Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20051877 Ver 1_Year 1 Monitoring Report_20120109
ME- . ' =� •;i. ;:�- ...ti• }r." .i L- :,;n�S_': '_ ''� \• tiles,.�. '.\r : .� �.i �t,:£�, tin; ;� �:.�, _ J- • .•�,. rt, .. pit 'i.. ^.':Y�'�7,:� ��� = }- -i=�':r t. "_,r�=' • ''^'_ - 2. ;�•' :'� i�. - . -'t.. '"y 't''�� "fir';; '; �." ..i' ^„•;o;n Ys! �. +'rfti.;:.4,.;ti Syi t`•::;i: :; �' •" ahi. �,.: ,5.i' .�. '.y -"=�• - ,+:y," .e, j� j• EiL'nvyr4 :�' '•.}...�; f3n,:;s\��_ .: �� a�.�`a�• ,. • -� , ._.y .� y, •ail -•- 7#:T;�Y.L�..Av atiY —_,. `l •' • "r _ .�s. %�. .�'�i. _ :1 INK Ji XI :,�.r•�T��a t cy,1.: -. `. ti.`. .yi_ Marv, - ' ,� .• v. d - lY_\•f,•`.� -•�Tc4 T'•1r 5,r+x' "r•:i:iw� .�Y"�'Y?" •�s � •(+ ,1• i, _�: �_•,3'aY -•� 'k` (.,''.b� �y_: � �.t::i• •,1:. f.� !i 53.��.c 'r .' �i r , mm �:: .i.,: ryi •i;_a;i� 1F`,1 p i, r ''.`f�U '. ?C�,� \•'. y. . r- Ll 13 l� �I L Monitoring Firm ,.E QUIN ENVIRONMENTAL CONSULTATI ®N & DESIGN 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 828 - 253 -6856 Protect Contact Win Taylor Email win@equinoxenvironmental com li J Ili i WC 20 30 Dye Branch II Stream Restoration 2011 Monitoring Report (MY 1) Table of Contents Executive Summary / Project Abstract Methodology References c Page 1 Page 3 Page 4 L_I 0 0 1 0 0 LI 0 J �I �j Appendix A Pr, Figure 1 Table 1 a Table lb Table 2 Table 3 Appendices )ject Vicinity Map and Background Tables Vicinity Map and Directions Project Components Component Summations Project Activity and Reporting History Project Contacts Table 4 Project Attributes Appendix B Visual Assessment Data Figure 2 Integrated Current Condition Plan View Table 5 Visual Stream Morphology Stability Assessment Table 6 Vegetation Condition Assessment Photo Station Photos Appendix C Vegetation Plot Data Table 7 Vegetation Plot Criteria Attainment Vegetation Monitoring Plot Photos Table 8 CVS Vegetation Plot Metadata Table 9 Planted and Total Stem Counts (Species by Plot with Annual Means) Appendix D Stream Survey Data Cross - Sections with Annual Overlays and Photos Longitudinal Profiles with Annual Overlays Pebble Count Plots with Annual Overlays Table 10a Baseline Stream Data Summary Table IOb Baseline Stream Data Summary (Substrate, Bed, Bank, and Hydrologic Containment Parameter Distributions) Table 1 la Monitoring Data — Dimensional Morphology Summary (Dimensional Parameters — Cross - Sections) Table 11 b Monitoring Data — Stream Reach Data Summary Appendix E Hydrologic Data Table 12 Verification of Bankfull Events Figure 3 Dye BranchWater Level Logger Chart Figure 4 Precipitation for Mooresville, North Carolina r1 U U U ri 0 1 1 �i 10 EXECUTIVE SUMMARY / PROJECT ABSTRACT The goals and objectives stated in the Dye Branch Stream Restoration Plan (NCEEP 2005) are as follows Provide a stable system of stream channels that neither aggrade nor degrade while maintaining dimension, pattern, and profile with the capacity to transport the watershed's water and sediment load, Improve the overall water quality and aquatic habitat by reducing sediment and waste inputs into the stream caused by bank erosion, mass - wasting, and stormwater runoff through stabilization of the stream channel and implementation of a stormwater wetland, and • Improve the overall viability of the riparian vegetative communities through establishment of native species and elimination of invasive exotic species Between the baseline monitoring and monitoring year 1 (MY]) vegetation plot data collection efforts, two monitoring plots were impacted during the stream repair efforts in the summer of 2011 In VP7 a significant number of planted stems were damaged and VP8 was completely destroyed Additionally, based on the MY vegetation plot data from plots 1 through 7 the project is not on track to meet the established criterion for planted stem density, which is a minimum survival of 320 planted stems per acre at the end of the year three monitoring period Average stem density for planted stems in MY is approximately 272 stems per acre Of the 76 planted stems recorded within VP1 — VP7 in MYO, 38% were reported as dead or missing in MY 1 Of the seven remaining plots, four plots ( -57 %) will not meet the year three interim success criteria numbers per acre These include VP 1, 4, 5, 6, and 7, which had 202, 243, 202, 162, and 283 stems per acre, respectively However, when planted and natural stems are combined, the average stem density is 619 stems per acre, which is above the minimum established criterion Problems with vegetation consist of approximately 29 currently isolated patches of high threat invasive plant species that span the project extent Stream longitudinal profiles within the Cemetery Branch reach have remained stable among monitoring years The primary stream issues observed during MY along Dye Branch include structure degradation, bank erosion, and bed aggradation The water level logger recorded three bankfull events during MY 1 Summary information/data related to the occurrence of items such as beaver or encroachment and statistics related to performance of various project and monitoring elements can be found in the tables and figures in the report appendices Narrative background and supporting information formerly found in these reports can be found in the mitigation and restoration plan documents available on EEP's website All raw data supporting tables and figures in the appendices is available from EEP upon request Ll Dye Branch 11 Final Project No 92255 Monitoring Year 1 of 5 rl I L Equinox Environmental Consultation and Design Inc January 2012 1 I 2 0 Methodology J , The stream monitoring methodologies utilized in MY1 were intended to replicate those employed during the previous monitoring year and are based on standard guidance and procedures documents (Rosgen 1996 and USACE 2003) Vegetation monitoring data were U collected following the standard CVS -EEP Protocol for Recording Vegetation, Level II (Lee et al 2008) D 0 l 1 it i 1 1 1 1 Dye Branch II Final 2 Equinox Environmental Consultation and Design Inc O Project No 92255 January 2012 Monitoring Year 1 of 5 1 r -� 1 1 ii �1 �f �r t U Fi Ll U LJ i� 1 �J 3 0 References Lee, M T, R K Peet, S D Roberts, and T R Wentworth 2008 CVS -EEP Protocol for Recording Vegetation Version 4 2 NCEEP (North Carolina Ecosystem Enhancement Program) October 2005 Dye Branch Stream Restoration Plan Town of Mooresville Iredell County, North Carolina Raleigh, NC Rosgen, D L 1996 Applied River Morphology Wildland Hydrology Books, Pagosa Springs, CO USACE (U S Army Corps of Engineers) 2003 Stream Mitigation Guidelines USACOE, USEPA, NCWRC, NCDENR -DWQ Wilmington District Dye Branch 11 Final - Project No 92255 Monitoring Year I of 5 3 Equinox Environmental Consultation and Design Inc January 2012 l � �I ' Appendix A Project Vicinity Map and Background Tables J �3 0 F1 I� n The subject project site is an environmental restoration site of j j �ie•^'��r` ` '. r'1;':: the NCDENR Ecosystem Enhancement Program (EEP) and is - - - I - - - encompassed by a recorded conservation easement, but is bordered by - 9; r _ land under private ownership. Accessing the site may require traversing areas near or along the easement boundary and therefor access by the general public is not permitted. Access by authorized personnel of state (( and federal agencies or their designees/contractors involved in the •• __- - 4.- -- - - -- -' �'.-.> development, oversight and stewardship of the restoration site is permitted within the terms and timeframes of their defined roles. Any a F l`` ,.,; intended site visitation or activity by any person outside of these _ previously sanctioned roles and activities requires prior coordination with EEP. 'r 115 h+ { v i 150 r 1 L li k - /ylv�i; ran, r Dye Branch II 15 f Stream Restoration Site '? it r t, ►� ` �jr `;,,. , fyA j 115 ` t I � :,r �. --J ! £ ',r " � � r -• + _. ,Ij- it ,. + '1 tip. ^ ��e 1,, , ; � ^�•- �i 9 � ',� i + r4 r r u. R• i �l I t ceaeN AreanaN, � uaVre c-WY Figure 1 - Vicinity Map r CNwxY heoyN Dye &ash II IIaNYy �Y 6Yae0a Stream RearonVnn Sib c "Y Dye Branch II EQUINOX P 4. ,NVI RONNENTAI. S S�V ` T - ar"em&t `� y Stream Restoration Site °•� ••• °�• PROGRAM •Cwnry 7< , Cabrru �Nnr Project No. 92255 N Directions: From Raleigh, proceed west on 1-40 towards 0 0.5 1 2 Statesville. Take Exit 152 A (1 -77S) towards Charlotte. Miles Proceed on I -77S to Exit 36 (NC -150) towards Mooresville. lredell County, North Carolina From NC -150 turn slight right onto McLelland Avenue/NC -152 for approximately 1.2 miles. The site is located on the west 7.5 Minute Series Mooresville side of McUlland Avenue/NC -152. August 2011 Quadrangle C L I Appendix A Project Vicinity Map and Background Tables Intorrnatton unavailable Non A IMabie Table is Project Components Actual Completion or Delivery Restoration Level Stream (H) Riparian Wetland (Ac) D Branch II /Pro ct No 92255 Buffer (Ac) BMP Project July 2010 Rtvenne Non Rivenne Footage Temr)orary S &E mix applied N/A Summer 2010 Restoration 3 685 Existing Restoration N/A Feb 2011 Mitigation Plan / As -built Year 0 Monrtorin - Baseline Buffer Enhancement Year 1 Monitonng Component or 00 Year 2 Monrtorin Approach or Stationing Enhancement I BMP Elements Comment Reach ID Feet/Acres Level Acreage Enhancement 11 Acres Creation Now SHEM 00 Cemetery Branch 9681£ R P3 10141f 0 +00 10+14 00 Stormwater wetlands Dye Branch HQ Preservation 0 00 00 Upstream 1 772 If R P2 1 500 if 0+00 15+40 Stormwater wetlands Dye Branch F3,685 0 0 0 0 3 Downstream 1 1 2321f R P2 1 171 If 16+00 27 +71 Intorrnatton unavailable Non A IMabie Non A Table 2 Project Activity &Reporting History wDyeilpranchlH, / PLro ect No 9.2255 Table lb Component Summations D, a Branch II /Pro ect No 9.2.255 Data Collection Complete Actual Completion or Delivery Restoration Level Stream (H) Riparian Wetland (Ac) Non - Riparian Ac Upland (Ac) Buffer (Ac) BMP N/A July 