETER (DBH). 6 FT. MIN. WIDTH FOR 2 IN. CAL. TREES OR SMALLERPLAN VIEW OF ROOT ZONE (NTS.) FOR PRUNING SEE INTERNATIONAL SOCIETY OF ARBORICULTURE SPECIFICATIONS STEEL FILTER FABRIC SHALL BE IN ACCORDANCE WITH CONSTRUCTION SPECIFICATIONS 8' MAXIMUM SPACING WITH WIRE SUPPORT FENCE; 6' MAXIMUM SPACING WITHOUT WIRE SUPPORT FENCE ATTACH FILTER FABRIC SECURELY TO UPSTREAM SIDE OF POST NOTES: 1. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL 2. LETTERS TO BE 3 IN. MIN. CLEARLY LEGIBLE AND SPACED AS DETAILED. SEE LETTERING DETAIL FOR PROPER SIGNAGE. 3. SIGNS TO BE PLACED 200 FT. O.C. MAX. 4. SIGNS TO BE PLACED AT EACH END AND 200 FT. O.C. THEREAFTER. 5. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 6. MAINTAIN FENCE THROUGHOUT DURATION OF PROJECT. 7. FOR SAFETY FENCE SIGN AS FOLLOWS: TREE PROTECTION AREA - DO NOT ENTER. 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE 6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE 5' T- POST PLASTIC OR WIRE TIES (TYP.) 18" TO 24"WIRE FENCE (BEHIND) WOVEN GEO-TEXTILE EXISTING GROUND 8" DOWN AND 4" FORWARD 24" 24" 5' T- POST PLASTIC OR WIRE TIES (TYP.) WIRE FENCE (BEHIND) WOVEN GEO-TEXTILE BACKFILL TRENCH AND COMPACT THOROUGHLY UPSLOPE 4" MIN. CROSS-SECTION VIEW POSTS SHALL BE PAINTED 'T'-POST 1.33 lb/ LF STEEL. HIVIS FLORESCENT YELLOW GREEN UV RESISTANT, HIGH TENSILE STRENGTH POLY FABRIC 8.0' O.C. MAX.WATERPROOF SIGN 40" 3 IN4 IN 4 IN 4 IN3 IN 3 IN SEE NOTES 2.0' MIN4.0' MIN1.75 IN X 1.75 IN STANDARD SAFETY FENCING MAY BE USED 2.0'4.0'NOTES: 1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 2. WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. 3. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. NTS TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT A A 2"-3" COURSE AGGREGATE MIN. 6" THICK DIVERSION RIDGE REQUIRED WHERE GRADE EXCEEDS 2% SECTION A-A ROADWAY SPILLWAY FILTER FABRIC 2% OR GREATER NOTE: USE SANDBAGS, STRAW BALES OR OTHER APPROVED METHODS TO CHANNELIZE RUNOFF TO BASIN AS REQUIRED. STRAW BALES, SANDBAGS, OR CONTINUOUS BERM OF EQUIVALENT HEIGHT SUPPLY WATER TO WASH WHEELS IF NECESSARY ROADWAYFLOWFLOWFLOW 20' MIN. 50' MIN. PLAN DIVERSION RIDGE CONSTRUCTION FENCING (NTS.) SILT FENCE DETAIL (NTS.) FLOWFLOW GENERALISSUED FOR: REVIEW & PERMITTING TURBIDITY CURTAIN DETAILS U.S . A . 516" H.G. BALLAST CHAIN FOR WEIGHT FLOTATION CHAIN TENSIONED THROUGH S.S. STRESS PLATES, VIA HOOK AND RING CONNECTION ANCHOR POINTS CURTAIN MEMBRANE4444444444 4 4 4 4 4 4 ANCHOR POINTS 4516" GAL CABLE CHANNEL BOTTOM FLOW DIRECTION CHANNEL BANK CHANNEL BANK TURBIDITY CURTAIN EXTENDS TO BOTTOM OF CHANNEL ANCHOR POINTS ANCHOR POINTS SECTION VIEW PLAN VIEW NOTE: INSTALL AND MAINTAIN TURBIDITY CURTAIN IN ACCORDANCE WITH MANUFACTURE'S SPECIFICATIONS. CONTRACTOR SHALL SUBMIT TO ENGINEER THE PRODUCT CUT SHEET, INSTALLATION SPECIFICATIONS, AS WELL AS A MAINTENANCE PLAN/SCHEDULE FOR REVIEW AND CONCURRENCE. ANCHORING STRUCTURES SHALL BE CONSTRUCTED AND/OR INSTALLED PER MANUFACTURE'S RECOMMENDATIONS FOR PROPER LATERAL FORCE REQUIREMENTS. NTS G:\2019\4519049\09-construction drawings\09a - working drawings\GENERAL.dwg, 3/1/2021 8:34:45 AM, DWG To PDF.pc3 VF - (1) VF - (2)XXXXXXXTOBTOB TOBTOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOBTOB TOBTOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB CFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFSF35 36 37 3839 40414243394041 3132333430 31 32 33 CFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLOD LOD LOD No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:6 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925PRIMARY SITE ACCESS WILL OCCUR THROUGH ELM ROAD. ACCESS WITHIN THE PROJECT WILL UTILIZE A DESIGNATED ACCESS PATH FROM THE ACCESS POINT UP THROUGH THE PROJECT AREA. SILT FENCE WILL BE PLACED ON THE SIDE OF THE ACCESS PATH WITH ACTIVE STREAM FLOW. SITE ACCESS AND STAGING SILT FENCE PRIOR TO ANY SOIL DISTURBANCE AND HAULING, APPROXIMATELY 250 FEET SILT FENCE WILL BE INSTALLED ON THE SITE AS INDICATED IN THE CONSTRUCTION DOCUMENTS. SILT FENCE WILL BE LOCATED ALONG THE DOWNSTREAM SIDE OF THE ACCESS AND STAGING AREAS. AT THE END OF THE PROJECT, WHEN ALL DISTURBED AREAS HAVE BEEN STABILIZED, ALL SILT FENCE WILL BE REMOVED. MATERIAL SPECIFICATIONS, INSTALLATION PROCEDURES, AND MAINTENANCE SHALL CONFORM TO SECTION 6.62 OF THE NORTH CAROLINA SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, INCLUDING THE CONSTRUCTION DETAIL BELOW.PLAN VIEW (1" = 50' HORIZ.) ELM ROA D EAST BOILING SPRING ROADCHERRY R O A D FLOW FLOW CONTRACTOR SHALL UTILIZE LAYDOWN AREA FOR CONSTRUCTION MATERIALS AND STAKING CHERRY ROAD CHANNEL BANK STABILIZATION SEE SHEETS 14 - 15 Cherry_RoadISSUED FOR: REVIEW & PERMITTING 081 - CHERRY ROAD E&SC LAYOUTHURRICANE FLORENCE EWP - ENGINEERINGASSISTANCEPROJECT SUMMARY LAND OWNER CITY OF BOILING SPRING LAKES PROPERTY ADDRESS 36 CHERRY ROAD SOUTHPORT NC 28461 COORDINATES LAT: 34.052316 LONG: -78.042848 PROPERTY SIZE (ACRES)DRAINAGE EASEMENT LOD (ACRES)3 EXISTING STREAM (L. FT)1,276 PROPOSED STREAM (L. FT)1,276 EXISTING STREAM IMPACTS (L. FT)NA PROPOSED STREAM IMPACTS (L. FT)NA CUT/FILL (YRD^3)APPROX 815 (F) TYPICAL CROSS SECTIONS SEE SHEET 30 STREAM BANKFULL WIDTH (FT)9 PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT IS TO STABILIZE THE BANKS OF AND RESTORE THE STREAM LOCATED AT CHERRY ROAD. THIS WILL BE ACCOMPLISHED THROUGH REGRADING TO INCLUDE A POOL-RIFFLE SEQUENCE THAT IMPROVES WATER QUALITY AND STREAM HABITAT. IT WILL ALSO BE ACCOMPLISHED VIA THE INSTALLATION OF 27 LOG V-DROPS TO HOLD STREAM GRADE AND PROMOTE BENEFICIAL POOL SCOUR. 7 LOG SILL STRUCTURES WILL BE INSTALLED TO MAINTAIN GRADE WITHIN THE STEEPEST PORTION OF THE STREAM REACH. THE LARGE HOLE ON THE DOWNSTREAM END OF THE STREAM REACH WILL BE BACKFILLED. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRACE CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR SHALL FURNISH AND INSTALL TURBIDITY CURTAIN CONTRACTOR SHALL FURNISH AND INSTALL SILT FENCE CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRACE CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING CONTRACTOR SHALL BACKFILL & COMPACT LARGE HOLE, ENSURE A SMOOTH TRANSITION TO EXISTING GRADE, & PLANT TO MINIMIZE EROSION CONTRACTOR SHALL FURNISH AND INSTALL LOG SILLS (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL LOG V-DROPS (TYP.)G:\2019\4519049\09-construction drawings\09a - working drawings\081 - Cherry Road\Cherry_Road.dwg, 3/1/2021 8:37:19 AM, DWG To PDF.pc3 202823.12FNC1 +7// SILT 202923.78FNC1// SILT 203025.69FNC1// SILT 203128.32FNC1 -7// SILTOVHEOVHE OVHEOVHEOVHE2728293031323334353633343 536 37383924252627 2 8 CFCFCF CF CF CF CF CF CFCFCFCFCFCFCFCFCF LODLODLODLODLODLODLODLODLOD LOD LODLODLODL O D L O D L O D L O DLODLODLODLODLODLOD LODLODLODNo.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCE082 - EAST BOILING SPRING ROAD AT PATRICIA LAKEE&SC LAYOUT7 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925PLAN VIEW (1" = 40' HORIZ.)082 - East Boiling Spring Road At Patricia Lake_E ISSUED FOR: REVIEW & PERMITTING PROJECT SUMMARY LAND OWNER CITY OF BOILING SPRING LAKES PROPERTY ADDRESS 987 NORTH SHORE DRIVE COORDINATES LAT: 34.041408 LONG: -78.052959 PROPERTY SIZE (ACRES)0.7 LOD (ACRES)0.7 CUT/FILL (YRD^3)APPROX 2500 (F) PROJECT DESCRIPTION THE PURPOSE OF THE PROJECT IS TO REPAIR THE BANK LOCATED AT EAST BOILING SPRING ROAD. THIS WILL BE ACCOMPLISHED BY REGRADING THE BANK AND STABILIZING IT WITH TURF REINFORCEMENT MATTING, SEEDING, AND PLANTING. ADDITIONALLY, A RIPRAP WILL BE USED TO ARMOR PORTIONS OF THE BANK THAT EXPERIENCE HIGH FLOW FROM STORMWATER DRAINAGE AND SHOREJAX WILL BE USED TO STABILIZE AND ARMOR THE BANK NEAR THE RETAINING WALL. SITE ACCESS AND STAGING SILT FENCE PRIOR TO ANY SOIL DISTURBANCE AND HAULING, APPROXIMATELY 250 FEET SILT FENCE WILL BE INSTALLED ON THE SITE AS INDICATED IN THE CONSTRUCTION DOCUMENTS. SILT FENCE WILL BE LOCATED ALONG THE DOWNSTREAM SIDE OF THE ACCESS AND STAGING AREAS. AT THE END OF THE PROJECT, WHEN ALL DISTURBED AREAS HAVE BEEN STABILIZED, ALL SILT FENCE WILL BE REMOVED. MATERIAL SPECIFICATIONS, INSTALLATION PROCEDURES, AND MAINTENANCE SHALL CONFORM TO SECTION 6.62 OF THE NORTH CAROLINA SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, INCLUDING THE CONSTRUCTION DETAIL BELOW. PRIMARY SITE ACCESS WILL OCCUR THROUGH EAST BOILING SPRING ROAD. ACCESS WITHIN THE PROJECT WILL UTILIZE A DESIGNATED ACCESS PATH FROM THE ACCESS POINT UP THROUGH THE PROJECT AREA. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR SHALL FURNISH AND INSTALL TURBIDITY CURTAIN CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING G:\2019\4519049\09-Construction Drawings\09A - Working Drawings\082 - East Boiling Spring Road at Patricia Lake\082 - East Boiling Spring Road at Patricia Lake_E.dwg, 3/1/2021 8:40:20 AM, DWG To PDF.pc3 OVHEOVHEOVHEOVHEOVHEOVHE OVHE OVHE OVHE OVHEOVHEOVHETOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB TOB 39404142383738373936373839383736354544434241403940414243444545454545CF CFCFCFCFCF CF CF CFCFCFCFSF LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLOD LOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODLOD LOD LODLODLODNo.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:8 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925PLAN VIEW (1" = 70' HORIZ.) FLOW FLOW SUNSET ROADWEST BOILING SPRING ROADHUNTERS ROAD CHANNEL BANK STABILIZATION SEE SHEETS 16 - 17 CONTRACTOR SHALL UTILIZE LAYDOWN AREA FOR CONSTRUCTION MATERIALS AND STAKING 083 - Hunters Road_EISSUED FOR: REVIEW & PERMITTING 083 - HUNTERS ROAD E&SC LAYOUTHURRICANE FLORENCE EWP - ENGINEERINGASSISTANCEPROJECT SUMMARY LAND OWNER CITY OF BOILING SPRING LAKES PROPERTY ADDRESS 22 BARCLAY ROAD SOUTHPORT NC 28461 COORDINATES LAT: 34.024189 LONG: -78.074770 PROPERTY SIZE (ACRES)DRAINAGE EASEMENT LOD (ACRES)2.7 EXISTING STREAM (L. FT)1,603 PROPOSED STREAM (L. FT)1,603 EXISTING STREAM IMPACTS (L. FT)NA PROPOSED STREAM IMPACTS (L. FT)NA CUT/FILL (YRD^3)APPROX 2,760 (C) TYPICAL CROSS SECTIONS SEE SHEET 30 STREAM BANKFULL WIDTH (FT)14 PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT IS TO STABILIZE THE BANKS OF AND RESTORE THE STREAM LOCATED AT HUNTERS ROAD. THIS WILL BE ACCOMPLISHED BY REGRADING THE BANKS AND CREATING A POOL-RIFFLE SEQUENCE THROUGHOUT THE STREAM REACH THAT IMPROVES WATER QUALITY AND PROMOTES WILDLIFE HABITAT. ADDITIONALLY, 26 LOG V-DROP STRUCTURES WILL BE INSTALLED TO HOLD GRADE AND PROMOTE BENEFICIAL POOL SCOUR. PRIMARY SITE ACCESS WILL OCCUR THROUGH WEST BOILING SPRING ROAD. ACCESS WITHIN THE PROJECT WILL UTILIZE A DESIGNATED ACCESS PATH FROM THE ACCESS POINT UP THROUGH THE PROJECT AREA. SILT FENCE WILL BE PLACED ON THE SIDE OF THE ACCESS PATH WITH ACTIVE STREAM FLOW. SITE ACCESS AND STAGING SILT FENCE PRIOR TO ANY SOIL DISTURBANCE AND HAULING, APPROXIMATELY 250 FEET SILT FENCE WILL BE INSTALLED ON THE SITE AS INDICATED IN THE CONSTRUCTION DOCUMENTS. SILT FENCE WILL BE LOCATED ALONG THE DOWNSTREAM SIDE OF THE ACCESS AND STAGING AREAS. AT THE END OF THE PROJECT, WHEN ALL DISTURBED AREAS HAVE BEEN STABILIZED, ALL SILT FENCE WILL BE REMOVED. MATERIAL SPECIFICATIONS, INSTALLATION PROCEDURES, AND MAINTENANCE SHALL CONFORM TO SECTION 6.62 OF THE NORTH CAROLINA SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, INCLUDING THE CONSTRUCTION DETAIL BELOW. