HomeMy WebLinkAboutNCC211246_ESC Approval Submitted_20210303dry I7-E
ROY COOPER
Governor
MICHAEL S. REGAN 4 - \
Secretary
BRIAN WRENN NORTH CAROLINA
Director Environmental Quality
February 24, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
Bailey's Ridge, LLC
Attention: Justin R. Nifong, Managing Member
3409 Union Grove Rd.
Winston-Salem, NC 27127
RE: Project Name: Bailey's Ridge Subdivision -
Acres Approved: 6.46
Project ID: DAVIE-2021-008
County: Davie
City: Shady Grove
Address: Bailey's Chapel Rd.
River Basin: Yadkin-PeeDee
Stream Classification: WS-IV
Submitted By: Latham -Walters Engineering, Inc.
Date Received by LQS: February 12, 2021
Plan Type: New -Express
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
received, you will receive the COC via email. You MUST obtain the COC prior to commencement
of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please
direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul
Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the
new responsible party is required to apply for his/her own COC.
J D Q> North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources
�' •/ [J/Winston-Salem Regional Office 1 450 Hanes MITI Road, Suite 3001 Winston-Salem, North Carolina 27103
Wimazo.w 336.776.9800
Letter of Approval with Modifications
Bailey's Ridge, LLC
February 24, 2021
Page 2 of 3
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules
may. a'_ro apply. -to: activity, This approval does not supersede. any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application fee.
You are requested to file an amended form if there is any change in the information included on
the form. In addition, it would be helpful if you notify this office of the proposed starting date for
this project. Your cooperation is appreciated.
Sincerely,
Z cha y Lentz, EI
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
cc: Jim Walters, PE of Latham -Walters Engineering, Inc. (via e-mail)
WSRO file
Letter of Approval with Modifications
Bailey's Ridge, LLC
February 24, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Bailey's Ridge Subdivision
Project ID: DAVIE-2021-008
County: Davie
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Per Section 6.20 of the North Carolina Erosion and Sediment Control Planning and Design
Manual, diversions that will stay in place longer than 30 working days should be seeded and
mulched as soon as they are constructed to preserve dike height and reduce maintenance.
[G.S. 113A-57(2)]
2. This ESC plan was approved based on information submitted via E-mail to Zachary Lentz, EI
on February 19, 2021. For inspection purposes, two hard copies of the revised plans
reflecting the E-mailed information must be delivered to this office by March 6, 2021 or
prior to the beginning of construction, whichever date is earlier. Please reference Project
Number DAVIE-2021-008 in your cover memo. [15A NCAC 4B .0107(c)]
Additional Comments:
1. If it is found additional area will be required for stockpiling of topsoil, contractor staging,
temporary access, haul roads, erosion control measures or other land -disturbing activities
associated with this project, a revised erosion control plan reflecting the additional area
must be submitted to this office. [15A NCAC 4B .0118]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
LM