Loading...
HomeMy WebLinkAbout20210461 Ver 1_ePCN Application_20210302 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form October 26,2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes ✓ No Is this project a public transportation project?* 0 Yes r No Change only if needed. BIMS#Assigned* Version#* 20210461 1 Is a payment required for this project?* ✓ No payment required 6 Fee received Reviewing Office* ✓ Fee needed-send electronic notification Central Office-(919)707-9000 Select Project Reviewer* Rob Ridings:eads\rgridings Information for Initial Review 1a.Name of project: Widening of US64 from US220 to Asheboro Bypass(U-5813 Central) 1a.Who is the Primary Contact?* NCDOT lb.Primary Contact Email:* 1c.Primary Contact Phone:* jldilday@ncdot.gov (919)707-6111 Date Submitted 3/2/2021 Nearest Body of Water Little River;Cedar Fork Creek Basin Yadkin-PeeDee Water Classification C;WS-II,HQW Site Coordinates Latitude: Longitude: 35.690875 -79.849547 Pre-Filing Meeting Information ID# Version 20210147 1 Pre-fling Meeting or Request Date* 1/27/2021 Attach documentation of Pre-Filing Meeting Request here:* U5813_DWR Pre-Filing Meeting Request Form.pdf 55.6KB A. Processing Information C^U County(or Counties)where the project is located: Randolph Is this a NCDMS Project ✓ Yes f No Is this project a public transportation project?* 6 Yes r No Is this a NCDOT Project?* 6 Yes r No (NCDOT only)T.I.P.or state project number: U-5813 WBS#(?) 44385.1.3 1a.Type(s)of approval sought from the Corps: [7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes ✓ No lb.What type(s)of permit(s)do you wish to seek authorization? r Nationwide Permit(NWP) 17 Regional General Permit(RGP) r Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? 6 Yes r No Regional General Permit(RGP)Number: 201902350-Work associated with bridge construction,widening,replacement,and interchanges RGP Numbers(for multiple RGPS): 1d.Type(s)of approval sought from the DWR: 17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes r: No For the record only for Corps Permit: r Yes t: No If.Is this an after-the-fact permit application?* ✓ Yes 6 No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? 6Yes rNo 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo Acceptance Letter Attachment U-5813-STR-YD 103&104.pdf 468.91KB Ih.Is the project located in any of NC's twenty coastal counties? C Yes F No 1j.Is the project located in a designated trout watershed? C Yes 6 No B. Applicant Information 1d.Who is applying for the permit? I7 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* C Yes G No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT 2b.Deed book and page no.: 2c.Responsible party: 2d.Address Street Address 1000 Birch Ridge Drive Address Line 2 Criy State/Rovince/Region Raleigh NC Postal/Zip Cale Country 27610 USA 2e.Telephone Number: 2f.Fax Number: (919)707-6000 2g.Email Address:* pharris@ncdot.gov C. Project Information and Prior Project History L) 1. Project Information lb.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Asheboro 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 Oty State/Rovince/Region Postal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Little River;Cedar Fork Creek 3b.Water Resources Classification of nearest receiving water:* C;WS-II,HQW 3c. What river basin(s)is your project located in?* Yadkin-PeeDee 3d.Please provide the 12-digit HUC in which the project is located. 030401040301,030401030403 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Land use in the project vicinity consists primarily of residential and commercial properties along with forested communities. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* C Yes 0- No C Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) 4f.List the total estimated acreage of all existing wetlands on the property: 0.15 4g.List the total estimated linear feet of all existing streams on the property: 3,500 4h.Explain the purpose of the proposed project:* The purpose of the project is to increase traffic capacity and operational improvements to accommodate projected traffic volumes.The project will also replace the functionally obsolete Albemarle Road bridge.As a secondary benefit,the project will improve traffic safety by limiting conflict points along the U.S.64 corridor within the project limits. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The proposed project will increase the capacity and improve mobility and connectivity within the study area.The mainline US64 will be widened to a 4-lane facility with a variable width median.The proposed improvements will limit left turning vehicles through superstreet design.The project will also upgrade the N.C.49/U.S.64 interchange,including replacing the Albemarle Road bridge,and the I-73/1-74/U.S.220 interchange with U.S.64 and Albemarle Road to meet current design standards and improve mobility,connectivity,and safety in the study area.The proposed project will widen approximately 1.1 miles of U.S.64 from a three-lane section to a four-lane median divided roadway between the Asheboro Bypass and the existing four-lane median divided section east of the Albemarle Road Bridge No.171.The widening will occur to the south of the roadway,primarily within existing right of way.The total project length is 2.26 miles.Typical road building equipment will be used including cranes,bulldozers,dump trucks,etc. 4j.Please upload project drawings for the proposed project. U-5813_Permit Drawing Package.pdf 39.71MB U5813_RDY_RPC_XPL.pdf 21.64MB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* r: Yes r No C Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* 6 Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Beth Reed Agency/Consultant Company: Kimley-Horn Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR Field visit conducted on 2/6/2018 with Andy Williams(USAGE)and April Norton(NCDWR).Written verification not received from USAGE.Revised information from field visit sent to USACE on 2/19/2018. 5d1.Jurisdictional determination upload 6. Future Project Plans 6a.Is this a phased project?