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCES CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCES CONTRACTOR SHALL FURNISH AND INSTALL TURBIDITY CURTAIN CONTRACTOR SHALL FURNISH AND INSTALL SILT FENCE CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING CONTRACTOR SHALL FURNISH AND INSTALL LOG V-DROPS (TYP.)G:\2019\4519049\09-construction drawings\09a - working drawings\083 - Hunters Road\083 - Hunters Road_E.dwg, 3/1/2021 8:41:16 AM, DWG To PDF.pc3 29303132333435363738394041 2 9 3 0 3 1 3 2 3 3 3 4 35 SF SF SFLODLODLODLODLODLOD LODLODLODLODLODLOD LOD LOD LODLODLOD LOD L O D L O D L O D LOD LODLODLODLODLODLODLOD0+000+500+60CFCFCFCFCFCFCFCFCFCFCFCFCFCF3637No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCE084 - N SHORE DRIVE E&SC LAYOUT9 084 - N SHORE DRIVE SHEET: of 33 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925PLAN VIEW (1" = 30' HORIZ.)ISSUED FOR: REVIEW & PERMITTING PROJECT SUMMARY LAND OWNER CITY OF BOILING SPRING LAKES PROPERTY ADDRESS 147 FOREST LANE SOUTHPORT NC 28461 COORDINATES LAT: 34.047758 LONG: -78.042902 PROPERTY SIZE (ACRES)0.65 LOD (ACRES)0.65 CUT/FILL (YRD^3)APPROX 300 (F) PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT IS TO REPAIR AND ENHANCE THE BERM SEPARATING A SMALL POND FROM PATRICIA LAKE AND TO RESTORE THE WATER LEVEL OF THE POND. THIS WILL BE ACCOMPLISHED BY BACKFILLING THE WASHED OUT SECTION OF THE BERM, REGRADING AND PLANTING THE BERM TO ENHANCE STABILITY, ADDING AN ARMORED EMERGENCY SPILLWAY FOR HIGH-FLOW EVENTS, AND ADDING A RISER STRUCTURE TO REGULATE THE WATER LEVEL OF THE POND. PRIMARY SITE ACCESS WILL OCCUR THROUGH N SHORE DRIVE. ACCESS WITHIN THE PROJECT WILL UTILIZE A DESIGNATED ACCESS PATH FROM THE ACCESS POINT UP THROUGH THE PROJECT AREA. SILT FENCE WILL BE PLACED ON THE SIDE OF THE ACCESS PATH WITH ACTIVE STREAM FLOW. SITE ACCESS AND STAGING SILT FENCE PRIOR TO ANY SOIL DISTURBANCE AND HAULING, APPROXIMATELY 250 FEET SILT FENCE WILL BE INSTALLED ON THE SITE AS INDICATED IN THE CONSTRUCTION DOCUMENTS. SILT FENCE WILL BE LOCATED ALONG THE DOWNSTREAM SIDE OF THE ACCESS AND STAGING AREAS. AT THE END OF THE PROJECT, WHEN ALL DISTURBED AREAS HAVE BEEN STABILIZED, ALL SILT FENCE WILL BE REMOVED. MATERIAL SPECIFICATIONS, INSTALLATION PROCEDURES, AND MAINTENANCE SHALL CONFORM TO SECTION 6.62 OF THE NORTH CAROLINA SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, INCLUDING THE CONSTRUCTION DETAIL BELOW. CONTRACTOR SHALL BACKFILL, COMPACT, AND TIE TO EXISTING GRADE CONTRACTOR SHALL UTILIZE LAYDOWN AREA FOR CONSTRUCTION MATERIALS AND STAKING CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR SHALL FURNISH AND INSTALL SILT FENCE CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING G:\2019\4519049\09-Construction Drawings\09A - Working Drawings\084 - North Shore Drive\084 - N SHORE DRIVE.dwg, 3/1/2021 12:51:13 PM, DWG To PDF.pc3 XXX X X X XVF - (1)SFSFLODLODLODLODLODLODLODLODLODL O D L O D L O D L O D L O DTOBTOB TOB TOB TOBTOBTOB TO B TOB TOB TOB TOB TOB TO B T O B TO B TO B TOB TOB TOB TOB TOB TO B 474645 44 43 47 46 45 44 43 42 494847484950 4847464544T O B TO B TOBTOBTOBTOBTO B T O B TOB TOBTOBTOBTOBOVHEOVHEOVHEOVHEOVHEOVHEOVHELODLODLO D LODLODLODLODLODLODL O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODCFC F C F CF C F C F CF CFCFCFCFCFCFCFCFCF CFCFCFCFCFCFCFCF0+0 0 0+50 1+00 1+5 0 2+0 0 2 + 5 03+003+504+004+ 5 05+005+506+006 + 5 0 6 + 5 4 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCE085 - PINE LAKE ROAD E&SC LAYOUT10 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925PLAN VIEW (1" = 30' HORIZ.)QUEENS RDPI N E L A K E R D FLOW PINE LAKE ROAD CHANNEL BANK STABILIZATION SEE SHEET 18 CONTRACTOR SHALL UTILIZE LAYDOWN AREA FOR CONSTRUCTION MATERIALS AND STAKING 085 - Pine Lake Road_E2ISSUED FOR: REVIEW & PERMITTING PROJECT SUMMARY LAND OWNER CITY OF BOILING SPRING LAKES PROPERTY ADDRESS 370 PINE LAKE ROAD SOUTHPORT NC 28461 COORDINATES LAT: 34.040290 LONG: -78.068214 PROPERTY SIZE (ACRES)DRAINAGE EASEMENT LOD (ACRES)1.2 EXISTING STREAM (L. FT)564 PROPOSED STREAM (L. FT)615 EXISTING STREAM IMPACTS (L. FT)NA PROPOSED STREAM IMPACTS (L. FT)NA CUT/FILL (YRD^3)APPROX 260 (C) TYPICAL CROSS SECTIONS SEE SHEET 30 STREAM BANKFULL WIDTH (FT)11 PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT IS TO STABILIZE THE BANKS OF AND RESTORE THE STREAM LOCATED AT PINE LAKE ROAD. THIS WILL BE ACCOMPLISHED BY REGRADING THE BANKS AND CREATING A POOL-RIFFLE SEQUENCE THAT ENHANCES WATER QUALITY AND PROMOTES WILDLIFE HABITAT. ADDITIONALLY, 6 LOG V-DROP STRUCTURES WILL BE INSTALLED WITHIN THE STREAM REACH TO HOLD GRADE AND PROMOTE BENEFICIAL POOL SCOUR. PRIMARY SITE ACCESS WILL OCCUR THROUGH PINE LAKE ROAD. ACCESS WITHIN THE PROJECT WILL UTILIZE A DESIGNATED ACCESS PATH FROM THE ACCESS POINT UP THROUGH THE PROJECT AREA. SILT FENCE WILL BE PLACED ON THE SIDE OF THE ACCESS PATH WITH ACTIVE STREAM FLOW. SITE ACCESS AND STAGING SILT FENCE PRIOR TO ANY SOIL DISTURBANCE AND HAULING, APPROXIMATELY 250 FEET SILT FENCE WILL BE INSTALLED ON THE SITE AS INDICATED IN THE CONSTRUCTION DOCUMENTS. SILT FENCE WILL BE LOCATED ALONG THE DOWNSTREAM SIDE OF THE ACCESS AND STAGING AREAS. AT THE END OF THE PROJECT, WHEN ALL DISTURBED AREAS HAVE BEEN STABILIZED, ALL SILT FENCE WILL BE REMOVED. MATERIAL SPECIFICATIONS, INSTALLATION PROCEDURES, AND MAINTENANCE SHALL CONFORM TO SECTION 6.62 OF THE NORTH CAROLINA SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, INCLUDING THE CONSTRUCTION DETAIL BELOW. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCES CONTRACTOR SHALL FURNISH AND INSTALL TOE WOOD (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL TOE WOOD (TYP.)CONTRACTOR SHALL FURNISH AND INSTALL TURBIDITY CURTAIN CONTRACTOR SHALL FURNISH AND INSTALL SILT FENCE CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING G:\2019\4519049\09-construction drawings\09a - working drawings\085 - Pine Lake Road\Old Alignment Design\085 - Pine Lake Road_E - 2.dwg, 3/1/2021 8:49:49 AM, DWG To PDF.pc3 1920212223242526272829 17181920212223242526272829303132333435363730313233343536377. 2 : 1 0+0 0 0+5 0 0+9 2 0+00 0+50 1+00 1+18 LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCE191 - N SHORE DRIVE AT PATRICIA LAKE E&SCLAYOUT11 SHEET: of 33 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925PLAN VIEW (1" = 30' HORIZ.)4519049 - 191_EISSUED FOR: REVIEW & PERMITTING PROJECT SUMMARY LAND OWNER CITY OF BOILING SPRING LAKES PROPERTY ADDRESS 1460 N SHORE DRIVE SOUTHPORT NC 28461 COORDINATES LAT: 34.046473 LONG: -78.041761 PROPERTY SIZE (ACRES)1 LOD (ACRES)1 CUT/FILL (YRD^3)APPROX 2000 (F) PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT IS TO STABILIZE THE BANK LOCATED AT NORTH SHORE DRIVE. THIS WILL BE ACCOMPLISHED BY ESTABLISHING A TOE OF SLOPE AND GRADING BACK TO DAYLIGHT IN THE DAMAGED YARD. THE SLOPE WILL THEN BE STABILIZED VIA PLANTING UNTIL THE WATER LEVEL OF PATRICIA LAKE IS RE-ESTABLISHED. PRIMARY SITE ACCESS WILL OCCUR THROUGH N SHORE DRIVE. ACCESS WITHIN THE PROJECT WILL UTILIZE A DESIGNATED ACCESS PATH FROM THE ACCESS POINT UP THROUGH THE PROJECT AREA. SITE ACCESS AND STAGING SILT FENCE PRIOR TO ANY SOIL DISTURBANCE AND HAULING, APPROXIMATELY 250 FEET SILT FENCE WILL BE INSTALLED ON THE SITE AS INDICATED IN THE CONSTRUCTION DOCUMENTS. SILT FENCE WILL BE LOCATED ALONG THE DOWNSTREAM SIDE OF THE ACCESS AND STAGING AREAS. AT THE END OF THE PROJECT, WHEN ALL DISTURBED AREAS HAVE BEEN STABILIZED, ALL SILT FENCE WILL BE REMOVED. MATERIAL SPECIFICATIONS, INSTALLATION PROCEDURES, AND MAINTENANCE SHALL CONFORM TO SECTION 6.62 OF THE NORTH CAROLINA SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, INCLUDING THE CONSTRUCTION DETAIL BELOW. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE G:\2019\4519049\09-construction drawings\09a - working drawings\191 - North Shore Drive at Patricia Lake\4519049 - 191_E.dwg, 3/1/2021 11:17:39 AM, DWG To PDF.pc3 TOB TOB TOBTOBTOBTOB TOB TOB TOBTOBTOBTOB OVHEOVHEOVHE OVHE OVHE OVHE OVHE OVHE OVHE OVHEOVHEOVHEOVHEOVHEOVHEO V H E TOB TOB TOBTOBTOB TOBTOB39 3939 40 4040 4141 41 42 42 3636 3737 38 38 39 39 3839 4041 42 3637383940414243 SF SF SF383739403638393741403938 374241403938373639383736353635LOD LOD LOD LOD LOD LOD LOD LODLODLOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODLODLODCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCF CF CF CF CF CF CF CF CF CF CF C F CFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCF CF CF CF CF CF CF No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:12 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925PLAN VIEW (1" = 40' HORIZ.) OAKDALE DR LUMBERTON RD E BOILING SPRING RDFLOW FLOWCONTRACTOR SHALL UTILIZE LAYDOWN AREA FOR CONSTRUCTION MATERIALS AND STAKING Allen CreekISSUED FOR: REVIEW & PERMITTING 192 - ALLEN CREEK E&SC LAYOUTHURRICANE FLORENCE EWP - ENGINEERINGASSISTANCEPROJECT SUMMARY LAND OWNER CITY OF BOILING SPRING LAKES PROPERTY ADDRESS 22 BARCLAY ROAD SOUTHPORT NC 28461 COORDINATES LAT: 34.024189 LONG: -78.074770 PROPERTY SIZE (ACRES)DRAINAGE EASEMENT LOD (ACRES)SR1: 1.1 SR2: 0.6 EXISTING STREAM (L. FT)SR1: 461 SR2: 455 PROPOSED STREAM (L. FT)SR1: 461 SR2: 455 EXISTING STREAM IMPACTS (L. FT)NA PROPOSED STREAM IMPACTS (L. FT)NA CUT/FILL (YRD^3)APPROX 285 (C)APPROX 405 (C) TYPICAL CROSS SECTIONS SEE SHEET 30 STREAM BANKFULL WIDTH (FT)SR1: 5 SR2: 6 PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT IS TO STABILIZE THE BANKS OF AND RESTORE THE STREAM LOCATED AT EAST BOILING SPRING ROAD. THIS WILL BE ACCOMPLISHED BY REGRADING THE STREAM AND CREATING A POOL-RIFFLE SEQUENCE THAT ENHANCES WATER QUALITY AND PROMOTES WILDLIFE HABITAT. ADDITIONALLY, 22 LOG V-DROPS WILL BE INSTALLED THROUGHOUT BOTH THE UPPER AND LOWER REACHES OF THE STREAM TO HOLD GRADE AND PROMOTE BENEFICIAL POOL SCOUR. A SERIES OF 7 LOG SILLS WILL BE INSTALLED AT THE START OF THE DOWNSTREAM REACH TO HOLD GRADE AS FLOW ENTERS FROM THE CULVERT THAT RUNS UNDERNEATH LUMBERTON ROAD. PRIMARY SITE ACCESS WILL OCCUR THROUGH OAKDALE DRIVE. ACCESS WITHIN THE PROJECT WILL UTILIZE A DESIGNATED ACCESS PATH FROM THE ACCESS POINT UP THROUGH THE PROJECT AREA. SILT FENCE WILL BE PLACED ON THE SIDE OF THE ACCESS PATH WITH ACTIVE STREAM FLOW. SITE ACCESS AND STAGING SILT FENCE PRIOR TO ANY SOIL DISTURBANCE AND HAULING, APPROXIMATELY 250 FEET SILT FENCE WILL BE INSTALLED ON THE SITE AS INDICATED IN THE CONSTRUCTION DOCUMENTS. SILT FENCE WILL BE LOCATED ALONG THE DOWNSTREAM SIDE OF THE ACCESS AND STAGING AREAS. AT THE END OF THE PROJECT, WHEN ALL DISTURBED AREAS HAVE BEEN STABILIZED, ALL SILT FENCE WILL BE REMOVED. MATERIAL SPECIFICATIONS, INSTALLATION PROCEDURES, AND MAINTENANCE SHALL CONFORM TO SECTION 6.62 OF THE NORTH CAROLINA SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, INCLUDING THE CONSTRUCTION DETAIL BELOW. CONTRACTOR SHALL FURNISH AND INSTALL TURBIDITY CURTAINCONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING CONTRACTOR SHALL FURNISH AND INSTALL SILT FENCE CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING CONTRACTOR SHALL FURNISH AND INSTALL LOG V-DROPS (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL LOG SILLS (TYP.)G:\2019\4519049\09-construction drawings\09a - working drawings\192 - Allen Creek\Allen Creek.dwg, 3/1/2021 10:48:25 AM, DWG To PDF.pc3 X X X X X X X X X X X TC219117012187 219117012131 219117012295 219117011372 219117011327 219117010444 218120919561 218120919516 218120918661 218120917688 218120917515 218120917560 218120918415 218120918461 218120919316 218120919361219117010237 219117010261 219117011116219117011076 219117014373 219117013445 218120918461 218120918415 218120917560 218120917515 TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBCF CF CF CF CFCFCFCF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF SFSF3132333430 31 32 33 3839 36 35 34 34 35 36 37 38 34 35 36 33 27 28 29 30 31 3226 31 30 29 28 38 37 36 35 34 0+0 0 0+50 1+00 1+50 2+00 2+503+003+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50CFCF CF CF CF CF CF CF CF CF CF CF CF CFCFCFCFCFCF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CFLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODSHEET ####MATCHLINE0+00.00-7+50.00GRADE BREAK STA = 0+45.38ELEV = 24.73GRADE BREAK STA = 0+67.38ELEV = 24.73GRADE BREAK STA = 1+09.62 ELEV = 22.84GRADE BREAK STA = 1+33.38ELEV = 25.23GRADE BREAK STA = 1+55.38ELEV = 25.23GRADE BREAK STA = 1+97.62 ELEV = 23.33GRADE BREAK STA = 2+21.38ELEV = 25.72GRADE BREAK STA = 2+43.38ELEV = 25.72GRADE BREAK STA = 2+85.62 ELEV = 24.71GRADE BREAK STA = 3+09.38ELEV = 27.60GRADE BREAK STA = 3+31.38ELEV = 28.10GRADE BREAK STA = 3+73.62 ELEV = 27.09GRADE BREAK STA = 3+97.13ELEV = 29.47GRADE BREAK STA = 4+18.88ELEV = 29.47GRADE BREAK STA = 4+60.64 ELEV = 27.58GRADE BREAK STA = 4+84.13ELEV = 29.96GRADE BREAK STA = 5+05.88ELEV = 29.96GRADE BREAK STA = 5+47.64 ELEV = 27.96GRADE BREAK STA = 5+71.13ELEV = 30.34GRADE BREAK STA = 5+92.88ELEV = 30.34GRADE BREAK STA = 6+34.64 ELEV = 28.34GRADE BREAK STA = 6+58.13ELEV = 30.78GRADE BREAK STA = 7+21.64 ELEV = 28.83 GRADE BREAK STA = 7+45.13ELEV = 31.27FLOW 0+5024.6824.6841+0024.6124.6081+5024.5324.5342+0025.0425.0402+5027.2627.2643+0026.9226.9163+5028.1328.1284+0028.7328.7274+5028.8028.8055+0029.0529.0485+5029.8929.8866+0030.0330.0346+5030.1930.1887+0030.5630.562- 9 : 1 1:1100:1 - 9 : 1 1:179:1 - 9 : 1 1:1100:1 - 9 : 1 1:181:1 - 9 : 1 1:1100:1 - 9 : 1 1:133:1 -1 2 : 1 1:131:1 -1 2 : 1 1:133:1 -1 2 : 1 1:1104:1 - 9 : 1 1:181:1 - 9 : 1 1:199:1 - 9 : 1 1:1128:1 - 9 : 1 1:1104:1 - 9 : 1 1:1128:1 - 9 : 1 1:181:1 - 9 : 1 1:199:1 - 9 : 1 1:181:1 200:1 200:1 38:1 35:1 44:1 136:1 198:1 256:1 207:1 272:1 155:1 198:1 161:1 165:1 197:1 236:1 PLAN VIEW (1" = 30' HORIZ.) PROFILE VIEW (1" = 30' HORIZ., 1" = 2.0' VERT.)No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 30' 30150 60 90VERTICAL SCALE: 1" = 2.0'1.0 0 2.0 4.0 6.0 081 - CHERRY ROAD P&P 0+00.00 - 7+50.0013 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925BANKFULL FG EG LOG V-DROPS (TYP.) ELM ROAD CHERRY ROAD FLOW EAST BOILING SPRING ROADCONTRACTOR SHALL BACKFILL & COMPACT LARGE HOLE, ENSURE A SMOOTH TRANSITION TO EXISTING GRADE, & PLANT TO MINIMIZE EROSION EXISTING 48" CMP x 2 CONTRACTOR SHALL UTILIZE LAYDOWN AREA FOR CONSTRUCTION MATERIALS AND STAKING Cherry_RoadISSUED FOR: REVIEW & PERMITTING HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCECONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRACE CONTRACTOR SHALL FURNISH AND INSTALL LOG V-DROPS (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL LOG SILLS (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION ACCESS CONTRACTOR SHALL FURNISH AND INSTALL TURBIDITY CURTAIN CONTRACTOR SHALL PREVENT AND AVOID DAMAGE TO SHEDS AND RESIDENTIAL PROPERTY CONTRACTOR SHALL FURNISH AND INSTALL SILT FENCE CONTRACTOR SHALL FURNISH AND INSTALL WOOD TOE (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING G:\2019\4519049\09-construction drawings\09a - working drawings\081 - Cherry Road\Cherry_Road.dwg, 3/1/2021 8:38:03 AM, DWG To PDF.pc3 X X X X X X X X 21812 0 9 1 9 5 6 1 21812 0 9 1 9 5 1 6 21812 0 9 1 8 6 6 1 21812 0 9 1 7 6 8 8 21911 7 0 1 0 7 6 1 21911 7 0 1 0 7 2 7 21812 0 9 1 9 8 6 1 21812 0 9 1 7 7 1 6 21812 0 9 1 6 8 2 0 21812 0 9 1 6 8 4 7 21812 0 9 1 8 4 6 1 21812 0 9 1 8 4 1 5 21812 0 9 1 7 5 6 0 21812 0 9 1 7 5 1 5 21812 0 9 1 6 6 1 6 21812 0 9 1 5 7 1 5 21812 0 9 1 4 7 6 9 21812 0 9 1 4 8 1 4 21812 0 9 1 3 8 5 9 21812 0 9 1 5 9 6 0 21812 0 9 1 5 9 1 5 21812 0 9 1 4 0 0 4 21812 0 9 1 3 9 0 4 21812 0 9 1 3 5 6 9 21812 0 9 1 2 6 6 9 21812 0 9 1 2 7 1 3 21812 0 9 1 1 7 6 8 21812 0 9 2 1 0 8 5TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBCF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF 353 6 37 38 39 404142 4339 40 41 38 37 3837373839 36 35 34 34 35 36 37 3838 37 36 35 34 6+00 6+50 7+00 7+50 8+00 8+50 9+0 0 9+50 10+ 0 0 10+ 5 0 11+00 11+50 12+00 12+50 12+76 CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CFCFLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODSHEET ####MATCHLINE7+50.00-12+76.46 8+0031.4831.4828+5031.7831.7789+0032.0532.0469+5032.5032.49610+0034.7134.71310+5035.2935.28911+0036.1536.14811+5036.9536.94512+0037.7537.75412+5038.8838.878- 9 : 1 1:1104:1 - 9 : 1 1:1128:1 - 9 : 1 1:181:1 - 9 : 1 1:181:1 - 9 : 1 1:1-5:10:1-5:10:1-5:10:1-5:10:1-5:10:1-5:10:1- 1 0 : 1 4:140:1 - 1 2 : 1 1:133:1 - 1 2 : 1 1:133:1 - 1 2 : 1 1:136:1 - 1 2 : 1 1:133:1 - 1 2 : 1 1:1GRADE BREAK STA = 7+65.14 ELEV = 29.10GRADE BREAK STA = 7+88.63ELEV = 31.48GRADE BREAK STA = 8+10.38ELEV = 31.48GRADE BREAK STA = 8+52.14 ELEV = 29.48GRADE BREAK STA = 8+75.63ELEV = 31.92GRADE BREAK STA = 8+97.38ELEV = 31.92GRADE BREAK STA = 9+39.14 ELEV = 30.02GRADE BREAK STA = 9+49.88ELEV = 32.61GRADE BREAK STA = 9+57.88 ELEV = 31.02GRADE BREAK STA = 9+67.88ELEV = 33.44GRADE BREAK STA = 9+75.88 ELEV = 31.86GRADE BREAK STA = 9+85.88ELEV = 34.27GRADE BREAK STA = 9+93.88 ELEV = 32.69 GRADE BREAK STA = 10+15.12 ELEV = 32.69GRADE BREAK STA = 10+23.88ELEV = 34.86GRADE BREAK STA = 10+71.88 ELEV = 33.57 GRADE BREAK STA = 10+98.88 ELEV = 36.48 GRADE BREAK STA = 11+23.88 ELEV = 36.73 GRADE BREAK STA = 11+71.88 ELEV = 35.57 GRADE BREAK STA = 11+98.88 ELEV = 38.42 GRADE BREAK STA = 12+23.88 ELEV = 38.67 GRADE BREAK STA = 12+71.88 ELEV = 37.50 GRADE BREAK STA = 12+73.88 ELEV = 39.67 FLOW 207:1 256:1 161:1 161:1 - 9 : 1 1:1-5:10:1-5:10:1-5:10:1-5:10:1-5:10:1-5:11:150:1 50:1 53:1 50:1 77:1 PLAN VIEW (1" = 30' HORIZ.) PROFILE VIEW (1" = 30' HORIZ., 1" = 2.0' VERT.)No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 30' 30150 60 90VERTICAL SCALE: 1" = 2.0'1.0 0 2.0 4.0 6.0 081 - CHERRY ROAD P&P 7+50.00 - 12+76.4614 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONISSUED FOR: REVIEW & PERMITTING SUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925BANKFULL FG EG LOG V-DROPS (TYP.) LOG SILLS (TYP.) THROUGHOUT CHUTE CHER R Y R O A D ELM R O A D FLOW Cherry_RoadHURRICANE FLORENCE EWP - ENGINEERINGASSISTANCECONTRACTOR SHALL FURNISH AND INSTALL LOG V-DROPS (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL LOG SILLS (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR TO TIE TO EXISTING GRADE AND PROVIDE SMOOTH TRANSITION CONTRACTOR SHALL PREVENT AND AVOID DAMAGE TO SHEDS AND RESIDENTIAL PROPERTY CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING G:\2019\4519049\09-construction drawings\09a - working drawings\081 - Cherry Road\Cherry_Road.dwg, 3/1/2021 8:38:36 AM, DWG To PDF.pc3 SCALE AS SHOWN HORIZONTAL SCALE: 1" = 15' 157.50 30 90 PLAN VIEW ( 1" = 15 ' HORIZ.)NOT FORCONSTRUCTIONGENERAL NOTES BOILING SPRING LAKES - SHORE STABILIZATION194 N. SHORE DRIVE, SOUTHPORT, NC 28461SUEG I S SURVEYINGGNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-1925 PROJ: SPEC-19260 DWG: SHORE STABILIZATION SHEET: of DATE: 10-22-2020 1 2 EXISTING STRUCTURE PATRICIA LAKEEXISTINGE. BOILING SPRING ROAD(VARIABLE WIDTH PUBLIC R/W)TURF REINFORCEMENT MATTING SEEDED WITH GRASS MIXTURE TREE/SHRUB LEGEND RIPRAP MINOR CONTOUR MAJOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 3:1 S L O P E (TY P . ) 3:1 S L O P E (TY P . )3:1 SLOPE(TYP.)3:1 SLOPE(TYP.)5:1 S L O P E (TY P . )5:1 SLOPE(TYP.)1.PRIOR TO CONSTRUCTION, ANY DISCREPANCIES IN THE PLANS AND NOTES SHALL BE BROUGHT TO THE DESIGNENGINEER'S ATTENTION IMMEDIATELY. 2.IT IS ANTICIPATED THAT DEWATERING MAY BE NECESSARY IN THE EXCAVATION AREAS (E.G. - EMBANKMENT SUB GRADE, ETC.). THEREFORE, THE CONTRACTOR SHALL FURNISH, INSTALL, OPERATE, AND MAINTAIN ANY PUMPINGEQUIPMENT, ETC. NEEDED FOR REMOVAL OF WATER FROM VARIOUS PARTS OF THE SITE. DURING PLACEMENT OFFILL WITHIN THESE AREAS, THE CONTRACTOR SHALL KEEP THE WATER LEVEL BELOW THE BOTTOM OF THE EXCAVATION / CONSTRUCTION AREAS. THE MANNER IN WHICH THE WATER IS REMOVED SHALL BE SUCH THAT THE EXCAVATION BOTTOM AND SIDE SLOPES ARE STABLE, WITH NO SEDIMENT DISCHARGED FROM THE SITE (I.E.PUMPED WATER MAY NEED TO BE DIRECTED TO AN APPROVED EROSION CONTROL DEVICE SUCH AS A DIRT BAG (ACF ENVIRONMENTAL), OR ENGINEER APPROVED EQUIVALENT, PRIOR TO DISCHARGE). 3.THE GRADES SHOWN ON THIS PLAN ARE FINISHED GRADES. IF THE EXISTING SOIL LAYER AFTER CONSTRUCTION / COMPACTION IS NOT DETERMINED SUITABLE BY A LANDSCAPE PROFESSIONAL FOR THE PLANTINGS, THEN THECONTRACTOR SHALL AMEND THE PLANTING AREA AS DIRECTED BY A LANDSCAPE PROFESSIONAL. 4.PRIOR TO CONSTRUCTION, THE OWNER SHALL OBTAIN A LAND DISTURBING (GRADING) PERMIT AND AN"APPROVAL TO CONSTRUCT" FROM THE TOWN OF BOILING SPRING LAKES AND ALL OTHER NECESSARY PERMITS FROM APPLICABLE AGENCIES (E.G. 404 / 401 PERMITS). 5.INSTALL ALL SEDIMENT AND EROSION CONTROL MEASURES PER THE APPROVED SEDIMENT AND EROSIONCONTROL PLAN. THE CONTRACTOR SHALL MAINTAIN ALL APPROVED SEDIMENT AND EROSION CONTROLMEASURES THROUGHOUT THE ENTIRE PROJECT, AS REQUIRED. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE EROSION CONTROL INSPECTOR, AS REQUIRED BY GOVERNING AGENCIES, PRIOR TO ANY CLEARING. 6.UPON COMPLETION OF EMBANKMENT, PROMPTLY STABILIZE AND SEED DAM EMBANKMENT PER SEEDINGSCHEDULE. PERMANENT GROUND COVER SHALL BE ESTABLISHED PER THE PERMANENT SEEDING SCHEDULE FOUND ON SHEET 2. 7.SCHEDULE A FINAL AS-BUILT INSPECTION AND AS-BUILT SURVEY WITH THE ENGINEER AND SURVEYOR. ANAS-BUILT INSPECTION AND SURVEY SHALL BE SCHEDULED BEFORE IMPOUNDING WATER IN THE FACILITY AND A MINIMUM OF 60 DAYS PRIOR TO THE ANTICIPATED DATE OF CERTIFICATION APPROVAL. ANY COMMENTS ORDEFICIENCIES IN THE SCM CONSTRUCTION MUST BE CORRECTED TO THE SATISFACTION OF THE ENGINEER ANDOWNER BEFORE CERTIFICATION SHALL BE GRANTED. 8.PRIOR TO CONSTRUCTION, THE ON-SITE GEOTECHNICAL ENGINEER SHALL IDENTIFY BORROW / FILL AREAS AND VERIFY THEIR SUITABILITY FOR USE WITHIN THE EMBANKMENT. ALSO, THE ON-SITE GEOTECHNICAL ENGINEERSHALL PERFORM STANDARD PROCTORS ON THE PROPOSED BORROW MATERIAL TO ENSURE THAT OPTIMUM MOISTURE CONTENT AND COMPACTION CAN BE ACHIEVED / CONTROLLED DURING CONSTRUCTION. 9.ALL FILL MATERIALS TO BE USED FOR THE EMBANKMENT SHALL BE TAKEN FROM BORROW AREAS APPROVED BY THE ON-SITE GEOTECHNICAL ENGINEER. THE FILL MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, WOOD,STONES GREATER THAN 6", AND FROZEN OR OTHER OBJECTIONABLE MATERIAL. THE FOLLOWING SOIL TYPES ARESUITABLE FOR USE AS FILL WITHIN THE EMBANKMENT: TBD. ALL FILL MATERIALS SHALL BE APPROVED BY THE ONSITE GEOTECHNICAL ENGINEER FOR THE INTENDED USE. 10.FILL PLACEMENT FOR THE EMBANKMENT SHALL NOT EXCEED A MAXIMUM 8" LIFT (UNCOMPACTED). EACH LIFTSHALL BE CONTINUOUS FOR THE ENTIRE LENGTH OF EMBANKMENT. BEFORE PLACEMENT OF FILL, ALL UNSUITABLE MATERIAL SHALL BE REMOVED AND THE SURFACE PROPERLY PREPARED FOR FILL PLACEMENT. 11.ALL FILL SOILS USED IN THE EMBANKMENT CONSTRUCTION SHALL BE COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698). THE FILL SOILS SHALL BE COMPACTED AT AMOISTURE CONTENT WITHIN -1 TO +3 PERCENT OF ITS OPTIMUM MOISTURE CONTENT. COMPACTION TESTSSHALL BE PERFORMED BY THE ON-SITE GEOTECHNICAL ENGINEER DURING CONSTRUCTION TO VERIFY THAT THEPROPER COMPACTION LEVEL HAS BEEN REACHED. THE FILL SHOULD BE COMPACTED USING A SHEEPSFOOT TYPE COMPACTOR. 12.THE DESIGN ENGINEER SHALL BE PROVIDED WITH REPORTS AND CERTIFICATION, BY THE ON-SITE GEOTECHNICALENGINEER, THAT THE GEOTECHNICAL ASPECTS OF THE FACILITY HAVE BEEN CONSTRUCTED PER PLAN. THISCERTIFICATION MUST ADDRESS THE TESTING FOR MATERIALS AND COMPACTION OF THE EMBANKMENT. THESE REPORTS AND CERTIFICATION WILL BE NEEDED DURING THE AS-BUILT CERTIFICATION PROCESS FOR THIS SHORESTABILIZATION. THEREFORE, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE TESTING ANDOBSERVATION WITH THE ON-SITE GEOTECHNICAL ENGINEER. 13.TESTING OF THE NEW FILL MATERIALS SHALL BE PERFORMED TO VERIFY THAT THE RECOMMENDED LEVEL OFCOMPACTION IS ACHIEVED DURING CONSTRUCTION. THEREFORE, ONE DENSITY TEST SHALL BE PERFORMED FOREVERY 2,500 SQUARE FEET OF AREA FOR EVERY LIFT OF FILL OR AS RECOMMENDED BY THE ON-SITE GEOTECHNICAL ENGINEER. SHOREJAX OVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHE21801 7 1 1 3 2 6 9 21801 7 1 1 2 2 2 1 21801 7 1 1 2 3 0 8 21801 7 1 1 5 1 1 7 21801 7 2 0 3 4 3 2 21801 7 1 1 6 1 3 1 21801 7 1 1 6 3 9 2 21801 7 1 1 4 4 9 2 21801 7 1 1 3 5 3 0 21801 7 1 1 4 5 3 6 21801 3 0 2 9 6 7 3 21801 7 0 1 9 4 8 8 21801 7 1 1 0 5 4 2 21801 7 1 1 1 6 4 0 21801 7 1 1 1 6 9 5 21801 3 0 2 9 6 7 3 TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB39 40 41423837 38 37 39 36 37 38 39 38373635CFCFCFCFCFCFCF CF CFCFCFCFCFCFCFCFCFCFCFCF CF CF CF CFCFCFCFCFSFSFSFLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD 0+00 0+501+001+50 2+00 2+5 0 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50SHEET 17MATCHLINESTREAM ALIGNMENT 0+00.00-8+90.00 0+5033.0233.0161+0034.2434.2381+5035.2835.2782+0042.9842.9812+5034.4134.4083+0035.7035.7043+5037.1137.1064+0037.0737.0674+5037.0037.0015+0036.8436.8435+5036.8236.8246+0042.8842.8796+5038.1538.1457+0038.2338.2357+5038.4038.4018+0038.6638.6588+5038.5238.525- 1 2 : 1 1:1100:1 - 1 2 : 1 1:1100:1 -5:14:1100:1 - 1 1 : 1 1:1100:1 - 1 1 : 1 1:1100:1 - 1 1 : 1 1:1100:1 - 1 1 : 1 1:1100:1 - 1 1 : 1 1:1100:1 - 1 1 : 1 1:1100:1 - 1 0 : 1 1:1104:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1GRADE BREAK STA = 0+37.46ELEV = 34.00GRADE BREAK STA = 0+63.50 ELEV = 31.75GRADE BREAK STA = 0+93.46ELEV = 34.45GRADE BREAK STA = 1+21.46ELEV = 34.61GRADE BREAK STA = 1+61.00 ELEV = 32.62 GRADE BREAK STA = 1+71.61 ELEV = 35.04 GRADE BREAK STA = 2+28.33 ELEV = 35.61 GRADE BREAK STA = 2+54.37 ELEV = 33.19 GRADE BREAK STA = 2+84.33 ELEV = 35.89 GRADE BREAK STA = 3+12.33 ELEV = 35.89 GRADE BREAK STA = 3+66.37 ELEV = 33.75GRADE BREAK STA = 3+96.33ELEV = 36.45GRADE BREAK STA = 4+24.33ELEV = 36.45GRADE BREAK STA = 4+78.37 ELEV = 34.31GRADE BREAK STA = 