2010 Rtvenne Non Rivenne 101111111111, 41 Temr)orary S &E mix applied N/A Summer 2010 Restoration 3 685 00 00 N/A Feb 2011 Mitigation Plan / As -built Year 0 Monrtorin - Baseline March 2011 Enhancement Year 1 Monitonng 00 00 Year 2 Monrtorin doom Enhancement I xi "10 Year 4 Monrtorin Year 5 Monrtorin Enhancement 11 0 Creation Now 00 00 Preservation 0 00 00 HQ Preservation 0 00 00 00 00 Totals F3,685 0 0 0 0 3 Non A Table 2 Project Activity &Reporting History wDyeilpranchlH, / PLro ect No 9.2255 Activity or Report Data Collection Complete Actual Completion or Delivery Restoration Plan - Oct 2005 Final Dest - Construction Plans - Aril 2006 Final Dest - Repair Plans N/A July 2010 Construction Repairs N/A Dec 2010 Temr)orary S &E mix applied N/A Summer 2010 Permanent seed mix apphed N/A Summer 2010 Plant= N/A Feb 2011 Mitigation Plan / As -built Year 0 Monrtorin - Baseline March 2011 Aujz 2011 Year 1 Monitonng Nov 2011 Jan 2012 Year 2 Monrtorin Year 3 Monrtorin Year 4 Monrtorin Year 5 Monrtorin Intormation unavailable N/A Item does not apply Dye Branch II Final Project No 92255 Monitoring Year 1 of 5 A 2 Equinox Environmental Consultation and Design Inc January 2012 Appendix A !11 Project Vicinity Map and Background Tables 0 Table 3 Project Contacts e Branch II /Pro ect No 912255 Designer Mulkey Engineers & Consultants 6750 Tryon Road Cary NC 27518 Primary Project Design POC Emmett Perdue (919) 858 1874 Construction Contractor Fluvial Solutions P O Box 28749 Raleigh NC 27611 Construction Contractor POC Peter Jelenevsky (919) 605 6134 Planting Contractor Fluvial Solutions P O Box 28749 Raleigh NC 27611 Planting Contractor POC Peter Jelenevsky (919) 605 6134 Seeding Contractor Fluvial Solutions P O Box 28749 Raleigh NC 27611 Seeding Contractor POC Peter Jelenevsky (919) 605 6134 Seed M ix Sources Hanes Geo Components Winston Salem NC 27101 Nursery Stock Suppliers North Carolina Forest Service Goldsboro NC 27530 Monitoring Performers (YO) - 2010 Equinox Environmental Consultation & Design Inc 37 Haywood Street Suite 100 Asheville North Carolina 28801 Stream M omtonng POC Wm Taylor (828) 253 6856 Vegetation Momtonng POC Win Taylor (828) 253 6856 Monitoring Performers (Y1) - 2011 Equinox Environmental Consultation & Design Inc 37 Haywood Street Suite 100 Asheville North Carolina 28801 Stream M onrtonng POC Wm Taylor (828) 253 6856 Vegetation Monrtonng POC Win Taylor (828) 253 6856 Monitoring Performers (Y2) - 2012 Stream M onrtonng POC Vegetation MonitonngPOC Monitoring Performers (Y3) - 2013 Stream MomtonngPOC Vegetation Monitoring POC Monitoring Performers (Y4) - 2014 Stream M omtonng POC Vegetation MomtonngPOC Monitoring Performers (Y5) - 2015 Stream M omtonng POC Vegetation M omtonng POC Dye Branch II Final Project No 92255 Monitoring Year I of 5 A 3 Equinox Environmental Consultation and Design Inc January 2012 l-J, 1 0 0 0 0 U 1 0 1 0 i 1 LI �l LI F-1 L1 i 0 Appendix A Project Vicinity Map and Background Tables Table 4 D e Branch Protect Attributes II / P,ro ct No 92255 Project County Iredell Ph sio ra hic Region Piedmont Ecore ion Southern Outer Piedmont River Basin Yadkin Pee Dee USGS HUC 03040105010010 NCDWQ Sub Basin 03 07 11 Within Extent ofEEP Watershed Plan Upper Roc River Local Watershed Plan W RC Class Warm % of Project Easement Fenced or Demarcated 1000/0 BeaverActivity Observed During Design Phase No Restoration Component Attributes Dye Branch Cemetery Branch Drainage Area (sq mi 0 6 0 06 Stream Order Fast / Second First Restored Length feet 2 671 1 014 Perennial or Internment Perennial Perennial Watershed Type Urban Watershed LULC Distribution Urban Other 85% 15% Watershed Impervious Cover NCDW Q AU /IndexNumber 13 172 NCDWQ Classification C 303d Listed Yes Upstream of 303d Listed Segment Yes Reasons for 303d Listing orStressor Poor Bioclassification Total Acreage of Easement 12 0 Total Vegetated Acreage within Easement 12 0 Total Planted Acreage as Part of Restoration 89 Ros en Class ification of Pre Existing E4 /G4c EA Ros gen Classification of As Built C C Valley Type Valley Sloe 0 0097 / 0 0125 00217 Valley Side Slope Range Valley Toe Slope Range Cowardm Classification N/A N/A Trout Waters Designation No No Species of Concern Endangered Etc None Dominant Sod Series and Characteristics Series Depth Clay% K T Chewacla / Cecil / Colfax Information unavailable N/A Item does not apply Dye Branch II Final Project No 92255 Monitoring Year i of 5 A 4 Equinox Environmental Consultation and Design Inc January 2012 ii r- �_ I Appendix B Visual Assessment Data �j r Appendix B Visual Assessment Data Dye Branch II Final B 2 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 1 Vertical Stability deflect flow laterally (not to include point bars) V Number Footage Adjusted / 2 Degradation EVdence of downcutting 0 Number Total Number of Amount of / Stable with txth for Major Channel Channel Metric Stale Number m Unstable Unstable Per Stabilizing Stabilizing Stabilizing Category Sub - Category Performing As built Segments Footage as intended Woody Woody Woody Condition 2 Len h appropriate ( >30 / of centerlme distance between tail of as Intended Vegetation Vegetation Vegetation 1 Bed 15 l Aegadation Bar formation/growth sufficient to significantly 0 0 100/ 1 Thalweg centering at up stream of meander bend (Run) Dye Branch II Final B 2 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 1 Vertical Stability deflect flow laterally (not to include point bars) V (Riffle and Run Units) 2 Degradation EVdence of downcutting 0 0 100/ 2 Riffle Condition I Texture/Substrate Riffle maintains coarser substrate 14 14 100/ I Depth Sufficient (Max Pool Depth Mean Bankfull Depth Z 1 6) 14 15 93/ 3 Meander Pool Condition 2 Len h appropriate ( >30 / of centerlme distance between tail of upstream nfte and head of downstream nffle) 15 15 100/ 1 Thalweg centering at up stream of meander bend (Run) 15 15 100/ 4 Thalweg Position 2 Thalweg centering at downstream of meander bend (Glide) 14 14 100 / 2 Bank Bank lacking vegetative cover resulting simply from poor growth 1 Scoured /Eroding and/or scour and erosion 0 0 100/ N/A N/A N/A Banks undercut /overhanging to the extent that mass wasting appears 2 Undercut likely Does NOT include undercuts that are modest appear 0 0 100/ N/A N/A N/A sustainable and are providing habitat 3 Mass Wasting Bank slumping, calving, or collapse 0 0 100/ N/A N/A N/A Totals 0 0 ]00/ N/A N/A N/A 3 Engineered 1 Overall tntegnty Structures physically intact with no dislodged boulders or logs 32 32 100/ Structures 2 Grade Control Grade control structures exhibiting maintenance of grade across the sill 28 28 100 / 2a Piping Structures lacking any substantial flow underneath sills or anru 28 28 100/ 3 Bank Protection Bank erosion within the structures event of influence does NOT 4 4 NO/ exceed 15 / Pool fomung structures maintaining - Max Pool Depth Mean 4 Habitat Bankfull Depth Ratio ? 1 6 Rootwad0ogs providing some cover at 13 13 100 / base flow N/A Item does not apply Dye Branch II Final B 2 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 Appendix B Visual Assessment Data N/A item aces not appiy Dye Branch lI Final Project No 92255 Monitoring Year I of 5 B 3 Equinox Environmental Consultation and Design Inc January 2012 Table 5 Visual ' ohoh logy Stabitlty Assessme5 ISor' -Dye Branch Usessed I,e th 1 00 feet Number Footage Adjusted / Number Total Number of Amount of / Stable with with for Major Channel Channel Metric Stable Number in Unstable Unstable Performing Stabiltzing Stabilizing Stabilizing Category Sub-Category Perfornung As built Segments Footage as Intended Woody Woody Woody as Intended Vegetation Vegetation Vegetation 1 Bed 1 AMadatlon Bar formation/growth sufficient to significantly 4 183 88/ 1 Vertical Stability deflect flow laterally (not to include point bars) 2 Degradation Evidence of downcuttmg 0 0 100/ (Riffle and Run Units) 2 Faffle Condition I Te#ure/Substrate Riffle maintains coarser substrate 15 17 88/ I Depth Sufficient (Max Pool Depth Mean Bankfull Depth 2 1 6) 16 20 80/ 3 Meander Pool Condition 2 Length appropriate (>30/ of centerlme distance between tail of 16 20 80/ upstream riffle and head of downstream nffle) l Thalweg centering at upstream of meander bend (Run) 14 17 82/ 4 Thalweg Position 2 Thalweg centering at downstream of meander bend (Glide) 14 l6 88/ 2 Bank '1 Scoured /Erochng Bank lacking vegetative cover resulting simply from poor growth 6 212 93/ 0 0 93/ and/or scour and erosion Banks undercut /overhanging to the extent that mass wasting appears 2 Undercut hkely Does NOT include undercuts that are modest appear 0 0 100/ N/A N/A N/A sustainable and are providing habitat 3 Mass Wasting Bank slump mg, calving, or collapse 0 0 100/ N/A N/A N/A Totals 6 212 93/ N/A N/A N/A 3 Engineered 1 Overall Integrity Structures physically intact with no dislodged boulders or logs 27 30 90/ Structures + 2 Grade Control Grade control structures exhibiting maintenance of grade across the sill 7 7 100/ 2a Piping Structures lacking any substantial flow underneath sills or arms 6 7 86/ 87/ 3 Bank Protection Bank erosion within the structures extent of influence does NOT 20 23 exceed 15 / Pool funning strictures maintaining Max Pool Depth Mean 4 Habitat Bankfull Depth Ratio ? 1 6 Rootwads/logs providing sonic cover at 5 5 100 / base flow N/A item aces not appiy Dye Branch lI Final Project No 92255 Monitoring Year I of 5 B 3 Equinox Environmental Consultation and Design Inc January 2012 Appendix B Visual Assessment Data � ; � � � ss Table 5 Visual Stream Morphology Stability Assess rnent:; ,r i r ° n Branch II / Project No 92255 - DyerB'ranch - Downstream r _Y w d Assessed Le ngth 1,171 feet—, Number Footage Adjusted / Nu Total Number of Amount of / Stable with with for Major Channel Channel Metric Stable Number in Unstable Unstable Performing Stabilizing Stabilizing Stabilizing Category Sub - Category Performing As built Segments Footage as intended Woody Woody Woody as Intended Vegetation Vegetation Vegetation 1 Bed 1 Apgradation Bar formation/growth sufficient to significantly f "^ B a " 14, i r 1 Vertical Stability deflect flow laterally (not to include point bars) g 2 85 93/ (Riffle and Run Units) e zt� ry w 2 Devadation Evidence of downcuttuiy 0 0 100/ V 2 lb le Condition 1 Texture/Substrate Riffle maintains coarser substrate 1 I I1 � 4� �"`i tr �. 