HomeMy WebLinkAboutWQ0004967_CEI_NOV2021PC0157_20210301
Certified Mail #7020 1290 0001 1766 8439
Return Receipt Requested
March 1, 2021
Mark Hoppe, Managing Member
Alljuice Realty LLC
2001 Butterfield Rd
Downers Grove, IL 60515
SUBJECT: NOTICE OF VIOLATION
Tracking Number: NOV-2021-PC-0157
Permit No. WQ0004967
Alljuice WWTF
Henderson County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Alljuice WWTF on January 26,
2021. This inspection was conducted to verify that the facility is operating in compliance with the conditions and
limitations specified in Non-discharge Permit No. WQ0004967. Please carefully review the summary of the findings
and comments noted during the inspection in the enclosed copy of the inspection report.
The Compliance Evaluation inspection was conducted by Division of Water Resources staff from the Asheville
Regional Office. The following violation was noted during the inspection:
Inspection Area Description of Violation _________________________________________________________________________________________________________________________________________________________________________ End Use-Irrigation Numerous weeds and moisture tolerant grasses are still present in the irrigation field. Permit Condition III.3 a suitable year-round vegetative cover shall be maintained at all times.
_________________________________________________________________________________________________________________________________________________________________________
In addition, the issues below must also be addressed:
Compliance Issue(s):
Influent Line: The report submitted by Anchor QEA to Mr. Laverty on September 9, 2020 concluded there may be a
structural integrity issue with a previous influent line repair. At the time of the inspection on January 26, staff
indicated the area had been excavated and the pipe was determined to be structurally sound and watertight.
Please submit documentation confirming the line is intact and watertight.
DocuSign Envelope ID: 3397D43B-0FA4-42F7-93D3-F5A48C723BB8
Remedial actions should have already been taken to correct this problem and prevent further occurrences in the
future. The Division of Water Resources may pursue enforcement action for this and any additional violations of
State law.
To prevent further action, a response is required, in writing (email is preferred), to this office within 30 days
upon your receipt of this Notice of Violation regarding your plans or measures to be taken to address the indicated
violations and other identified issues. A timeline should accompany the plans for corrective action.
If you should have any questions, please do not hesitate to contact Mikal Willmer with the Water Quality
Regional Operations Section in the Asheville Regional Office at 828-296-4686 or via email at
mikal.willmer@ncdenr.gov.
Sincerely,
G. Landon Davidson, P.G., Regional Supervisor
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: LF
DocuSign Envelope ID: 3397D43B-0FA4-42F7-93D3-F5A48C723BB8
Compliance Inspection Report
Permit:WQ0004967 Effective:04/27/17 Expiration:03/31/22 Owner :Alljuice Realty LLC
SOC:
Contact Person:
Region:
County:
Directions to Facility:
Henderson
Asheville
Kristina Armbrust
Effective:Expiration:Facility:Alljuice WWTF
352 Jet St
Hendersonville NC 28792
Title:Phone:Operations Manager
I-26 East to Hwy. 64 East (toward Bat Cave). Turn right at the first stop light onto Sugarloaf Road. Follow signs to Alljuice. Facility is
located approximately 3 miles on the left.
Robert P Barr 24262 828-251-1900
Secondary ORC(s):
828-251-1900Phone:1007992Certification:Danielle Ann HunterPrimary ORC:
SI,System Classifications:
On-Site Representative(s):
Related Permits:
Secondary Inspector(s):
Primary Inspector:
Inspection Date:Exit Time:Entry Time:
Phone:
01/26/2021 09:50AM 12:00PM
Mikal Willmer 828-296-4686
Facility Status:
Permit Inspection Type:
Reason for Inspection:Inspection Type:
Not CompliantCompliant
Routine
Wastewater Irrigation
Compliance Evaluation
Question Areas:
Miscellaneous Questions Treatment Treatment Barscreen
Record Keeping Treatment Lagoons End Use-Irrigation
(See attachment summary)
Page 1 of 5
DocuSign Envelope ID: 3397D43B-0FA4-42F7-93D3-F5A48C723BB8
Inspection Date:
Permit:
Inspection Type :
Owner - Facility:
Reason for Visit:
WQ0004967
01/26/2021 Compliance Evaluation
Alljuice Realty LLC
Routine
Inspection Summary:
Mikal Willmer, with the Asheville Regional Office, conducted a compliance evaluation inspection of the Alljuice spray
irrigation system on January 26, 2021. This inspection was conducted to assess corrective measures and determine
whether the facility is being operated and maintained in compliance. Alljuice and RPB systems representatives were
present and assisted in the inspection.
Influent Screening: Process wastewater exits the facility into an open vault that has a stainless-steel basket to catch solids.
It was noted that while this basin appears to be under the buildings overhang, some runoff and one downspout appear to
enter the process wastewater vault based on staining of the concrete. This setup should be further assessed as there is the
potential for runoff near the vault to enter the waste stream.
