HomeMy WebLinkAboutNCC200151_NOT Closeout Documents_20210302Charlolte-Mecklenburg
STORM
WATER
Services ���
2145 Suttle Avenue
EC Inspection Report Charlotte, NC 2 8 2 0 8
Project Name: BELLEGLADE SD
Location: CARBARRUS RD & ARLINGTON CHURCH RD - Mint Hill
Owner:
EC - Final Inspection #: 57,055 - Date/Time: 2/15/21 8:00 - 2/15/21 8:30 - Inspector: Chanell Hatch
Weather conditions: Rain
Soil conditions: Workable
Contact made: N/A
Erosion and sediment control measures removed: YES
Site permanently stabilized: YES
BMP's installed per approved plans: N/A
Summary: Final inspection for 14830 Belleglade Trail, Mint Hill (Lot#79). All erosion control measures have been
removed and the lot has been permanently stabilized (#404796).
•
CHARLOTTE_
To report pollution or drainage problems call: 311
http://stormwater.charmeck.org
0
2/15/2021 9:08:36AM Page 1 of 1