100/ V t 3 Meander Pool 1 Depth Sufficient (M ax Pool Depth Mean Bankfull Depth z 1 6) 10 10 100/ Condition 2 Length appropriate (>30/ of centerline distance between tad of upstream time and head of downstream nffle) 10 10 ��� i X �� e ° V 100/ 1 Thalwegcemermg at upstream of meander bend (Run) 9 10 90/ i'` � a r 4 Thalweg Position *'k �,: 'pb+t�,�l`l� 90/ 2 Thalwegcentering at downstream of meander bend (Glide) 9 10 s i , .,�`. 2 Bank 1 Scoured /Eroding Bank lacking vegetative cover resultmg simply from poor growth _ `sq r }' 7 @° 3 146 94/ 0 0 94/ and/or scour and erosion 4 r 1 "fix Banks undercut /overhangingto the extent that mass wasting appears 2 Undercut likely Does NOT include undercuts that are modest appear .�? -�'� ? V g 0 0 100/ N/A N/A N/A sustainable and are providing habitat ` t 3 Mass Wasting Bank slumping, calving, or collapse % 0 0 100/ N/A N/A N/A se zlyil w - Total 3 146 94/ N/A N/A N/A Strueturesred 1 Overall Integrity Structures physically intact with no dislodged boulders or logs 22 22f�zy r C 100/ >• v ° "' �p `rL r P 2 Grade Control Grade control structures exhibiting maintenance of grade across the sill 8 8 t 100/ g 2a Piping Structures lacking any substantial flow underneath sills or arms 5 8 63/ .a t , - Y� Bank erosion within the structures extent of influence does NOT 3 Bank Protection exceed l5 / 12 14 tr > ' 86/ d iF Pool forming structures maintaining- Max Pool Depth Mean 4 Habitat Bankfull Depth Ratio? 1 6 Rootwads/logs providing some cover at 5 5 �e i' 100/ base -flow '- iieiil a fi Ui appy Dye Branch II Final B 4 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 Appendix B Visual Assessment Data n Assessment11 No 92255 IDMveghanoni,6576 );leafed Acre e 9 0 Number of Combined % of Vegetation Category Defimtions CCPV Depiction Polygons Acreage Planted Acre e I Bare Areas Very limited cover of both woody and herbaceous material N/A 0 0 0/0 2 Low Stem Density Areas Woody stem densities clearly below target levels based on M Y3 N/A 0 0 0/0 4 or 5 stem count criteria Totalr 0 0 0/ 3 Areas of Poor Growth Rates or Vigor Areas with woody stems of a size class that are obviously small N/A 0 0 0/0 given the monitoring year Cnmulati—wIT_otale 0 0 0/ Easement Acrea a 12 01 % of Vegetation Category Defimtions CCPV Depiction Number of Combined Easement Polygons Acreage Acreage 4 Invasive Areas of Concern Areas or points (if too small to render as polygons at map scale) Cross Hatch 29 244 20/o (Red Dense/Yellow Present) 5 Easement Encroachment Areas Areas or points (if too small to render as polygons at at map scale) 1 003 02/o Orange Dots White Background N/A item noes not appiy Dye Branch 11 Final Project No 92255 Monitoring Year 1 of 5 B 5 Equinox Environmental Consultation and Design Inc January 2012 Appendix B Visual Assessment Data Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Cemetery Branch — Permanent Photo Station I Looking Downstream B -6 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix B Visual Assessment Data Cemetery Branch — Permanent Photo Station 2 Looking Upstream Cemetery Branch — Permanent Photo Station 2 Looking Downstream Dye Branch II Final B -7 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year I of 5 Appendix B Visual Assessment Data Dye Branch — Permanent Photo Station 3 Looking Downstream Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Dye Branch — Permanent Photo Station 4 Looking Upstream B -8 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix B Visual Assessment Data Dye Branch — Permanent Photo Station 5 Looking Upstream Dye Branch — Permanent Photo Station 6 Looking Upstream Dye Branch II Final B -9 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix B Visual Assessment Data Dye Branch — Permanent Photo Station 7 Looking Downstream Dye Branch - Permanent Photo Station 8 Looking Upstream Dye Branch II Final B -10 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix B Visual Assessment Data Dye Branch II Final Project No. 92255 Monitoring Year I of 5 Dye Branch — Permanent Photo Station 9 Looking Upstream B -11 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix C Vegetation Plot Data Appendix C Dye Branch 11 Final Project No. 92255 Monitoring Year 1 of 5 Vegetation Plot Data Table 7. Vegetation Plot Criteria Attainment Dye Branch II /Pro' ct No. 92255 Vegetation Plot ID Vegetation Survival Threshold Met? Tract Mean 1 No 29% 2 Yes 3 Yes 4 No 5 No 6 No 7 No C -1 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 1 Monitoring Year 1 — September 22, 2011 Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Vegetation Monitoring Plot 2 Monitoring Year 1 — September 22, 2011 C -2 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix C Vegetation Plot Data Vegetation Monitoring Plot-3 Monitoring Year 1 — September 22, 2011 Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Vegetation Monitoring Plot 4 Monitoring Year 1 — September 22, 2011 C -3 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 5 Monitoring Year 1 — September 22, 2011 Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Vegetation Monitoring Plot 6 Monitoring Year 1 — September 22, 2011 C -4 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix C Vegetation Plot Data Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Vegetation Monitoring Plot 7 Monitoring Year 1 — September 22, 2011 C -5 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix C Vegetation Plot Data Table 8 CVS Vegetation Plot Metadata Dye Branch II / Project No 92255 Report Prepared By W ilham Carson Date Prepared 9/29/2011 15 40 Database Name Equinox 2011 B DyeBranch mdb Database Location \ \FILESERVER \shared \ES \NRI &M \EEP Monitorng \Dye Branch \DB -MYI 2011 \Data \Veg Computer Name D16TNK71 File Size 151068928 DESCRIPTION OF WORKSHEETS IN THIS DOCUMENT Metadata Description of database file the report worksheets and a summary ofproject(s) and project data Protect Planted Each project is listed with its PLANTED stems per acre for each year This excludes live stakes Protect Total Stems Each project is listed with its TOTAL stems per acre for each year This includes live stakes all planted sterns and all naturaUvolunteer sterns Plots List of plots surveyed with location and summary data (live stems dead stems missing etc ) Vigor Frequency distribution of vigor classes for stems for all plots Vigor by Species Frequency distribution of vigor classes listed by species Damage List of most frequent damage classes with number of occurrences and percent of total stems impacted by each Damage by Species Damage values tallied by type for each species Damage by Plot Damage values tallied by type for each plot Planted Steins by Plot and Species A matrix of the count of PLANTED living stems of each species for each plot dead and missing stems are excluded ALL Stems by Plot and Species A mat nxofthe count of total living stems of each species (planted and natural volunteers combined) for each plot dead and missing stems are excluded PROJECT S UMMARY Project Code 92255 Project Name Dye Branch Description River Basin Yadkin Pee Dee Length(ft) Stream•to-Fdge Width (ft) Area (sq m) Required Plots (calculated) Sampled Plots 7 Dye Branch II Final Project No 92255 Monitoring Year 1 of 5 C 6 Equinox Environmental Consultation and Design Inc January 2012 Appendix C Vegetation Assessment Data Table 9 planted and Total Stem Counts (Species by Plot with Annual Means) Dye Branch 11 Project No 92255 ��000���0000 ©o���00000 ©oom ® ®m oo ©mmmoom ©omo ©000 ®vv ®mm�mmm 000000000 o ©© ©000 ©v ©vvo ©vo ©0000m ®mmmm Dye Branch II Final Project No 92255 Monitoring Year 1 of 5 C 7 Equinox Environmental Consultation and Design Inc January 2012 I� LI Appendix D Stream Survey Data J ( l Appendix D 840 839 838 837 a� w C 0 836 v W 835 834 833 832 0+00 Stream Survey Data Cemetery Branch Cross - Section 1 - Pool Station 1 + 04.27 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 Station (feet) As -built 12/6/2010 -t MY16/13/2011 - - -- Bkf Dye Branch lI Final D -1 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Cemetery Branch — Cross - Section I — Pool (Looking at Left Bank Descending) Monitoring Year 1 — June 13, 2011 Dye Branch 1I Final Project No. 92255 Monitoring Year 1 of 5 Cemetery Branch — Cross - Section 1 — Pool (Looking at Right Bank Descending) Monitoring Year 1 —June 13, 2011 D -2 Equinox Environmental Consultation and Design, Inc. January 2012 nppcndis I) Stream Survey Data Cemetery Branch — Cross - Section 1 — Pool (Looking Downstream) Monitoring Year 1 — June 13, 2011 Cemetery Branch — Cross - Section 1 — Pool (Looking Upstream) Monitoring Year 1— June 13, 2011 Dye Branch II Final D -3 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix D 830 829 828 d 827 w C O CC 826 W 825 824 823 0+00 Stream Survey Data Cemetery Branch Cross - Section 2 - Riffle Station 1 + 04.27 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 Station (feet) As -built 12/6/2010 —E-- MY 16/13/2011 – – – - Bkf Dye Branch 11 Final D -4 Equinox Environmental Consultation and Design. Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Cemetery Branch — Cross - Section 2 — Riffle (Looking at Left Bank Descending) Monitoring Year 1 —June 13, 2011 Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Cemetery Branch — Cross - Section 2 — Riffle (Looking at Right Bank Descending) Monitoring Year 1 — June 13, 2011 D -5 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D Stream Survey Data Cemetery Branch — Cross - Section 2 — Riffle (Looking Downstream) Monitoring Year 1 — June 13, 2011 Cemetery Branch — Cross - Section 2 — Riffle (Looking Upstream) Monitoring Year 1 — June 13, 2011 Dye Branch II Final D -6 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix D 824 823 a� 822 w C O ee a� W 821 820 819 Stream Survey Data Cemetery Branch Cross - Section 3 - Riffle Station 8 + 77.10 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 Station (feet) As -built 12/6/2010 t MY16/13/2011 - -- Bkf Dye Branch 11 Final D -7 Equinox Environmental Consultation and Design, Inc. Project No. 92255 November 2011 Monitoring Year 1 of 5 Appcndi\ I) Stream Survey Data Cemetery Branch — Cross - Section 3 — Riffle (Looking at Left Bank Descending) Monitoring Year 1 —June 13, 2011 Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Cemetery Branch — Cross - Section 3 — Riffle (Looking at Right Bank Descending) Monitoring Year 1 — June 13, 2011 D -8 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D Stream Survey Data Cemetery Branch — Cross - Section 3 — Riffle (Looking Downstream) Monitoring Year 1 — June 13, 2011 Cemetery Branch — Cross - Section 3 — Riffle (Looking Upstream) Monitoring Year 1 — June 13, 2011 Dye Branch II Final D -9 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix D 829 828 827 826 d w 825 c 0 > 824 as W 823 822 821 Stream Survey Data Dye Branch - Upstream Cross - Section 4 - Riffle Station 1 + 15.75 820 1I I I I I I I i i F I I 4 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0+45 0+50 0+55 0+60 0+65 0 +70 Station (feet) As- built5 /10/2011 tMY16 /13/2011 - - --Bkf Dye Branch 11 Final D -10 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year I of 5 Appendix D Stream Survey Data Dye Branch Upstream — Cross - Section 4 — Riffle (Looking at Left Bank Descending) Monitoring Year 1 — June 13, 2011 Dye Branch 11 Final Project No. 92255 Monitoring Year 1 of 5 Dye Branch Upstream — Cross - Section 4 — Riffle (Looking at Right Bank Descending) Monitoring Year 1 —June 13, 2011 D -I 1 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D Stream Survey Data Dye Branch Upstream — Cross - Section 4 — Riffle (Looking Downstream) Monitoring Year 1 — June 13, 2011 Dye Branch I1 Final Project No. 92255 Monitoring Year 1 of 5 Dye Branch Upstream — Cross - Section 4 — Riffle (Looking Upstream) Monitoring Year 1 — June 13, 2011 D -12 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D 822 821 820 819 as w 818 c 0 > 817 d W 816 815 814 813 0+00 Stream Survey Data Dye Branch - Upstream Cross - Section 5 - Pool Station 7 + 74.58 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 Station (feet) As-built 5/11/2011 — WMY16/14/2011 - -- Bkf 0+45 0+50 Dye Branch 11 Final D -13 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Dye Branch Upstream — Cross - Section 5 — Pool (Looking at Left Bank Descending) Monitoring Year 1 — June 14, 2011 Dye Branch 11 Final Project No. 92255 Monitoring Year 1 of 5 Dye Branch Upstream — Cross - Section 5 — Pool (Looking at Right Bank Descending) Monitoring Year 1 —June 14, 2011 D -14 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D Stream Survey Data Dye Branch Upstream — Cross - Section 5 — Pool (Looking Downstream) Monitoring Year 1 — June 14, 2011 Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Dye Branch Upstream — Cross - Section 5 — Pool (Looking Upstream) Monitoring Year 1 —June 14, 2011 D -15 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D 821 820 819 818 817 a� 816 c 0 815 a� W 814 813 812 811 Stream Survey Data Dye Branch - Upstream Cross - Section 6 - Riffle Station 10 + 75.57 810 1 I I I I I I I I E 1 I I I I I 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0 +45 0+50 0+55 0+60 0+65 0 +70 0 +75 0 +80 0 +85 Station (feet) As -built 12/6/2010 t MY 16/14/2011 - -- Bkf Dye Branch 11 Final D -16 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Dye Branch Upstream — Cross - Section 6 — Riffle (Looking at Left Bank Descending) Monitoring Year 1 — June 14, 2011 Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Dye Branch Upstream — Cross - Section 6 — Riffle (Looking at Right Bank Descending) Monitoring Year 1 — June 14, 2011 D -17 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D Stream Survey Data Dye Branch Upstream — Cross - Section 6 — Riffle (Looking Downstream) Monitoring Year 1 — June 14, 2011 Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Dye Branch Upstream — Cross - Section 6 — Riffle (Looking Upstream) Monitoring Year 1 — June 14, 2011 D -18 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D 819 818 817 816 815 w w e 0 814 ca as W 813 812 811 810 Stream Survey Data Dye Branch - Upstream Cross - Section 7 - Riffle Station 13+ 85.87 809 1 i i I I F I I I I I 1 I I 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0+45 0+50 0+55 0+60 0+65 0 +70 Station (feet) As -built 12/6/2010 – w— MY0 6/14/2011 – – – - Bkf Dye Branch 11 Final D -19 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix 1) Stream Survey Data Dye Branch Upstream — Cross - Section 7 — Riffle (Looking at Left Bank Descending) Monitoring Year 1 — June 14, 2011 Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Dye Branch Upstream — Cross - Section 7 — Riffle (Looking at Right Bank Descending) Monitoring Year 1 — June 14, 2011 D -20 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D Stream Survey Data Dye Branch Upstream — Cross - Section 7 — Riffle (Looking Downstream) Monitoring Year 1 — June 14, 2011 Dye Branch II Final Project No. 92255 Monitoring Year I of 5 Dye Branch Upstream — Cross - Section 7 — Riffle (Looking Upstream) Monitoring Year 1 — June 14, 2011 D -21 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D 815 814 813 812 a� 811 w C 810 W 809 808 807 806 Stream Survey Data Dye Branch - Downstream Cross - Section 8 - Riffle Station 17 + 27.43 805 1� 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0 +45 0+50 0+55 0+60 0+65 0 +70 0 +75 0 +80 0 +85 Station (feet) As -built 12/6/2010 t MY1 6/14/2011 - -- Bkf Dye Branch 11 Final D -22 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Dye Branch Downstream — Cross - Section 8 — Riffle (Looking at Left Bank Descending) Monitoring Year 1 —June 14, 2011 Dye Branch Downstream — Cross - Section 8 — Riffle (Looking at Right Bank Descending) Monitoring Year 1 — June 14, 2011 Dye Branch II Final D -23 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year I of 5 Appenclix 1) Stream Survey Data Dye Branch Downstream — Cross - Section 8 — Riffle (Looking Downstream) Monitoring Year 1 —June 14, 2011 Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Dye Branch Downstream — Cross - Section 8 Riffle (Looking Upstream) Monitoring Year 1 — June 14, 2011 D -24 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D 812 811 810 809 808 a� ��. 807 C O 806 6J W 805 804 803 802 801 0+00 Stream Survey Data Dye Branch - Downstream Cross - Section 9 - Pool Station 19 + 80.80 Dye Branch It Final Project No. 92255 Monitoring Year I of 5 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0+45 0+50 0+55 0+60 0+65 Station (feet) As -built 12/6/2010 t MY1 6/14/2011 - -- Bkf D -25 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D Stream Survey Data Dye Branch Downstream— Cross - Section 9 — Pool (Looking at Left Bank Descending) Monitoring Year 1 — June 14, 2011 Dye Branch Downstream— Cross - Section 9 — Pool (Looking at Right Bank Descending) Monitoring Year 1 —June 14, 2011 Dye Branch II Final D -26 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Dye Branch Downstream— Cross - Section 9 — Pool (Looking Downstream) Monitoring Year 1 —June 14, 2011 Dye Branch II Final Project No. 92255 Monitoring Year I of 5 Dye Branch Downstream— Cross - Section 9 — Pool (Looking Upstream) Monitoring Year 1 — June 14, 2011 D -27 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D 810 809 808 807 806 805 a� 804 C O 803 Q W 802 801 800 799 798 797 0+00 Stream Survey Data Dye Branch - Downstream Cross - Section 10 - Riffle Station 24 + 85.22 Dye Branch II Final Project No. 92255 Monitoring Year I of 5 0 +05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0+45 0+50 0+55 0+60 Station (feet) As -built 12/6/2010 --a— MY1 6/14/2011 – – – - Bkf D -28 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D Stream Survey Data Dye Branch Downstream — Cross - Section 10 — Riffle (Looking at Left Bank Descending) Monitoring Year 1 — June 14, 2011 Dye Branch II Final Project No. 92255 Monitoring Year 1 of 5 Dye Branch Downstream — Cross - Section 10 — Riffle (Looking at Right Bank Descending) Monitoring Year 1 —June 14, 2011 D -29 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D Stream Survey Data Dye Branch Downstream — Cross - Section 10 — Riffle (Looking Downstream) Monitoring Year 1 — June 14, 2011 Dye Branch R Final Project No. 92255 Monitoring Year 1 of S Dye Branch Downstream — Cross - Section 10 — Riffle (Looking Upstream) Monitoring Year 1 — June 14, 2011 D -30 Equinox Environmental Consultation and Design, Inc. January 2012 Appendix D 840 839 838 837 836 835 834 833 832 831 830 a� 829 828 e� 827 a W 826 825 824 823 822 821 820 819 818 817 816 815 Stream Survey Data Cemetary Branch Longitudinal Profile 0 +00 to 9 +89.93 O ! 