Loading...
HomeMy WebLinkAbout20210216 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210301Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, March 1, 2021 12:02 AM To: jhinkle@ldsi-inc.com Cc: Mairs, Robb L Subject: Pre -Filing Time Clock has been reached for USDA - NRCS - Hurricane Florence EWP Assistance - 20210216 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for USDA - NRCS - Hurricane Florence EWP Assistance that you submitted on 1/29/2021. The ID number for that project is 20210216, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20210216 Version* 1 Regional Office* Wilmington Regional Office - (910) 796-7215 Reviewer List* Robb Mairs Pre -Filing Meeting Request submitted 1/29/2021 Contact Name * JonathanHinkle Contact Email Address* jhinkle@ldsi-inc.com Project Name* USDA - NRCS - Hurricane Florence EWP Assistance Project Owner* City of Boiling Spring Lakes Project County* Brunswick Owner Address: Street Address 9 East Boiling Spring Road Address Line 2 aty State / Frovince / Region Southport NC Rbstal / Zip Code Country 28461 Burnswick Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * This project is an NRCS Emergency Watershed Protection Project that falls under 7 CFR Part 624. The project includes debris removal, bank stabilization, stream restoration, pond perm stabilization across eight (8) sites within Boiling Spring Lakes. All eight sites should experience positive environmental effects via water quality enhancements, repair bank failures, and stabilize currently eroding banks. Additional construction shall be done in a manner which avoids and minimizes adverse effects to the Waters of the United States. Please give a couple of dates you are available for a meeting. 2/3/2021 2/4/2021 2/5/2021 2/10/2021 2/11 /2021 Please attach the documentation you would like to have the meeting about. BOILING SPRING LAKES HURRICANE FLORENCE EWP - ENGINEERING 45.18MB ASSISTANCE.pdf pdF only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 1/29/2021