HomeMy WebLinkAbout20210451 Ver 1_Pre-Filing Attachment_20210301 tie R�.'.
fr
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
Environmental Qunfuy
ID#* 20210451 Version* 1
Regional Office* Winston-Salem Regional Office-(336)776-9800
Reviewer List* Dave Wanucha
Pre-Filing Meeting Request submitted 2/25/2021
........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Jerry Parker
Contact Email Address* japarker3@ncdot.gov
Project Name* Gatewood Rd Bridge Removal
Project Owner* NCDOT
Project County* Caswell
Owner Address: Street Address
1584 Yanceyville Street
Address Line 2
P.O. Box 14996
City State/Rovince/Region
Greensboro NC
Fbstal/Zip Cade Country
27415-4996 USA
Is this a transportation project?* Yes r No
Type(s)of approval sought from the DWR:
17 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
17BP.7.R.130
Do you know the name of the staff member you would like to request a meeting with?
Dave Wanucha
Please give a brief project description below.*
NCDOT is proposing to remove Bridge#117 over Country Line Creek
in Caswell County. In order to do so, a temporary causeway will need
to be utilized which will result in stream impacts. NCDOT does not
plan to replace the bridge once removed.
Please give a couple of dates you are available for a meeting.
3/4/2021
3/10/2021
Please attach the documentation you would like to have the meeting about.
Gatewood Rd Permit Drawings.pdf 1.34MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature c
vttto
Submittal Date 2/25/2021