PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: k.52 Z
Facility Name: / Q fiwihS/#/A%tr
Certified Operator Name: 12o44.tt.0 7:4ti/GoC
County: \IA
Operator #
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): .1 1O 2• fi 3
Spillway (Yes or No): ali.k Ak Ak
Level (inches): /8 " /7 v /7 ''
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: AZ At ,Cal
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
7ov4K,o et- -
Facility Owner/Manager (print)
Phone: J�52 - LS"6L `55a3
Date: ireX5I f �i/
Facility Owner/Manager (signature)
PoA Cover Page 2/21/00
Feb 24 2021 04:30PM Selby Land Concepts 2529646775
page 13
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID).
52-2 #1
2. Current liquid volume in 25 yr./24 hrstorm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e line c112 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
1200
certified herd #
18.01
19,8
inches
inches
1.8 inches
51330
ft2
57592 gallons
180
52748.7
16001
actual waste produced = current herd # x line g
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
days
ft3
39562 ft3
0
29942.5
ft3
ft3
86648 gallons
I. current waste analysis dated I 10/26/2020 1.26 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
181.7 lbs. PAN
Feb 24 2021 04:30PM Selby Land Concepts 2529646775
page 14
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Namelldentifier (ID):
152-2 #2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
2400
certified herd #
17.01
19.81
2.8
125450
218952
1801
1 221390.41
9100
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)11000) x line l =
10/26/20201
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
58389
01
1 102159.8
200150
0.78
326.9
Feb 24 2021 04:31PM Selby Land Concepts 2529646775
page 15
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID):
52-2 #3
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #' 2400 certified herd #
17.0
19.51
2.5
102545.2
159800
180
221390.4
4000(
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
10/26/2020
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
132834
0
89762.7
277504
1.27
555.4
Feb 24 2021 04:31PM Selby Land Concepts 2529646775
page 16
- 2 7,04101-r-o T�►�/� o,�.
fl. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID:
2. Structure ID:
3. Structure ID:
4, Structure ID:
5. Structure ID:
6. Structure IDS
52-2 #1
52-2 #2
52-2 #3
n.lines1+2+3+4+5+6_
Tine m = 181.7 Ib PAN
line m = 326 9 Ib PAN
line m = 555.4 Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
1064.0 Ib PAN
III. TOTAL. PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED U
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(Ib/acre)
D RING THIS
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
3o DAY l'I lUIJ.
u application window'
240
Pivot
Cover Crop
16.60
20,00
332.0
9/1-3/31
240
Field 1
Cover Crop
3.63
15.00
54.5
9/1-3/31
240
Field 2
Cover Crop
4.42
20.00
88.4
9/1-3/31
240
Field 3
Cover Crop
6,07
10.00
60.7
911-3/31
240
Field 4
Cover Crop
5.37
20.00
107.4
9/1-3/31
240
Pull #8
Cover Crop
4.32
20.00
86.4
9/1-3/31
240
Pull #9
Cover Crop
4.32
15.0
64.8
9/1-3/31
240
Pull #10
Cover Crop
4.32
10.00
43.2
9/1-3/31
240
Pull #11
Cover Crop
4.99
12.00
59.9
9/1-3/31
240
Pull #12
Cover Crop
4.99
16.00
79.8
9/1-3/31
240
Pull #13
Cover Crop
4.81
10.00
48.1
9/1-3/31
240
Pull #14
Cover Crop
4.81
10.00
48.1
9/1-3/31
240
Pull #17
Cover Crop
3.98
20.00
79.6
9/1-3/31
240
Pull #18
Cover Crop
3.98
30.00
119.4
9/1-3/31
240
Pull #21
Cover Crop
2.72
30.00
81.6
9/1-3/31
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) =
IV. FACILITY'S PoA OVERALL PAN BALANCE
PoA (30 Day) 2/21/00
1353.9 Ib. PAN
Feb 24 2021 04:31PM Selby Land Concepts 2529646775
page 17
S2 - 2 AArto TA2
w. Total PAN to be land applied (line n from section II) _
x. Crop's remaining PAN balance (line v from section III) _
y. Overall PAN balance (w - x) =
1064.0 Ib. PAN
----77r37 Ib. PAN
-290 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Date: 4/25/17
Eve H. Honeycutt
Extension Agent
Agriculture, Livestock
Certified Technical Specialist