Loading...
HomeMy WebLinkAbout20210190 Ver 1_Pre-Filing Attachment_20210227 -,414117 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWircnmenred Quaffry ID#* 20210190 Version* 1 Regional Office* Mooresville Regional Office-(704)663-1699 Reviewer List* Donna Hood Pre-Filing Meeting Request submitted 1/27/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Larry Thompson Contact Email Address* Ihompson@ncdot.gov Project Name* Bridge No. 165 on SR 5469(Shopton Road)over Coffey Creek; 17BP.10.R.013.1 Project Owner* NCDOT Highway Division 10 Project County* Mecklenburg Owner Address: Street Address 716 W Main Street Address Line 2 City State/Bovine/Region Albemarle NC Fbstal/Zip Code Country 28001 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: I� 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* c Yes No Do you know the name of the staff member you would like to request a meeting with? Donna Hood Please give a brief project description below.* NCDOT proposes to replace the existing functionally deficient bridge on SR 5469(Shopton Road)over Coffey Creek with a new bridge. STV Engineers is providing planning,design,and Section 404/401 services on behalf of Division 10; a modified NRTR in support of MCDC has been prepared; a delineation of waters of the U.S. has been completed-jurisdictional waters of the U.S. in the project area include Coffey Creek,two unnamed tributaries of Coffey Creek, and one wetland. Replacing the existing bridge with a new bridge adjacent to the current structure is the proposed alternative.This alternative would allow the existing structure to maintain traffic during construction while the new structure is being built. Once the bridge is complete the traffic will be routed onto the new alignment and the old bridge structure would be removed. Due to potential utility conflicts in the vicinity of the existing bridge,an off-site detour is also being evaluated.The project has a Let date of October 20, 2021. Please give a couple of dates you are available for a meeting. 2/1/2021 2/2/2021 2/3/2021 2/4/2021 2/5/2021 Please attach the documentation you would like to have the meeting about. R_138_Bridge_Mecklenburg 165_Figure 1_Wa... 1.62MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature (-20fre rrri&r.firrq kOal*?,,nr Submittal Date 1/27/2021