5+08.33ELEV = 37.01GRADE BREAK STA = 5+36.33ELEV = 37.01GRADE BREAK STA = 5+93.09ELEV = 37.18GRADE BREAK STA = 6+33.65ELEV = 37.57GRADE BREAK STA = 6+59.69 ELEV = 35.15GRADE BREAK STA = 6+89.65ELEV = 37.71GRADE BREAK STA = 7+17.65ELEV = 37.71GRADE BREAK STA = 7+71.69 ELEV = 35.43GRADE BREAK STA = 8+01.65ELEV = 37.99GRADE BREAK STA = 8+29.65ELEV = 37.99GRADE BREAK STA = 8+85.65ELEV = 38.13FLOW PLAN VIEW (1" = 30' HORIZ.) PROFILE VIEW (1" = 30' HORIZ., 1" = 2.0' VERT.)No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 30' 30150 60 90VERTICAL SCALE: 1" = 2.0'1.0 0 2.0 4.0 6.0 16 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925EXISTING 48" CMP EG FG BANKFULL EXISTING 48" CMP LOG V-DROPS (TYP.) EXISTING 48" CMP EXISTING 48" CMP FLOW SUNSET ROADWEST BOILING SPRING ROAD083 - Hunters Road_EISSUED FOR: REVIEW & PERMITTING 083 - HUNTERS ROAD P&P 0+00.00 - 8+90.00HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCECONTRACTOR SHALL UTILIZE LAYDOWN AREA FOR CONSTRUCTION MATERIALS AND STAKING CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCES CONTRACTOR SHALL FURNISH AND INSTALL LOG V-DROPS (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCES CONTRACTOR SHALL FURNISH AND INSTALL TURBIDITY CURTAIN CONTRACTOR SHALL FURNISH AND INSTALL SILT FENCE CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING G:\2019\4519049\09-construction drawings\09a - working drawings\083 - Hunters Road\083 - Hunters Road_E.dwg, 3/1/2021 8:42:05 AM, DWG To PDF.pc3 218017111640 218013029673 218017023252 TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB45 44 43 42 41 40 39404142434445 45 45 45 45 LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLOD8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+0016+03 SHEET 16MATCHLINESTREAM ALIGNMENT 8+90.00-16+03.08 9+0037.6437.6429+5036.7636.76010+0037.7237.72210+5038.7838.78311+0039.0939.08811+5039.1639.16212+0038.8138.81012+5038.5538.55413+0038.9938.99313+5039.2939.29314+0038.1138.11114+5039.2039.19715+0039.5239.52215+5039.7239.72416+0039.8939.886200:1 - 1 1 : 1 5:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1200:1 - 1 1 : 1 1:1703:1 GRADE BREAK STA = 9+23.65ELEV = 38.32GRADE BREAK STA = 9+50.00 ELEV = 35.90 GRADE BREAK STA = 9+89.65ELEV = 38.46GRADE BREAK STA = 10+17.65ELEV = 38.46GRADE BREAK STA = 10+71.69ELEV = 36.18GRADE BREAK STA = 11+01.65ELEV = 38.74GRADE BREAK STA = 11+29.65ELEV = 38.74GRADE BREAK STA = 11+83.69ELEV = 36.46GRADE BREAK STA = 12+13.65 ELEV = 39.02 GRADE BREAK STA = 12+41.65 ELEV = 39.02 GRADE BREAK STA = 12+95.69ELEV = 36.74GRADE BREAK STA = 13+25.65 ELEV = 39.30 GRADE BREAK STA = 13+53.65 ELEV = 39.30 GRADE BREAK STA = 14+07.69ELEV = 37.02GRADE BREAK STA = 14+37.65 ELEV = 39.58 GRADE BREAK STA = 14+65.65 ELEV = 39.58 GRADE BREAK STA = 15+19.69ELEV = 37.30GRADE BREAK STA = 15+49.65 ELEV = 39.86 GRADE BREAK STA = 15+77.65 ELEV = 39.86 FLOW PLAN VIEW (1" = 30' HORIZ.) PROFILE VIEW (1" = 30' HORIZ., 1" = 2.0' VERT.)No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 30' 30150 60 90VERTICAL SCALE: 1" = 2.0'1.0 0 2.0 4.0 6.0 17 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925BANKFULL EG FG LOG V-DROPS (TYP.) FLOW 083 - Hunters Road_EISSUED FOR: REVIEW & PERMITTING 083 - HUNTERS ROAD P&P 8+90.00 - 16+03.08HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCELAYDOWN AREA CONTRACTOR SHALL FURNISH AND INSTALL LOG V-DROPS (TYP.) CONTRACTOR TO PROVIDE SMOOTH TRANSITION TO EXISTING GRADE CONTRACTOR TO PROVIDE SMOOTH TRANSITION TO EXISTING GRADE CONTRACTOR TO PROVIDE SMOOTH TRANSITION TO EXISTING GRADE G:\2019\4519049\09-construction drawings\09a - working drawings\083 - Hunters Road\083 - Hunters Road_E.dwg, 3/1/2021 8:43:33 AM, DWG To PDF.pc3 29303132333435363738394041 2 9 3 0 3 1 3 2 3 3 3 4 35 SF SF SFLODLODLODLODLODLOD LODLODLODLODLODLOD LOD LOD LODLODLOD LOD L O D L O D L O D LOD LODLODLODLODLODLODLOD0+000+500+60CFCFCFCFCFCFCFCFCFCFCFCFCFCF3637FLASHBOARD RISER & PIPE -0+50.00-1+50.00 0+00 0+5030.5530.5451+00 PLAN VIEW (1" = 30' HORIZ.) PROFILE VIEW (1" = 30' HORIZ., 1" = 2.0' VERT.)No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 30' 30150 60 90VERTICAL SCALE: 1" = 2.0'1.0 0 2.0 4.0 6.0 HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCE084 - N SHORE DRIVE RISER BOX P&P18 SHEET: of 33 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925084 - N SHORE DRIVE CONTRACTOR SHALL FURNISH AND INSTALL 24" CMP CONTRACTOR SHALL FURNISH AND INSTALL 4' X 3' (INTERNAL) FLASHBOARD RISER CONTRACTOR SHALL BACKFILL, COMPACT, AND TIE TO EXISTING GRADE 24" CMP EG FLASHBOARD RISER RIM ELEV 34' INV 30.7' INV 31' ISSUED FOR: REVIEW & PERMITTING CONTROL POINTS CONTRACTOR SHALL UTILIZE LAYDOWN AREA FOR CONSTRUCTION MATERIALS AND STAKING CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR SHALL FURNISH AND INSTALL SILT FENCE CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING G:\2019\4519049\09-Construction Drawings\09A - Working Drawings\084 - North Shore Drive\084 - N SHORE DRIVE.dwg, 3/1/2021 12:51:57 PM, DWG To PDF.pc3 XXXXXXX2 1 8 0 1 0 2 7 5 0 2 2 2 1 8 0 1 0 2 6 5 9 7 6 2 1 8 0 0 9 2 7 4 0 3 7 2 1 8 0 1 0 2 7 3 1 6 2 2 1 8 0 1 0 2 6 6 9 3 2 2 1 8 0 0 9 2 6 4 7 0 7 2 1 8 0 0 9 2 6 3 8 5 2 2 1 8 0 0 9 2 6 2 8 9 6 2 1 8 0 0 9 2 6 2 9 3 0 2 1 8 0 0 9 1 6 9 8 9 2 2 1 8 0 0 9 1 6 9 9 2 0 2 1 8 0 0 9 1 6 8 9 6 6 2 1 8 0 0 9 1 7 8 0 1 2 2 1 8 0 0 9 1 7 7 0 6 7 2 1 8 0 0 9 1 7 9 1 2 7 2 1 8 0 0 9 2 7 0 0 2 6 2 1 8 0 0 9 2 7 0 1 8 1 2 1 8 0 0 9 2 7 1 1 4 6SFSF LODLODL O D L O D L O D L O D L O D LODLODLODLODLODLODLODTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB47464544434746454443424948474849504847464544TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBOVHEOVHEOVHEOVHEOVHEOVHEOVHELODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LO D L O D LODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD L O D LODLODLODLODCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCF C F C F C F C F C F C F 0+0 0 0+50 1+00 1+50 2+0 0 2+ 5 0 3+003+504+004+ 5 0 5+005+50 6+006 + 5 0 6 + 5 4 -0+50.00 - 7+50.00 0+0039.4539.4510+5039.9839.9761+0040.2940.2861+5040.5140.5052+0039.0239.0222+5048.9648.9603+0042.8642.8603+5044.7744.7754+0042.6642.6624+5044.0944.0915+0049.6449.6375+5046.3046.3036+0050.3850.3816+5046.8446.8417+00 -1 6 : 1 1:1100:1 -1 2 : 1 1:167:1 - 1 1 : 1 1:1100:1 -1 2 : 1 2:173:1 -1 4 : 1 1:1100:1 -1 2 : 1 1:166:1 -1 2 : 1 1:1100:1 - 1 1 : 1 1:1148:1 - 1 2 : 1 1:150:1 - 1 2 : 1 1:150:1 GRADE BREAK STA = 0+00.00ELEV = 39.45GRADE BREAK STA = 0+32.00ELEV = 39.62GRADE BREAK STA = 1+28.00ELEV = 40.58GRADE BREAK STA = 1+60.00ELEV = 40.75GRADE BREAK STA = 2+22.08 ELEV = 38.64 GRADE BREAK STA = 2+66.39ELEV = 41.76GRADE BREAK STA = 2+98.39ELEV = 41.93GRADE BREAK STA = 3+60.47 ELEV = 39.83 GRADE BREAK STA = 3+99.39ELEV = 42.97GRADE BREAK STA = 4+31.39ELEV = 43.14GRADE BREAK STA = 4+83.77 ELEV = 41.12 GRADE BREAK STA = 5+36.77ELEV = 44.04GRADE BREAK STA = 5+63.77ELEV = 44.46GRADE BREAK STA = 6+16.15 ELEV = 42.83GRADE BREAK STA = 6+38.11ELEV = 45.82PLAN VIEW (1" = 30' HORIZ.) PROFILE VIEW (1" = 30' HORIZ., 1" = 2.0' VERT.)No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 30' 30150 60 90VERTICAL SCALE: 1" = 2.0'1.0 0 2.0 4.0 6.0 085 - PINE LAKE ROAD P&P19 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925CONTROL POINT CONTROL POINT CONTROL POINT QUEENS RDPI N E L A K E R D FLOW FLOW CONTRACTOR SHALL UTILIZE LAYDOWN AREA FOR CONSTRUCTION MATERIALS AND STAKING 085 - Pine Lake Road_E2ISSUED FOR: REVIEW & PERMITTING HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCECONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR SHALL FURNISH AND INSTALL LOG V-DROPS (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR SHALL ENSURE SMOOTH TRANSITION TO EXISTING GRADE CONTRACTOR SHALL ENSURE SMOOTH TRANSITION TO EXISTING GRADE CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCES EXISTING 48" CMP EXISTING 48" CMP EG FG BANKFULL LOG V-DROP (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL TOE WOOD (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL TOE WOOD (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL TURBIDITY CURTAIN CONTRACTOR SHALL FURNISH AND INSTALL SILT FENCE CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING G:\2019\4519049\09-construction drawings\09a - working drawings\085 - Pine Lake Road\Old Alignment Design\085 - Pine Lake Road_E - 2.dwg, 3/1/2021 8:50:34 AM, DWG To PDF.pc3 PIN: 1440000106-310000005966 ORTON LONGLEAF LLC PIN: 1440000123-209913132797 NATURE CONSERVANCY THE No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 30' 30150 60 90 PLAN VIEW (1" = 30' HORIZ.)20 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925190 - RIVER ROAD CLEARING AND SNAGGING ISSUED FOR: REVIEW & PERMITTING FLOW REMOVE STORM DEBRIS FROM CHANNEL TO IMPROVE FUNCTION (NRCS 326) ~300 FT UP & DOWNSTREAM OF RIVER RD RIVER ROAD190 - RIVER ROAD CLEARING AND SNAGGINGHURRICANE FLORENCE EWP - ENGINEERINGASSISTANCEG:\2019\4519049\09-construction drawings\09a - working drawings\190 - River Road\190 - RIVER ROAD CLEARING AND SNAGGING.dwg, 3/1/2021 10:44:39 AM, DWG To PDF.pc3 1920212223242526272829 17181920212223242526272829303132333435363730313233343536377. 2 : 1 0+0 0 0+5 0 0+9 2 0+00 0+50 1+00 1+18 LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD 191 - North Section 191 - South Section 0+0018.330+5023.6624.3291+0029.9530.9711+50 0+5025.3425.7861+00 PLAN VIEW (1" = 30' HORIZ.) PROFILE VIEW (1" = 30' HORIZ., 1" = 2.0' VERT.)No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 30' 30150 60 90VERTICAL SCALE: 1" = 2.0'1.0 0 2.0 4.0 6.0 HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCE191 - N SHORE DRIVE AT PATRICIA LAKE P&P21 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-19254519049 - 191_EISSUED FOR: REVIEW & PERMITTING EG EG FGFG CONTROL POINT CONTROL POINT CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR SHALL GRADE TO A UNIFORM SLOPE G:\2019\4519049\09-Construction Drawings\09A - Working Drawings\191 - North Shore Drive at Patricia Lake\4519049 - 191_E.dwg, 3/1/2021 9:28:00 AM, DWG To PDF.pc3 219110372248 219110279334 219110374130 219110364886 219110365613219110365567219110366511 219110363550219110364319219110364354 219109178125 TOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHETOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB21911 0 3 6 1 6 4 7 39 39 39 40 40 40 41 41 41 42 42 363637 373838 3939 38 39 404142 3637383940414243SFSFSFSF0+00 0+501+00 1+50 2+00 2+503+003+504+004+504+5538 37 39 40 363839 37 41 40 39 38 37424140 393837363938373635 3635 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 4+61LODLODLODLODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODL O D L O D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLOD LOD CFCF CF CF CF CFCFCFCFCF CF CF CF CF CF CF CF CF CFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCF CF CF CF CF CF CF CFCFCFCFCFCFCF CFCFCFCFCFCFCFCFCFCFCFCFCFCFCFUPSTREAM -0+50.00-5+00.00 -0+50 0+0033.2333.2310+5041.4541.4471+0034.6034.6041+5035.0735.0732+0035.2735.2732+5035.3935.3893+0035.7235.7173+5035.8335.8304+0035.1935.1854+5035.7235.7165+00 51:1 -1 2 : 1 1:1100:1 -1 2 : 1 1:1133:1 -1 2 : 1 1:1100:1 -1 2 : 1 1:1133:1 - 1 2 : 1 1:1133:1 -1 2 : 1 1:1100:1 -1 2 : 1 1:1200:1 -1 2 : 1 1:1100:1 -1 2 : 1 1:1100:1 -22 : 1 1:1147:1 GRADE BREAK STA = 0+00.00ELEV = 33.23GRADE BREAK STA = 0+61.79ELEV = 34.43GRADE BREAK STA = 0+81.79ELEV = 34.43GRADE BREAK STA = 1+19.99 ELEV = 33.13GRADE BREAK STA = 1+41.79ELEV = 34.78GRADE BREAK STA = 1+61.79ELEV = 34.78GRADE BREAK STA = 1+99.99 ELEV = 33.48GRADE BREAK STA = 2+21.79ELEV = 35.13GRADE BREAK STA = 2+41.79ELEV = 35.13GRADE BREAK STA = 2+79.99 ELEV = 33.78GRADE BREAK STA = 3+01.79ELEV = 35.48GRADE BREAK STA = 3+21.79ELEV = 35.48GRADE BREAK STA = 3+59.99 ELEV = 34.08GRADE BREAK STA = 3+81.79ELEV = 35.78GRADE BREAK STA = 4+01.79ELEV = 35.78GRADE BREAK STA = 4+53.27 ELEV = 34.58 GRADE BREAK STA = 4+60.86ELEV = 36.11FLOW PLAN VIEW (1" = 30' HORIZ.) PROFILE VIEW (1" = 30' HORIZ., 1" = 2.0' VERT.)No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 30' 30150 60 90VERTICAL SCALE: 1" = 2.0'1.0 0 2.0 4.0 6.0 22 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925EG BANKFULL FG EXISTING 36" CMP EXISTING 36" CMP EXISTING 12" CMP E BOILING SPRING RD CONTROL POINT CONTROL POINT LOG V-DROPS (TYP.) FLOW OAKDALE RD LUMBERTON RD E