1 .,? Q S 6 > 8 9 -1p �o �o �o �o X&o �o �o �o �o �o 'bo Station (feet) TW- MY012/6/2010 TW MY16 /13/2011 WS BKF o Structure Dye Branch 11 Final D -31 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix D 826 825 824 823 822 821 820 819 818 a� w c 817 y CO 816 w 815 814 813 812 811 810 809 808 Stream Survey Data Dye Branch - Upstream Longitudinal Profile 0 +30.36 to 15 +03.3 I • 1 1 Average $ankfull Slop --------- -__ ___ At -------------------- -- -- -- - - -- -- -- • • -- - - - - -- • • • 1 1 r------------ 1 O)9 0 Station (feet) TW- MY012/6/2010 TW- MY16/14/2011 WS • BKF o Structure '619 Dye Branch II Final D -32 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 Appendix D 810 809 808 807 806 805 w 804 a 0 y 803 W 802 801 800 799 798 797 xS0 Stream Survey Data Dye Branch - Downstream Longitudinal Profile 16 +52.72 to 25 +34.71 �O !8 so l9�0 200 2! �O 12 �O Station (feet) TW- MY012 /6 /2010 TW -MY16 /15/2011 WS BKF o Structure 1� xS0 ly 'PO 1S O Dye Branch II Final D -33 Equinox Environmental Consultation and Design, Inc. Project No. 92255 January 2012 Monitoring Year 1 of 5 f) I[] 0 i �i l' r Appendix D Stream Survey Data Dye Branch II / Project No 92255 Cemetery Branch - Cross - Section 1- Pool Pebble Count Summary D50 M onng Year 1 Descnption Matenal Size (mm) Total # Item % Cum % Silt /Clay sdUclay 0 062 0 0% 0% Sand very fine sand 0 125 0 0% 0% fine sand 025 0 0% 0% medium sand 050 4 4% 4% coarse sand 100 4 4% 8% very coarse sand 200 26 26% 34% Gravel very fine gravel 40 8 8% 42% fine gravel 57 9 9% 51% fine gravel 80 9 9% 60% medium gravel 113 10 100/0 70% medium gravel 160 15 15% 85% coarse gravel 223 7 7% 92% coarse gravel 32 5 5% 97% very coarse gravel 45 3 3% 1000/0 very coarse gravel 64 0 0% 1000/0 Cobble small cobble 90 0 0% 100% medium cobble 128 0 0% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 100% Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 00/0 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 1000/0 TOTALS 100 100% 100% S Data D50 57 D84 16 D95 28 Dye Branch 11 Final Project No 92255 Monitoring Year 1 of 5 D 34 Equinox Environmental Consultation and Design, Inc January 2012 Appendix D Stream Survey Data p o � r } e � c d � t Cemetery Branch Pebble Count Percent Cumulative Cross Section 1 Pool 100/ at ti 1 90/ v t a 80/ O a � L t F 7 1 70/ L u G 60 / G C u 50/ 06. 40/ a m E 301 U 20 / 10/ O N e7 Y O O O 0/ O O O O Particle Size (mm) N Q 9 m — MYl 6/13/2011 Cemetery Branch Pebble Count Percent Individual Cross Section 1 Pool 41 45/ 40 / 35/ 301 0 > 25/ a 20/ c d V L a 1S/ 10/ 5/ 0/ N Y1 V) O •� V1 .w N 7 O b 00 `O N N V) Q O 00 O �O R b O, N 00 to N N Q 00 10 'O O Y O en h O O O a f>a Particle Size (mm) m MYl 6/13/2011 p o � r } e � c d � t Dye Branch II Final D 35 Equinox Environmental Consultation and Design Inc I l Protect No 92255 January 2012 Monitoring Year 1 of 5 I at ti 1 v t a � L 7 1 Dye Branch II Final D 35 Equinox Environmental Consultation and Design Inc I l Protect No 92255 January 2012 Monitoring Year 1 of 5 I f� t I IJ r Appendix D Stream Survey Data Dye Branch II / Protect No 92255 Cemetery Branch - Cross - Section 2 - Riffle Pebble Count Summary D50 M itonng Year 1 Description Material Size (mm) Total # Item % Cum % Silt /Clay sdUclay 0 062 0 0% 0% Sand very fine sand 0 125 0 0% 0% fine sand 025 0 0% 0% medium sand 050 1 1% 1% coarse sand 100 10 100/0 11% very coarse sand 200 27 27% 38% Gravel very fine gravel 40 3 3% 41% fine gravel 5 7 3 3% 44% fine gravel 80 5 5% 49% mednun gravel 113 6 6% 55% medium gravel 160 13 13% 68% coarse gravel 22 3 5 5% 73% coarse gravel 32 3 3% 76% very coarse gravel 45 2 2% 78% very coarse gravel 64 6 6% 84% Cobble small cobble 90 8 8% 92% medium cobble 128 7 7% 99% large cobble 180 1 1% 100% very large cobble 256 0 0% 1000/0 Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 0° /U 1000/0 large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 1000/. TOTALS I 1 100 100% 100% S Data D50 84 D84 64 D95 100 Dye Branch 11 Final Project No 92255 Monitoring Year 1 of 5 D 36 Equinox Environmental Consultation and Design, Inc January 2012 I t� r a Appendix D Stream Survey Data Dye Branch II Final D 37 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 Cemetery Branch Pebble Count Percent Cumulative Cross Section 2 Riffle t 100/ � 90/ 80/ a m � r 70/ F a G 60/ [% O V u v. 40/ t m 301 } U 1 20/ q 10/ � 0/ `O N O � �• N en Q `O T 00 N V � Q O� Particle Size (mm) m —•— MY1 6/13/2011 Cemetery Branch Pebble Count Percent Individual Cross Section 2 Riffle 45/ 40/ L a 35/ c 30/ � 'O 25/ a c q O ` e 20/ � u v. _ 15/ I to/ 4 L T { r E i 5/ t A s t q b 0/ V Oa Particle Size (mm) m MY1 6/13/2011 Dye Branch II Final D 37 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Dye Branch II / Project No 92255 Cemetery Branch - Cross - Section 3 - Riffle Pebble Count Summary D50 Mo ormg Year 1 Descnption Material Size (mm) Total # Item % Cum % Sdt/Clay sift/clay 0 062 0 0% 0% Sand very fine sand 0 125 3 3% 3% fine sand 025 0 0% 3% medium sand 050 1 1% 4% coarse sand 1 00 2 2% 6% very coarse sand 200 37 37% 43% Gravel very fine gravel 40 3 3% 46% fine gravel 57 4 4% 50% fine gravel 80 8 8% 58% medium gravel 113 1 1% 59% medium gravel 160 7 7% 66% coarse juavel 223 4 4% 70% coarse gravel 32 3 3% 73% very coarse gravel 45 7 7% 80% very coarse gravel 64 14 14% 94% Cobble small cobble 90 4 4% 98% medium cobble 128 2 2% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 1000/0 Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 0% 1000/0 large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100° /a TOTALS1 100 100% 1000/0 S Data D50 6 D84 50 D95 70 Dye Branch 11 Final D 38 Equinox Environmental Consultation and Design, Inc Project No 92255 January 2012 Monitoring Year 1 of 5 i 1 Appendix D Stream Survey Data Dye Branch I[ Final D 39 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 Cemetery Branch a v � r 5 ; ! Pebble Count Percent Cumulative r � 1 r Cross Section 3 Riffle c � 3 r _ r t too/ - r 90/ t 80/ a c m .0 70/ F L T `t e 60 / G% V c 1 50/ i > 40/ L ra E A f 301 i e U 20/ 10/ 0/ O O N Q 9 d m Particle Size (mm) — MYl 6/13/2011 Cemetery Branch Pebble Count Percent Individual Cross Section 3 Riffle 45/ 40/ 35/ 301 m 0 t 25/ 9 C .t 20/ o V L d 0+ 15/ 10/ 5/ 0/ N M M h .ti N O b 00 `O N N V1 O 00 O �O N N 10 M LO N 00 V �D Y C, u d W Particle Size (mm) ® MYl 6/13/2011 Dye Branch I[ Final D 39 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 1 a v � r 5 ; ! 4 r � 1 r vA r l c � 3 r _ r Dye Branch I[ Final D 39 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 1 � - t - r t c L T `t V { 1 ry A f i Dye Branch I[ Final D 39 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Dye Branch II / Project No 92255 Dye Branch - Upstream - Cross - Section 4 - R><81e Pebble Count Summary D50 Mo oring Year 1 Descnption Material Size (mm) Total # Item % Cum % Sdt/Clay stldc lay 0 062 0 0% 0% Sand very fine sand 0 125 0 0% 0% fine sand 025 0 0% 0% medium sand 050 22 22% 22% coarse sand 100 24 24% 46% very coarse sand 200 13 13% 59% Gravel very fine gravel 40 3 3% 62% fine gravel 57 6 6% 68% fine gravel 80 7 7% 75% medium gravel 113 1 1% 76% medium gravel 160 9 9% 85% coarse gravel 223 0 0% 85% coarse gravel 32 0 0% 85% very coarse gravel 45 2 2% 87% very coarse gravel 64 7 7% 94% Cobble small cobble 90 5 5% 990/0 medium cobble 128 1 1% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 1000/0 Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 0% 1000/0 large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 1000/0 TOTALS1 100 100% 1 1000/0 Summ ary Data D50 1 2 D84 15 D95 69 Dye Branch 11 Final D 40 Equinox Environmental Consultation and Design, Inc Project No 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Dye Branch II Final D 41 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 Dye Branch Upstream n k Pebble Count Percent Cumulative Cross Section 4 Riffle Y T i t r y 100/ r � r 90/ 80/ a i F 70/ e r 60/ e u u d i > 40/ m r 30/ E -- c U 20/ 10/ O N MI h O O O 0/ O Particle Size (mm) .NOi d m —r MYl 6/13/2011 Dye Branch Upstream Pebble Count Percent Individual Cross Section 4 Riffle 45/ Y M1 t � � 40/ 7+v 35/ 30 / _ 9 25 / G e 20 / u u d 15/ a 10/ 5/ 0/ to to Vi 10 C, V1 O N M 0O 0 N to N Particle Size (mm) e MY13/201 Dye Branch II Final D 41 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 n k + Y T i t r y Dye Branch II Final D 41 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Dye Branch II / Project No 92255 Dye Branch - Upstream - Cross - Section 5 - Pool Pebble Count Summary D50 Mo oring Year l Description Material Size (mm) Total # Item % Cum % Sdt/Clay siWctay 0 062 0 0% 0% Sand very fine sand 0 125 0 0% 0% fine sand 025 0 0% 0% medium sand 050 4 4% 4% coarse sand 100 12 12% 16% very coarse sand 200 24 24% 40% Gravel very fine gravel 40 4 4% 44% fine gravel 57 6 6% 50% fine gravel 80 18 18% 68% medium gravel 113 18 18% 86% medium gravel 160 11 11% 97% coarse gravel 223 0 0% 97% coarse gravel 32 2 2% 990/0 very coarse gravel 45 0 0% 990/0 very coarse gravel 64 0 0% 990/0 Cobble small cobble 90 0 0% 990/0 medium cobble 128 1 1% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 100% Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 00/0 100% large boulder 2048 0 0% 100% very lar e boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 1000/0 TOTALS 1 100 100% 1000/0 S Data D50 6 D84 11 D95 15 Dye Branch If Final D 42 Equinox Environmental Consultation and Design, Inc Project No 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Dye Branch Upstream Pebble Count Percent Cumulative Cross Section 5 Pool too/ 90/ 80/ a a r 1 N �O O O 1 O O `t 4 n t .r k + " - VN r O � c � Y � �" a' � ., , s � ' T ; L " b i } �N � � r d � e .p - ^, S c r ±3,t 'i 1 v t 1 � " M a " � t ' � t r � S F s ,s i de � 1 � f 3 a ; r J d W � � r N � �� a >` � ! 4 r � d ''.� 4 d � '� � � . �ro 4 t � �R y � r r 6 �' � `1 a �7 r t , a n A x 4� tr � �w . f 4 i Y l = � x C� J s l i � � i � � i . 5 k I � d ° ) k1 6 � k o- 1°i t �C�'�,' `} ' � i* M N M i ! � ." # 7l7 r y" rw jt � � vk B + � ” 7 •� � � '? 1l � r g � . Y � m 6 , .�� .$ s . ti � t 4 �.i%"a� " 5 3° � � I . ' M�'{-0 - w � 3 �� < , ^ � � . ; 'i.h � r p L �x . t,`.+ h � ' ,��a� l . Y� •N ti {1 I � � W N .V �. � �� q� f K .. , `b .{t � � t a e 3N # � . j i y! lS � � # r c f '� � � ' O .� 0 + � i �• bf �P e j^� MJ }„°l� i �f i d's Hi *�b � . ^ � ]� ^♦9 _ „i�y ui �N h ra � f �4 a 'ce+t +i ,h ; �a ' �) . , �+D ^ a�, aa ' w5 , �t.� eT - t � Z X �i' � i J y .° �µ. cj k� f F a�^ a4? � S - 1 E X '� '' eiry ° •C "ih.' ' « 4 � ' X O t 1r .M i N .O f N O a "N O ` D � + � h O O 3 r + ` � g r� � " -'� � F'� � i e- C C t Q 'ti � �a ' n �i' .