Loading...
HomeMy WebLinkAbout20090936 Ver 1_DCM Permit_20120514Y -r N T, i r f- a Y i � - - ,T 3 r ptrsi rtt Y,. Os �rC�- A- +OLP � C tc OIL � Cc i qq -0�3,6 P LC-W \ 4 -49-y, 6 F ^a F -v i o, Xenia Cc), e > xc-ty r on a J� ci f 1J p,ii t.qi * to NCGS 113 l.sued to Alvin Ravnor. PD Box 1535. NMor2inton, NC 28580 Authorizing development in Carteret County at add Calico Creek 1409 Oglesby Road, Crab Point Bay S/D , as requested in the permittee s application dated 8/21/09 (MP 1) and 4/3/09 (MP 4), including the attached workplan drawings (3), all dated revised 7/27/09 This permit issued on Nfql 14, 2012 is subject to compliance with the application (where consistent with the permit) all applicable regulations special conditions and notes set forth below Any violation of these teims may be subject to fines imprisonment or civil action or may cause the permit to be null and void Docking Facility 1) Unless specifically altered herein this permit authorizes the addition of a boat lift and uses located in or over the water that are expressly and specifically set forth in the permit application No other structure whether floating or stationary shall become a permanent part of this docking facility without permit modification No non water dependent uses of structures shall be conducted on in or over public trust waters without permit modification (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee of other qualified persons within twenty (20) days of the issamg o ite An appeal requires resolution prior to work initiation or rontmuance as the case may be This permit must be accessible on site to Department x pr sonnel when the project is inspected for compliance Any maintenance work or project modification rot covered hcieundei requires further Division approval All work must cease when the permit expires on December 31, 2015 In issuing this permit the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program Signed by the authority of the Secretaiy of DENR and the Chairman of the Coastal Resources Commission r� ,7 � Biaxton C Datiiz lliiector Division of Coastal Management a This permit and its conditions are hereby accepted Signature of Permittee 7 x a }S 7 0 1 I 4� The peimittee shall maintain the authorizes' cork in good condition ax d in conto -manse with the teams and conditions of this permit The permitter, is not relieved of this r-qui ement if he abandons the permitted activity without having it transferred to a third party 5) This permit does not authorize the interference with any existing or proposed Federal project and the permittee shall not be entitled to compensation for damage to the authorized structure or work or injury which may be caused from existing or future operations undertaken by the United States in the public interest 6) The permittee shall install and mainta n at his expense any signal lights or signals prescribed by the U S Coast Guard through regulation or otherwise on the authorized facilities At a minimum permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather 1) The authorized project is located within a primary nursery area (PNA) Therefore in accordance with T15A 07H 0208 of the Rules of the Coastal Resources Commission no new dredging or excavation within the PNA shall be permitted New dredging in any manner including ' kicking' with boat In propellers is not authorized This prohibition shall be applied and enforced throughout the entire existence of the permitted structure 8) This permit authorizes one new formalized boatslip in association with this docking facility General 9) The permittee understands and agre,-s that if future operations by the United States requires the removal relocation of other alteration of the structure or work authorized by this permit or if in the opinion of the Secretary of the Army or his authorized representative said structure or work shall cause unreasonable obstruction to free navigation of the navigable watt rs the permittee will be required upon due notice from the Corps of Engineers, to remove relocate of alter the work er obst,-u(,tions caused thereby, without expense to the United States or the state of North Carolina No claim shall be made x against the United States or the state of North Carolina on account of any such removal or alteration f 0) This permit shall not be assigned, transferred sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management 11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation 1'1,31' 7" i *fir J f , t �t C h X t t " _U (IT) tl i7 1 [ L1 f l C c E e �t ,. ° , t p� i r 4 I $ o atte1f,-,* shall be made >^v the i, Pi t t1 t Ai , rs at o adjaLLn t) tl e a i'ior g 4� The peimittee shall maintain the authorizes' cork in good condition ax d in conto -manse with the teams and conditions of this permit The permitter, is not relieved of this r-qui ement if he abandons the permitted activity without having it transferred to a third party 5) This permit does not authorize the interference with any existing or proposed Federal project and the permittee shall not be entitled to compensation for damage to the authorized structure or work or injury which may be caused from existing or future operations undertaken by the United States in the public interest 6) The permittee shall install and mainta n at his expense any signal lights or signals prescribed by the U S Coast Guard through regulation or otherwise on the authorized facilities At a minimum permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather 1) The authorized project is located within a primary nursery area (PNA) Therefore in accordance with T15A 07H 0208 of the Rules of the Coastal Resources Commission no new dredging or excavation within the PNA shall be permitted New dredging in any manner including ' kicking' with boat In propellers is not authorized This prohibition shall be applied and enforced throughout the entire existence of the permitted structure 8) This permit authorizes one new formalized boatslip in association with this docking facility General 9) The permittee understands and agre,-s that if future operations by the United States requires the removal relocation of other alteration of the structure or work authorized by this permit or if in the opinion of the Secretary of the Army or his authorized representative said structure or work shall cause unreasonable obstruction to free navigation of the navigable watt rs the permittee will be required upon due notice from the Corps of Engineers, to remove relocate of alter the work er obst,-u(,tions caused thereby, without expense to the United States or the state of North Carolina No claim shall be made x against the United States or the state of North Carolina on account of any such removal or alteration f 0) This permit shall not be assigned, transferred sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management 11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation w -143 ' C i i 1 t i t r 1 j 7 t J o Laz_ ' a7 ! l t71 t d e clt pr al of t,tu t 1 F { orta a represer+atm c{ t'�e a lrn at ( 4r _Fnv p t t river cl, iieti U ary { 3uc.h c etiv ty fo,_ this dettrm natz -)n Th L`LIMI rt , is Ini'll ak', i ! t , i+ many no i eater Y drNndent activities ai:, not aufliolized m ni 30 et of thr normal h gl w'ILC, leVLi a z z x i