Influent line: The report submitted to Mr. Laverty on September 9, 2020 indicated there was a potential issue with the
structural integrity of the influent line to the irrigation pond. Discussions with facility staff on January 26, indicated Anchor
QEA had excavated around the pipe repair and documented the pipe was intact and not in need of further
repair/replacement. If so, please submit documentation and confirmation of the pipe’s overall integrity. If the pipe is indeed
failing and allowing wastewater to leave the influent line, the pipe must be immediately repaired to prevent an illegal
discharge to the surrounding environment.
Irrigation Pond: The wastewater pond is unlined based on historical facility documentation. Anchor QEA proposed a
modification in the existing footprint of the pond to remove the potential impact on groundwater. The email to Mr. Laverty
dated September 9, 2020 indicated they were moving forward with the pond modification design work and application field
improvements. Please provide an update, with a timeline, for any planned corrective action.
Groundwater Exceedances: The facility has been and is still exceeding state Groundwater Standards at MW-2 for iron,
manganese, and ammonia. Findings by Anchor QEA state there is probable impact to groundwater at MW-2 due to
ammonification of organic nitrogen from the previous septic system leach field and from the unlined irrigation pond.
Groundwater exceedances and associated corrective actions will be addressed separately by the regional hydrogeologist.
Irrigation Field: All Juice staff inspect the spray heads every 2-3 weeks. Moisture tolerant weeds and grasses are still
present along patches of the irrigation field. The health of the cover crop, tall fescue, has been mentioned in the previous
three inspections. To date, active field maintenance and corrective action beyond mowing the field have not occurred.
Please note, while the permit does not specifically require the removal of a crop from the field, the permittee is required by
permit to maintain a good cover crop and subsequently soils to maximize the fields assimilative capacity for long-term
wastewater disposal without potential impacts to ground or surface waters. It was observed and has been noted in previous
assessments and inspections a boundary ditch/ephemeral stream runs along the southside of the irrigation field and
parallels the wastewater pond. While runoff has not been documented during inspections, visual observations of the field
after days of rain reveal areas more prone to water retention and ponding. Steps should be taken, based on the agronomic
study, to improve crop and soil health. The low-lying areas, which appear to be outside of the wetted area closest to the
ditch, should continually be monitored during application events to determine if the current dosing schedule is causing any
oversaturation of the soils. While runoff has not been noted during irrigation, initial findings from transducer readings along
this boundary ditch, indicate saturation of the soils immediately following an irrigation event. Based on the agronomic study,
to fully optimize the current crop and soils, the irrigation schedule should be altered to allow for longer applications spaced
further apart, the intended or similar cover crop needs to be reestablished and the soil should be amended to address high
sodium concentrations. Please provide intended corrective action with a timeline.
Annual Soils Analysis: Alljuice should specify the crop type when submitting samples for soils analysis so nutrient and
amendment recommendations can be made by the laboratory
Page 2 of 5
DocuSign Envelope ID: 3397D43B-0FA4-42F7-93D3-F5A48C723BB8
Inspection Date:
Permit:
Inspection Type :
Owner - Facility:
Reason for Visit:
WQ0004967
01/26/2021 Compliance Evaluation
Alljuice Realty LLC
Routine
Type Yes No NA NE
Single Family Drip
Single Family Spray, LR
Activated Sludge Spray, LR
Reuse (Quality)
Infiltration System
Activated Sludge Spray, HR
Activated Sludge Drip, LR
Recycle/Reuse
Lagoon Spray, LR
Treatment Yes No NA NE
Are Treatment facilities consistent with those outlined in the current permit?
Do all treatment units appear to be operational? (if no, note below.)
Facility utilizes an aerated lagoon, which provides some treatment before irrigation. Aerators
appeared operational at the time of the inspection. Current permit does not contain limits. See
summary for additional details.
Comment:
Treatment Barscreen Yes No NA NE
Is it free of excessive debris?
Is disposal of screenings in compliance?
Are the bars spaced properly?
Is the unit in good condition?
Facility has a stainless-steel basket/trough to catch and filter out solids from the process
wastewater. See summary for details.
Comment:
Record Keeping Yes No NA NE
Is a copy of current permit available?
Are monitoring reports present: NDMR?
NDAR?
Are flow rates less than of permitted flow?
Are flow rates less than of permitted flow?
Are application rates adhered to?
Is GW monitoring being conducted, if required (GW-59s submitted)?
Are all samples analyzed for all required parameters?
Are there any 2L GW quality violations?
Is GW-59A certification form completed for facility?
Is effluent sampled for same parameters as GW?
Page 3 of 5
DocuSign Envelope ID: 3397D43B-0FA4-42F7-93D3-F5A48C723BB8
Inspection Date:
Permit:
Inspection Type :
Owner - Facility:
Reason for Visit:
WQ0004967
01/26/2021 Compliance Evaluation
Alljuice Realty LLC
Routine
Do effluent concentrations exceed GW standards?
Are annual soil reports available?
# Are PAN records required?
# Did last soil report indicate a need for lime?
If so, has it been applied?
