HomeMy WebLinkAbout20210180 Ver 1_Pre-Filing Attachment_20210227 gy sn"
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20210180 Version* 1
Regional Office* Wilmington Regional Office-(910)796-7215
Reviewer List* Robb Mairs
Pre-Filing Meeting Request submitted 1/27/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Michael Leggett
Contact Email Address* michael.leggett@ncwildlife.org
Project Name* Sutton Lake Canoe/Kayak Launch
Project Owner* North Carolina Wildlife Resources Commission
Project County* New Hanover
Owner Address: Street Address
1720 Mail Service Center
Address Line 2
City State/Rovince/Region
Raleigh NC
Fbstal/Zip Code Country
27699 United States
Is this a transportation project?* r Yes (' No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
• Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
No
Please give a brief project description below.*
The North Carolina Wildlife Resources Commission (NCWRC)is
working with partner organizations to try to establish a fully ADA
complaint canoe/kayak launch at the Sutton Lake BAA/PFA site.The
intent is to provide some additional ADA parking, an ADA access
path, and an abutment/floating dock.
No fill is expected below the OHWM.Also,the area for the proposed
abutment/dock contains the abandoned concrete ramp that was
utilized prior to the 2011 renovation that created the existing boat
launch area.The abandoned ramp has prevented fringe wetlands
from establishment.
ACOE has indicated that the project will be covered by a Regional
General Permit 56 as the lake is considered a Section 10 water.
Attached is the concept plans, photo of the area to be disturbed and
ACOE correspondence.
Please give a couple of dates you are available for a meeting.
2/8/2021
2/9/2021
Please attach the documentation you would like to have the meeting about.
21.01.27 ACOE Correspondance.pdf 825.36KB
Sutton Launch Concept(Preliminary).pdf 1.35MB
Proposed Location.pdf 1.91MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
Submittal Date 1/27/2021