Loading...
HomeMy WebLinkAbout520002_Plan of Action_20210224Feb 24 2021 04:30PM Selby Land Concepts 2529646775 page 12 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: k.52 Z Facility Name: / Q fiwihS/#/A%tr Certified Operator Name: 12o44.tt.0 7:4ti/GoC County: \IA Operator # 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): .1 1O 2• fi 3 Spillway (Yes or No): ali.k Ak Ak Level (inches): /8 " /7 v /7 '' 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: AZ At ,Cal I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. 7ov4K,o et- - Facility Owner/Manager (print) Phone: J�52 - LS"6L `55a3 Date: ireX5I f �i/ Facility Owner/Manager (signature) PoA Cover Page 2/21/00 Feb 24 2021 04:30PM Selby Land Concepts 2529646775 page 13 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID). 52-2 #1 2. Current liquid volume in 25 yr./24 hrstorm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e line c112 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 1200 certified herd # 18.01 19,8 inches inches 1.8 inches 51330 ft2 57592 gallons 180 52748.7 16001 actual waste produced = current herd # x line g certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period days ft3 39562 ft3 0 29942.5 ft3 ft3 86648 gallons I. current waste analysis dated I 10/26/2020 1.26 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 181.7 lbs. PAN Feb 24 2021 04:30PM Selby Land Concepts 2529646775 page 14 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (ID): 152-2 #2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2400 certified herd # 17.01 19.81 2.8 125450 218952 1801 1 221390.41 9100 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)11000) x line l = 10/26/20201 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 58389 01 1 102159.8 200150 0.78 326.9 Feb 24 2021 04:31PM Selby Land Concepts 2529646775 page 15 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): 52-2 #3 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd #' 2400 certified herd # 17.0 19.51 2.5 102545.2 159800 180 221390.4 4000( actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 10/26/2020 REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 132834 0 89762.7 277504 1.27 555.4 Feb 24 2021 04:31PM Selby Land Concepts 2529646775 page 16 - 2 7,04101-r-o T�►�/� o,�. fl. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4, Structure ID: 5. Structure ID: 6. Structure IDS 52-2 #1 52-2 #2 52-2 #3 n.lines1+2+3+4+5+6_ Tine m = 181.7 Ib PAN line m = 326 9 Ib PAN line m = 555.4 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 1064.0 Ib PAN III. TOTAL. PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED U o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Ib/acre) D RING THIS t. TOTAL PAN BALANCE FOR FIELD (Ibs.) 3o DAY l'I lUIJ. u application window' 240 Pivot Cover Crop 16.60 20,00 332.0 9/1-3/31 240 Field 1 Cover Crop 3.63 15.00 54.5 9/1-3/31 240 Field 2 Cover Crop 4.42 20.00 88.4 9/1-3/31 240 Field 3 Cover Crop 6,07 10.00 60.7 911-3/31 240 Field 4 Cover Crop 5.37 20.00 107.4 9/1-3/31 240 Pull #8 Cover Crop 4.32 20.00 86.4 9/1-3/31 240 Pull #9 Cover Crop 4.32 15.0 64.8 9/1-3/31 240 Pull #10 Cover Crop 4.32 10.00 43.2 9/1-3/31 240 Pull #11 Cover Crop 4.99 12.00 59.9 9/1-3/31 240 Pull #12 Cover Crop 4.99 16.00 79.8 9/1-3/31 240 Pull #13 Cover Crop 4.81 10.00 48.1 9/1-3/31 240 Pull #14 Cover Crop 4.81 10.00 48.1 9/1-3/31 240 Pull #17 Cover Crop 3.98 20.00 79.6 9/1-3/31 240 Pull #18 Cover Crop 3.98 30.00 119.4 9/1-3/31 240 Pull #21 Cover Crop 2.72 30.00 81.6 9/1-3/31 State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2/21/00 1353.9 Ib. PAN Feb 24 2021 04:31PM Selby Land Concepts 2529646775 page 17 S2 - 2 AArto TA2 w. Total PAN to be land applied (line n from section II) _ x. Crop's remaining PAN balance (line v from section III) _ y. Overall PAN balance (w - x) = 1064.0 Ib. PAN ----77r37 Ib. PAN -290 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Date: 4/25/17 Eve H. Honeycutt Extension Agent Agriculture, Livestock Certified Technical Specialist PoA (30 Day) 2/21/00