Loading...
HomeMy WebLinkAbout20210192 Ver 1_Pre-Filing Attachment_20210227 -,414117 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWircnmenred Quaffry ID#* 20210192 Version* 1 Regional Office* Mooresville Regional Office-(704)663-1699 Reviewer List* Donna Hood Pre-Filing Meeting Request submitted 1/27/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Larry Thompson Contact Email Address* Ihompson@ncdot.gov Project Name* Bridge No. 101 on SR 2453(S Lentz Harness Shop Road)over Little Bear Creek; 17BP.10.R020.1 Project Owner* NCDOT Highway Division 10 Project County* Cabarrus Owner Address: Street Address 716 W Main Street Address Line 2 City State/Bovine/Region Albemarle NC Fbstal/Zip Code Country 28001 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: I� 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* c Yes No Do you know the name of the staff member you would like to request a meeting with? Donna Hood Please give a brief project description below.* NCDOT proposes to replace the existing functionally deficient bridge on SR 2453(S Lentz Harness Shop Road)over Little Bear Creek with a new bridge. STV Engineers is providing planning, design, and Section 404/401 services on behalf of Division 10;a modified NRTR in support of MCDC has been prepared;a delineation of waters of the U.S. has been completed-jurisdictional waters of the U.S. in the project area include Little Bear Creek, no wetlands were identified within the study area.An off-site detour of approximately 9-miles is required for the full duration of construction.The project has a Let date of August 4, 2021. Please give a couple of dates you are available for a meeting. 2/1/2021 2/2/2021 2/3/2021 2/4/2021 2/5/2021 Please attach the documentation you would like to have the meeting about. R_159_Pipe_Cabarrus101_Figurel_WatersM... 2.64MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature (-20fre rrri&r,firrq kOal*?,,nr Submittal Date 1/27/2021