Loading...
HomeMy WebLinkAbout20210191 Ver 1_Pre-Filing Attachment_20210227 -,414117 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWircnmenred Quaffry ID#* 20210191 Version* 1 Regional Office* Mooresville Regional Office-(704)663-1699 Reviewer List* Donna Hood Pre-Filing Meeting Request submitted 1/27/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Larry Thompson Contact Email Address* Ihompson@ncdot.gov Project Name* Bridge No.035 on SR 1134(Millingport Road)over Long Creek; 17BP.10.PE.147 Project Owner* NCDOT Highway Division 10 Project County* Stanly Owner Address: Street Address 716 W Main Street Address Line 2 City State/Bovine/!Region Albemarle NC Fbstal/Zip Code Country 28001 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: I� 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* c Yes No Do you know the name of the staff member you would like to request a meeting with? Donna Hood Please give a brief project description below.* NCDOT proposes to replace the existing functionally deficient bridge on SR 1134(Millingport Road)over Long Creek with a new bridge. STV Engineers is providing planning,design,and Section 404/401 services on behalf of Division 10; a MCDC has been prepared; a delineation of waters of the U.S. has been completed-jurisdictional waters of the U.S. in the project area include Long Creek, no wetlands were identified within the study area.An approximately eight-mile off-site detour would be required for the full duration of construction.The project has a Let date of May 5, 2021. Please give a couple of dates you are available for a meeting. 2/1/2021 2/2/2021 2/3/2021 2/4/2021 2/5/2021 Please attach the documentation you would like to have the meeting about. R_147_Bridge_Sta n ly035_Fig u re 1_WatersMa... 826.17KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature l� .rrlkr.firrq kOal*?,,nr Submittal Date 1/27/2021