BOILING SPRING RDFLOWCONTRACTOR SHALL UTILIZE LAYDOWN AREA FOR CONSTRUCTION MATERIALS AND STAKING Allen CreekISSUED FOR: REVIEW & PERMITTING 192 - ALLEN CREEK UPSTREAM P&PHURRICANE FLORENCE EWP - ENGINEERINGASSISTANCECONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR SHALL FURNISH AND INSTALL LOG V-DROPS (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL LOG SILLS (TYP.) CONTRACTOR SHALL SECURE OVERLAPPING LOGS CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR SHALL FURNISH AND INSTALL SILT FENCE CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING G:\2019\4519049\09-construction drawings\09a - working drawings\192 - Allen Creek\Allen Creek.dwg, 3/1/2021 10:49:20 AM, DWG To PDF.pc3 21 9 1 1 0 3 6 5 6 1 3 2 1 9 1 1 0 3 6 5 5 6 7 2 1 9 1 1 0 3 6 6 5 1 1 2 1 9 1 1 0 3 6 3 5 5 0 2 1 9 1 1 0 3 6 6 6 6 9 2 1 9 1 0 9 1 7 8 1 2 5 21 9 1 1 0 3 6 7 7 3 6 TOBTOBTOBTOBTOBTOBTOBTOBOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHEOVHETOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOBTOB2 1 9 1 1 0 3 6 8 6 2 1 2 1 9 1 1 0 3 6 8 5 8 0 2 1 9 1 1 0 3 6 6 4 6 4 21911 0 3 6 1 6 4 7 21911 0 3 6 1 6 1 1 21911 0 3 6 0 5 7 6 42 4 2 3636 37 37 3 8 38 3 9 3 9 38 3940 41 42 36 37 38 39 40 41 42 43SFSFSFSF0+0 0 0+50 1+00 1+5 0 2+ 0 0 2+50 3+003+504+004+504+5538 39 37 4 140 3 938 3 742414039383736393837 3 6 3 5 36 3 5 0 + 0 0 0 + 5 0 1+ 0 0 1+502+ 0 0 LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODL O D L O D L O D LOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD L O D L O D L O D LOD LOD LOD LOD LOD L O D L O D CFC F C F C F C F CFCFCFCFC F C F CFCFCFCFCFCFCFCFCF CF CF CF CF C F C F CF CF CF CFCFCFC F CFCFCFCFCFCFCFCFCFCFCFCFCFCFCFDOWNSTREAM -0+50.00-5+00.00 0+0032.8632.8590+5033.5833.5771+0033.8333.8321+5033.7433.7432+0034.1734.1662+5031.7131.7123+0031.5531.5533+5032.5032.4994+0040.0740.0724+50 - 9 : 11:1133:1 - 9 : 11:1200:1 - 9 : 11:1133:1 - 9 : 11:1200:1 - 9 : 11:1100:1 - 9 : 11:1200:1 - 9 : 11:1129:1 -1 2 : 1 1:1138:1 - 9 : 11:1200:1 - 9 : 11:1133:1 - 9 : 11:1- 1 1 : 11:1- 1 1 : 11:1- 1 1 : 11:1- 1 1 : 11:1- 1 1 : 11:1- 1 1 : 11:1-5:14:1GRADE BREAK STA = 0+00.00ELEV = 32.86GRADE BREAK STA = 0+14.08 ELEV = 31.36GRADE BREAK STA = 0+32.00ELEV = 32.98GRADE BREAK STA = 0+48.00ELEV = 32.98GRADE BREAK STA = 0+78.08 ELEV = 31.56GRADE BREAK STA = 0+96.00ELEV = 33.18GRADE BREAK STA = 1+12.00ELEV = 33.18GRADE BREAK STA = 1+42.08 ELEV = 31.76GRADE BREAK STA = 1+60.00ELEV = 33.42GRADE BREAK STA = 1+76.00ELEV = 33.42GRADE BREAK STA = 2+06.08 ELEV = 32.00GRADE BREAK STA = 2+30.00ELEV = 33.67GRADE BREAK STA = 2+50.00ELEV = 33.67GRADE BREAK STA = 2+86.08 ELEV = 32.33GRADE BREAK STA = 3+04.00ELEV = 33.91GRADE BREAK STA = 3+20.00ELEV = 33.91GRADE BREAK STA = 3+50.08 ELEV = 32.53GRADE BREAK STA = 3+52.00ELEV = 34.03GRADE BREAK STA = 3+69.00 ELEV = 34.28GRADE BREAK STA = 3+70.00ELEV = 36.03GRADE BREAK STA = 3+87.00 ELEV = 36.28 GRADE BREAK STA = 4+05.00 ELEV = 38.28 GRADE BREAK STA = 4+06.00 ELEV = 40.03 GRADE BREAK STA = 4+13.53 ELEV = 40.09 FLOW PLAN VIEW (1" = 30' HORIZ.)No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:23 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925PROFILE VIEW (1" = 30' HORIZ., 1" = 2.0' VERT.) HORIZONTAL SCALE: 1" = 30' 30150 60 90VERTICAL SCALE: 1" = 2.0'1.0 0 2.0 4.0 6.0 FG EG EXISTING 12" CMP EXISTING 12" CMP EXISTING 36" CMP CONTROL POINT LOG V-DROPS (TYP.) LOG SILLS (TYP.) THROUGHOUT CHUTE BANKFULL FLOW E BOILING SPRING RDLUMBERTON RDFLOWCONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE Allen CreekISSUED FOR: REVIEW & PERMITTING 192 - ALLEN CREEK DOWNSTREAM P&PHURRICANE FLORENCE EWP - ENGINEERINGASSISTANCECONTRACTOR SHALL FURNISH AND INSTALL LOG SILLS (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL LOG V-DROPS (TYP.) CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY CONSTRUCTION ENTRANCE CONTRACTOR SHALL UTILIZE LAYDOWN AREA FOR CONSTRUCTION MATERIALS AND STAKING CONTRACTOR SHALL FURNISH AND INSTALL TURBIDITY CURTAIN CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING CONTRACTOR SHALL FURNISH AND INSTALL SILT FENCE CONTRACTOR SHALL FURNISH AND INSTALL CONSTRUCTION FENCING G:\2019\4519049\09-construction drawings\09a - working drawings\192 - Allen Creek\Allen Creek.dwg, 3/1/2021 10:49:59 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCELOG V-DROP24 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925A A PROFILE (NTS.) PLAN VIEW (NTS.) LOG V-DROP (NTS.) BANKFULL LOG BURIED IN BANKLOG EXPOSED 4% SLOPE MAX.INVERT TO PROP. BANKFULL FILTER FABRIC SCOUR POOL PROPOSED STREAM INVERT FLOW FLOW TOP LOG FOOTER LOG B B TYPICAL SECTION B-B (NTS.) PROPOSED BANKFULL EMBED 3' MIN. VANE LOG FOOTER LOG FILTER FABRIC DEADMAN NOTE: TACK FILTER FABRIC FROM UPSTREAM FACE OF LOG VANE ARMS TO BOTTOM OF FOOTER LOGS ADDITIONAL FOOTER LOGS AS REQUIRED TO FILL VOIDS NOTES: 1. LOGS SHALL BE SIZED PER LOG CROSS VANE CHART, AND RELATIVELY STRAIGHT. 2. LOGS SHALL NOT BE SALVAGED FROM PROJECT AREA, CONTRACTOR SHALL SUBMIT TO ENGINEER PROPOSED HARVEST LOCATIONS FOR VIEWING. SPECIES PER CONSTRUCTION SPECIFICATIONS.. 3. NAIL FILTER FABRIC USING 3" ROOFING NAILS AT 4 INCH INTERVALS ALONG LOG. 4. FILTER FABRIC USED SHALL BE NON-WOVEN GEOTEXTILE FABRIC PER CONSTRUCTION SPECIFICATIONS. 5. SECURING BOLDER SHALL BE A MINIMUM OF 2' WIDE X 3' LONG X 1.5' THICK. 6. LOGS SHALL NOT BE DE-BARKED, ALL LOGS SHALL HAVE BARK ATTACHED. PROPOSED VEGETATION 50% LIVE AND 50% DEAD TREE TOPS AND LIVE WHIPS (SAME SPECIES AS SPECIFIED WITHIN LIVE STAKE SPECIFICATION) SHALL BE INSTALLED 23 OF THE TOP OF BANK WIDTH. TACK FILTER CLOTH TO UPSTREAM SIDE OF BOTTOM LOG NOTE: ALL LOGS ARE TO BE SIZED ACCORDING TO THEIR AVERAGE DIAMETER MEASUREMENT. THIS IS NOT TO BE CONFUSED WITH THE LOGS DBH. CONTRACTOR SHALL INSTALL STREAM STRUCTURES IN CORRECT LOCATION BASED ON DETAIL INFORMATION. STRUCTURE TABLE INFORMATION IS PROVIDED AS A REFERENCE ONLY. BANK STABILIZATION PLANTING NOTES: 1. PLANTINGS SHALL BE INSTALLED FROM THE TOE OF SLOPE TO THE OUTSIDE EDGE OF THE BANKFULL BENCH. 2. JUNCUS PLUGS AND CONTAINERIZED TREES SHALL BE A SUBSIDIARY ITEM TO THIS BID ITEM, AND SHALL BE INCLUDED IN THE PAYMENT. 3. JUNCUS SHALL BE PLANTED 1' (ONE) O.C. OFFSET ROWS FROM THE TOE OF SLOPE TO THE OUTSIDE EDGE OF THE BANKFULL BENCH 4. (4) CONTAINERIZED TREES (1 1/2" - 2" CALIPER) SHALL BE (2) BALD CYPRESS (Taxodium distichum) (1) SWAMP CHESTNUT OAK (Quercus michauxii ). OR (1) SWAMP WHITE OAK (Quercus bicolor) AND (1) BLACK GUM (Nyssa syluatica) TREES SHALL BE EVENLY SPACED ALONG LOG, BUT NO CLOSER THAN 5' O.C. 5. CONTRACTOR SHALL INSURE THAT JUNCUS REMAINS 6 INCHES OFF LOG STRUCTURE AND TREE STOCK IN NOT PLANTED ANY CLOSER THAT 3 FOOT FROM LOG STRUCTURE. OAK SWAMP CHESTNUT (Quercus michauxii ). BALD CYPRESS (Taxodium distichum) SOFT RUSH / JUNCUS (Juncus effusus) BANK STABILIZATION PLANTS SWAMP WHITE OAK (Quercus bicolor ). BLACKGUM / SWAMP TUPELO (Nyssa sylvatica var biflora). EMBED 3' MINIMUMTOP LOG PROPOSED TOP OF BANK C 8" -12" DIAMETER FOOTER LOG 42" LONG HOOKED #6 REBAR AT 3' SPACINGTYPICAL SECTION A-A (NTS.) 2' MIN A BANK STABILIZATION PLANTING IN ACCORDANCE WITH PLANTING PLAN SCOUR POOL BANKFULL B 42" LONG HOOKED #6 REBAR FILTER FABRIC DEADMAN LOGS TO BE NOTCHED AND SECURED LOG EXPOSED MIN 14" DIA. ROOTWAD OUTSIDE EDGE BANKFULL BENCH ADDITIONAL FOOTER LOGS AS REQUIRED TO FILL VOIDS (ALL LOGS SHALL HAVE A MIN. SIZE PER STRUCTURE TABLE)CONTRACTOR SHALL PROVIDE SMOOTH TRANSITION BETWEEN BANKFULL ELEVATION AND TOP VANE LOG (3) DEADMAN ANCHOR PER SPECIFICATIONS L NOTES: 1. WHEN CUTTING TRENCH FOR ROOTWAD, THE CUT END SHOULD BE DUG DEEPER THAN THE ROOTWAD END FOR INCREASED STABILIZATION AND ANCHORING. 2. RE-COMPACT ANY FILL AREAS TO THE DENSITY OF ORIGINAL SUBSTRATE. 3. SECURING STONE SHALL BE BOLDER OF SIZE 2ft X 3ft X 1.5FT. BANKFULL STAGE BASEFLOW FLOOD PLAIN SOD MAT OR COIR MATTING SIZE PER STRUCTURE TABLE TOP OF BANK CROSS SECTION VIEW (NTS.) PLAN VIEW (NTS.) DRIVE POINT METHOD: SHARPEN THE END OF THE LOG WITH A CHAINSAW BEFORE "DRIVING" IT INTO THE BANK. ORIENT ROOT WADS UPSTREAM SO THAT THE STREAM FLOW MEETS THE ROOT WAD AT A 90° ANGLE, DEFLECTING THE WATER AWAY FROM THE BANK. TRENCHING METHOD: IF THE ROOT WAD CANNOT BE DRIVEN INTO THE BANK OR THE BANK NEEDS TO BE RECONSTRUCTED, THE TRENCHING METHOD SHALL BE USED. THIS METHOD REQUIRES THAT A TRENCH BE EXCAVATED PARALLEL TO THE BANK AND WELL BELOW THE STREAMBED FOR THE LOG PORTION OF THE ROOT WAD. ONE-THIRD OF THE ROOT WAD SHALL REMAIN BELOW NORMAL BASE FLOW CONDITIONS. ROOT WAD REVETMENT (NTS.) F L OW ROOT WAD ROOT WAD60° (max)GIVEN X, Y, & Z SECURING STONE BUTTRESS OF ROOT WAD SHALL BE FLUSH WITH CHANNEL BANK 6'6'SECURING STONE 30° (min)NOTE: ALL LOGS ARE TO BE SIZED ACCORDING TO THEIR AVERAGE DIAMETER MEASUREMENT. THIS IS NOT TO BE CONFUSED WITH THE LOGS DBH. DESIGNATION A (lf)B (lf)C (lf)L (lf)TOP LOG DIA FOOTER LOG DIA ELEV X MSL ELEV Y MSL ELEV Z1 MSL ELEV Z2 MSL V-DROP 1 12"12" V-DROP 2 12"12" V-DROP 3 12"12" V-DROP 4 12"12" V-DROP 5 12"12" V-DROP 6 12"12" V-DROP 8 12"12" V-DROP 9 12"12" V-DROP 10 12"12" V-DROP 11 12"12" LOG V-DROPISSUED FOR: REVIEW & PERMITTING G:\2019\4519049\09-construction drawings\09a - working drawings\LOG V-DROP.dwg, 3/1/2021 10:51:30 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCELOG SILL25 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925LOG SILL B SECTION B-B (NTS.) LOG SILLS STRUCTURE ALIGNMENT STATION OFFSET SIDE X1 Y1 Z1 ELEV LOG DIA (IN)APPROX. LOG LENGTH (FT) PROPOSED STREAM BED ELEVATION FLOW END OF FILTER FABRIC REPLACE CHANNEL BED MATERIAL FOR LOG SILLS. COVER LOGS SHALL BE ABOVE CHANNEL BOTTOM ELEV. REFERENCE POINT PER STRUCTURE TABLE. SEE TABLE NOTES: 1. LOGS SHALL BE SIZED PER LOG SILL CHART, AND RELATIVELY STRAIGHT. 2. LOGS SHALL NOT BE SALVAGED FROM PROJECT AREA, CONTRACTOR SHALL SUBMIT TO ENGINEER PROPOSED HARVEST LOCATIONS FOR VIEWING. SPECIES PER CONSTRUCTION SPECIFICATIONS. 3. NAIL FILTER FABRIC USING 3" ROOFING NAILS AT 4 INCH INTERVALS ALONG LOG. 4. FILTER FABRIC USED SHALL BE NON-WOVEN GEOTEXTILE FABRIC PER CONSTRUCTION SPECIFICATIONS. 5. COVER LOGS SHALL BE A SINGLE LOG INSTEAD OF THE THREE AS SHOWN IN SECTION A-A. 6' FLOW PROPOSED STREAM BANK REFERENCE POINT PER STRUCTURE TABLE. SEE LOG SILL TABLE B B AA SECTION A-A (NTS.) PROPOSED STREAM BED ELEVATION FILTER FABRIC STREAM BANK COIR FIBER MATTING LOG SILL STRUCTURE (NTS.) PLAN VIEW (NTS.) COIR MATTING COIR MATTING NOTES: COIR MATTING AS SPECIFIED IN SECTION 404 OF THE SPECIFICATIONS AND SHALL BE FOLDED 3 TIMES (THEREFORE) 4 PLY AND PLACED UNDER UPSTREAM SECURING STONE, WRAPPED OVER LOG STRUCTURE THEN UNDER DOWN STREAM SECURING STONES. SECURING STONE SHALL BE BOULDERS WITH DIMENSIONS 2 FT X 3 FT X 1.5 FTBANK STABILIZATION PLANTING (TYP.) BOTH SIDES SEE NOTES THIS PAGE BANK STABILIZATION PLANTING NOTES: 1. PLANTINGS SHALL BE INSTALLED FROM THE TOE OF SLOPE TO THE OUTSIDE EDGE OF THE BANKFULL BENCH. 2. JUNCUS PLUGS AND CONTAINERIZED TREES SHALL BE A SUBSIDIARY ITEM TO THIS BID ITEM, AND SHALL BE INCLUDED IN THE PAYMENT. 3. JUNCUS SHALL BE PLANTED 1' (ONE) O.C. OFFSET ROWS FROM THE TOE OF SLOPE TO THE OUTSIDE EDGE OF THE BANKFULL BENCH 4. (4) CONTAINERIZED TREES (1 1/2" - 2" CALIPER) SHALL BE (2) BALD CYPRESS (Taxodium distichum) (1) SWAMP CHESTNUT OAK (Quercus michauxii). OR (1) SWAMP WHITE OAK (Quercus bicolor) AND (1) BLACK GUM (Nyssa syluatica) TREES SHALL BE EVENLY SPACED ALONG LOG, BUT NO CLOSER THAN 5' O.C. 5. CONTRACTOR SHALL INSURE THAT JUNCUS REMAINS 6 INCHES OFF LOG STRUCTURE AND TREE STOCK IN NOT PLANTED ANY CLOSER THAT 3 FOOT FROM LOG STRUCTURE. OAK SWAMP CHESTNUT (Quercus michauxii ). BALD CYPRESS (Taxodium distichum) SOFT RUSH / JUNCUS (Juncus effusus) BANK STABILIZATION PLANTS SWAMP WHITE OAK (Quercus bicolor ). BLACKGUM / SWAMP TUPELO (Nyssa sylvatica var biflora). ISSUED FOR: REVIEW & PERMITTING G:\2019\4519049\09-construction drawings\09a - working drawings\LOG SILL.dwg, 3/1/2021 10:53:03 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCETOE WOOD REVETMENT26 TOE WOOD SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925NOT TO SCALE APPROX. BASE FLOW WSE NOT TO SCALE 3:1 TO BAN K F U L LFLOW AA' 1. ALL OUTSIDE MEANDER BENDS WITH RADIUS OF CURVATURE RATIO LESS THAN 4.0 SHALL BE PROTECTED WITH BANK REVETMENTS. 