DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnWircnmenred Quaffry
ID#* 20210190 Version* 1
Regional Office* Mooresville Regional Office-(704)663-1699
Reviewer List* Donna Hood
Pre-Filing Meeting Request submitted 1/27/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Larry Thompson
Contact Email Address* Ihompson@ncdot.gov
Project Name* Bridge No. 165 on SR 5469(Shopton Road)over Coffey Creek;
17BP.10.R.013.1
Project Owner* NCDOT Highway Division 10
Project County* Mecklenburg
Owner Address: Street Address
716 W Main Street
Address Line 2
City State/Bovine/Region
Albemarle NC
Fbstal/Zip Code Country
28001 USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
I� 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
c Yes No
Do you know the name of the staff member you would like to request a meeting with?
Donna Hood
Please give a brief project description below.*
NCDOT proposes to replace the existing functionally deficient bridge
on SR 5469(Shopton Road)over Coffey Creek with a new bridge.
STV Engineers is providing planning,design,and Section 404/401
services on behalf of Division 10; a modified NRTR in support of
MCDC has been prepared; a delineation of waters of the U.S. has
been completed-jurisdictional waters of the U.S. in the project area
include Coffey Creek,two unnamed tributaries of Coffey Creek, and
one wetland. Replacing the existing bridge with a new bridge adjacent
to the current structure is the proposed alternative.This alternative
would allow the existing structure to maintain traffic during
construction while the new structure is being built. Once the bridge is
complete the traffic will be routed onto the new alignment and the old
bridge structure would be removed. Due to potential utility conflicts in
the vicinity of the existing bridge,an off-site detour is also being
evaluated.The project has a Let date of October 20, 2021.
Please give a couple of dates you are available for a meeting.
2/1/2021
2/2/2021
2/3/2021
2/4/2021
2/5/2021
Please attach the documentation you would like to have the meeting about.
R_138_Bridge_Mecklenburg 165_Figure 1_Wa... 1.62MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
(-20fre rrri&r.firrq kOal*?,,nr
Submittal Date 1/27/2021