` �� „t r t � � d{ 1 t � S $ K i Y � G ` ( 2 � ¢ � -'$t « - ' '. � t t "� ,''�'# � t i� .3 � . rn . 9 . � t � ` c � � ° � '.'A �a ,a A � ' A " -4 ' r � Y et n J � 3k nr � k a � -�� , Y a i a .3 A � Q �� 8 � ' {,� .� 11t ^ f D i Y r. �. a4� , b M #{` r r '.� r 4 N K � t U O �G�4 J k ✓ �S t�� � iYC ¢�Y J Y Dye Branch II Final D 43 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 r 1 O t 1r .M i N .O f N O a "N O ` D � + � h O O 3 r + ` � g r� � " -'� � F'� � i e- C C t Q 'ti � �a ' n �i' .` �� „t r t � � d{ 1 t � S $ K i Y � G ` ( 2 � ¢ � -'$t « - ' '. � t t "� ,''�'# � t i� .3 � . rn . 9 . � t � ` c � � ° � '.'A �a ,a A � ' A " -4 ' r � Y et n J � 3k nr � k a � -�� , Y a i a .3 A � Q �� 8 � ' {,� .� 11t ^ f D i Y r. �. a4� , b M #{` r r '.� r 4 N K � t U O �G�4 J k ✓ �S t�� � iYC ¢�Y J Y Dye Branch II Final D 43 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 Dye Branch II Final D 43 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 i Appendix D i it I� I Stream Survey Data Dye Branch II / Project No 92255 Dye Branch - Upstream - Cross - Section 6 - Riffle Pebble Count Summary D50 M omg Year 1 Description Material Size (mm) Total # Item % Cum % Sdt/Clay sdUclay 0 062 0 0% 0% Sand very fine sand 0 125 3 3% 3% fine sand 025 2 2% 5% medium sand 050 8 8% 13% coarse sand 100 0 0% 13% very coarse sand 200 41 41% 54% Gravel very fine gravel 40 9 90/0 63% fine gravel 57 16 16% 79% fine gravel 80 9 9% 88% medium gravel 113 4 4% 92% medium gravel 160 3 3% 95% coarse gravel 223 0 0% 95% coarse gravel 32 1 1% 96% very coarse gravel 45 0 0% 96% very coarse gravel 64 0 0% 96% Cobble small cobble 90 0 0% 96% medium cobble 128 2 2% 98% large cobble 180 1 1% 990/0 very large cobble 256 1 1% 1000/0 Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 00/0 1000/0 large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 100 100% 100% Summ ary Data D50 19 D84 7 D95 22 Dye Branch II Final Project No 92255 Monitoring Year I of 5 D 44 Equinox Environmental Consultation and Design Inc January 2012 r � I Appendix D Stream Survey Data } Dye Branch Upstream Pebble Count Percent Cumulative rf Cross Section 6 Riffle 100/ rr r L r r PQ 4 4 +t 90/ r r r 80/ a 1 a a Z F A r 70/ C 60 / t r O w � a+ 501 i d r a > r 40/ r m E 301 e U 20/ ]0/ 0/ O O Particle Size (mm) N O 4 'm —� MYl 6/14/2011 Dye Branch Upstream Pebble Count Percent Individual Cross Section 6 Riffle 45/ 40/ 35/ 301 0 9 25/ .C. e 20/ 151 4� ]0/ 5/ up 0/ N Vl Vl tn .y N �O 00 V O 00 O 10 N N R 00 `O Y V1 O O O O V m Particle Size (mm) ®MYl 6/14/2011 } z � rf rr r L r r PQ 4 4 +t r r r 1 a A r r w � r r } z � rf rr r L r r PQ 4 4 +t r Dye Branch [[ Final D 45 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 i Appendix D i Stream Survey Data Dye Branch II / Project No 92255 Dye Branch - Upstream - Cross - Section 7 - Riffle Pebble Count Summary D50 M onng Year 1 Description Material Size (mm) Total # Item % Cum % Silt /Clay sdt/c lay 0 062 0 0% 0% Sand very fine sand 0 125 0 0% 0% fine sand 025 5 5% 5% medium sand 050 7 7% 12% coarse sand l 00 11 11% 23% very coarse sand 200 24 24% 47% Gravel very fine gravel 40 7 7% 54% fine gravel 5 7 12 12% 66% fine gravel 8 0 6 6% 72% medium gravel 113 9 9% 81% medium gravel 160 13 13% 94% coarse gravel 22 3 4 4% 98% coarse gravel 32 2 2% 1000/0 very coarse gravel 45 0 0% 1000/0 very coarse gravel 64 0 0% 1000/0 Cobble small cobble 90 0 0% 100% medium cobble 128 0 0% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 1000/0 Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 00/0 1000/0 large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 1000/0 TOTALS1 100 1000/0 1 100% S Data D50 27 D84 12 D95 17 Dye Branch 11 Final Project No 92255 Monitoring Year 1 of 5 D 46 Equinox Environmental Consultation and Design, Inc January 2012 Appendix D Stream Survey Data Dye Branch II Final D 47 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 Dye Branch Upstream 4 t ( 1 Pebble Count Percent Cumulative � + Y Cross Section 7 Riffle 100/ _ o F c 90/ m t s F 70/ a_ as e O 50/ ► i > - k 40/ t a E 301 s 0 U c + 20 / t a 10/ r 0/ Particle Size (mm) m —r MY1 6/14/201 l Dye Branch Upstream Pebble Count Percent Individual Cross Section 7 Riffle 45/ 40/ 35/ 30/ 0 t 25/ > 20/ d d o, 15/ to/ 5/ 0/ N Ln to V+ .y N 10 00 `O N N VI Q O 00 O N 00 10 V1 N N N_ �D t7 to N T O O O V O V m Particle Size (mm) - MYl 6/14/201 l Dye Branch II Final D 47 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 4 t ( 1 j 1 i � + Y _ o F c c t - k s c + t a c r Dye Branch II Final D 47 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 t 1 j 1 i � Y _ o F c Dye Branch II Final D 47 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 Appendix D �J Stream Survey Data Dye Branch II / Project No 92255 Dye Branch - Downstream - Cross - Section 8 - Riffle Pebble Count Summary D50 M oring Year 1 Description Material Size (mm) Total # Item % Cum % Silt /Clay sdUclay 0 062 0 0% 0% Sand very fine sand 0 125 8 8% 8% fine sand 025 8 8% 16% medium sand 050 11 11% 27% coarse sand 100 10 100/0 37% very coarse sand 200 38 38% 75% Gravel very fine gravel 40 6 - 6% 81% fine gravel 57 9 90/0 90% fine gravel 80 4 4% 94% medium gravel 113 4 4% 98% medium gravel 160 0 0% 98% coarse gravel 223 0 0% 98% coarse gravel 32 1 1% 990/0 very coarse gravel 45 0 0% 990/0 very coarse gravel 64 0 0% 990/0 Cobble small cobble 90 0 0% 990/0 medium cobble 128 1 1% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 100% Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 00/0 1000/0 large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 1000/0 TOTALS1 100 1 100% 1 1000/0 S Data D50 13 D84 46 D95 87 Dye Branch II Final Project No 92255 Momtonng Year 1 of 5 i D 48 Equinox Environmental Consultation and Design, Inc January 2012 I I'd L- i i Appendix D Stream Survey Data a Dye Branch Downstream s L�, y Pebble Count Percent Cumulative b 1 d J t Cross Section 8 Riffle " d v R t b � t 7 Z y f I � r k � 4 100/ r w r T t r t � 90/ 80/ O W Z F 70/ e 60 / e 50/ u a > 40/ L as 3 30/ U 20/ lo/ 0/ Particle Size (mm) m —+— MY 1 3/2/2011 Dye Branch Downstream Pebble Count Percent Individual Cross Section 8 Riffle 45/ 40/ 35/ 301 7 'O 25/ G c 20/ d u u 15/ 0. 10/ 5/ 0/ N IA V1 1A ...i N R �O 00 `O N N 1f1 ? O 0p O �O N N Q QD b Y u CC Particle Size (mm) O MY1 6/14/2011 a s L�, y b 1 d J t " d v R t b � t 7 Z y f I � r k � 4 r w r T t r t � a � r i L�, y v 1 c 7 Z y f I Dye Branch II Final D 49 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 i Appendix D 1 .I 1 i I' U 0 1 I J Stream Survey Data Dye Branch II / Protect No 92255 Dye Branch - Downstream - Cross - Section 9 - Pool Pebble Count Summary D50 M oring Year 1 Description Material Size (mm) Total # Item % Cum % Silt /Clay sdUclay 0 062 2 2% 2% Sand very fine sand 0 125 7 7% 90/0 fine sand 025 2 2% 11% medium sand 050 30 300/. 41% coarse sand 100 17 17% 58% very coarse sand 200 24 24% 82% Gravel very fine gravel 40 1 1% 83% fine gravel 5 7 8 8% 91% fine gravel 80 5 5% 96% medium gravel 113 3 3% 99% medium gravel 160 0 0% 99% coarse gravel 22 3 0 0% 99% coarse gravel 32 0 0% 99% very coarse gravel 45 0 0% 990/0 very coarse gravel 64 1 1% 1000/0 Cobble small cobble 90 0 0% 100% medium cobble 128 0 0% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 1000/0 Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% mednun boulder 1024 0 00/0 1000/0 large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS1 100 100% 1 100% Summ Data D50 072 D84 42 D95 76 Dye Branch II Final Project No 92255 Monitoring Year 1 of 5 D 50 Equinox Environmental Consultation and Design Inc January 2012 ,I i� C �I i i Appendix D Stream Survey Data � b + � R Dye Branch Downstream .r fst�44 � i /•y �' � l ^ JIZv4T 3 Pebble Count Percent Cumulative Cross Section 9 Pool s t � � s I t y 100/ E rs a i 90/ 80/ a W Z F 70/ i a u a L r 60 / t `e 50/ a r [ 40/ > as r 301 U 20/ 1o/ 0/ O O Particle Size (mm) '� Q •� d m — MYI 6/14/2011 Dye Branch Downstream Pebble Count Percent Individual Cross Section 9 Pool 45/ 40 / 35/ 301 0 25/ .C. e 20/ m 15/ a 10/ 5/ 0/ d Oi Particle Size (mm) E MY1 6/14/2011 � b + � R yil .r fst�44 � i /•y �' � l ^ JIZv4T 3 s t � � s I t y � E rs a i Dye Branch II Final D 51 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 s s � � s i a L r r [ r Dye Branch II Final D 51 Equinox Environmental Consultation and Design Inc Protect No 92255 January 2012 Monitoring Year 1 of 5 1' r_ Appendix D t, r I� r Stream Survey Data Dye Branch II / Project No 92255 Dye Branch - Downstream - Cross - Section 10 - Riffle Pebble Count Summary D50 Mo onng Year 1 Description Material Sin (mm) Total # Item % Cum % Sdt/Clay sdUclay 0 062 6 6% 6% Sand very fine sand 0 125 21 21% 27% fine sand 025 3 3% 30% medium sand 050 16 16% 46% coarse sand 100 3 3% 49% very coarse sand 200 27 27% 76% Gravel very fine gravel 40 3 3% 79% fine gravel 57 7 7% 86% fine gravel 80 6 6% 92% medium gravel 113 3 3% 95% medium gravel 160 1 1% 96% coarse gravel 223 3 3% 990/0 coarse gravel 32 0 0% 990/0 very coarse gravel 45 1 1% 1000/0 very coarse gravel 64 0 0% 100% Cobble small cobble 90 0 0% 100% medium cobble 128 0 0% 100% large cobble 180 0 0% 100% very large cobble 256 0 0% 1000/0 Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medtum boulder 1024 0 00/0 1000/. large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 1 0% 1000/0 TOTALS1 100 1 100% 100% Summ ary Data D50 1 D84 5 3 D95 11 Dye Branch 11 Final Project No 92255 Monitoring Year 1 of 5 D 52 Equinox Environmental Consultation and Design Inc January 2012 Appendix D Stream Survey Data } Dye Branch Downstream i 7 1 t } ' Pebble Count Percent Cumulative � z t ✓1 J � Cross Section 10 Riffle 5 +• k - E� c j ,.t ti 100/ r a 90/ 80/ o h t Al i F 70/ 60/ [% G t d i r � 50/ a 40/ i Jr W 4 7 � 301 5 0 U 4 20 / � � 1 y 1 1o/ 0/ �O ^ N O .• .