2. COARSE WOODY DEBRIS SHALL CONSIST OF LOGS, ROOTWADS, AND LARGE BRANCHES NOT SUITABLE FOR CONSTRUCTION OF LOG STRUCTURES. ALL MATERIALS ARE TO BE APPROVED BY THE ENGINEER. COARSE WOODY DEBRIS SHALL BE CONSTRUCTED WITH THE LARGEST MATERIAL PLACED FIRST. NO LOGS SHALL BE PLACED PARALLEL TO THE FLOW OF WATER, UNLESS DIRECTED BY THE ENGINEER. LOGS SHALL BE PLACED IN A CROSSING PATTERN OR WEAVE SUCH THAT EACH LOG IS ANCHORED BY ANOTHER LOG. 3. SMALL/FINE WOODY DEBRIS SHALL CONSIST OF MEDIUM TO SMALL LIMBS, BRANCHES, BUSHES, AND/OR LOGS. INVASIVE SPECIES SHALL NOT BE USED. SMALL/FINE WOODY DEBRIS SHALL BE PLACED ABOVE THE COARSE WOODY DEBRIS WITH THE LARGEST MATERIAL BEING PLACED FIRST AND THE SMALLEST MATERIAL PLACED LAST. 4. ALL WOODY DEBRIS SHALL BE COMPACTED WITH THE EXCAVATOR BUCKET TO REDUCE THE PRESENCE OF VOIDS IN THE SMALL/FINE WOODY DEBRIS LAYER. 5. GRAVEL LEVELING BASE SHALL BE INSTALLED ABOVE THE HIGHEST ELEVATION OF THE WOODY DEBRIS BEFORE THE SOIL LIFTS ARE INSTALLED. 6. THE SOIL BACKFILL USED FOR LIFTS AND TOPSOIL USED FOR LAYERING WITH THE LIVE BRANCHES SHALL BE FREE OF ANY LARGE ROOTS OR WOODY DEBRIS AND SHALL GENERALLY BE FREE FROM ANY GRAVEL OR COBBLE MATERIAL. 7. SOIL BACKFILL SHALL BE COMPACTED SUCH THAT FUTURE SETTLING WILL BE KEPT TO A MINIMUM; YET, NOT SUCH THAT THE UNDERLYING BRUSH IS DISPLACED OR DAMAGED. THE TOP OF THE BACKFILL FOR THE FIRST LIFT SHALL BE SLOPED AT APPROXIMATELY 5% AWAY FROM THE STREAM. 8. PLACE A LAYER OF TOPSOIL AND LIVE BRANCHES ON THE GRAVEL LEVELING BASE SUCH THAT APPROXIMATELY 6 INCHES TO 1 FOOT OF EACH LIVE BRANCH WILL BE EXPOSED AND THE REMAINDER (2' TO 4') OF EACH LIVE BRANCH WILL BE COVERED BY THE SOIL LIFT. LIVE BRANCHES SHALL BE OF THE SPECIES SPECIFIED FOR LIVE STAKES OR APPROVED BY THE ENGINEER. 9. PLACE A LAYER OF 6.5 FEET WIDE BIODEGRADABLE EROSION CONTROL BLANKET AND 700 GRAM EROSION CONTROL MATTING, ON TOP OF THE TOPSOIL AND LIVE BRANCHES SUCH THAT 2.5 FEET OF THE BLANKET WILL BE BURIED BELOW THE NEXT SOIL LIFT. ALLOW THE REMAINING 4.0 FEET OF BLANKET AND MATTING TO HANG OVER THE GRAVEL LEVELING BASE. 10. PLACE SOIL BACKFILL UP TO THE LIFT HEIGHT SPECIFIED OF NO GREATER THAN 1.0 FT BEING CAREFUL NOT TO PUSH/PULL OR TEAR THE FABRIC PREVIOUSLY PLACED. 11. TOP DRESS THE SOIL LIFT WITH TOPSOIL FROM THE FACE OF THE SOIL LIFT BACK INTO THE FLOODPLAIN AT LEAST 4FT. 12. THE EROSION CONTROL FABRICS SHALL BE PULLED AS TIGHT AS POSSIBLE WITHOUT TEARING OR EXCESSIVELY DISTORTING THE FABRIC. SECURE THE EROSION CONTROL AND NON-WOVEN MATTING IN PLACE BY STAKING THE END OF THE EROSION CONTROL FABRIC WITH WOODEN STAKES ON 1.5-FOOT CENTERS. 13. REPEAT STEPS 8 THROUGH 12 AS NEEDED TO BUILD SOIL LIFTS UP TO DESIGN BANKFULL ELEVATION. 14. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS-SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED OR APPROVED BY THE ENGINEER. 15. RE-DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN-STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 16. COIR LOG TOE PROTECTION MAY USED AS ALTERNATIVE BANK REVETMENT WHERE TOE WOOD IS NOT FEASIBLE DUE TO FIELD CONDITIONS. EXCAVATION LIMITS WOOD STAKE UNDISTURBED OR COMPACTED EARTH SELECT SOIL BACKFILL TOP OF WOODY DEBRIS 1.5' ABOVE U/S TW PC ELEV FINE WOODY DEBRIS (2" - 4") COARSE WOODY DEBRIS (4" - 10") GRAVEL BASE TO 1.0' BELOW TW ELEV LIVE STAKES AND BARE ROOTS SOIL GEOLIFT WITH EROSION CONTROL BLANKET (ECB) AND 700 GRAM EROSION CONTROL MATTING (ECM) (EACH LIFT REQUIRES 1 LAYER OF ECB AND ECM) LIVE CUTTINGS SELECT GRAVEL BACKFILL AND TOPSOIL FOR BASE OF FIRST SOIL LIFT FILL VOIDS WITH FINE WOODY MATERIAL STREAMBED MIN. WIDTH OF MATTING X' BANKFULL TOE WOOD REVETMENT LIVE CUTTINGS WOOD STAKE (TYP) BANKFULL TOE WOOD REVETMENT DETAILED PLAN TOE WOOD REVETMENT DETAILED PROFILE - SECTION A - A' 1.0' OFFSET 1.0' MAX TOE WOOD REVETMENT NOTES ISSUED FOR: REVIEW & PERMITTING G:\2019\4519049\09-construction drawings\09a - working drawings\TOE WOOD.dwg, 3/1/2021 10:54:00 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCEFLASHBOARD RISER27 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925HDPE TYPE "S" AASHTO M 294 ALUMINUM FLASHBOARDS 1/4" STAINLESS STEEL PLATES DRILLED W/ 1 1/2" HOLE FOR LOCKING ROD (TYP.) PIPE-TO-MANHOLE CONNECTOR BOOT 10 Ga. ALUMINUM GUIDE CHANNEL BUTYL-SEALANT GASKET (TYP.) INTERNAL STEEL AND LIFTING HOOKS SHALL BE DESIGNED BY A NORTH CAROLINA REGISTERED PROFESSIONAL ENGINEERCONCRETE FLASHBOARD RISER DETAIL NTS. TOP FRONT RIGHT ORTHOGRAPHIC VIEW 10 Ga. ALUMINUM GUIDE CHANNEL BUTYL-SEALANT GASKET (TYP.) LOCKING EYE STRUCTURAL CONCRETE LOCKING ROD PLAN VIEW NTS. FLATTEN END AND DRILL 12" HOLE. LENGTH VARIES TO FIT STRUCTURE. TWO LIFTING HOOKS PER STRUCTURE. LENGTH OF LIFTING HOOKS ADEQUATE TO REACH BOTTOM STOPLOG.6"3"VARIES1' - 0" 1/2'" ROUND BAR 3/4" ALUMINUM ROD 8"1/2" ROUND BAR WELDED TO TUBULAR ALUM. AS SHOWN (2 REQ'D PER STOPLOG). NOTE: CONTRACTOR SHALL FURNISH, FABRICATE, AND INSTALL STOPLOGS TO BE FABRICATED FROM 18" TUBULAR ALUMINUM. LENGTH OF STOPLOGS SHALL BE 1/2" LESS THAN DISTANCE BETWEEN CHANNELS.3"8"2"4"3"2" 8"2"1 14"2" REAR WALL OF RISER SHALL BE FLUSH WITH DITCH PLUG SLOPE VARIABLE MIN. 5:1 WRAP NON-WOVEN GEOTEXTILE AROUND PIPE AT ALL PIPE JOINTS. (MIN. 1.0' OVERLAP BOTH SIDES) 2.0', #57 STONE BEDDING 5 DEPTH OF CONCRETE BASE 0.5' MINIMUM, TO BE DESIGNED BY PRECAST ENGINEER. (EL. "C" - EL. "D") 11 GEOTEXTILE TOP OF FILL EL. "A" = CONSTRUCTED LEGEND OF TABLE DIM. "AA" = INSIDE RISER WIDTH DIM. "BB" = INSIDE RISER LENGTH EL. "A" = TOP OF FILL OVER STRUCTURE EL. "B" = TOP OF RISER EL. "C" = BOTTOM OF CONCRETE EL. "D" = UPPER INVERT OF PIPE EL. "E" = LOWER INVERT OF PIPE EL. "F" = PERMANENT WEIR L = LENGTH OF PIPE FLOW CONCRETE FLASH BOARD RISER TOP OF RISER EL. "B" = 1 1/2" HOLE FOR LOCKING ROD "L"= LENGTH OF PIPE STOPLOG LIFTING HOOK DETAIL NTS TYPICAL SECTION OF WATER CONTROL STRUCTURE LOCATION NTS 2 LF (TYP) STANDARD ALUMINUM STOPLOG DETAIL NTS NOTE: ALL DIMENSIONS SHOWN ARE MINIMUM. FABRICATION ENGINEER SHALL SIZE STRUCTURES IN ACCORDANCE WITH THEIR CALCULATIONS, MAINTAINING THE WEIR LENGTH SPECIFIED WITHIN THE TABLE BELOW. COMPACTED BACK FILL TO TIE TO SUITABLE MINERAL SOILS. (DEPTH VARIES) "BB" "AA" EL. "B" TOP RISER EL. "F" TOP WEIR FABRICATION NOTES: 1. THE PLANS (SHOP DRAWINGS) FOR PRECAST UNITS SHALL BE DRAWINGS FURNISHED BY THE CONTRACTOR FOR APPROVAL BY THE NRCS PROJECT ENGINEER. THESE DRAWINGS SHALL SHOW COMPLETE DESIGN, INSTALLATION, STRUCTURAL LOADING, AND CONSTRUCTION INFORMATION IN SUCH DETAIL AS TO ENABLE THE PROJECT ENGINEER TO DETERMINE THE ADEQUACY OF THE PROPOSED UNITS FOR THE INTENDED PURPOSE. DETAILS OF THE STEEL REINFORCEMENT SIZE AND PLACEMENT SHALL BE INCLUDED. THE DRAWINGS SHALL INCLUDE A SCHEDULE WHICH WILL LIST THE SIZE AND TYPE OF PRECAST UNIT AT EACH LOCATION WHERE THE UNITS ARE TO BE USED. DRAWINGS SHALL BE CERTIFIED BY A NORTH CAROLINA REGISTERED PROFESSIONAL ENGINEER. THESE DRAWINGS SHALL BE SUBMITTED TO THE NRCS PROJECT ENGINEER SIX (6) WEEKS PRIOR TO THE UNITS BEING INSTALLED FOR APPROVAL. THE PRECAST UNITS SHALL BE PRODUCED IN ACCORDANCE WITH THE APPROVED DRAWINGS. 2. TOLERANCE SHALL BE ± 1/4" FROM APPROVED SHOP DRAWINGS. 3. THE FABRICATION ENGINEER IS TO CERTIFY THAT UNITS ARE BUILT IN ACCORDANCE WITH SHOP DRAWINGS. FABRICATION ENGINEER, REGISTERED PROFESSIONAL ENGINEER IN THE STATE OF NORTH CAROLINA, SHALL SEND A SEALED CERTIFICATION LETTER TO NRCS UPON PRODUCT DELIVERY ONSITE THAT PRECAST UNITS MEET OR EXCEED THE APPROVED SHOP DRAWINGS.INTERNAL STEEL AND LIFTING HOOKS SHALL BE DESIGNED BY A NORTH CAROLINA REGISTERED PROFESSIONAL ENGINEER LOCKING EYE DETAIL NTS 1 1/2"R 1" EL. "F" = PERMANENT WEIR EL."E" = OUTLET CONTRACTOR SHALL GRADE OUTLET TO DRAIN CONCRETE BASE EL. "C" EL. "D" = INVERT OUT RIP-RAP SLOPE PROTECTION (TYP.) CONCRETE CENTER SUPPORT ONLY FOR STRUCTURES 5 FOOT OR WIDER. CENTER SUPPORT MIN. 8" X 12" U CHANNEL SHALL BE TABBED AND TIED TO RE-BAR ON VERTICAL SUPPORTS. RE-BAR SHALL RUN THROUGH THE ENTIRETY OF THE CENTER SUPPORT EQUILATERAL ORIENTED POLYPROPYLENE GEOGRID RIP-RAP SLOPE PROTECTION SHALL BE INSTALLED TO THE TOP OF THE WATER CONTROL STRUCTURE (TYP. ) BOTH SIDES RISER RUBBER BOOT GASKET PER FABRICATION ENGINEER AND GROUTED IN PLACE (BOTH SIDES) PIPE-TO-MANHOLE-CONNECTOR BOOT PER FABRICATION ENGINEER AND GROUTED IN PLACE PER SPECIFICATIONS. (BOTH SIDES) 3 1 1 3 6.0' TYPICAL STRUCTURE OUTLET SWALE (NTS.) SEED AND STRAW OUTLET SWALE IMMEDIATELY AFTER GRADING FLASHBOARD RISERISSUED FOR: REVIEW & PERMITTING G:\2019\4519049\09-construction drawings\09a - working drawings\FLASHBOARD RISER.dwg, 3/1/2021 10:56:50 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 15' 157.50 30 90 PLAN VIEW ( 1" = 15 ' HORIZ.)LK####DCW####08-28-2020NOT FORCONSTRUCTIONGENERAL NOTES ISSUED FOR:SEALBOILING SPRING LAKES - SHORE STABILIZATION194 N. SHORE DRIVE, SOUTHPORT, NC 28461SUEG I S SURVEYINGGNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-1925 PROJ: SPEC-19260 DWG: SHORE STABILIZATION SHEET: of DATE: 10-22-2020 2 2 NOTES: 1.AREAS NOTED AS LIVE STAKES WITHIN THE PLANTING ZONE SHALL BE PLANTED WITH RIVER BIRCH (BETULA NIGRA) AND BUTTONBUSH (CEPHALANTHUS OCCIDENTALIS). 2.ONE LIVE STAKE SPECIES PER LIVE STAKE AREA. STAKES SHOULD BE PLACED EVERY 10 FT, ALTERNATING SPECIES ANDELEVATION. 3.ALL LIVE STAKES SHALL BE DORMANT AT TIME OF ACQUISITION AND PLANTING. 4.LIVE STAKES SHALL BE 1/2-2” IN DIAMETER. LIVE STAKES SHALL ALSO BE 2 - 4 FEET IN LENGTH. 5.DURING PREPARATION, THE BASAL ENDS OF THE LIVE STAKES SHALL BE CLEANLY CUT AT AN ANGLE TO FACILITATEEASY INSERTION INTO THE SOIL, WHILE THE TOPS SHALL BE CUT SQUARE OR BLUNT FOR TAMPING. ALL LIMBS SHALL BE REMOVED FROM THE SIDES OF THE LIVE CUTTING PRIOR TO INSTALLATION. 6.CUTTINGS FOR LIVE STAKES SHALL BE HARVESTED IN A MANNER SUCH THAT THEY ARE CUT, IMMEDIATELY PUT INTOWATER TO BE SOAKED FOR 10 DAYS, AND THEN PLANTED IMMEDIATELY AFTER THE 10 DAYS ARE COMPLETED.CUTTINGS SHALL REMAIN WET UNTIL THEY ARE PLANTED. OUTSIDE STORAGE LOCATIONS SHOULD BE CONTINUALLYSHADED AND PROTECTED FROM WIND AND DIRECT SUNLIGHT. 7.LIVE STAKES SHALL BE TAMPED AT AN ANGLE INTO THE GROUND SURFACE WITH A DEAD BLOW HAMMER, WITH BUDS ORIENTED IN AN UPWARD DIRECTION. STAKES SHOULD BE TAMPED UNTIL APPROXIMATELY 3/4 OF THE STAKE LENGTH IS WITHIN THE GROUND. ANY STAKES THAT ARE SPLIT OR DAMAGED DURING INSTALLATION SHALL BE REMOVED ANDREPLACED. 8.THE AREA AROUND EACH LIVE STAKE SHALL BE COMPACTED BY FOOT AFTER THE LIVE STAKE HAS BEEN INSTALLED. 9.ONE TO TWO INCHES SHALL BE CUT CLEANLY OFF OF THE TOP OF EACH LIVE STAKE (WITH LOPPERS) AT AN ANGLE OFAPPROXIMATELY 15 DEGREES FOLLOWING INSTALLATION. LIVE STAKE DETAIL N.T.S. SEEDBED PREPARATION PLANTING INSTRUCTIONS PLANTING SCHEDULE 1.ONCE THE GRADING IS COMPLETE, THE CONTRACTOR SHALL REQUEST AN ON-SITE INSPECTION ANDAN AS-BUILT SURVEY PRIOR TO INSTALLATION OF THE STORMWATER MANAGEMENT FACILITY PLANTS. IF THE CONTRACTOR PLANTS THE PROPOSED VEGETATION PRIOR TO AN AS-BUILT SURVEY (AND SUBSEQUENT APPROVAL), ANY CHANGES TO THE GRADING / RE-PLANTING OF PLANTS WILL BE AT THECONTRACTOR'S EXPENSE. 2.ONCE THE ENGINEER HAS APPROVED THE AS-BUILT GRADING, THE CONTRACTOR SHALL PLANT THE PROPOSED STORMWATER MANAGEMENT FACILITY PLANTS SHOWN ON THE LANDSCAPE PLAN FORTHE FACILITY. AFTER COMPLETION OF THE PLANTING, THE LANDSCAPE CONTRACTOR SHALL PROVIDEA LETTER TO THE ENGINEER CERTIFYING THAT THE PLANTS HAVE BEEN INSTALLED PER THE APPROVEDSTORMWATER MANAGEMENT FACILITY PLANTING PLAN. 3.OPTIMAL PLANTING PERIODS RANGE APPROXIMATELY FROM APRIL 15TH THRU JUNE 30TH ANDSEPTEMBER 1ST THRU OCTOBER 31ST. FOR FINAL DETERMINATION OF THE SITE'S PLANTING PERIOD,THE CONTRACTOR SHALL COORDINATE WITH A LANDSCAPE PROFESSIONAL REGARDING SCHEDULINGFOR PLANT INSTALLATION. 4.IT IS RECOMMENDED THAT THE CONTRACTOR TAKE MEASURES TO PREVENT WILDLIFE FROM DAMAGING OR CONSUMING WETLAND PLANTINGS. 1.CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3-4 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. TOPSOIL SHOULD BE INCORPORATED INTO THE FINAL GRADING OF THE BASIN SIDE SLOPES AND AQUATIC SHELF. CONTRACTOR SHOULD SCARIFY THETOP 3-4 INCHES OF THE COMPACTED FILL TO PROMOTE BONDING WITH TOPSOIL. 2.RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3.REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4.PER ONE TIME ONLY, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL. 5.CONTINUE TILLAGE UNTIL A WELL-PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6.SEED ON A FRESHLY PREPARED SEEDBED AND COVER. 