Loading...
HomeMy WebLinkAbout520077_Plan of Action_20210224Feb 24 2021 04:28FM Selby Land Concepts 2D2b4b / in page 6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: - 77 County: /4.Joa Facility Name: AMCaQ UC- 4JAQ64,15 Certified Operator Name: c..kee 4`" 4a.r " Operator # 9 222. 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 � Lagoon Name/Identifier (ID): ' '# �� 7` Spillway (Yes or No): dam_oth A/p Level (inches): /7 " a /% /8 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: c 22-/ I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Jez_avcr ,ecosc Facility Owner/Manager (print) Phone: 152 - -2434 Date: ceZ /f ', Facility Owner/Manager (signature) PoA Cover Page 2/21/00 Feb 24 2021 04:29PM Selby Land Concepts 2529646775 page 7 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 152-77 #2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 5000 certified herd # 17.0 195 inches inches 2.5 inches 149850 ft2 233516 gallons 180 213632 6480 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period !. current waste analysis dated m. ((lines e + k)/1000) x line I = 10/26/2020 j REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 days ft3 164840 ft3 0 87412 ft3 ft3 314474 gallons 1.62 Ibs/1000 gal. 887.7 lbs. PAN Feb 24 2021 04:29PM Selby Land Concepts 2529646775 page 8 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): (52-77 #3 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c112 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 1900 certified herd # 17.0 19.5 2.5 152550 237724 180 213632 6480 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 10/26/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 62639 0 88987 189027 0.50 213.4 FPh 24 2071 04:29PM Selby Land Concepts 2529646775 page 9 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): 52-77 #4 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/fta 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 4000 certified herd # 18.0 19.5 1.5 32786 30655 180 38096.3 5200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 10/26/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 29305 0 20416.7 61986 1.05 97.3 Feb 24 2021 04:29PM Selby Land Concepts 2529646775 page 10 52--7? II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 52-77 #2 2. Structure ID: 52-77 #3 3. Structure ID: 52-77 #4 4. Structure ID: 5. Structure ID: 6. Structure ID: n. lines 1+2+3+4+5+6= line m = 887.7 lb PAN line m= 213.4IbPAN line m = 97.3 Ib PAN line m = Ib PAN line m = lb PAN line m = Ib PAN 1198.4 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PE o. tract # p. field # q. crop r. acres s. remaining IRR. 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) r�vv. u. application window P PIVOT #2 Wheat 11.70 38.00 444.6 9/1-4/30 Hyd #2 Wheat 6.42 30.00 192.6 9/1-4/30 Hyd #3 Wheat 6.42 40.00 256,8 9/1-4/30 Hyd #13 Wheat 6.42 35.00 224.7 9/1-4/30 Hyd #14 Wheat 6.42 55.00 353.1 911-4130 H Hyd #30 Wheat 4.57 25.00 114.3 9/1-4/30 Hyd #31 Wheat 3.77 30.00 113.1 9/1-4/30 ate current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2/21/00 1699.2 Ib. PAN Feb 24 2021 04:29PM Selby Land Concepts 2529646775 - ?7 page 11 w_ Total PAN to be land applied (line n from section II) _ x. Crop's remaining PAN balance (One v from section III) = y. Overall PAN balance (w • x) 1198.4 lb. PAN 191rj99.2 Ib. PAN -501 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Date: 4/25/17 Eve H. Honeycutt Extension Agent Agriculture, Livestock Certified Technical Specialist PoA (30 Day) 2/21/00