Loading...
HomeMy WebLinkAbout20210199 Ver 1_PreFiling Acknowledgement Email_20210228ID#* 20210199 Version* 1 Regional Office* Wilmington Regional Office - (910) 796-7215 Reviewer List* Robb Mairs Pre -Filing Meeting Request submitted 1/28/2021 Contact Name * andy dortch Contact Email Address* adortch@lmgroup.net Project Name* 100 Spencer-Farlow Drive, Waterfronte Villas Project Owner* Waterfronte Villas HOA Inc Project County* New Hanover Owner Address: Street Address 1630 Military Cutoff Road, 108 Address Line 2 aty State / Frovince / Region vvilmington nc Rbstal/Zip Code Country 28403 united states Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit W Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? no Please give a brief project description below. The project is located on the Atlantic Intracoastal Waterway at 100 Spencer Farlow Drive in Carolina Beach, New Hanover County. The overall property operates as Waterfronte Villas condominium complex and marina facility. Permitting history for the property is extensive. The most recent permits issued are Emergency GP #76166 (11/13/2020) for repairs to existing docking facilities damaged by Hurricane Isaias, and Major Renewal / Maintenance #84-05 (2/27/2020) for maintenance dredging within the existing permitted dredging boundary. Alternate permits that have been issued include minor modification #84-05 (12/21/2016), minor modification #84-05 (10/29/2015), minor modification #84-05 (6/9/2006), new express #84-05 (7/8/2005), renewal / transfer #168-96 (7/7/2009), and renewal / transfer #168-96 (9/4/2001). See Appendix B for details. Waters in the project area are classified as SIB and are not open to shellfishing. There are no SAV or shellfish resources present. The applicant proposes major modification to Permit 84-05 for replacement of —265 of the existing degraded bulkhead 2' waterward of the existing location, after which the vacant area will be backfilled with sand. Replacement of the already compromised portions of bulkhead 2' waterward rather than in the original footprint will minimize sediment discharge and potentially dangerous earth slides of the already jeopardized soil stability. Note that the applicant is proposing the replacement of portions of the bulkhead rather than the entire bulkhead in an effort to minimize impacts to coastal wetlands. Approximately 132 square feet of coastal wetlands will be impacted. The proposed construction method of backfill intends to minimize auxiliary impacts to coastal wetlands by focusing construction efforts to within 2 feet of the existing bulkhead. The proposed replacement bulkhead will measure approximately 1' wide and will be constructed of naval style vinyl sheet pile with a wooden cap. The proposed bulkhead will tie to adjacent bulkheads. An 8' wooden walkway will be installed in the original footprint when bulkhead construction concludes. There is no additional upland work proposed on the property. See Appendix A for details. It should be noted that Mike Cannard with Carolina Marine Contractors will be applying for a General Permit for immediate bulkhead replacement outside Coastal Wetland boundaries between approximate stations 35 — 180 on the southern portion of the property (-61 feet away from the southern property boundary and spanning —116 feet north). Please give a couple of dates you are available for a meeting. 2/2/2021 2/9/2021 Please attach the documentation you would like to have the meeting about. DWR Request Binder.pdf 3.52MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 1/28/2021