HomeMy WebLinkAboutNCC205892_Email RE COC Payment Required_20210303Georgoulias, Bethany
From:
Selkane, Aziza
Sent:
Wednesday, March 3, 2021 1:37 PM
To:
Adam Furr
Cc:
Lucas, Annette; Georgoulias, Bethany
Subject:
RE: [External] Re: NCC205892
Good afternoon Mr. Furr.
I talked to Adam this morning. I was not able to reach you, so I hope you get this email since this is the only email
address provided in the e-NOI application.
It is very important to pay $100 annual fee for NCC205892: Wedgefield phase IIIB, lots 67-69 & 72-74.
The COC generated on 2/12/21 was a mistake. The construction was completed before getting the Certification of
Coverage, which is considered a violation. Having the ES&C plan is not enough to start the construction without the COC.
The inspector said that the project had not been ready for close-out in January when the inspector was on site and the
NCG01 COC was required. At this point, the easiest way to solve this is to go online and make a payment for $100 in
order to validate the COC you had applied for. Make sure you put NCC205892 to pull up the permit number. Until this
happens, the COC sent prematurely on 2/12 remains invalid, and the submittal and COC documents will not be
accessible in our repository.
Please confirm once payment has been submitted.
Aziza Selkane
Stormwater Program Billing Specialist
Division of Energy, Mineral and Land Resources
Department of Environmental Quality
512 N. Salisbury Street, Office 640K, Raleigh, NC 27604
1612 Mail Service Center, Raleigh, NC 27699-1612
919-707-3710
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
1 -7
D.. E 2��A
_ c',AfaCA_rntA Q,
64rparTnWW of EiIY} !pe14n IJA OualiTY
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Before printing this email, please consider your budget and the environment.
From: Adam Furr [mailto:adamfurrl0@gmail.com]
Sent: Monday, February 22, 2021 9:11 PM
To: Selkane, Aziza <aziza.selkane@ncdenr.gov>
Subject: [External] Re: NCC205892
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hey, if you could give me a call tomorrow whenever is convenient. This is in regards to our conversation we
had last week regarding our Wedgefield lots. Thank you.
910-391-3670
On Mon, Feb 15, 2021 at 3:00 PM Selkane, Aziza <aziza.selkanekncdenr.gov> wrote:
Good afternoon,
The COC issuance of NCC205892: Wedgefield, Phase 11113 — Lots 67-69 & 72-74 was a mistake because the incorrect
option was recorded on Friday 2/12/2021.
Please use the following link and make a payment as soon as possible.
https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater-
p rog ra m/sto rmwate r-e paw
If payment is not submitted by Monday 2/22/2021, the coverage will be terminated.
Thank you.
Aziza Selkane
Stormwater Program Billing Specialist
Division of Energy, Mineral and Land Resources
Department of Environmental Quality
512 N. Salisbury Street, Office 640K, Raleigh, NC 27604
1612 Mail Service Center, Raleigh, NC 27699-1612
919-707-3710
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
D, E
{}p�in�ir��i al F na �ronniriii� I {h„iliYy
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Before printing this email, please consider your budget and the environment.
Thank you,
Adam Furr
(910)- 391-3670
Furr Construction and Development, Inc.