* rYes 6No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): r Wetlands fJ Streams-tributaries 1 Buffers n Open Waters r Pond Construction 3.Stream Impacts 3a.Reason for impact(?) 3b.Impact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* 81 S1-Channel Stabilization Permanent Stabilization SL Perennial Both 4 52 Average(feet) (linear feet) 32 S1-Channel Stabilization Temporary Stabilization SL Perennial Both 4 10 Average(feet) (linear feet) S3 S2-Relocation Permanent Relocation SK Intermittent Both 2 103 Average(feet) (linear feet) S4 S2-Relocation Temporary Relocation SK Intermittent Both 2 31 Average(feet) (linear feet) S5 S3-Bank Stabilization Permanent Bank Stabilization SJ Perennial Both 8 50 Average(feet) (linear feet) S6 S3-Bank Stabilization Temporary Bank Stabilization SJ Perennial Both 8 15 Average(feet) (linear feet) 87 S3-Culvert Permanent Culvert SJ Perennial Both 8 53 Average(feet) (linear feet) S8 S4-Relocation Permanent Relocation SH Perennial Both 5 190 Average(feet) (linear feet) S9 S4-Relocation Temporary Relocation SH Perennial Both 5 11 Average(feet) (linear feet) S10 S5-RipRap at Embankment Permanent Rip Rap Fill SI Intermittent Both 2 5 Average(feet) (linear feet) S11 S5-RipRap at Embankment Temporary Rip Rap Fill SI Intermittent Both 2 20 Average(feet) (linear feet) S12 S6-Pipe Outfall Permanent Fill SE Perennial Both 6 19 Average(feet) (linear feet) S13 S6-Pipe Outfall Temporary Fill SE Perennial Both 6 23 Average(feet) (linear feet) S14 S7-Pipe Outfall Permanent Fill SF Intermittent Both 2 16 Average(feet) (linear feet) S15 S7-Pipe Outfall Temporary Fill SF Intermittent Both 2 20 Average(feet) (linear feet) S16 S7-Channel Permanent Relocation SF Intermittent Both 2 132 Change/Relocation Average(feet) (linear feet) S17 S7-Channel Temporary Relocation SF Intermittent Both 2 10 Change/Relocation Average(feet) (linear feet) S18 S8-Pipe Outfall Permanent Fill SA Intermittent Both 3 55 Average(feet) (linear feet) S19 S8-Pipe Outfall Temporary Fill SA Intermittent Both 3 17 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 675 157 3i.Total stream and ditch impacts: 832 3j.Comments: 50 linear feet of permanent impact due to bank stabilization and does not require mitigation. E. Impact Justification and Mitigation v 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: -Maintaining existing drainage patterns to the maximum extent practical. -Riprap utilized at the outlet of open pipes -Riprap proposed in ditches with high velocity -No wetland impacts -2:1 fill slopes at jurisdictional streams lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Traffic will be maintained within the existing roadway and phased during construction.Design standards in Sensitive Watersheds will be used in the vicinity of all streams to Cedar Fork Creek. 2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ( Yes rNo 2c.If yes,mitigation is required by(check all that apply): l DWR fJ Corps 2d.If yes,which mitigation option(s)will be used for this project? 1 Mitigation bank fJ Payment to in-lieu fee r' Permittee Responsible program Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a.Approval letter from in-lieu fee program is attached. F Yes r No 4b.Stream mitigation requested: (linear feet) 4c.If using stream mitigation,what is the stream temperature: 625 warm 4d.Buffer mitigation requested(DWR only): 4e.Riparian wetland mitigation requested: (square feet) (acres) 4f.Non-riparian wetland mitigation requested: 4g.Coastal(tidal)wetland mitigation requested: (acres) (acres) 4h.Comments F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes r No If no,explain why: Waters within the project vicinity are not subject to riparian buffers. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* 6 Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* 6 Yes rNo lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* G Yes rNo 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* ✓ Yes r No NEPA or SEPA Final Approval Letter 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes r No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes f•No 3b.If you answered"no,"provide a short narrative description. Due to minimal transportation impact resulting from this road widening,this project will neither influence nearby land uses nor stimulate growth. Therefore,a detailed indirect or cumulative effects study will not be necessary. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes r No G N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* 6 Yes r No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* F Yes rNo 5c.If yes,indicate the USFWS Field Office you have contacted. Raleigh 5d.Is another Federal agency involved?* ✓ Yes 6 No r Unknown 5e.Is this a DOT project located within Division's 1-8? G Yes r No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? N.C.Natural Heritage Program database;USFWS-Raleigh Field Office website;biological surveys for protected species listed for Randolph County, which include Cape Fear shiner and Schweinitz's sunflower.Habitat for Cape Fear shiner does not exist in the study area and the biological conclusion is No Effect.This project is within the Yadkin/PeeDee Basin,not the Cape Fear basin.Surveys for Schweinitz's sunflower were conducted on 9/27/2018 and updated on 8/20/2019.Habitat is present however no individuals were observed.The biological conclusion for Schweinitz's sunflower is No Effect. Consultation Documentation Upload 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes 6 No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS County Index 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ✓ Yes f No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NEPA documentation 7c.Historic or Prehistoric Information Upload 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-yearfloodplain?* ✓ Yes f No 8c.What source(s)did you use to make the floodplain determination?* FEMA maps Miscellaneous Comments Miscellaneous attachments not previously requested. U5813_Final CP4C Meeting Minutes_HNTB Response to Comments.pdf 162.26KB Signature U * 17 By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Mack Christopher Rivenbark Ill Signature Xa C. Ri'u 111 Date 3/2/2021