Loading...
HomeMy WebLinkAbout20200362 Ver 2_Meeting Request Review Doc Attachment_202103021 2 2 2 3 4 5 160' RT 150' RT L3 +55 5 4 3 2 3 150' RT L3 +24 160' RT L3 +24 15" CMP48" CONC72" CONCFES N /C CONCBST1SMTLBUS GRGR109W/LT48" WD RAILW/LTDIMTLMTL MTLMTL MTL MTL MTLDI MTL18' BSTSS48" WD RAI LHTR72" CHLHTRHTR10' SOIL10' SOIL10' SOIL10' SOIL 72" CHL 72" CHL 72" CHL96" CHL 96" CHLHTR HTRHTRW/LT36" CONC 72" CHLW/LTBSTBST REPAIR FIELDSEPTIC SEPTIC TANK LINE DRAIN SEPTIC TANK10" D I (PER SS PLA N S)10" DI (PER SS PLANS)10" DI (PER SS PLANS) 10" DI (PER SS PLANS) 10" DI (P E R S S P L ANS) 10" DI (PER SS PLANS) 10" DI (PER SS PL A NS) 10" DI (PER SS PL A NS) 2 4 " CMPTOP=993.86' TOP=993.38'DI APPROX JB DI CUL1CUL2CE1H W1 CUL3CUL4CE2HW2 5'X5' CONC BOX CULV 24" HDPE WW12' CONC HWCONC9' WW12' CONC WW CONC 6' WW CONC14' 10' CONC HW 6' CONC 6' CONC 24" CMP 24" CMP 60" C MP 12 " PVC 12" P VC12" PVC12" PVC12" PV C12" PV C 5 PR 5 P R 12" PVC TSPINDALE SPINDALE US 74-A BYP 30' BST US 74 -A BYPASS 30 ' BST108GR GR GRGR GR5 PR 5 PR5 PRK D.B. 642, Pg. 273 EIPR/W MONR/W MONR/W MON R/W MON 30' SE WER E ASE ME NT 30' SE WER E ASE ME NT 30' SE WER E ASE ME NT 30' SE WER E ASE ME NT 30' SEWER EASEMENT 30' SEWER EASEMENT N 73°25'57" W241.16'N 73°25'57" W415.14'S 74°15'57" E90.40'N 17°41'03" E50.82'N 17°41'03" E47.96'N 15°45'17" E107.12'N 15°33'31" E43.55'S 26°04'07" E150.65'S 66°32'04" E38.82'S 13°38'18" E65.60'S 13°57'19" W70.91'S 84°48'43" W424.82'S 07°15'37" E 469.84'N 84°07'03" E520.39'N 84°07'01" E106.98'EI PEIPEIP S 73°55'04" E89.99'S 73°32'09" E144.20'30' SE WER E ASE ME NT 30' SE WER E ASE ME NT 30' SE WER E ASE ME NT 30' SE WER E ASE ME NT 30' SEWER EASEMENT 30' SEWER EASEMENT S 15°44'03" W30.00'EIP EIP EIP EXISTING R/W RUNS ALONG PROPERTY LINE EX IS T IN G R /W R U N S A L O N G P R O P E R T Y L IN E EXISTING R/W RUNS ALONG PROPERTY LINE EXISTING R/W RUNS ALONG PROPERTY LINE GEORGE E. HOLLAND & LOUISE A. HOLLAND DB 860, PG 116, PORTION OF TRACT FIVE HORTON-AMERICAN PROPERTIES, LLC DB 745, PG 622 LEE VARNER STERLING VARNER & ETHEL LOUISE 183.14' +02.77 281.65' +54.05 REBAR S 84°02'32" W225.96'S 84°10'32" W171.89'N 15°59'32" E220.53' GEORGE E. HOLLAND & LOUISE A. HOLLAND DB 860, PG 116, PORTION OF TRACT FIVE GEORGE E. HOLLAND & LOUISE A. HOLLAND DB 860, PG 116, PORTION OF TRACT FIVE BM #8 48 ST 48 ST 48 ST HORTON-AMERICAN PROPERTIES, LLC DB 745, PG 622 DB 812, PG 160 FRANCES LOGAN J. W. LOGAN & EXISTING R/W RUNS ALONG PROPERTY LINE HTR HTR HTR HTR HTR HTR HTR HTR HTR LEE VARNER STERLING VARNER & ETHEL LOUISE DB 488, PG 689 DB 456 PG 111, TRACT TWO & MARY ELLEN OWNBY DALLAS JERRY OWNBY PG 689 DB 488, GEORGE E. HOLLAND & LOUISE A. HOLLAND DB 860, PG 116, TRACT SIX GEORGE E. HOLLAND & LOUISE A. HOLLAND DB 860, PG 116, TRACT SIX SEE DETAIL B TOE PROTECTION SEE DETAIL A 3' LATERAL DITCH TO EL. 935.0 FILL EXISTING CHANNEL SEE DETAIL D 3' LATERAL BASE DITCH SEE DETAIL C 2' LATERAL BASE DITCH WIT H SILLS A N D B AFFLES 1 @ 10'x8' RC BC B U RIE D 1' 25' SPACIN G 1' HIG H BAFFLES @SEE DETAIL D 3' LATERAL BASE DITCH JB w/MH JB w/MH JB w/MH JB w/MH SEE DETAIL B TOE PROTECTION -L3-24'46'24'PS2'PS2'.02.02FUTURE BRIDGE FUTURE BRIDGE -Y74- 150' TAPER 550' TURN LANE -Y74- PC Sta. 10+32.93 -Y25REV- POT Sta. 29+53.10 -L3- POT Sta. 743+46.24= -Y25REV- POC Sta. 2 3 + 0 0.0 0 -Y25EXT- POT Sta. 10 + 0 0.0 0 = -Y74- POT Sta. 10+00.00 BEGIN CONSTRUCTION -Y74- POC Sta. 17+89.51 END CONSTRUCTION-Y25REV--Y25REV- -Y74- POC Sta. 17+22.67 -Y25REV- POT Sta. 33+72.53= .01 .02 .01 .00 .01 .02 .06 .05 .04 .03 .02 .06 .05 .04 .03 .02 .01 .00 .02 .01 12' 12' Sta. 31+88.43 -Y25REV- PT Sta. 30+31.35 -Y25REV- PCTL-3GREU73574074512'12' 12'12' +41.84 +50+0012' 4' PS +00+68.865 0'RR11'20.00' LT +89.40 -Y74- 0.27' RT +95.33 -Y74- 43.02' LT +31.18 -Y74-70'R55.51' LT +89.51 -Y74- 6 0'R24.00' RT +61.68 -Y25REV-AT-1TYP.21'TYP.21'-Y25REV- +56.12 GUIDERAIL PROP. CABLE BEGIN TIP PROJECT R-2233BB END TIP PROJECT R-2233BA -L3- POT Sta. 731+35.00 FUTURE LANES GRADING LIMIT - EDGE OF FUTURE SHOULDER GRADING ONLY GRADING ONLY GRADING LIMIT - EDGE OF FUTURE SHOULDER FUTURE LANES GRADING ONLY GRADING ONLY FUTURE LANES FUTURE LANES -L3- POT Sta. 744+75.00 BEGIN PAVING PROPOSED LENGTH OF PROJECT R-2233BA TO BE INCLUDED IN PROJECT R-2233BB 1340 LF-L3- POT STA. 731+35.00GRADING ONLYBEGIN CONSTRUCTION-L3- POT STA. 744+75.00BEGIN PAVINGSITE 16 WB SITE 15 SP