Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
310124_5 day poa_20210226
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-124 Facility Name: J&R Farm County: Duplin Certified Operator Name: Jason Cavenaugh Operator Number: AWA 18735 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lag 1 Lag 2 N N 11 11 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached_ Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information_ Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. `Attach a complete schedule with corresponding animal units and dates fro depopulation cif animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Jason Cavenaugh Phone. Facility Owner/Manager (print) )CL_C hU Date: —Facility Owner/Manager (signat ) 910-289-7659 2/26/2021 IL TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDIOR 25 YR.I24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 1097.5 lb PAN 2. Structure ID: Lag 2 line m = 1435.0 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line rn = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 2532.5 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST Fin nS M W141r`la PAKu r`AAIAIPIT QC Aorm 10r% r%I IMILF� D. tract # p. field # q. crop r. acres S. remaining IRR- 2 PAN balance (Ib/acre) v A A AAV JV t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s V/11 rGnIV U. u. application window' 1 Bermuda 35.47 169.00 5994.4 March -Sept 'State current crop endina annJir:atinn rintP nr npYt r rnn nnnl;r+ Finn konin ,;r„v 4 4. F receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) _ IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section ll) 5994.4 lb. PAN 2532.5 lb. PAN PoA (30 Day) 2/21100 x, Crop's remaining PAN balance (line v from section ill) = 5994.4 Ib. PAN y. Overall PAN balance (w - x) _ -3462 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is avai for pumping if needed. Bermuda yeilds have been increased because producer will be cutting for hay. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): I Lagoon 1 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/W 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 11.0 inches 19.5 inches 8.5 inches 67375 ft' 356975 gallons 180 days g. volume of waste produced according to structural design 80705 ft3 h. current herd # F-2-44-8-1 certified herd #1 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4_ Total PAN to be land applied during draw down period I_ current waste analysis dated 1 1/13/2021 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 53803 ft' © ft3 39302.1 ft3 116071 gallons 2.32 Ibs/1000 gal. 1097.5 lbs. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 11-ag 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/W 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 11.0 inches 19.0 inches 8.0 inches 96100 ff 479219 gallons 180 days g. volume of waste produced according to structural design I 121058 ft3 h, current herd # 1 3672 certified herd # 3672 actual waste produced = current herd # x line g T 121058 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 1/13/2021 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) ®f3 56058 ft3 220805 gallons 2.05 Ibs/1000 gal. 1435.0 lbs. PAN PoA (30 Day) 2/21/00 ll. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: La oon 1 fine I = 42808 gallons 2. structure ID: Lagoon 2 line I = 71550 gallons 3. structure ID: line I = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons n. lines 1+2+3+4+5+6= o. line n 127154 = 114358 gallons 4.21 acre -inches III. TOTAL. ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD1.2 While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-Z PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) 1 Woodington Small Grain 35.47 15.00 0A 1 2 Foreston Small Grain 13.88 8.00 0.5 1 sub3 Noboco Small Grain 11.05 6.00 0.5 1 1 Wo Bermuda 35.47 169 0.4 1 x. total acres available during 5 day draw down (sum of column t) = 95.87 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE PoA (5 Day) 2/21 /00 y. line o = 0.04 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y, lust course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. Plan to land apply hydraulic load; 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar clown in tield; "tratticabilit " across soils; will soils absorb application without runoff, etc. jam, aiiu amuuiu ui idsr iainraii event! DATE: lication AMOUNT: I inches 71VG11 vNuinuni sun cmu wearner conarrions, is irrigation equipment capable of applying the volume in ime n at appropriaie seasonal i.e. winter application rates within 5 da n schedule for next 5 days - include daily schedule; proposed application rates and amounts rrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposea cnan es in application rates and amounts; and any other information for con PoA (5 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): La oon 1 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/W 3. Projected volume of waste liquid produced during draw down period f, temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 0 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i_ volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h+ i+ j) x 7.48 x 5 days/line f 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 11.0 inches 12A inches 1.0 inches 67375 ftz 41997 gallons 180 days 80705 Jft3 ft3 l7ft3 3902.1 Jft3 811 gallons 42808 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon 2 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. fine b - line a (inches within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/f13 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # Q certified herd #1 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h+ i +j) x 7.48 x 5 days/line f 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k 11 .01 inches 12.0 inches 1.0 inches 96100 ftz 59902 gallons 180 days 3 ft3 -1 ft3 56058 ft3 11648 gallons 71550 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00