• N e7 Q `O O. 00 h V � N Q O� Particle Size (mm) m —r MYl 6/14/2011 Dye Branch Downstream Pebble Count Percent individual Cross Section 10 Riffle 45/ 40/ 351 301 0 �o 25/ 2: �o C c 20/ d u o. 15/ 10/ 5/ 0/ N to to �O N N -n .+ N Q I'D 00 `O N N -n R O 00 O `O N N N 00 ? a Y d\ u O O O O N -It � d m Particle Size (mm) E MY1 6/14/201 l } ra i 7 1 t } ' 4 { }L � z t ✓1 J � r � t 5 +• k - E� c j ,.t ti Dye Branch II Final D 53 Equinox Environmental Consultation and Design Inc ProJectNo 92255 January 2012 Monitoring Year 1 of 5 ' r ti r a t h t t r � 4 7 � 4 � � 1 y 1 Dye Branch II Final D 53 Equinox Environmental Consultation and Design Inc ProJectNo 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data aTsb1e110aYBasehne Stieam Data Summaiy , ap �D a Branch H / Pro ct No 92255 - Cemete Branch 977 feet)- L -to Parameter Regional Curie Pre Ensting Condition Reference Reach Data Design Monitoring Baseline Dimension"'g &)Sub-strat6�, Fiftte,;� ��,s ILI t UOJeEq Mn Mean Med Max SD, Na plMn Meani Mcd JiMax SD¢ N Nn Mean t1Na: I Min Mean Med Max SD yr N , Bankfull Width (ft) 70 70 70 70 N/A 1 89 11 1 113 141 1 8 7 100 55 72 72 89 N/A 2 Floodprone Width (ft) r M e gN y 142 142 142 142 N/A 1 190 540 160 1000 381 5 280 >30 >30 >30 20 N/A 2 Bankfull Mean Depth (ft) 10 10 1 0 1 0 N/A 1 07 09 08 16 6-3 7 07 05 07 07 08 N/A 2 Bankfull Max Depth (ft) 1 5 1 5 1 5 1 5 N/A 1 1 0 1 5 1 3 24 0 5 7 08 1 1 1 6 10 1 2 1 2 1 4 N/A 2 Bankfull Cross Sectional Area (ft2)1 1 68 68 68 68 N/A 1 68 96 84 184 39 7 70 30 50 50 70 N/A 2 Width/Depth Ratio j'° 7 2 7 2 7 2 7 2 N/A I 1 69 112 1171 1501 NA 1 3 14 3 1031 1081 108 1 1 2 N/A 2 Entrenchment Ratio i '-1 1 20 1 20 1 20 1 20 1 N/A I I 1 38 1 68 1 77 1 89 1 NA 1 3 1 1 28 1 1>34 1>44 1>44 1>541 N/A 2 Bank Height Ratiol I I 1 1 5 1 15 1 15 1 15 1 N /Aq, I I 1 0 1 1 1 1 1 0 1 1 2 1 NA 1 3 1 10 1 10 1 1 0 1 10 1 10 1 10 1 10 N/A 4y�, ,p• } r "c,.A. e6itz` t* *-f qd2 Riffle Length (ft) 68 234 195 539 114841 14 Riffle Slope (ft /ft) 4 0 012 0 034 0 006 0 027 0 026 0 052 0 016 6 0 048 0 004 0 023 0 022 0 049 0 Al 14 Pool Length (ft) 47 82 35 193 196 328 115 6 138 207 276 58 162 169 391 717 24 Pool Max Depth (ft) 26 12120882 18 26 29 32 05 7 20 18 30 29 37 048 18 Pool Spacing(ft) 228 860 180 52 7 402 140 8 41 7 7 18 4 27 6 32 2 4 5 38 7 36 4 ] 11 0 24 40 24 Pattern t 4- 1 r-A k —, -0 4 r P M A-, t F t"4 b Y u ChannLBeItWidth (ft) g 5 3 10 8 22 6 26 0 49 1 40 0 119 0 29 8 9� 23 0 32 2 41 4 11 3 30 6 37 0 46 7 12 3w 16 Radius (ft) 3 9 19 6 37 0 5 0 23 8 22 0 48 0 14 6 9 18 4 27 6 36 8 8 3 13 7 12 0 29 9 5 7 16 Rc Ban/ft) 6. 0 6 2 8 5 3 0 6 2 1 1 8 4 3 1 3 9 1 8 2 8 3 7 2 4 2 4 2 4 2 4 N/A 1 Meand (ft) 13 6 42 0 71 0 26 0 72 9 69 0 155 0 47 6 9 46 0 55 2 64 4 38 8 77 4 79 1 167 0 36 1 11 Meaatty MENEM a 0 8 1 5 3 2 2 5 47 3 6 101 2 7 7 2 3 3 2 4 1 49 66 66 82 N/A 2 Trans rtParameteis a M" wMinin rT MMN!!MMMw ,7M F �{ MENLO " 7` y Reach Shear Stress (Competency) lb /ft' 6z Max Part Size (mm) Mobilized at Bankfull 1 1 45 180 Stream Power (Transport Capacity) W/m'1 I Adldillonel Reach Parameters k r r " I sr _ - r �' Y °" ` x� �` b�"" `a "44. ffi ' t 6 e Rosgen Classification 4+' E4 E4 / C4 / C5 C4 C Bankfull Velocity (fps) 66 7 8 4 1 70 5 5 67 7 e 'K 4', ug y S $ Cv° e eez ii Bankfull Discharge (cfs) 443 528 350 128 1 384 466 _eY Valley Length (ft) a*r 11 * i rid a9'a``� Channel ThalwegLength (ft) F 977 Smuosity v $ N 1 14 1 15 222 1 14 1 08 Water Surface Slope (ft /ft) r 00190 00057 00130 00190 Bankfull Slope (ft /ft) gk - 00191 Bankfull Floodplam Area (acres) ° 4 it ¢ s" *kK '_ vh "-U" / of Reach with Eroding Banks Channel Stability or Habitat Metric ; r 7 wet a+ Biological or Other, 4 T �u b mrormauon unavauame N/A Item does not a I Non Applicable rr, Dye Branch II Final Project No 92255 Monitoring Year 1 of 5 D 54 Equinox Environmental Consultation and Design Inc January 2012 Appendix D Stream Survey Data Table l0a Basehne Stream Data Summary e Branch II /Pro ct No 92255 - e BranclhU tream 1 465 feet Parameter Regional Curve I I Pre Eiiishng Condition I Reference Reach Data Ur to Os tin Creek Design Monitoring Baseline Dimension &iSubetiayMRIHIe �[J[, E jj L__] Mean Med Maz SD �N� EMi-D Mean Med IMO (SDj "N� Mn] can IM-7 LM� Mea_n Med }_M-, SD "N� Banl.f ill Width (ft) 112 160 185 206 20 1 25 7 284 269 327 N/A 3 Floodprone Width (ft) 89 5 672 702 728 709 769 888 544 649 586 818 N/A 3 Bankfull Mean Depth (ft) 16 1 6 16 1 7 15 1 1 13 1 3 14 N/A 3 Bankfull Max Depth (ft) 28 1 5 1 9 24 1 5 1 8 22 22 28 25 36 N/A 3 Bankfull Cross Sectional Area (ft) 181 202 197 229 NA 3 274 303 334 110 295 363 325 469 N/A 3 Width/Depth RatiolMIMIM 62 70 70 79 NA 3 93 114 1271 130 203 226 228 246 N/A 3 Entrenchment Ratio = >3 2 >4 4 1 >5 0 >5 0 NA 3 3 5 3 8 44 35 3 8 44 20 23 23 25 N/A 3 Bank Height Ratio 10 +"10 1 1 2 1 1 14 1 1 1 1 0 1 1 0 1 0 1 1 0 1 10 1 1 0 1 1 0 N/A 3 Aroflle Riffle Length (ft) 61 176 302 66 191 327 201 516 47 1 97 295 8 Riffle Slope (ft /ft) 0 002 0 014 0 042 0 006 0 028 0 066 0 007 0 030 0 070 0 002 0 006 0 005 0 016 0 005 8 Pool Length (ft) ® 183 35 1 629 199 38 1 68 1 876 246 224 664 13 20 Pool Max Depth (ft) 22 29 33 21 27 31 21 344 361 448 067 20 Pool Spacmg (ft) 503 789 1058 545 855 1147 24 1 668 653 125 286 19 Pattern Channel Belt Width (ft) 6 6 243 569 360 670 115001 390 726 1626 285 450 484 54 1 8 34 17 Radius of Curvature (ft) 14 5 524 1488 190 490 1150 20 6 53 1 124 6 1.376 3l 3 312 396 47 14 Re Bankfull Width (ft/ft) ®� 13 47 133 10 27 62 1 0 2 7 62 2 2 3 23 23 1 Meander Wavelength (ft) 401 797 1727 330 940 1550 358 102 168 0 100 5 1300 1382 153 L18 12 Meander Width Ratio 0 6 2 2 5 1 1 9 3 6 8 1 1 9 3 6 8 1 1 7 1 9 l 9 2 1 3 Traneport�Parsmeten Reach Shear Stress (Competency) lb/ft Max Part Size(mm) Mobilized at Bankfull 30 100 Stream Power (Transport Capacity) W /m2 AddlttonMIReA&jh srameters Rosgen Classification E4 C4 C5 C Bankfull Velocity (fps) 62 69 42 35 Bankfull Discharge (cfs) 1122 1248 128 110 Valley Length (ft) Channel Thalweg Length (ft) 2086 1 034 2 405 2 455 Smuosity 104 120 120 121 Water Surface Slope (Channel) (ft /ft) 00090 00088 00080 00080 Bankfull Slope (ft/ft) 00083 Bankfull Floodp lain Area (acres) / of Reach with Eroding Banks Channel Stability or Habitat Metric Channel Stability or Habitat Metric Biological or Other intonnation mavauanie N/A Item doesnot apply on A h e Dye Branch II Final D 55 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Table 10a.kBasetme Stream Data Summary '9 ' ` —5% vm^+ H�E,t J f f � }w. 4 wt"i "�5�.. ,r s f a Branch III / Pro "ct No 92255 = ch- Downstream 870efeet �'� r l t,4., .Vii. r,,, 4 r .a r 9 ' Parameter Regional Curve Pre Eusting Conahon 7U1r ference Reach Data to Ostin Creek Design Monitoring Baseline Dimensl`on &- Substrate iW-L 9IL UL-1 Wq Min's Me&l Med tMax SD "+N %nt NUan Med' Max SD, i N Min r& an Max 11Ln Mean Med ima= SDj N„r Bank-full Width (ft) 148 148 148 148 NA 1 160 185 206 20 1 184 186 186 188 N/A 3 Floodprone Width (ft) 3 f l ink 220 220 220 220 NA 1 672 702 72 8 709 769 888 487 61 8 61 8 748 N/A 3 Bankfull Mean Depth (ft) I ') 12 12 1 2 NA 1 16 1 6 1 7 15 19 20 20 20 N/A 3 Bankfull Max Depth (ft) ? s 24 24 24 24 NA 1 1 5 1 9 24 1 5 18 22 29 30 30 3 1 N/A 3 Bankfull Cross Sectional Aiea (ft') 174 174 174 24 NA 1 274 303 334 310 340 361 36 1 381 N/A 3 Width/Depth Ratio 125 125 12 5 24 NA 1 93 114 12 7 13 0 93 96 96 99 N/A 3 Entrenchment Ratio s E 1 5 1 5 1 5 24 NA 1 3 5 38 44 3 5 3 8 44 2 7 34 3 T —45 N/A 3 Bank Height Ratio . I- 49 49 4 9 24 NA 1 10 12 14 1 0 1 0 1 0 10 1 0 10 10 N/A 3 Pro81e,z", -, - t +i"' q w In .1' _ v I tr a� 3" �. - r}mti. -r �a "t `. a Q s� br r Riffle Length (ft) s 6 1 176 302 66 191 327 15 7 503 55 7 793 202 7 Riffle Slope (ft/ft) , 0 003 0 021 0 121 0 006 0 028 0 066 0 007 0 030 0 070 0 001 0 006 0 006 0 014 0 004 7 Pool Length (ft) 29 248 120 183 35 1 629 199 38 1 68 1 101 199 159 396 891 14 Pool Max Depth (ft) 31 22 29 33 21 27 31 33 391 377 505 059 12 Pool Spacing (ft) f 79 0 162 0 261 0 503 789 105 8 545 85 5 1147 153 575 388 130 41 5 14 Pattern^ a3'= $4 - I 3#" - s j -'f t-%, w ~ ', R % 7 � --1 — I' _'� -" 6 g� =� , p'! ^ s Channel Belt Width (ft) 156 306 677 3601670 1500 390 72 6 162 6 28 3 492 575 654 15 4 9 Radius of Curvature (ft) a 110 42 1 819 190 490 1150 206 53 1 124 6 32 7 407 422 50 1 56 7 Rc Bankfull Width (ft /ft) 07 29 56 10 27 62 10 2 7 6 2 1 7 1 7 1 7 1 7 N/A 1 Meander Wavelength (ft) " i 620 1030 157 330 940 1550 358 102 168 0 138 9 1622 1573 2105 27 2 6 Meander Width Ratio 1 1 2 1 46 19 36 8 1 19 3 6 8 1 2 4 28 28 3 1 051 2 Tuns -ort Parameters ° 15 { 5 v ° a . t �- r *, t r �r i �� e, I Reach Shear Stress (Competency) lb /ftz a e' { '4 Max Part Size (nun) Mobilized at Bankfullj 30 100 Stream Power (Transport Capacity) W /m2 I e "� 'Af i 14'. r* aC sd' w Additional Reach Parameters-, j- q 4 'rS P Rosgen Classification - ', - G4c C4 C5 C Bankfull Velocity (fps) 6 1 72 42 3 5 a t , Bankfull Discharge (cfs) 1054 1260 128 110 _ " +� Valley Length (ft) c °� "t"e ft a r i t^�" °�� T Channel Thalweg Length (ft) x 870 Sinuosity -A -ry 1 14 146 109 1 10 Water Surface Slope (ft /ft) - 00110 00090 00095 Bankfull Slope (ft/ft) "° " 00106 Bankfull Floodplam Area (acres) .1�' - + r „ y e 4e k / of Reach with Eroding Banks ' ' 'iv Channel Stabihtv or Habitat Metric Pg y -1 Biological or Other „t -r w Information unavauawe N/A Item doesnot a I Dye Branch 11 Final Project No 92255 Monitoring Year 1 of 5 D 56 Equinox Environmental Consultation and Design Inc January 2012 Appendix D Stream Survey Data Well Ob Baieline StresmData'S®imary ( Substrate, Bed, Bank and Hydrologic Contslament Parameter Distributions) Branch II /Pro jec t1No 92255 Cemete Brturch 977 feet Parameter Pre Existing Con6hon Reference Reach Data Design Moaitonng Baseline R / /Ru/ /P/ /G/ /S/ — — — -- � � — -- — -- — �® jam - -- — — — - -- -- —43/ 35/ 4/ 42/ 13/ 1 =1 SC/ /Sa / /G / /C / /B / /Be°/ l� ������ �[� � � dl6/D35/d50/d84/d95/d /dl( m) 09 12 20 80 101 889 021 