HomeMy WebLinkAbout20210191 Ver 1_Pre-Filing Attachment_20210227 -,414117
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnWircnmenred Quaffry
ID#* 20210191 Version* 1
Regional Office* Mooresville Regional Office-(704)663-1699
Reviewer List* Donna Hood
Pre-Filing Meeting Request submitted 1/27/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Larry Thompson
Contact Email Address* Ihompson@ncdot.gov
Project Name* Bridge No.035 on SR 1134(Millingport Road)over Long Creek;
17BP.10.PE.147
Project Owner* NCDOT Highway Division 10
Project County* Stanly
Owner Address: Street Address
716 W Main Street
Address Line 2
City State/Bovine/!Region
Albemarle NC
Fbstal/Zip Code Country
28001 USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
I� 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
c Yes No
Do you know the name of the staff member you would like to request a meeting with?
Donna Hood
Please give a brief project description below.*
NCDOT proposes to replace the existing functionally deficient bridge
on SR 1134(Millingport Road)over Long Creek with a new bridge.
STV Engineers is providing planning,design,and Section 404/401
services on behalf of Division 10; a MCDC has been prepared; a
delineation of waters of the U.S. has been completed-jurisdictional
waters of the U.S. in the project area include Long Creek, no
wetlands were identified within the study area.An approximately
eight-mile off-site detour would be required for the full duration of
construction.The project has a Let date of May 5, 2021.
Please give a couple of dates you are available for a meeting.
2/1/2021
2/2/2021
2/3/2021
2/4/2021
2/5/2021
Please attach the documentation you would like to have the meeting about.
R_147_Bridge_Sta n ly035_Fig u re 1_WatersMa... 826.17KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
l� .rrlkr.firrq kOal*?,,nr
Submittal Date 1/27/2021