Loading...
HomeMy WebLinkAbout540051_Plan of Action_20210224Feb 24 2021 04:33PM Selby Land Concepts 2529646775 page 22 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: ST - 1.57 Facility Name: f•%' County: /...eabie Certified Operator Name: 77Ma7 441/ Operator # /OO20/ 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): ? Spillway (Yes or No): Level (inches): 2 Check all applicable items /da 18" Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. KLiquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: rrO3 , 201"/ I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. 7;47it %��i►L-Ct�' Facility Owner/Manager (print) Facility Owner/Manager (signature) PoA Cover Page 2121/00 Phone: Date: /65 /4, 2.4-t Feb 24 2021 04:33PM Selby Land Concepts 2529646775 page 23 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD i. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 4/ 2. Current liquid volume in 25 yr./24 hr. storm storage & structural a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down pe f. temporary storage period according to structural design g. volume of waste produced according to structural design freeboard /c9• 0 inches inches S inches /9'S 1LZ 94 ft2 7/337 gallons riod 180 days (87O35 ft3 h. actual waste produced = current herd # x line g = g1035 ft3 certified herd # i. volume of wash water according to structural design -51ft3 j. excess rainfall over evaporation according to design Ted ft3 k. (lines h + i +i) x 7.48 x 30 days = .22241 gallons line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated /O2.Z4 • ,Zo m. (lines e + k) x line I = 1000 lb/1000 gal. qB. 3 lb PAN REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21/00 1 Feb 24 2021 04:33PM Selby Land Concepts 2529646775 page 24 1. structure ID:� 2. structure ID: 3. structure ID: 4. structure ID. 5. structure ID: 6. structure ID: n. lines 1 + 2 + 3 + 4 + 5 + 6 = 7% M� y44,,/6x line m = 98' 3 Ib PAN line m = line m = line m = line m = line m = 98.3 Ib PAN Ib PAN Ib PAN Ib PAN Ib PAN lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PE o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' P Pi var lJA,r J. JZ! 6 g65 2 --,aM IC 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period b v. Total PAN available for all fields (sum of column t) = S6%2 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2/21/00 2 Feb 24 2021 04:34PM Selby Land Concepts 2529646775 page 25 w. Total PAN to be land applied (line n from section II) = 949.3 x. Crop's remaining PAN balance (line v from section III) = ,g4 7 2. y. Overall PAN balance (w - x) = -- 770.9 Ib. PAN Ib. PAN Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. if new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: 5 (71- S/ T,'ri if Ctkt,Ntx, PoA (30 Day) 2121/00 3