05 35 139 266 450 l�i���j Etrench 99/ 1s 15 15 199 2 49 50 99 10 Entrenchment Class 15 15 199 2 49 50 99 10 M MEMEMM®MEM®ENNEN ® ® � Inctston Class <12 12 149 15 199 20 IS Inasion 12/12 149/15 199 >20 ENE ME EMINEE®E®ENEEMENE MME MEMENEEMM MEMEMM�'iN E N/A It m do s aot a u h on AppWbiel N /Au It m do snot I on e Dye Branch II Final Project No 92255 Monitoring Year 1 of 5 D 57 Equinox Environmental Consultation and Design Inc January 2012 Table IOb Baseline Stream S®imary (Substrate Bed, Bank, and Hydrologh: Containme� Parameter Distribirtlons) e Branch II /Pro M1No 92255 Branch -U tream 465 feet Parameter Pre Emsting ConBtion Reference Reach Data Design Monitoring Baseline R //R / /P / /G / /S°/ ®� ®— — — —�� �® - -- — — — - -- -- —43/ 28/ 15/ 34/ 20/ 3/ =1 SCI /Sa / /G / /C / /B / /Be°/ l� dl6 /D35 /d50 /d84 /d95 /dP /d'(mm) 015 04 33 103 137 457 l�i���j Etrench 99/ 1s 15 15 199 2 49 50 99 10 M MEMEMM®MEM®ENNEN ® ® � Inctston Class <12 12 149 15 199 20 ENE EMINEE®E®ENEEMENE MEMENEEMM N /Au It m do snot I on e Dye Branch II Final Project No 92255 Monitoring Year 1 of 5 D 57 Equinox Environmental Consultation and Design Inc January 2012 T-F.J.'KIWORIM hue Stream, Summary (Substrate Bed, Bank, and Hydrologic Containment Parameter Disiributlom) Dye R Branch(II !Pro et No 92235 a Braneb Downstreamt 870 feet Parameter Pre Existing Conclition Reference Reach Data Design Waitonng Baseline R / /Ru / /P / /G / /$°/ ®— — — —�� - -- — — — — —43/ 6/ 34/113/1 3/ =1 SC/ /Sa / /G / /C / /B / /Be°/ dl6/D35/d50/d84/d95/d /d' (mm) 015 028 056 107 130 457 l�i���j Entrenr0 9 9 Class 15/15 199/2 49/50 99 >30 M ® ® � Incision Class 12/12 149/15 199 20 MEN MEME MEMENEEMM N /Au It m do snot I on e Dye Branch II Final Project No 92255 Monitoring Year 1 of 5 D 57 Equinox Environmental Consultation and Design Inc January 2012 Appendix D Stream Survey Data p ble lla. Basehne Morphology & Hyflraullc Monitoring Summary Dye Branch II / ,fact No 92255 - C *emetery Branch (971 Feet) Parameter Cross Section 1 Pool Cross Section 2 Riffle Cross Section 3 Rlflle Dimension Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Record Elevation (datum) Used 8363 8363 MYl MY2 MY3 MY4 18263 8263 8243 8243 8217 8217 8174 8174 Bankfull Width (ft) 97 102 815 5 89 106 8125 5 5 60 257 238 Floodprone Width (ft) >50 1 >50 170 1 >30 >30 1 1 >30 >30 241 Bankfull Mean Depth (ft) 1 9 1 5 528 08 06 47 1 05 05 782 Bankfull Max Depth (ft) 3 1 27 14 12 1 1 10 10 14 Bankfull Cross Sectional Area (ft) 189 15 2 70 63 30 28 20 Bankfull Width/Depth Ratio 5 0 68 112 181 103 127 Bankfull Entrenchment Ratio >5 1 >4 9 >3 4 >2 8 >5 4 >5 0 Bankfull Bank Height Ratio 1 0 10 Bankfull Width/Depth Ratio 10 10 10 10 Cross Sectional Area between End pins (ft) 189 152 246 70 63 Bankfull Entrenchment Ratio 30 28 d50 (mm) N/A TT 25 N/A 84 20 N/A 60 Bankfull Bank Height Ratio N/A Item does not apply N/A Item does not apply Dye Branch 11 Final D 58 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 Table lla. Baseline Mo phology & Hydranhc - o tom- ma Summary Dye Branch II / P ject No 92255 -Dye Branch- Upstream,(1,47�1 Feet) Parameter Cross Section 4 Riffle Cross Section 5 Pool Cross Section 6 Riffle Cross Section 7 Riffle Dimension Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Record Elevation (datum) Used 8243 8243 1 8174 8174 815 5 815 5 8125 8125 Bankfull Width (ft) 257 238 171 170 327 287 269 241 Floodprone Width (ft) 586 528 50 47 1 81 8 782 544 526 Bankf ill Mean Depth (ft) 13 1 1 17 14 14 13 1 1 10 Bankfull Max Depth (ft) 25 20 34 28 36 32 22 20 Bankfull Cross Sectional Area (ft2) 325 27 1 288 237 469 375 295 242 Bankfull Width/Depth Ratio 203 209, 102 122 228 220 246 240 Bankfull Entrenchment Ratio 23 2 2 29 28 25 27 20 22 Bankfull Bank Height Ratio 1 0 1 0 1 0 1 0 1 0 l 0 10 1 0 Cross Sectional Area between End Pins (ftZ) 325 27 1 288 237 469 375 295 242 d50 (mm) N/A 1 2 N/A 6 0 1 1 1 1 N/A 19 N/A 2 7 N/A Item does not apply Dye Branch 11 Final D 58 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data Table 11 Basehne Morphology & Hydranhc MQomtoring Summary Dye Branch II / Project No 92255 -Dye Branch - Downstream (869 Feet) Parameter Cross Section 8 Rt81e Cross Section 9 Pool Cross Section 10 Riffle Dimension Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Record Elevation (datum) Used 8093 8093 806 1 8061 801 1 801 l Bankfull Width (ft) 188 188 263 263 184 18 5 Floodprone Width (ft) 748 1 73 5 1 1 >70 >70 487 476 Bankfull Mean Depth (ft) 20 1 9 1 8 17 1 9 16 Bankfull Max Depth (ft) 3 1 30 35 35 29 24 Bankfull Cross Sectional Area (ft2) 38 1 35 9 484 436 340 295 Bankf ill Width/Depth Ratio 93 99 143 159 99 117 Bankfull Entrenchment Ratio 40 39 >2 7 >2 7 27 26 Bankfull Bank Height Ratio 10 10 10 10 1 0 10 Cross Sectional Area between End Pins (ft') 38 1 35 9 484 436 34 0 295 4 d50 (mm) N/A 1 3 N/A 072 N/A 1 0 F-1 N/A Item does not apply Dye Branch 11 Final Project No 92255 Monitoring Year 1 of 5 D 59 Equinox Environmental Consultation and Design Inc January 2012 O• �� O OO O O O O� OO OO OO rO� O OO O O� OO OO O O J L - - _ — ( —D C-_ _ Appendix D Stream Survey Data R: RRn / R. R. I P P "I 4 U do S 9 p X YI CI / M S d G G, I / C C bbl B Bo I& / Ik && : P m , hxd In dp Ip W . Dye Branch 11 Final D 60 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 ... .:... ®®® m®® 00000000000000f�00000�000000000 � m ® ®m ® ®000000000000000000�0 ©0000000001 .:. mmmmm00000000000000000000000000�0000 _: m ® ®mmm00000 ©oo ©000000000000000000000 _.,.- mmomm ©0000000000000000000 ©0000000000 I: ® mm® mommm ®mommmmmommmmmommmmmommmmmo `. 000000mmmmm0mmmmmmmmmmmmmmmmmmmmmmmm . : :: ::: o000000t�0000mmmmmommmmmommmmmommmmmo R: RRn / R. R. I P P "I 4 U do S 9 p X YI CI / M S d G G, I / C C bbl B Bo I& / Ik && : P m , hxd In dp Ip W . Dye Branch 11 Final D 60 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 Appendix D Stream Survey Data RLf /R Z/P PY'I /G Gl do 5 9 P C 91 CI /$4 Wd /G Gr 1/C C bbl /B Bad& /Bc B.& k P _ , bsd fB dpo IP" - Dye Branch 11 Final Project No 92255 Momtonng Year 1 of 5 D 61 Equinox Environmental Consultation and Design Inc January 2012 1 ®®® �m�OD�OD000D ©DD ©OD�O�OODO ©�m�E� ©DD :' mmmm�00000000 ©0000 ©0000 ©o ©0000 ©00000 ®® �® � ®0000000 ©o ©oo ©000000 ©000000000© ' Ommm®© ��O <�1�0000 © © ©�0� ®E�Om000�DODOO�I� RLf /R Z/P PY'I /G Gl do 5 9 P C 91 CI /$4 Wd /G Gr 1/C C bbl /B Bad& /Bc B.& k P _ , bsd fB dpo IP" - Dye Branch 11 Final Project No 92255 Momtonng Year 1 of 5 D 61 Equinox Environmental Consultation and Design Inc January 2012 Appendix D Stream Survey Data IL^RLC /Bu W /P PY11 /G U&/% 9p SC �I 0 M % d/G C I/C C bH /B B. We /Bc B.& 1 P a g b—d (B d p I p MI Dye Branch II Final D 62 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 r 1 1 1 L' FT •I . � � m ® ® ®�am ®mm�© 11111 ■lllll■_lllll■11111■_lllll■ 11111■ 11111■ 11111 ♦_________l__lllll■1111■11111♦ •• ��������® 111`• --••'- 111111111■ 11111111 11111■ 11111111 11111111 11111111 11111111 111111111 11111■ 11111♦ 111111■ 11111■ 11111■ 11111♦ 11111■ 11111■ 11111♦ 11111♦ 11111■ 11111 ■1111111111111■11111♦11111■ •' • ®m ®� ®11(1♦1�1�00��1�1 "'1� ©�00 �' �001J 1�1�'' �0 ����0' �� • ::, I mmmm® oo ©o00000000000000000�000000000 - - m�®®® oo r�0000000000000000000r�oo ©oo�oo -., . mmmmm ©00000000 ©0000000000�0000000000 •� mmm®® om ® ®�mommmmmommmmm ©mmmmmommmm�o 000�oom ® ®m ®ommmmmmmmmmmmmmmmmmmmmm�m 00000001�0000mmmmmr�mmmmm ©�����o�����o IL^RLC /Bu W /P PY11 /G U&/% 9p SC �I 0 M % d/G C I/C C bH /B B. We /Bc B.& 1 P a g b—d (B d p I p MI Dye Branch II Final D 62 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 if 'I Appendix E Hydrologic Data I� J d 10 J J J I1 1 L. J I J 1 Appendix E I e �I l- 1 Ali I Ta° b1e ls2 Vet, capon of B n cffl Df a Branc Events 2255 Date ofOccurrence Method Feet Above Average Bankfidl Elevation 7/8/2011 Water level logger 107 9/21/2011 Water level logger 114 9/24/2011 j Water level logger j 0 52 I + Dye Branch II Final Project No 92255 Monitoring Year I of 5 + �I Hydrologic Data E 1 Equinox Environmental Consultation and Design, Inc January 2012 Appendix E 5 45 4 35 3 25 2 15 1 05 0 Hydrologic Data Figure 3 Dye Branch Water Level Logger Chart r 2 2 � ?oro bolo olr orr orr 9�2) /roll S�2) /2orr 6 /j6i ,/26i 8 /jS� 9/�9 to /2Yi r,�2Si roll roll 2011 Corr tor' loll Dye Branch II Final E 2 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 H E Hi •, Y � Y i 4 [ i 53 t 1 t `"' r� 4-z �a"Y '~ 'L`�M1� " y., A ii t ,a1'F 2 a x �a�w ar +.,P}�' l r 4 �h•� ,n. µ `4 ryT 1Y �� .yam y '� ♦ } y S �v ?,.'2 � kU ..S � # i '� r §¢v d �r .� +8i � R 4 � � - ,y. � s- .., 4F Y 3 10- 'x z' °" -, � 'Y�y- ..., .. a•. - AverageBanldul12 8 Feet ,- .. „ ,�, � n ; ✓ �d<a .. ,y, w "� i �tw � � > � V XH, � "'s J r`✓ r r { �Y., s� 4 x �y °� ?� a *. � '�` '% � � r ./,,..7} .�w `` � t t..c�r "'k,����� ell { �' r' x�^ Y' f .� �"' ��+- 4yf� d!- _' ,. ,•-i k�y� .'� 'Y y�I. �lrA a i 21, �' • �a4 '�"; �' ii 't P 4y r . .. -y x{ °.-' 'r P'�.� �-•• �d '� T ht y, y,++ .n� r,� ^p @ y� 3; y f mkt Y4 iw 'p� .�. h # 4 <jr T y 3fn 1" T� *g �4 .�, 'k ._ &- � ! i 7 < 5,� A. 1 tN cil. m F ) �^ t mss` i Cj e P ,a a 1+ F of .Fw � w � W-&,-7z rti, Fi k"` u.. 1 d U Y `� " t y J� 1 .. 8- r 2 2 � ?oro bolo olr orr orr 9�2) /roll S�2) /2orr 6 /j6i ,/26i 8 /jS� 9/�9 to /2Yi r,�2Si roll roll 2011 Corr tor' loll Dye Branch II Final E 2 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5 Appendix E 4 35 3 25 2 1�1 ICI 15 1 05 Hydrologic Data Figure 3 Precipitation for Mooresville, North Carolina k 7 v L d r t R i ^ 5 `- i c ^ x r r � z� -�p 8-11 -9D ! ! ��j0 910 !! !! NC CRONOS (North Carolina Climate Retrieval and Observations Network of the Southeast Database) State Climate Office of North Carolina Version 2 7 2 Mooresville 1 9 SSE (NC IR 1) http //www nc climate ncsu edu/cronos/ Accessed November 2011 Dye Branch II Final E 3 Equinox Environmental Consultation and Design Inc Project No 92255 January 2012 Monitoring Year 1 of 5