7.MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8.INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE.AFTER PERMANENT COVER IS ESTABLISHED. 9.CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT. PLANTING TECHNIQUESA.INSURE THAT ROOTS, ONCE REMOVED FROM POT, ARE STRAIGHTENED AND FACE DOWNWARD.B.CREATE PLANTING AREA FOR EACH PLANT AND EXCAVATE PIT. C.PLACE PLANTS IN PIT INSURING ROOTS ARE FACING COMPLETELY DOWNWARD.D.HEEL IN SOIL AROUND PLANT AND PROCEED TO NEXT PLANTING LOCATION.E.NEWLY PLANTED PLANTS NEED TO BE FASTENED TO THE SUBSTRATE FOR THE ESTABLISHMENT OFNEW ROOTS. F.ROOTS SHALL BE SPREAD IN THEIR NORMAL POSITION. ALL BROKEN OR FRAYED ROOTS HALL BE CUTOFF CLEANLY.G.THE DIAMETER OF THE PITS FOR ALL VEGETATIVE STOCK SHALL BE AT LEAST THREE TIMES THEDIAMETER OF THE ROOT MASS. PLANT PIT WALL SHALL BE SCARIFIED PRIOR TO PLANT INSTALLATION. H.SET THE PLANTS UPRIGHT, IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BERESTING ON UNDISTURBED SOIL.I.PLACE THE BACKFILL AROUND THE BASE AND SIDES OF THE ROOT MASS, AND WORK EACH LAYER TO SETTLE BACKFILL AND TO ELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 2/3 FULL,WATER THOROUGHLY BEFORE PLACING REMAINDER OF THE BACKFILL. WATER AGAIN AFTER PLACING FINAL LAYER OF BACKFILL.J.BROKEN OR DAMAGED PARTS WILL BE CUT BACK TO UNDAMAGED TISSUE, LEAVING AS MUCH GREEN BASAL TISSUE AS POSSIBLE ABOVE THE ROOTS. IF MORE THAN FIFTY PERCENT (50%) OF THE PLANT ISDAMAGED THEN CONTRACTOR SHALL REPLACE THE PLANT. CONTAINER STOCK / BARE ROOTA.STOCK SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVEDEVELOPED SUFFICIENTLY TO HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER.B.CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTIL PLANTING OCCURS. C.BARE ROOT PLANTS ARE FOR IMMEDIATE PLANTING, OTHERWISE SEE D) BELOW. D.IF BARE ROOTS SPECIMENS ARE NOT TO BE PLANTED WITHIN FOUR (4) DAYS, TEMPORARY HOLDING OF BARE ROOT SPECIMENS ARE TO BE COVERED ENTIRELY BY A SUITABLE MEDIUM (ETC. SOIL, SAWDUST, MULCH OR THE LIKE) AND WATERED REGULARLY SO AS TO NOT DRY OUT. PLANT LOCATIONSA.NEW PLANTINGS SHALL BE LOCATED WHERE SHOWN ON PLAN EXCEPT WHERE CHANGES HAVE BEENMADE IN PROPOSED CONSTRUCTION.B.NECESSARY ADJUSTMENTS SHALL BE MADE ONLY AFTER APPROVAL BY THE OWNER OR THE OWNER'S REPRESENTATIVE. WATERWATER SHALL BE POTABLE AND SHALL NOT CONTAIN ELEMENTS TOXIC TO PLANT LIFE. TEMPORARY SEEDING SCHEDULE SEEDING DATE SEEDING MIXTURE APPLICATION RATE JAN 1 - MAY 1 RYE (GRAIN) 120 LBS/AC KOBE LESPEDEZA 50 LBS/AC MAY 1 - AUG 15 GERMAN MILLET 40 LBS/AC AUG 15 - DEC 30 RYE (GRAIN) 120 LBS/AC SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/AC GROUND AGRICULTURE LIMESTONE AND 750 LB/AC 10-10-10 FERTILIZER (FROM AUG 15 - DEC 30, INCREASE 10-10-10 FERTILIZER TO 1000 LB/AC). MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE JAN 1 - AUG 15:REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. AUG 15 - DEC 30:REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB/AC OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/AC KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. NOTE: USE THE TEMPORARY SEEDING SCHEDULE ONLY WHEN DATE IS NOT CORRECT TO USE THE PERMANENT SEEDING SCHEDULE. PERMANENT SEEDING SCHEDULE (DAM EMBANKMENTS) SEEDING DATE SEEDING MIXTURE OPTIONS (CHOOSE ONE)APPLICATION RATE TBD TBD TBD SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 4,000 LB/AC GROUND AGRICULTURE LIMESTONE AND 1000 LB/AC 10-10-10 FERTILIZER. MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE INSPECT AND REPAIR MULCH FREQUENTLY. REFERTILIZE IN LATE WINTER OF THE FOLLOWING YEAR; USE SOIL TESTS OR APPLY 150 LB/AC 10-10-10 FERTILIZER. MOW REGULARLY TO A HEIGHT OF 2-4 INCHES. NOTE: PERMANENT SEEDING SCHEDULE IS FOR SLOPES OF THE BASIN AND TOP OF BERM. NOTES: 1.CHANNEL DIMENSION (1.0' DEEP, 6'.0 BOTTOM WIDTH) ARE TO TOP OF RIP-RAP IN CHANNEL. ACTUAL CHANNELEXCAVATION MUST CONSIDER THICKNESS OF THE RIPRAP AND FILTER FABRIC LINER. BYPASS CHANNEL TO STOP ATTOP OF BANK. 2.A FILTER BLANKET IS TO BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. THE FILTER BLANKET WILL CONSIST OF A MINIMUM 4" THICK LAYER OF STONE (NCDOT #57) UNDERLAIN WITH MIRAFI FILTER WEAVE 700 ORENGINEER-APPROVED EQUIVALENT. 3.RIPRAP TO EXTEND TO TOP OF CHANNEL WITH 2:1 SIDE SLOPES THROUGHOUT THE EXTENT OF CHANNEL. RIPRAP CHANNEL DETAIL N.T.S. STABILIZATION JACKS DETAILS N.T.S. No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCETEMPORARY STREAM CROSSING29 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925TEMPORARY STREAM CROSSING PERSPECTIVE VIEW (NTS.) SIDE VIEW (NTS.) 25 FT MINIMUM SILT FENCE (TYP.) ANCHOR BRIDGEMAT TO A TREE OR OTHER OBJECT WITH SUFFICIENT STRENGTH USING STEEL CHAIN OR CABLE SURFACE FLOW DIVERSION (TYP.) APPR O A C H W A Y BRID G E M A T STREA M B A N K STRE A M C H A N N EL 6" LIP MINIMUM 14 SUPPORTED 14 SUPPORTEDMINIMUM 6" LIP AGGREGATE APPROACHWAY 2" - 3" SURGE STONE OR RAILROAD BALLAST BRIDGEMATSURFACE FLOW DIVERSION SURFACE FLOW DIVERSION STREAM ORIGINAL STREAMBANK INSTALLATION NOTES: 1. REFER TO "NORTH CAROLINA DIVISION OF FOREST RESOURCES" LITERATURE, INSTALLATION MAINTENANCE GUIDELINES, & "NORTH CAROLINA FORESTRY BMP MANUAL - 2006" 2. INSTALL WATER DIVERSION DEVICES (WATER BARS, TURNOUTS, BROAD-BASED DIPS, ETC.) ON BOTH SIDES OF THE MATS. 3. STABILIZE EXPOSED MINERAL SOIL WITH TREE TOPS OR BRUSH DURING MAT INSTALLATION, AND SEEDING/MULCH AFTER REMOVAL. 4. INSTALL MATS TO CREATE A MINIMUM TEN FOOT BRIDGE WIDTH. 5. INCLUDE COARS AGGREGATE ON THE APPROACHWAY FOR A MINIMUM OF 25 FEET SILT FENCE ALONG STREAMBANKS ADJACENT TO CROSSING FOR A MINIMUM OF 25 FEET. MAINTENANCE NOTES: 1. KEEP MATS' SURFACE FREE OF MINERAL SOIL AND DEBRIS THAT COULD ENTER STREAM. 2. PERIODICALLY CHECK MAT HARDWARE; RETIGHTEN NUTS & CABLE CLAMPS AS NECESSARY TO MAINTAIN BRIDGE STRENGTH AND INTEGRITY. 3. IMMEDIATELY REMOVE ANY DEBRIS WHICH ENTERS THE STREAM AT THE CROSSING LOCATION. REMOVAL NOTES: 1. CLEAN OFF BRIDGE SURFACE. 2. REMOVE MATS BY USING MAT CABLE LOOP OR SKIDDER GRAPPLE. 3. PERMAENTLY STABILIZE DISTURBED PORTIONS OF STREAMBANK AND APPROACH ROADS WITH PERENNIAL GRASSES/MULCH (OR WETLAND MIX WHEN APPLICABLE.) 4. LEAVE APPROPRIATE WATER DIVERSION STRUCTURES IN PLACE ON BOTH SIDES OF STREAM. 5. RESTORE THE STREAM CHANNEL TO ITS ORIGINAL CROSS-SECTION, SMOOTH, AND APPROPRIATELY STABILIZE ALL DISTURBED AREAS. ISSUED FOR: REVIEW & PERMITTING G:\2019\4519049\09-construction drawings\TEMPORARY STREAM CROSSING.dwg, 3/1/2021 11:03:09 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCEEROSION CONTROL MATTING30 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925EROSION CONTROL MATTING A A' BANKFULL EROSION CONTROL MATTING NOTES EROSION CONTROL MATTING DETAILED PLAN NOT TO SCALE EROSION CONTROL MATTING DETAILED STAKING PLAN NOT TO SCALE EROSION CONTROL MATTING DETAILED CROSS-SECTION A - A' NOT TO SCALE 700 GRAM COIR 1. EROSION CONTROL MATTING IS USED TO PROTECT RECENTLY CONSTRUCTED STREAMBANKS FROM EROSION. THE MATTING WILL REMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES, PROVIDING CRITICAL BANK PROTECTION. 2. BEFORE INSTALLING COIR FIBER MATTING, RAKE SOIL LEVEL, ADD TEMPORARY AND PERMANENT SEED, FERTILIZER, LIME AND MULCH. 3. 700 GRAM COIR FIBER EROSION CONTROL MATTING SHALL BE PLACED ALONG THE LENGTH OF THE NEW CHANNEL FROM THE TOE OF SLOPE OUT TO A MINIMUM OF 4.0' BEYOND THE BANKFULL ELEVATION. 4. SECURE COIR MATTING IN PLACE BY STAKING AND OVERLAPPING AT THE SEEMS WITH A SHINGLE-TYPE METHOD SUCH THAT THE OVERLAPPING PIECE IS IN THE SAME DIRECTION AND AS THE STREAM FLOW. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST IF THE MATTING SEPARATES FROM THE SOIL MORE THAN ONE INCH UNDER A REASONABLE PULL. 700 GRAM COIR FIBER MATTING FROM TOE OF CHANNEL TO 4' BEYOND BANKFULL CHANNEL TOE OF SLOPE BANKFULL 700 GRAM COIR FIBER MATTING SUPPLEMENT WOODEN STAKES WITH 12" ECO-STAKES 2' LONG 2" X 2" WOOD STAKES 1/3" GALVANIZED ROOFING NAIL AT THE TOP TO SECURE MATTING 700 GRAM COIR FIBER MATTING 2' LONG 2" X 2" WOOD STAKES 1/3" GALVANIZED ROOFING NAIL AT THE TOP TO SECURE MATTING6" MIN. HORIZONTAL OVERLAP 6" MIN. HORIZONTAL OVERLAP 6" MIN. VERTICAL OVERLAP 2.5'(TYP.)2.5'(TYP.)2' (TYP.)2.5' (TYP.) 2' (TYP.)3'G:\2019\4519049\09-construction drawings\EROSION CONTROL MATTING.dwg, 3/1/2021 11:04:01 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCETYPICAL CROSS SECTIONS31 TYPICAL CROSS SECTIONS SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925ISSUED FOR: REVIEW & PERMITTING VARIES DEPTH VARIES SEE PROFILE PROPOSED GRADE EXISTING GRADE EROSION CONTROL MATTING ℄ ℄ FURNISH & INSTALL LIVE STAKES (SEE PLANTING DETAILS) PROPOSED CHANNEL BED BACKFILL & COMPACT WITH SUITABLE MATERIAL SLOPE VARIES PER STREAM SEE PLAN & PROFILE SHEETS G:\2019\4519049\09-construction drawings\09a - working drawings\TYPICAL CROSS SECTIONS.dwg, 3/1/2021 11:04:52 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCEPLANTING DETAILS32 SHEET: of 32 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925GENERALISSUED FOR: REVIEW & PERMITTING PROPOSED SLOPE WITH ECMPLAN VIEW TUBELING EX. SLOPE ECM FIRMLY PACK SOIL AROUND THE BASE OF THE TUBELING, SO THAT NO AIR POCKET REMAIN. NOTES: 1. SEE PLANTING SCHEDULE FOR DESIRABLE SPECIES AND SIZE. 2. SPACE AT 3.0' O C. (TRIANGULAR SPACING). 3. ALL TUBELINGS SHALL COMPLY WITH THE RECOMMENDATIONS AND REQUIREMENTS OF ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK." 4. CUT AND FOLD BACK SLOT IN MAT TO INSTALL TUBELING. SEAL SLOT WITH COMPOST AND STAPLE. ALLOW 6" DIAMETER AROUND TUBELING WITH NO ECM. 5. PLANT THE ROOT BALL SLIGHTLY DEEPER THAN IT WAS IN THE TUB. TOP OF SLOPE 3 ft 3 ft FLOW 45° 6 INCH MINIMUM TO REMAIN ABOVE GROUND. ZONE 1 PLANTING PLAN SEEDING MIX* COMMON NAME SCIENTIFIC NAME PERCENTAGE Deertongue, 'Tioga'Panicum clandestinum, 'Tioga'30% Indiangrass, PA Ecotype Sorghastrum nutans, PA Ecotype 16% Riverbank Wildrye, PA Ecotype Elymus riparius, PA Ecotype 15% Big Bluestem, 'Niagara'Andropogon gerardii, 'Niagara'10% Switchgrass, 'Carthage', NC Ecotype Panicum virgatum, 'Carthage', NC Ecotype 7% Partridge Pea, PA Ecotype Chamaecrista fasciculata, PA Ecotype 3% Blackeyed Susan, Coastal Plain NC Ecotype Rudbeckia hirta, Coastal Plain NC Ecotype 3% Blue Vervain, PA Ecotype Verbena hastata, PA Ecotype 3% Swamp Milkweed, PA Ecotype Asclepias incarnata, PA Ecotype 2% Oxeye Sunflower, PA Ecotype Heliopsis helianthoides, PA Ecotype 2% Soft Rush Juncus effusus 2% Path Rush, PA Ecotype Juncus tenuis, PA Ecotype 2% Purplestem Aster, PA Ecotype Aster puniceus, PA Ecotype 2% Boneset, PA Ecotype Eupatorium perfoliatum, PA Ecotype 1% New York Ironweed, PA Ecotype Vernonia noveboracensis, PA Ecotype 1% Flat Topped White Aster, PA Ecotype Aster umbellatus, PA Ecotype 1% Joe Pye Weed, PA Ecotype Eupatorium fistulosum, PA Ecotype 1% Wild Bergamot, Fort Indiantown Gap-PA Ecotype Monarda fistulosa, Fort Indiantown Gap-PA Ecotype 1% Narrowleaf Mountainmint Pycnanthemum tenuifolium 0% *SEED AT 25 LBS (PLS) TO ACRE NURSE CROP SEED AUG. 15 - APR 15 COMMON NAME SCIENTIFIC NAME RATE Wheat Triticum aestivum 40 LBS APR 15 - AUG 15 COMMON NAME SCIENTIFIC NAME RATE Browntop millet Urochloa ramosa 60 LBS LIVE STAKES** COMMON NAME SCIENTIFIC NAME PERCENTAGE Black Willow Salix nigra 15% Silky Willow Salix sericea 15% Elderberry Sambuscus nigra 15% Buttonbush Cephalanthus occidentalis 20% Redosier dogwood Cornus serciea 15% Silky dogwood Cornus amomum 20% **LIVE STAKES SHALL BE PLANTED 3 FT O.C. PER DETAIL ZONE 2 PLANTING PLAN SEEDING MIX* COMMON NAME SCIENTIFIC NAME PERCENTAGE Deertongue, 'Tioga'Panicum clandestinum, 'Tioga'30% Indiangrass, PA Ecotype Sorghastrum nutans, PA Ecotype 16% Riverbank Wildrye, PA Ecotype Elymus riparius, PA Ecotype 15% Big Bluestem, 'Niagara'Andropogon gerardii, 'Niagara'10% Switchgrass, 'Carthage', NC Ecotype Panicum virgatum, 'Carthage', NC Ecotype 7% Partridge Pea, PA Ecotype Chamaecrista fasciculata, PA Ecotype 3% Blackeyed Susan, Coastal Plain NC Ecotype Rudbeckia hirta, Coastal Plain NC Ecotype 3% Blue Vervain, PA Ecotype Verbena hastata, PA Ecotype 3% Swamp Milkweed, PA Ecotype Asclepias incarnata, PA Ecotype 2% Oxeye Sunflower, PA Ecotype Heliopsis helianthoides, PA