Are operational logs present?
Are lab sheets available for review?
Do lab sheets support data reported on NDMR?
Do lab sheets support data reported on GW-59s?
Are Operational and Maintenance records present?
Were Operational and Maintenance records complete?
Has permittee been free of public complaints in last 12 months?
Is a copy of the SOC readily available?
No treatment units bypassed since last inspection?
The recent assessment and ground water monitoring data indicate some wastewater is
bypassing treatment and exfiltrating the lagoon and intersecting the water table. Additionally, the
influent line to the pond may need repair. See summary for details.
Comment:
End Use-Irrigation Yes No NA NE
Are buffers adequate?
Is the cover crop type specified in permit?
Is the crop cover acceptable?
Is the site condition adequate?
Is the site free of runoff / ponding?
Is the acreage specified in the permit being utilized?
Is the application equipment present?
Is the application equipment operational?
Is the disposal field free of limiting slopes?
Is access restricted and/or signs posted during active site use?
Are any supply wells within the CB?
Are any supply wells within 250' of the CB?
How close is the closest water supply well?
Is municipal water available in the area?
# Info only: Does the permit call for monitoring wells?
Are GW monitoring wells located properly w/ respect to RB and CB?
Are GW monitoring wells properly constructed, including screened interval?
Are monitoring wells damaged?
Page 4 of 5
DocuSign Envelope ID: 3397D43B-0FA4-42F7-93D3-F5A48C723BB8
Inspection Date:
Permit:
Inspection Type :
Owner - Facility:
Reason for Visit:
WQ0004967
01/26/2021 Compliance Evaluation
Alljuice Realty LLC
Routine
One of the spray heads was down for repair. Due to recent rains, could not assess the irrigation
system. Areas of the field appear to be oversaturated after several days of rain. The cover crop
is partially tall fescue. Drought tolerant weeds have taken over immediately under the spray
heads. The field is currently only mowed and the fescue is not removed. Permit specifies 7.05
acres, but the current wetted acreage is approximately 5.8 acres.
Comment:
001 -
Treatment Lagoons Yes No NA NE
Lagoon Type Aerated
Primary/Secondary Primary
Influent structure
Banks/berms (seepage and erosion)
Vegetation (excessive vegetation on banks/berms)
Liner
Liner Type Unlined
Baffles/curtains
Freeboard Marker
Required freeboard 2
Feet
Actual freeboard 4.5
Feet
Are increments clearly marked on gauge at adequate intervals?
Has the water level gauge been surveyed w/ respect to lowest point on dike? wall?
No Evidence of overflow
Acceptable color
Floating mats
Excessive solids buildup
Aerators/mixers
Effluent structure
Lagoon cover
Page 5 of 5
DocuSign Envelope ID: 3397D43B-0FA4-42F7-93D3-F5A48C723BB8
■.Complete Items 1, 2, and 3.
■ Print your name and address on the reverse
so that we can return the card to you.
■ Attach this card to the back of the mailpiece,
or on the front If space permits.
1. Article Addressed to:
Mark Hoppe, Managing Member
Alljuice Realty LLC
2001 Butterfield Rd
Downers Grove, IL 60515
IIIIIIII IIII I�IIIIII I IIIIIII III'llllll II III
9590 9402 5735 0003 0177 24
7020 1290 OD01 1766 8439
PS Form 3811, July 2015 PSN 7530-02-000.906
A. Signature
❑ Agent
X O Addre
B. Received by (Printed Name) C. Date of Deli
G ( 9 3 15 2
D. Is delivery address different from item 14 ❑ Yes
If YES, enter delivery address below: ❑ No
o. ourvlce type
❑ Priority Mall Express®
❑ tlull Signature
❑ Registered Mall*-
❑ dolt Signature Restrlcted Delivery
❑ Replstered Mall Restricted.
Cerufied Mall®
Certified Mail Restricted Delivery
Delivery
❑ Retum Receipt for
❑ Collect on Delivery
Marchentlise
❑ Collect on Delivery Restricted Delivery
❑ Signature Confirmationr-
❑ Insured Mal
❑ Signature Confirmation
—I( WO0004967 - HENDE
Restricted Delivery
NOV-2021-PC-0157
omestio Return Receipt
Postal
CERTIFIED MAILO RECEIPT
cr
m
Domestic Mail -Only
1-11
r>7
USE
..D
CeNfietl Mall Fee
Etdre services&Fees (clxc ber, s&1W sapPmPMM)
❑R rn flecelpt((hardoapy) Is
O
❑flatumflxeig(electronio) $
Postmark
p
❑Certified Mall Reablcted DelNary $
Here
1:3❑Muh
Slgrsture Required $
pMuh Signature ReeWOM DelNery $
F3
Postage
D'
$
ru
7o"'--•-__ ---
l7
S
ru
Mark Hoppe, Managing Member -------------------------------------
r
S Alljuice Realty LLC
-----------
2001 Butterfield Rd .... "...
"".............
Downers Grove, IL 60515