Ecotype 2% Soft Rush Juncus effusus 2% Path Rush, PA Ecotype Juncus tenuis, PA Ecotype 2% Purplestem Aster, PA Ecotype Aster puniceus, PA Ecotype 2% Boneset, PA Ecotype Eupatorium perfoliatum, PA Ecotype 1% New York Ironweed, PA Ecotype Vernonia noveboracensis, PA Ecotype 1% Flat Topped White Aster, PA Ecotype Aster umbellatus, PA Ecotype 1% Joe Pye Weed, PA Ecotype Eupatorium fistulosum, PA Ecotype 1% Wild Bergamot, Fort Indiantown Gap-PA Ecotype Monarda fistulosa, Fort Indiantown Gap-PA Ecotype 1% Narrowleaf Mountainmint Pycnanthemum tenuifolium 0% *SEED AT 25 LBS (PLS) TO ACRE NURSE CROP SEED AUG. 15 - APR 15 COMMON NAME SCIENTIFIC NAME RATE Wheat Triticum aestivum 40 LBS APR 15 - AUG 15 COMMON NAME SCIENTIFIC NAME RATE Browntop millet Urochloa ramosa 60 LBS TREE SEEDLINGS** COMMON NAME SCIENTIFIC NAME PERCENTAGE Bald cypress Taxodium distichum 40% Oaks Quercus ***20% Blackgum Nyssa sylvatica var biflora 30% Longleaf Pine Pinus palustris 10% **TREE STOCKING RATE SHALL BE 680 STEMS PER ACRE ***SEE CONSTRUCTION SPEC FOR APPROVED OAK SPECIES GENERAL PLANTING NOTES: SEEDING TEMPORARY & PERMANENT ·AREAS TO BE SEEDED SHALL BE DRESSED TO A SMOOTH, FIRM SURFACE. ON SITES WHERE EQUIPMENT CAN OPERATE ON SLOPES SAFELY, THE SEEDBED SHALL BE ADEQUATELY LOOSENED (4 TO 6 INCHES DEEP) AND SMOOTHED. DEPENDING ON SOIL AND MOISTURE CONDITIONS, DISKING OR CULTIPACKING, OR BOTH, MAY BE NECESSARY TO PROPERLY PREPARE A SEEDBED. WHERE EQUIPMENT CANNOT OPERATE SAFELY, THE SEEDBED SHALL BE PREPARED BY HAND METHODS BY SCARIFYING TO PROVIDE A ROUGHENED SOIL SURFACE SO THAT BROADCAST SEED WILL REMAIN IN PLACE. ·FERTILIZER, LIME, AND OTHER SOIL AMENDMENTS SHALL BE APPLIED AS SPECIFIED IN SPECIFICATIONS. THE FERTILIZER AND SOIL AMENDMENTS SHALL BE THOROUGHLY INCORPORATED INTO THE SOIL IMMEDIATELY FOLLOWING SURFACE APPLICATION. ·ALL DISTURBED AREAS SHALL BE SEEDED WHEN THEY ARE EXPECTED TO BE BARE OF GROUND OVER FOR MORE THAN 15 CALENDAR DAYS; WHERE ACTIVE CONSTRUCTION IS NOT BEING UNDERTAKEN, OR AS DIRECTED BY THE ENGINEER/INSPECTOR. THESE AREAS SHALL BE SEEDED (TEMPORARY SEED MIX) AT THE END OF EACH DAY UNLESS OTHERWISE DIRECTED BY THE ENGINEER/INSPECTOR. ·SEEDING (PERMANENT SEED MIX) SHALL BE ACCOMPLISHED WITHIN TWO (2) DAYS AFTER FINAL GRADING IS COMPLETED AND APPROVED BY THE ENGINEER. ·FERTILIZER SHALL BE APPLIED AT THE RATE OF 1,000 LBS. PER ACRE. THE FERTILIZER SHALL BE 10-10-10, OR EQUIVALENT. LIME SHALL BE APPLIED AT THE RATE OF TWO (2) TONS PER ACRE. STRAW SHALL BE APPLIED AT A RATE OF TWO (2) TONS PER ACRE. THE AREA SHOULD THEN BE SMOOTHED AND ANY DEBRIS LARGER THAN 3 INCHES IN DIAMETER OR WHICH WOULD INTERFERE WITH MOWING SHALL BE REMOVED FROM THE SURFACE. A CYCLONE SEEDER, DRILL OR CULTIPACKER SEEDER SHALL BE USED TO APPLY THE SPECIFIED SEED EVENLY ON THE FRESHLY PREPARED SEEDBED. WHEN SEED IS BROADCAST, A CULTIPACKER OR OTHER APPROPRIATE EQUIPMENT SHALL BE USED IMMEDIATELY FOLLOWING SEEDING TO INCORPORATE THE SEED. LIVE STAKES ·THREE (3) WEEKS PRIOR TO INSTALLATION OF LIVE STAKES CONTRACTOR SHALL SUBMIT A ROPOSED HARVESTING AND CONSTRUCTION SCHEDULE, INCLUDING SOURCE OF SUPPLY OF LIVE CUTTING, TO PROJECT ENGINEER FOR REVIEW AND APPROVAL. NO WORK SHALL BE PERFORMED UNTIL PROJECT ENGINEER APPROVES THE SOURCE AND SCHEDULE. HARVESTING, TRANSPORTING, AND INSTALLATION SHALL TAKE PLACE WHEN PLANTS ARE DORMANT (DECEMBER 1 THROUGH APRIL 1). IF DUE TO CONSTRUCTION SCHEDULING LIVE STAKES CANNOT BE USED BASED ON THE TIMEFRAMES SET ABOVE, LIVE TUBELINGS OF THE SAME SPECIES MAY BE SUBSTITUTED WITH APPROVAL FOR THE PROJECT ENGINEER. ·PLANT MATERIALS SHALL BE FROM SOURCES THAT ORIGINATED WITHIN PLANT HARDINESS ZONES 7 OR 8. LIVE CUTTINGS FOR LIVE STAKES SHALL BE 0.75 INCHES TO 2.0 INCHES IN DIAMETER AND 3 FEET IN LENGTH. SIDE BRANCHES SHALL BE REMOVED AND BARK LEFT INTACT PRIOR TO INSTALLATION. BUDS ON THE STAKES SHALL BE ORIENTED IN AN UPWARD POSITION. CONTRACTOR SHALL SCRAPE A PORTION OF THE CAMBIUM LAYER OFF EACH LIVE STAKE AT THE BASAL END APPROXIMATELY TWO (2) INCHES IN LENGTH BY 0.25 INCHES WIDE TO STIMULATE ROOT GROWTH. THE BASAL ENDS SHALL BE DIPPED IN A ROOT STIMULATING GROWTH HORMONE APPROVED BY THE PROJECT ENGINEER. THE BASAL ENDS SHALL BE TAPERED TO A POINT FOR EASY INSERTION INTO THE SOIL. THE TOP SHALL BE CUT SMOOTH AND SQUARE. ·THE TOPS OF THE LIVE STAKES SHALL BE PAINTED WITH LATEX TREE MARKING PAINT TO ENSURE CORRECT PLANTING DIRECTION. MARK SPECIES WITH DIFFERENT COLORS. LIVE STAKE CUTTINGS SHALL CONSIST OF THE SPECIES AS LISTED ON THE CONSTRUCTION DRAWINGS. ·LIVE STAKE INSTALLATION - DRIVE LIVE STAKES INTO THE GROUND SO THAT SEVENTY-FIVE PERCENT (75%) OF THE STAKE IS BELOW THE GROUND SURFACE. FOR EASY INSERTION INTO THE SOIL THE BOTTOM END OF THE STAKE SHOULD BE CUT AT AN ANGLE OF 30 TO 45 DEGREES. TO ENSURE A FLAT SURFACE FOR HAMMERING INTO THE SLOPE, THE TOP SHOULD BE CUT AT 90-DEGREE ANGLE. FOR LARGER BRANCHES THE USE OF PRUNING SHEARS OR POWER SAW MAY BE NECESSARY. ALL BUDS OF THE LIVE BRANCH SHOULD BE FACED UPWARDS DURING STAKING. AS SHOWN IN THE DETAILED PLAN ABOVE. THE CONTRACTOR SHALL USE A DEADPAN HAMMER FOR DRIVING THE STAKE DIRECTLY INTO THE GROUND OR DRIVE A PILOT HOLE, SMALLER IN DIAMETER THEN THE LIVE STAKE, AND THEN DRIVING THE LIVE STAKE INTO THE PILOT HOLE. ·CONTRACTOR SHALL STAGGER SPECIES AS DIRECTED BY PROJECT ENGINEER. ·THE PROJECT ENGINEER SHALL MAKE A FINAL INSPECTION WITH THE CONTRACTOR TO ENSURE ALL LIVE STAKES HAVE BEEN INSTALLED ACCORDING TO THE SPECIFICATION, PLANS, AND DETAILS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ALL DEFICIENCIES WITHIN TEN (10) CALENDAR DAYS OF THE INSPECTION. THE PROJECT ENGINEER AND CONTRACTOR PRIOR TO FINAL COMPLETION SHALL PERFORM A FINAL INSPECTION OF THE CORRECTED ACTIONS. TREE SEEDLINGS ·HARVESTING, TRANSPORTING, AND INSTALLATION SHALL TAKE PLACE WHEN PLANTS ARE DORMANT (DECEMBER 1 THROUGH APRIL 1); UNLESS OTHERWISE DIRECTED BY PROJECT ENGINEER. ·CONTRACTOR SHALL SUBMIT TO PROJECT ENGINEER FIVE (5) LIVE SEEDLINGS OF EACH SPECIES ABOVE, FOUR (4) WEEKS PRIOR TO PLANTING FOR APPROVAL. CONTRACTOR SHALL NOT PLANT ANY SEEDLINGS UNTIL PROJECT ENGINEER APPROVES OF SUBMITTED SEEDLING STOCK. SUBMITTAL SHALL BE MADE IN AN APPROVED NURSERY TREE BAG ALONG WITH SEEDLING AND NURSERY INFORMATION. SEEDLINGS SHALL BE CLEARLY MARKED FOR IDENTIFICATION PURPOSES. ·NO MATERIAL SHALL BE PLANTED WHEN THE GROUND OR BACKFILL IS IN A FROZEN CONDITION, OR CONDITIONS ARE UNUSUALLY WET, AS DETERMINED BY THE PROJECT ENGINEER.TREE SEEDLINGS SHALL BE ONE (1) GALLON NURSERY STOCK. ·SEEDLINGS SHALL BE PLANTED ON A 12 FT BY 12 FT OR 8 FT BY 8 FT GRID UNIFORMLY YIELDING 302 OR 600 SEEDLINGS PER ACRE DEPENDING ON ZONE. SEEDLINGS SHALL BE PLANTED IN ZONES IN ACCORDANCE WITH CONSTRUCTION DRAWINGS. ·SEEDLINGS SHALL BE PLANTED IN A HOLE MADE WITH A TREE PLANTING BAR, DIBBLE, MATTOCK, OR OTHER APPROPRIATE TOOL. THE HOLE SHALL BE LARGE ENOUGH TO ACCOMMODATE THE ENTIRE ROOT SYSTEM. EACH SEEDLING SHALL BE PLANTED AT THE SAME DEPTH AS IT GREW IN THE NURSERY. EACH SEEDLING SHALL BE GIVEN A LIGHT TUG TO ENSURE PROPER PLANTING. ANY SEEDLING NOT SNUG MUST BE RESET. SEEDLINGS SHALL BE KEPT MOIST UNTIL PLANTED. SEEDLINGS THAT ARE TO BE PLANTED LATER IN THE DAY SHALL BE KEPT IN THE BAG OR CONTAINER AND LEFT IN A COOL, MOIST, SHADY AREA. SEEDLINGS SHALL BE STORED IN A COOLER THAT MAINTAINS A TEMPERATURE BETWEEN 35 DEGREES AND 55 DEGREES FAHRENHEIT. ·SEEDLINGS MAY BE FIELD STORED IN A SHED, BARN OR DENSE SHADE FOR UP TO 7 CALENDAR DAYS WHEN THE TEMPERATURE ADJACENT TO THE SEEDLINGS CAN BE MAINTAINED FROM 30 DEGREES TO 60 DEGREES FAHRENHEIT THROUGHOUT THE FIELD STORAGE PERIOD. ·INSPECTION OF SEEDLING QUALITY BY THE PROJECT ENGINEER OR OWNER SHALL BE PERFORMED UNDER THIS CONTRACT PRIOR TO OR AT THE BEGINNING OF THE PLANTING OF THE SEEDLINGS. THE PROJECT ENGINEER OR OWNER SHALL BE GIVEN AT LEAST ONE (1) WEEK NOTICE OF THE ANTICIPATED ARRIVAL OF SEEDLINGS AND PLANTING CREW TO EACH SITE TO FACILITATE THE COMPLETION OF THIS INSPECTION REQUIREMENT. INSPECTION OF THE TREE PLANTING BY THE PROJECT ENGINEER OR OWNER SHALL BE PERFORMED UNDER THIS CONTRACT BY MEASURING SAMPLE PLOTS. IN THE EVENT A SAMPLE PLOT FAILS TO MEET CONTRACT REQUIREMENTS, THE CONTRACTOR WILL BE REQUIRED TO RE-WORK THE REPRESENTATIVE AREA PRIOR TO RE-INSPECTION. THE RE-INSPECTION SAMPLE PLOT SHALL NOT BE THE ORIGINAL SAMPLE PLOT. 3/ 4 le n g t h EXISTING SLOPE OR NEW STAKES 3 4 IN - 2 IN DIA. X 3 FT LENGTH SPACED 3.0 FT O.C. (TRIANGULAR SPACING) ANGLES AT 45° TO DOWNSTREAM FLOW 45° CUT TOP OF SLOPE PLAN VIEW NOTES: 1. ACCEPTABLE SPECIES: SEE CONSTRUCTION SPECIFICATIONS 2. INSTALL PER CONSTRUCTION SPECIFICATIONS. 3. USE 12 IN -3/4 IN REBAR FOR PILOT HOLES PRIOR TO DRIVING LIVE STAKES INTO GROUND 4. DRIVE LIVE STAKE 3/4 OF ITS LENGTH INTO THE GROUND 5. RECUT ANY LIVE STAKE TIPS DAMAGED BY INSTALLATION 6. STAKES TO BE 3 4 IN TO 2 IN DIAMETER, 3 FT LONG 7. 6 INCH MINIMUM TO REMAIN ABOVE GROUND. 3 ft 3 ft FLOW 45° TOE OF SLOPE 6" M I N . (T Y P . ) LIVE STAKE DETAILS (NTS)TUBELING DETAILS (NTS) INSTALL PLANTS WHERE CROWN IS FLUSH WITH SOIL SURFACE CUT AND REMOVE ANY COVERING AROUND ROOTS GENERAL PLANTING NOTES: 1. DO NOT COMPACT TOPSOIL, TO PROMOTE HEALTHY ENVIRONMENTAL CONDITIONS FOR THE PLANTS. 2. PLANTS OF THE SAME SPECIES SHOULD BE PLANTED IN CLUSTERS, THESE CLUSTERS SHOULD CONTAIN (5) FIVE PLANTS OF THAT SPECIES. NO MORE THAN ONE (1) CLUSTER OR FIVE (5) PLUGS OF THE SAME SPECIES WITHIN A 10 FT BY 10 FT GRID. 3. ALL PLANTS SHOULD BE PLANTED IN THE INDICATED RANGE TO ENSURE SURVIVAL. TYPICAL PLANTING DETAIL (NTS.) AMENDED TOPSOIL (TYP.) 0.5 FT. DEEP EXISTING SOIL TWICE ROOT DIAMETER ZONE 1 ZONE 1ZONE 2 ZONE 2 CL CHANNEL SIDE SLOPES BANKFULL BENCH TO LOD LINE STREAM PLANTING ZONE PROFILE (NTS.) PLANTING ZONE ACREAGE SITE ZONE 1 (ACRES)ZONE 2 (ACRES) 081 1 2 082 0 0.2 083 1.3 1.4 084 0 0.5 085 0.4 0.8 190 0 0 191 0.5 1.2 192 0 0.4 G:\2019\4519049\09-construction drawings\09a - working drawings\GENERAL.dwg, 3/1/2021 11:05:53 AM, DWG To PDF.pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:HURRICANE FLORENCE EWP - ENGINEERINGASSISTANCETRAFFIC CONTROL33 SHEET: of 33 4519049 7/9/2020 JDH NAEJDHJDH7/9/2020NOT FORCONSTRUCTIONSUEG I S SURVEYINGGNIREENIGNELDSISURVEYING SOLUTIONS FOR A CHANGING WORLDSEALCHARLOTTE OFFICE: 201 W 29TH STREET, CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE:WWW.LDSI-INC.COM NC FIRM #: C-1925TRAFFIC CONTROL GENERAL NOTES THE FOLLOWING GENERAL NOTES SHALL APPLY AT ALL TIMES FOR THE DURATION OF THE CONSTRUCTION PROJECT, EXCEPT WHEN OTHERWISE NOTED IN THE PLAN, OR DIRECTED BY THE ENGINEER. THE TRAFFIC CONTROL PLAN FOR THIS PROJECT CONSISTS OF STANDARD DETAIL DRAWINGS, THESE DRAWINGS ARE TYPICAL SITUATIONS AND SHOULD BE ADAPTED TO THE ACTUAL FIELD CONDITIONS, SUCH AS WHEN PHYSICAL DIMENSIONS ARE NOT ATTAINABLE, OR WHEN MORE THAN ONE DRAWING IS APPLIED SIMULTANEOUSLY RESULTING IN DUPLICATE SIGNING, OR UNDESIRED OVERLAPPING OF DEVICES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADAPTING THE TRAFFIC CONTROL PLAN TO FIELD CONDITIONS TO PROVIDE SAFE AND EFFICIENT TRAFFIC MOVEMENT. SHOULDER CLOSURE A. SHOULDER CLOSURES SHALL BE REMOVED AS SOON AS PRACTICAL AFTER WORK BEHIND THE CLOSURE IS COMPLETED OR WHEN SHOULDER CLOSURE IS NO LONGER NEEDED. B. CONTRACTOR SHALL MAINTAIN EXISTING TRAFFIC PATTERNS AND LANE CONFIGURATION AT THE END OF EACH DAYS OPERATION AND DURING CONSTRUCTION INACTIVITY, EXCEPT AS OTHERWISE INDICATED ON THE PHASING PLAN. C. WHEN SHOULDER CLOSURES ARE NOT IN EFFECT, CHANELIZING DEVICES IN WORK AREAS SHALL BE SPACED NO GREATER THAN TWICE THE POSTED SPEED LIMIT, EXCEPT 10 - FT ON CENTER IN RADII, AND SHALL BE SET 3 FT OFF THE EDGE OF AN EXISTING TRAVEL LANE. D. DURING SHOULDER CLOSURES, FLAGGER SHALL BE USED WHEN DELIVERING MATERIALS TO LOCATIONS CLOSE TO THE PAVEMENT. FLAGGERS AND PROPER VEHICLE ACCESS TECHNIQUES SHALL BE USED FOR AREAS WHERE CONSTRUCTION TRAFFIC IS UTILIZING STANDARD CONSTRUCTION ENTRANCES. SINGING A. EXISTING TRAFFIC SIGNAGE SHALL BE MOVED AND OTHERWISE MAINTAINED BY THE CONTRACTOR AS APPROPRIATE DURING CONSTRUCTION. B. ALL NECESSARY TRAFFIC CONTROL SIGNING SHALL BE IN PLACE PRIOR TO ALTERING ANY TRAFFIC PATTERN. ISSUED FOR: REVIEW & PERMITTING G:\2019\4519049\09-construction drawings\TRAFFIC CONTROL.dwg, 3/1/2021 11:15:29 AM, DWG To PDF.pc3